Loading...
HomeMy WebLinkAboutBLD2025-00585 - BLD Permit / Conditions - 7/3/2025 Mason County Mason County - Division of Community Development 615 W.Alder St. ONyCy Building 8 Shelton,WA 98584 360-427-9670 ext 352 www.masoncountywa.gov B DD2025-00585 NEW SINGLE FAMILY RESIDENCE PROJECT DESCRIPTION: NEW SFR W/ATTACHED GARAGE ISSUED: 07/03/2025 SITE ADDRESS: 300 NE HAVEN LAKE DR TAHUYA EXPIRES: 12/30/2025 PARCEL: 223305000307 APPLICANT: ATKINSON RICHARD&MONICA OWNER: ATKINSON RICHARD&MONICA 300 NE HAVEN LAKE DR 300 NE HAVEN LAKE DR TAHUYA,WA 98588 TAHUYA,WA 98588 253-297-1342 VALUATIONS: FEES: Paid Due Covered Deck/Carport 2664.00 $63,936.00 Mechanical Base Fee $30.00 $0.00 R-3 VB Residential, one- 1624.00 $271,808.88 Plan Check Fee $2,468.21 $0.00 and two-family Technology Surcharge $126.41 $0.00 U VB Utility, miscellaneous 3176.00 $211,140.48 State Fee-Residential $6.50 $0.00 Building Plan Review/Change of $140.00 $0.00 Use,-Onsite Sewage Plumbing fees for new single $232.00 $0.00 family residence Mechanical fees for new single $232.00 $0.00 family residences Building Permit Fee $3,797.24 $0.00 Planning Residential Review $275.00 $0.00 Fee Plumbing Base Fee $25.00 $0.00 Residential Energy Code Fee $189.86 $0.00 Total: $546,885.36 Totals : $7,522.22 $0.00 FIXTURES (fi Mechanical Fixtures Qty Plumbing Fixtures 1.0000 Dryer Vent(s) 1.0000 Number of Clothes Washers 1.0000 Kitchen Exhaust Hood(s) 1.0000 Number of Dishwashers Printed by:Annie Wilson on:07/03/2025 01:37 PM Page 1 of 7 t.. Mason County Mason County - Division of Community Development 3q 615 W.Alder St. `f D, t Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2025-00585 (3y Mechanical Fixtures .(qty Plumbing Fixtures 1.0000 Heat Pump(s) 1.0000 Number of Water Heaters and or Vent 1.0000 Propane Tank(s) 2.0000 Number of Kitchen Sinks 2.0000 Gas Outlet(s) (1-5) 2.0000 Number of Showers 2.0000 Spot Vent Fan(s) 2.0000 Number of Toilets 3.0000 Bathroom Sink 4.0000 Number of Hose Bibs REQUIRED INSPECTIONS Setback Inspection Mechanical Inspection ...................................................... — __.. — — — — — — — — — — — — — — — — — — — — — — — Footing Inspection Gas Piping Inspection Foundation Wall-Pre-Pour Inspection Rough-Plumbing Inspection ...................................................... — — — — — — — — —— — — — — — — — — — —— — — — — Underground Plumbing Framing Inspection ------------------------------------------------------ — — — — — — — — — — --. — — — — — — — — — — — — — — Slab Insulation Insulation Inspection -------------------------------------------- — — —'— — — — — — — — — — — — — — — — — — — — — — Radiant Piping Inspection Connection is to be verified by Health or Utilities — SLAB,INSPECTION BLD-Final Inspection ------------------------------------------------------. — —.—— —_ ——— —. — ——— — — — — ———— — —_ CONDITIONS * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982.The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. - ----------------------------------------=--------------------------------------------------------------------. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * All changes to"approved"building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason n County prior to construction. * WIND LOADS-Roof coverings shall be designed'and tested to withstand the maximum basic wind speed.The basic wind, speed for Mason County is 85 mph with 110 mph gust factor. .. - __....._- ----- - ------------------------------ - - -- * Carbon monoxide alarms, listed as complying-with UL 2075 shall be installed in accordance with manufacturer specifications and in accordance with IRC Section R315. Alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms and on each level of the dwelling. EXISTING DWELLINGS shall be equipped with carbon monoxide alarms when alterations(including addition or alteration of fuel burning appliances), repairs, or additions requiring a permit occur, or when one or more sleeping rooms are added or created. Printed by:Annie Wilson on:07/03/2025 01:37 PM Page 2 of 7 Mason County • s I"'1v, M1 Mason County - Division of Community Development 615 W.Alder St. N C Building 8 Shelton,WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2025-00585 * The use, handling and storage of hazardous materials or flammable and combustible liquids is not allowed without the approval of the Mason County Fire Marshal. ' ------------ -------------------------•--------------------------------------------------------------------•- * A minimum of 90 percent of all permanently installed lamps in lighting fixtures shall be high efficacy lamps in accordance with IECC/WSEC Section R404.1. - - ---------------------------------------------------------------------------•-------..---------------.---- * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed.The Building Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being taken. * Concrete encased grounding.electrodes must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor & Industries (L&I). For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415- 4000. --- -------------------------------------------------------------------------------•-------------•----- * Disclaimer: Mason County does not require a survey to obtain a building permit.As a result, site plans may not reflect accurate data. It is the applicant's responsibility to comply with setback requirements. ---------------------------------------------------------------•-•---------------------------------....._._... * REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way: * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site,then approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. * Retaining walls needed to support a surcharge such as structures, roads,or to support slopes, shall require a_separate building permit and approval prior to construction of the retaining wall. -------------------------------------------------------------------------------------------------------------. * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the farthest projection of the structure. Front setbacks are measured from the front lot line or road easement boundary,whichever is closer. ---------------------------------------------------.-..-...._--.------------------------------•------..._..._. * The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility of the applicant, owner or contractor to make the required corrections indicated on the plans: Once the plans are marked "APPROVED",they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. Printed by:Annie Wilson on:07/03/2025 01:37 PM Page 3 of 7 • 1 Mason County • Mason County - Division of Community Development 3q 615 W.Alder St. k, Building 8 Shelton,WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2025-00585 * A permanent certificate, completed by the builder or registered design professional, shall be posted on a wall in the space where the furnace is located, a utility room, or an approved location inside the building.When located on the electrical panel, the certificate shall not cover or obstruct the visibility of the circuit directory label, service disconnect label, or other required labels. The certificate shall list the predominant R-values of insulation installed in or on ceiling/roof,walls,foundation (slab, basement wall, crawlspace wall and/or floor), and ducts outside the conditioned spaces; U-factors for fenestration; and the solar heat gain coefficient(SHGC)of fenestration. Where there is more than one value for each component, the certificate shall list the value covering,the largest area. The certificate shall list the type and efficiency of heating, cooling, and service water heating equipment,duct leakage rates including test conditions as specified in WSEC Chapter 4, and air leakage results of the blower door test conducted. Building envelope air leakage control shall be considered acceptable when tested to have an air leakage less than 5 air changes per hour when tested with a blower door in accordance with WSEC Section R402.4.1.2. The blower door test results shall be recorded on the permanent certificate required located near the electrical distribution panel. Air leakage testing is not required for additions less than 500 square feet. Reference WSEC R402.4.1.2. Compliance certificates are available online at the WSU Energy program website titled, "WSEC 2021 Certificate"and are available in %or%sheets. * Owner!Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Code 14.28 and 14.17. ------ ------------------------------------------------------------------------------------------------------ * ,The foundation/footing must be placed on undisturbed,firm-native soil. Proper frost depth, minimum 12 inches,shall be observed below grade in undisturbed soils. - -------------------------------------------------------------------------------------- --------------------- * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. , The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. ----------------------------------------------------------------------------------------------------------- * All other necessary permits from Mason County, Washington'State, Federal Agencies, and/or other agencies/groups that are required for this proposed development and construction must be obtained PRIOR TO DEVELOPMENT AND CONSTRUCTION. * Concrete used for basement walls,foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi(IRC Table R402.2). ---------------------------------------------------------------------------------------- * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition,a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. Printed by:Annie Wilson on:07/03/2025 01:37 PM Page 4 of 7 Mason County Mason County - Division of Community Development 3q 615 W.Alder St. `�aNC Building 8 Shelton,WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2025-00585 * Installation of heating equipment in a single-family residence shall meet the requirements of the current WSEC R403, applicable sections of the IRC, and IMC. Heating equipment shall be sized in accordance to ICC/WSEC,Section R403.7. Heating and design load calculations for the purpose of sizing HVAC systems are required and shall be calculated in accordance with accepted practice, including infiltration and ventilation. Design calculations shall be available for inspection during inspection. Referencing IRC M1601.4, all ducts, air handlers,filter boxes, and building cavities shall be sealed. All joints of duct systems and seams shall be made substantially air tight by means of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Closure systems used with rigid fibrous glass ducts shall comply with UL181A and shall be marked 181A-P for pressure-sensitive tape, 181A-M for mastic or 181 A-H for heat-sensitive tape. Closure systems used with flexible air ducts and flexible air connectors shall comply with UL1-81 B and shall be marked 181 B-FX for pressure- sensitive tape or 181 B-M for mastic. Duct connections to flanges of air distribution system equipment or sheet metal fittings shall be mechanically fastened. Mechanical fasteners for use with flexible nonmetallic air ducts shall comply with UL 181 B and shall be marked 181 B-C. Crimp joints for round metal ducts shall have a contact lap of at least 1-1/2 inches(38 mm) and shall be mechanically fastened by means of at least three sheet-metal screws or rivets equally spaced around the joint. Closure systems used to seal metal ductwork shall be installed in accordance with the manufacturer's installation instructions. Duct tape is NOT permitted as a sealant on any ducts. When ducts are located in unheated spaces the ducts hall be insulated to R-8 DUCT TIGHTNESS TESTING shall be conducted by person(s)trained to perform such testing. A signed affidavit documenting test results in accordance to IECCWWSEC Section R403.3.3 shall be provided to the Mason County Building Department prior to the final occupancy inspection. Affidavit forms are available on at the WSU-Energy Program website titles, "Duct Leakage Affidavit"or"Duet Leakage Testing Results(Existing Construction)." Duct tightness testing is not required if the air handler and all ducts are located within the heated space. --------------------------------•---••---------------------------------------------------•---------- --------- * The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. --- ----- ------------------- --- -------- ------ -------•..-.._--_ _----.-._....---- ...---.-.-- ------- * Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed. * A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design,sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities.*NOTE if Stormwater Management option"A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots,The Small Parcel Stormwater Site Plan"constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have,a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. * All property lines shall be clearly identified at the time of foundation inspection. Printed by:Annie Wilson on:07/03/2025 01:37 PM Page 5 of 7 Mason County Mason County - Division of Community Development 615 W.Alder St. Cy. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2025-00585 * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance contact the Mason County Public Works Department prior to construction at Ext 450 * By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. " Adopted Washington State Energy Code Compliance has been approved as follows: Heat Type: Electric or other than electric, Compliance Method: Prescriptive option Marine-4C,Window(Max U- Factor):0.30, Skylight(Max U-Factor):0.50, Doors(Type/Max U-Factor):0.30 or less,Wall insulation R-20+5ci, Floor insulation R-30, Ceiling Insulation min. R-60, Vault Insulation R-38, and Slab Insulation R-10. * When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. For more information contact Public Works, at(360)427-9670,ext.450 or 100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled and approved. ----- ------------'._-__.-.---.-..____-__._-__..._-.__.....___--------.-_-.._----------------------------- When parcel development requires direct access to state road(s),a Road Access Permit or Approval must be granted and approved by the Washington State Department of Transportation. For more information contact Washington State Department of Transportation, at(206)357-2620, ext. 630. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. -------------------------------------------------------------------------------------------------------------- * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that,the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED. " On-site Septic System final installation approval required prior to temporary/final occupancy of the residence. -__--- ------ ---- - ---- ------ ----- --------- -- ---- --- ------------- * Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered. A.) Drainfield/Reserve requires a 1 Oft setback from all footing/foundations. B.)Septic tank(s)requires 5ft setback from all footing/foundations. C.) No foundation/Perimeter Drains within 30ft, down gradient of Drainfield/Reserve area. D.)No Cut Bank(s)(greater than 5ft and over 45 degrees)within 50ft, down gradient of Drainfield/Reserve area. * No additional sink may be installed in the shop/garage without review from planning for ADU compliance * Approved up to authorized heights of 35'. Height shall be measured by taking the average of the natural or existing topography of the portion of the lot, parcel, or tract of real property which will be directly under the proposed structure and shall be determined by averaging the ground elevations at the midpoint of all exterior walls of the proposed structure. Printed by:Annie Wilson on:07/03/2025 01:37 PM Page 6 of 7 Mason County Mason County - Division of Community Development 615 W.Alder St. aNsC, Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2025-00585 * Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. ----------------------------------------------------------------------------------------------------- ------. In addition to the inspections required in IBC, Section 110,the owner,the engineer or architect of record acting as the owner's agent shall employ one or more special inspectors who shall provide inspections during construction on the types of work listed under Chapter 17 and as specified by the design professional. The special inspectors duties&responsibilities shall be as specified in Chapter 17. Special Inspection Agency: Krazan &Associates Inc. Special Inspections Required: Cold Form Steel Trusses Spanning 60 Feet or Greater.Per IBC 1705.2.4 Concrete Construction Per IBC 1705.3&Table 1705.3 Post Installed Mechanical Anchors Per ICC ESR Special inspection reports shall be submitted to the Mason County Building Department, 615 W Alder St, Shelton WA 98584 and available for inspection. Inspection reports shall be completed and submitted to the dept. in a timely manner and shall be submitted prior to the framing and final occupancy inspections. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: tV•t, , VJt1sov Contractor or Authorized Agent: Date: S Printed by:Annie Wilson on:07/03/2025 01:37 PM Page 7 of 7 Department of Community Development MASON COUNTY 615 W.Alder St.Bldg 8,Shelton,WA 98584 COMMUNITY DEVELOPMENT 360-427-9670 ext.352 Permit Assistance Center,Building,Planning www.MasonCountyWA.gov INSPECTION CARD AND CERTIFICATE OF OCCUPANCY** To schedule an inspection call or visit https://masoncountywa.gov/departments/community_development/buildinglinspections/index.phpp - Permit Number BLD2025-00585 Date Issued 07/03/2025 Issued By Project NEW SFR W/ATTACHED GARAGE Site Address 300 NE Haven Lake Dr Applicant ATKINSON RICHARD&MONICA Contractor Contractor Phone 2021 Primary Code UPS IBC,IRC,IFC,IEC,IMC,& Type Permit Type NEW SINGLE FAMILY RESIDENCE Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. **THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.** PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks -1 -3S Ec Slab - g-Y•1f f7 Footing Perimeter '7-Jy-?s �, Point load Footing Footing Interior Sld�— Footing Decks/Porches. Foundation Stem Walls Other Rough-In Groundwork Plumbing 7�cl;2f ix/) Framing 57fLv I tap,Z &A (n ' Groundwork Mechanical - Plumbing -p'i4 4' Groundwork Gas Pipe Mechanical g- Gas Piping cr. o•a .0q" Shear Wall Nailing Underfloor Other - Insulation Slab 97-Y t f&V Ceiling Floor Vaulted Ceiling Walls CJ_a 7_Z 6 d) i Vapor Barrier Other SL < Z3 Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building '.2, lb Manufactured Setbacks Setup Home Concrete Foot!Runners Final Other �di T 4- j%luOr Qr •; -�AS5 Q M v.cC F4 act-o26 j2€, 1 -3-.Z3-26 Del) Special Inspection Requirements MASON COUNTY COMMUNITY SERVICES BLD2025-00585 Atkinson Barnominium 300 N.E. Haven Lake Dr. Tahuya WA 98588 Permit Number Project Title Project Address/Parcel Number Applicants of projects requiring Special Inspection or Testing per Chapter 1704&1705 of the International Building Code, as amended by Washington State. Please acknowledge and return this form to the Mason County Permit Center. THESE INSPECTIONS ARE NOT PERFORMED'BY THE BUILDING DEPARTMENT AND MUST BE PERFORMED BY QUALIFIED SPECIAL INSPECTORS, HIRED BY THE OWNER AND APPROVED BY THE COUNTY PERMIT CENTER. Individuals certified in a special inspection category by Washington Association of Building officials(WABO)or individuals employed by a recognized testing laboratory and under the direct supervision of a Registered Professional Engineer are typically considered qualified at the discretion of the local jurisdiction having authority for enforcement. BEFORE A PERMIT CAN BE ISSUED: The Owner or his/her representative, on the advice of the responsible Project Engineer or Architect, shall fill out completely, sign and submit two (2) copies of the attached"Structural Tests and Inspection Schedule"to this Department for review and approval including any requirements related to the Mason County Municipal Code. The Owner, General Contractor, and Inspection/Testing Agency, where applicable, shall also acknowledge'the following conditions applicable to Special Inspection and/or Testing. 1. Inspection/Testing Agency shall submit names and qualifications of on-site Special Inspectors to the Building Inspection Permit Center for approval PRIOR TO PERMIT/S BEING ISSUED. 2. All Special Inspections shall be noted on the approved plans or attached approved documents. 3. All special inspections shall be approved by the County or as recommended by the Engineer -of Record (EOR). 4. It is the responsibility of the General Contractor to review County approved plans for additional inspection or testing requirements that may be noted or required per IBC as noted on approved plans. 5. The General Contractor is responsible'for proper notification to the Inspection/Testing Agency for items listed on this form. 6. Special Inspectors shall provide detailed reports on company letterhead to the Building Inspector of all required-inspection activities. These may also be provided when the inspector visits the jobsite for the scheduled inspection but must be completed before the subject of inspection is approved by the building inspector. 7. Copies of all ongoing laboratory and testing reports shall be sent directly to the Building Inspector by the Inspection/Testing Agency or other responsible party within a reasonable time to test results.' d 8. BEFORE A CERTIFICATE OF OCCUPANCY APPROVAL CAN BE ISSUED: The Inspection/Testing Agency shall submit a FINAL REPORT LETTER stating that all items requiring testing and inspection have been fulfilled and reported and a final inspection report shall be provided. A copy of the statement is to be maintained at the jobsite for the Building Inspectors review prior to final inspections. Page 1 of 4 Special Inspection Requirements MASON COUNTY COMMUNITY SERVICES ACKNOWLEDGEMENTS Prior, to issuance of a building permit, the Owner, on the advice of the Project Engineer or Architect, shall complete, sign,and submit this form to the County Permit Center. Declaration of Owner - I, as the owner of the project, declare that the testing agency firm/s or individual/s listed herein are hired by me to perform "Special Inspections" and/or "Structural Testing" in accordance with the provisions of the International Building code(IBC) Chapter 17. Rick Atkinson 7/1/25 Owner @rint) Owner(Signature) (date) Declaration of Registered Professional Architect/Engineer I, as the design professional in responsible charge of the project listed herein, declare that the special inspection listed herein are required for this project in accordance with the provisions of the International Building Code (IBC) Chapter 17. James Dow P.E. �A S DOS, Architect/Engineer(print) ���o� 8j�� Architect/Engineer Stamp/Signature (date) Z' r°¢ 250048dS �� 8sr0 AL ��G Testing Agency Name/Contact No Special Inspections Requied for Titan HD Anchors. info: Install per manufacturer reccomendations. James Dow P.E. Engineer of Record for,Wood Framed Structure The Special Inspection/Testing Agency listed above must have a current Portfolio of Qualifications on file with the County prior to performing work. Declaration of the General Contractor I, as the General Contractor of the project, agree to comply with the "Contractor Responsibility" items noted herein. Rick Atkinson 7/1/25 General Contractor(print) General Contractor Signature (date) Page 2 of 4 Special Inspection Requirements MASON COUNTY COMMUNITY SERVICES Required Special Inspections International Building Code; Chapter 17: A completed and signed copy of pages 1 through 4 of this form shall be submitted to the "Permit Center" prior to building permit approval. Engineer shall check the applicable items:, ❑ Special inspection of fabricated items 1704.2.5 ❑ Submittals to the building official 1704.5 ❑ Structures over 75' in height located in Seismic Design Category D, 1704.6.1 ❑ Structures classified as Risk Category III or IV located in Seismic Design Category D, 1704.6.1 ❑ Steel construction& structural Steel 1705.2.1 ❑ Cold form steel deck 1705.2.2 ❑ Open-web steel joists & girders 1705.2.3 ❑ Cold form steel trusses spanning 60 feet or greater 1705.2.4 ❑ Concrete construction 1705.3 & Table 1705.3 ❑ Shotcrete 1705.3 ❑ Welding of reinforcing bars 1705.3.1 ❑Material Tests 1705.3.2 ❑Masonry Construction 1705.4 ❑ Empirically designed masonry, glass unit&masonry in Risk Category IV 1705.4.1 ❑Vertical masonry foundation elements 1705.4.2 ❑ Wood construction 1705.5 ❑ High Load Diaphragms 1705.5.1 ❑Metal-plate connected wood trusses spanning 60 feet or greater 1705.5.2 ❑ Soils 1705.6 & Table 1705.6 ❑ Driven deep foundations 1705.7 & Table 1705.7 ❑ Cast in-place deep foundations 1705.8 &Table 1705.8 ❑ Helical pile foundations 1705.9 ❑Fabricated'items 1705.10 Page 3 of 4 Special Inspection Requirements MASON COUNTY COMMUNITY SERVICES ❑ Special inspections for wind resistance 1705.11 ❑ Structural wood 1705.11.1 ❑ Wind resisting components 1705.11.3 ❑ Cold formed steel light frame 1705.1-1.2 ❑ Special inspection for seismic resistance 1705.12 ❑ Special inspection for structural steel per 1705.12.1 ❑ Seismic force-resisting systems 1705.12.1.1 ❑ Structural steel elements 1705.12.1.2 ❑ Special inspection for structural wood per 1705.12.2 ❑ Special inspection for cold-formed steel per 1705.12.3 ❑ Designated seismic systems 1705.12.4 ❑Architectural components 1705.12.5 ❑ Plumbing, mechanical & electrical components 1705.12.6 ❑ Storage racks 1705.12.7 ❑ Seismic isolation systems 1705.12.8 ❑ Cold-formed steel special bolted moment frames 1705.12.9 ❑ Testing for seismic resistance 1705.13 ❑ Structural steel 1705.13.1 ❑ Seismic fore-resisting systems 1705.13.1.1 ❑ Structural steel elements 1705.13.1.2 ❑Nonstructural components 1705.13.2 ❑ Designated seismic systems 1705.13.3 ❑ Seismic isolation systems 1705.13.4 ❑ Sprayed fire-resistance materials 1705.14 ❑ Physical and visual tests 1705.14.1 ❑ Structural member surface conditions 1705.14.2 (1705.14.3 through 1705.14.6.3) ❑ Mastic & intumescent fire-resistance costings 1705.15 ❑ Exterior insulation& finish systems (EIFS) 1705.16 ❑ Fire-resistance penetrations and joints 1705.17 ❑ Penetration firestops 1705.17.1 ❑ Fire-resistant joint systems 1705.17.2 ❑ Testing for smoke control 1705.18 ❑ Testing Scope 1705.18.1 Page 4 of 4 - t- S • cial Inspector R quit m nt�s f1L15O21 COUNTY - . COMMUN(IY SERViCFS BLD2025-00585 RICK AND MONICA ATKINSON, 300 NE:HAVEN LAKE DR.TAHUYA,WA 98588 Project Address/Parcel Number Pro Permit Number Project Title j Applicants of projects requiring Special Inspection or Testing per Chapter 1704&1705 of the International Building Code, as amended by Washington State.Please acknowledge and return this form to the Mason County Permit Center. THESE INSPECTIONS ARE NOT PERFORMED BY THE BUILDING DEPARTMENT AND-MUST',BE PERFORMED BY QUALIFIED SPECIAL INSPECTORS, HIRED BY'THE OWNER AND APPROVED BY THE COUNTY PERMIT CENTER. Individuals 'certified, in a, special inspection category by Washington Association of Building officials(WABO)or individuals'employed by a recognized testing laboratory and under the direct supervision of a Registered Professional Engineer are 'typically' considered qualified at the discretion of the local jurisdiction having authority for enforcement. f � l BEFORE A PERMIT CAN BE ISSUED: The'Owner or his/her representative, on the advice of the responsible Project Engineer or Architect,shall'fill out completely, sign and submit two (2) copies of ithe attached"Structural Tests and Inspection Schedule"'to this Department for review and approval including any requirements related to the Mason County Municipal Code. The "Owner,, General Contractor, and Inspection/Testing Agency, where applicable,' shall also acknowledge the following conditions applicable to Special Inspection and/or Testing. 1. 'Inspection/Testing Agency shall submit names and qualifications of on-site Special Inspectors to the Building Inspection Permit Center for!approval PRIOR TO PERMIT/S BEING ISSUED. �I 2. All Special Inspections shall be noted on the approved plans or attached approved documents. Yf 3. All special inspections shall be approved by the County or as recommended by the Engineer of Record (EOR). 4. It is the responsibility of the General Contractor to review County approved plans for additional' inspection or testing requirements that may be noted or required per IBC 'as noted ,on ,approved plans. 5. The General Contractor is responsible for proper notification to the Inspection/Testing Agency for items listed on this form. 6. Special Inspectors shall provide detailed reports on company letterhead to the Building Inspector of all required inspection activities. These may also be provided when the inspector visits the jobsite for the scheduled inspection but must be. completed before the subject'of inspection is approved by the building inspector. 7. Copies of all ongoing laboratory and testing reports shall'be sent directly to the Building 'Inspector by. the Inspection/Testing Agency or other responsible party within.a reasonable time to test results. 8. BEFORE' A. CERTIFICATE 'OF OCCUPANCY APPROVAL, CAN BE "ISSUED: The Inspection/Testing Agency shall submit a FINAL REPORT LETTER stating that all items. requiring testing and inspection have been fulfilled and reported and a final inspection report. shall be provided. A copy of the statement is to be maintained at the jobsite for the Building Inspectors review prior to final inspections. Page 1 of 4 ;t Le1spiamm1ts o Re = MASOKCOUM COA1NTIYSt VICC5 { ACKNOWLEDGEIVIENTS , Prior to issuance.of a building'permit,,the Owner,,on the advice of the Project Engineer or.Architect, shall complete,sign,and submit this form to the County Permit Center. Declaration of Owner I, as the owner of the.project,declare that the testing agency firm/s or individual/s listed herein are hired by me to perform "Special Inspections"-and/or"Structural Testing" in accordance with the provisions of the International Building code(IBC)Chapter 17. Rick Atkinson 7/1/25 Owner(print) Owner(Signature) (date) Declaration of Registered Professional Architect/Engineer 'g I, as-the design professional in responsible charge of the project listed herein, declare that the special inspection listed herein are required for this project in accordance with the provisions of the.International' Building Code(IBC) Chapter 17. SAADY AM IN N Architect/Engineer(print) Architect/Engineer Stamp/Signature(date) 'r' 57344 tCI S7 G { IGNED.0612512025 "Testing Agency Name/Contact Krazan&Associates,INC. 1230 Finn Hill Rd NW, Ste A, info: Paulsbo WA 98370 Rob Michaelson 360-598-2126 The Special Inspection/Testing Agency listed above niust have a current Portfolio-'Of Qnalificat 'ons on file with the County prior to performing work. Declaration of the General Contractor Las the General Contractor of the project, agree to comply with the"Contractor-Responsibility" items noted herein. a I' P — / — General Contractor rit) G eral Contractor Signature (date),? t Page2of4 - Ir , S C Ct Q q ,,,,SICOU-rY COMMUNITY SERVICES Required Special Inspections' International Building Code; Chapter 17: A completed and signed copy of pages 1 through 4 of this form shall be submitted to the;; "Permit Center" prior to building permit approval. Engineer shall check the applicable items: ❑ Special inspection of fabricated items 1704.2.5 L O Submittals to the building official 1704.5 Structures over 75' in height located in Seismic Design Category D, 1704.6.1 .,❑ Structures classified as Risk Category III or IV located in Seismic Design Category D, 1704.6.1 ❑Steel construction& structural Steel,1705.2.1 ❑ Cold form steel deck 1705.2.2 ❑ Open-web steel joists & girders 1705.2.3 0 Cold form steel-trusses spanning 60 feet or greater 17052.4 0 Concrete construction 1705.3 &Table 1705.3 ❑ Shotcrete 1705.3 ❑ Welding of reinforcing bars 1705.3.1 ❑Material Tests 1705.3.2 ;F ❑ Masonry. Construction 1705.4 ❑Empirically designed masonry, glass unit&masonry in Risk Category IV 1705.4.1 o P� Y � g rY Vertical masonry foundation elements 1705.4.2 ❑Wood.construction 1705.5 ❑ High Load Diaphragms 1705.5.1 ❑Metal-plate connected wood trusses spanning 60 feet or greater 1705.5.2 ❑'Soils 1705..6 &Table 1705.6 ❑Driven deep foundations 1705.7 &Table 1705.7 ❑ Cast in-place deep foundations 1705.8& Table 1705.8 0 Helical pile foundations 1705.9 ❑Fabricated items 1705.10. ® Post Installed Mechanical Anchor per ICC ESR Page 3 of 4 --- ',r peci I In�pect�ion R � ui e � M.iSON cou&ry COMMUNM sntvicrs ❑Special inspections for'wind resistance 1705.11 ti ❑ Structural wood 1-705.11.1. ❑Wind resisting.components 1705.11.3 ❑ Cold formed steel light frame 1705.11.2 ❑ Special inspection for seismic resistance 1705.12' ❑ Special inspection for structural steel per -1.705.12.1 D Seismic force-resisting systems 1705.12.1.1 ' ❑ Structural steel elements.1705.12.1.2 O Special inspection for structural wood per 1705.-12.2 ❑ Special inspection for "cold-formed steel per 1705.12.3 ❑Designated seismic.systems 1705.12.4 D,Architectural components 1705.12.5 - ❑Plumbing,mechanical& electrical.components .1705.12.6 O Storage racks 1705.12.7 ❑,Seismic isolation systems 1705.1.2:8 ❑ Cold-formed steel special bolted moment frames 1705.12.9 k { ❑Testing for seismic resistance 1705.13 ❑ Structural steel 1705.13.1 {, ❑ Seismic fore-resisting systems 1705.13.1.1 ❑ Structural steel elements 1705:13.1.2 ❑ Nonstructural components 1705.13.2 r ❑ Designated seismic systems 1705.13.3 ❑ Seismic isolation systems 1705.13.4 ❑ Sprayed fire-resistance materials 1705.14 ❑ Physical and visual tests 1705.14.1 ❑ Structural member surface conditions 1705.14.2(1705.14.3.'through 1705.14.6.3) ,k ❑ Mastic&intumescent'fire-resistance costings 1705.15 O Exterior insulation&finish systems(EIFS) 1705,16 ❑ Fire-resistance penetrations and joints-1705.17 ' ❑ Penetration firestops 1705.171 ❑ Fire-resistant.joint systems 1705.17.2 ❑ Testing:for smoke control 1705..18 ❑ Testing Scope 1705.18.1 Page 4 of 4 i4