HomeMy WebLinkAbout49-88 - Res. Assigning County Road Project (CRP) Numbers 1145 - 1159RESOLUTION NO.
49-88
BEFORE THE BOARD OF COUNTY COMMISSIONERS of MASON County, Washington.
In the matter of initiating county road projects and assigning CRP numbers.
IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated.
These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to
report and proceed thereon as by law provided. (RCk' 36.73.050, 36.80.030. 6.80.070) (Oprr,nrat Refrrrnres,.
IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county
engineer's estimates are hereby made in the amounts and for the purposes shown:
I1)
12)
131
14)
MI
16)
17)
le)
19)
Annul
ROAD
TYPE OF
N
COST ESTIMATE X' + • _
Conti.
ROAD NAME AND/OR
LOG
WORK
TT
P'oG.
CRP
BRIDGE NUMBER
Moo Cody)
A
C
ENGoN.
CoNSTRvcrIon
own
No,
No
NO.
M.P. TO M.P.
T
R.O.w.
FEDERAL
LOCAL
Elfendahl Pass
80610
1.85
3.50
D-2
X
13,200
2
114
Dewatto Road
76080
3,.10
3..73
''
X
5,040
114E
Camas Dr.
30380
0.00
0.46
X
3,680
"
114
Dana Dr,
31110
5,08
5,70
"
X
4,960
114
Hartstene Island So,
31110
4,27
5.08
X
6,480
114
Spencer Lake Road
28240
1.88
2,45
"
X
4,560
115
Haven Drive
02090
0,00
0.501
D-3
X
4,000
115
Elson Road
1059Q
0.15
0,67
X
4,160
"
115,
Davey Jones Place
89020
0.00
0.11
X
880
":
115
Davey Jones Court
89030
0.00
0.,16
X
1,280
115,
Peg Leg Court
89160
0.00
0.07
X
560
115!
Harpoon Dr.,
89200
0.00
0.15
X
1,200
115!
Salty Dr.
89330
0,00
0.09
X
720
115"
Dewatto-Holly
76690
0,00
0.90
"
X
7,200
"
115
Somers Dr,
19940
1.27
1.42
X
1,200
"
115!
TYPE OF WORK CODE
A, PRELIMINARY ENGINEERING
8. R)GHT•OF•WAY
C. GRADING. DRAINING, SURF ACING
D. LIGHT 81T.SURF.TREATMENT
E A.C. OR P.C.C. PAVEMENT
F. CURBS & GUTTERS
G SIDEWALKS
H. TRAFFIC FACILITIES
I. BRIDGE CONSTRUCTION
J. PATHS & TRAILS RCW
47.301
ADOPTED this 21st day of June, 1988
ATTEST
Clerk of the Board
CC; Cmmrs.
Engineer
Journal: Publ. 1T:
(5) The construction is to be accomplished by contract
in accordance with RCW 36.77.020 et. seq.
(6) The construction is to be accomplished by county
forces in accordance with RCW 36.77.060 and WAC
136-18.
BOARD OF COUNTY COMMISSIONERS OF
MAS1 COUNTY, WASH.
Member
6/30/88
(Bill Rd. Dept.)
5
9
3