HomeMy WebLinkAboutBLD2026-00746 - BLD CD Environmental Health Review - 9/25/2026 "` • -,r` `�r ►~ ci c
• c'.. • C O 2"G
\ 4 7 /
c Carport must �„� ,
be removed 0 Id
• Y from DF area
• prior to final
. s st occupancy
2o `
• EH APPROVED
Rhonda Thompson 09/25/2026
4O3. He
{ N AG 1> . t 7 ) Clea lout
r
I,C7pa Gallon Septic Tank
2-Compartment
EH Setbacks
51 9 ] A.) Drainfield/Reserve requires 10'setback from foundations.
y PAULA JOY JQHht50t' ', ` B.)Septic tank(s)requires 5'setback from all foundations. **Note to instaJler *
C.)No foundation/Perimeter Drains within 30ft,downgradient of Sleeve waterline y�! 10'
i�+ �s + Drainfield/Reserve area yt
r r A D.)No Cut Bank(s)(greater than 5ft and over 45 degrees)within Of septic traxlsj&r '!ne'.Maintain
50ft,down gradient of Drainfield/Reserve area 1 0> minimum between water
E.)Use approved mitigation from section C1-9 of the department c
ecology's"Criteria For Sewage Works Design,"when sewer line and septic tank$/drainfieid,
transport lines are within 1 Oft of water supply lines.