HomeMy WebLinkAbout2026-044 - Res. Adopting the Six-Year Transportation Improvement ProgramRESOLUTION NO. D-044
Adoption of the Six-Year Transportation Improvement Program
WHEREAS, in compliance with 136-15 WAC, Mason County has prepared the attachment Six-
Year Transportation Improvement Program for the period January 1,2027,through December 31,2032;
and,
WHEREAS,the Board of County Commissioners hereby certifies that the priority array of
potential projects on this County's road system, including bridges,was prepared by the County Engineer
during the preparation of the said Six-Year Transportation Improvement Program;and,
WHEREAS,the Board of County Commissioners reviewed the current bridge condition report as
prepared by the County Engineer on August 24, 2026;and,
WHEREAS,the Board of County Commissioners finds that the proposed 2027-2032 Six-Year
Transportation Improvement Program is consistent with the County Comprehensive plan;and,
WHEREAS,the Board of County Commissioners has held a public hearing on this 15`h day of
September 2026.
NOW,THEREFORE,BE IT RESOLVED,that the attached Six-Year Transportation Improvement
Program for 2027 through 2032 be adopted,which is hereby incorporated and made part of this
Resolution.
BE IT FUTHER RESOLVED that the County Engineer is hereby directed to distribute copies of the Six-Year
Transportation Improvement Program for 2027-2032 to all required agencies.
ADOPTED this bay of SC C111OCR 2026.
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY,WASHINGTON
ATTEST:
PAT TARZWELL,Chair
YY1C Cunn'r ;mz'n
MCKENZIE SMITH,Clerk of the Board
RAND NEATHERLIN,Vice Chair
APPROVED AS TO FORM:
SHARON TRASK,Commissioner
TIM W ITEHEAD,Ch. DPA
cc: Comma i ners
Public Works
Community Development
County Road Admin. Board
WSDOT
Agency:Mason County SEPT 2026
Co. No.:23 Co. Name:Mason County
City No.- - -MPO/RTPO:Peninsula
Hearing Date: 9/15/2026
Amend Date:
Adoption Date: 9/15/2026
Resolution No.: 2026-044
Project Identification Project Costs in Thousands of Dollars
A. Federal Aid No.B. Bridge No.Fund Source Information
Federal Funding
Phase Federal Federal State
Start Fund Cost by Fund State Local Total
(mm/dd/yy)Code Phase Source Funds Funds Funds
CRP PE 0
HIGHLAND ROAD IMPROVEMENT PROJECT RW 0
Rd. No.: 79800 CN 7/1/2027 STP 999.343 300.657 1300 1300 N/A
From: MP 4.62 TO: MP 7.92
HMA OVERLAY
Total 2027 Project Cost $ 1,300,000 TOTALS 999.343 0 300.657 1300 1300 0 0 0
CRP PE 0
BROCKDALE RD/ ISLAND LK RD ROUNDABOUT RW 0
Rd. No.: 90090 CN 7/4/2027 150 150 150 N/A
From: MP 1.97 To: MP 1.97
INTERSECTION MINI ROUNDABOUT
Total 2027 Project Cost $ 150,000 TOTALS 0 0 150 150 150 0 0 0
CRP PE 0
EELLS HILL ROAD (GRAVEL CONVERSION) RW 0
Rd. No.: 40850 CN 7/4/2027 80 80 80 N/A
From MP 1.28 To: MP 2.30
GRAVEL CONVERSION TO CHIP SEAL
Total 2027 Project Cost $ 80,000 TOTALS 0 0 80 80 80 0 0 0
CRP PE 0 0
CLOQUALLUM RD IMPROVEMENT PROJECT RW 0
Rd. No.: 10000 CN 7/4/2027 RAP 1314 146 1460 1460 N/A
From: MP 6.60 To: MP 7.80
SHIFT RD AND HMA OVERLAY
Total 2027 Project Cost $ 1,460,000 TOTALS 0 1314 146 1460 1460 0 0 0
CRP PE 0
FINCH CR AND UPPER FINCH CR IMPROVEMENT PROJECT RW 0
Rd. No.: 45140 LOCAL ROAD PROGRAM CN 8/1/2027 LRP 400 400 400 N/A
From: MP 0.00 To: MP 0.80
ROAD REPAIR AND HMA OVERLAY
Total 2027 Project Cost $ 400,000 TOTALS 0 400 0 400 400 0 0 0
E
09 3 1.02
Phase
PE - Preliminary Engineering
RW - Right of Way
CN - Construction
Funding
STP - Surface Transportation Program
HSIP - Highway Safety Improvement Program
RATA - Rural Arterial Trust Account
BROS - Bridge Replacement Project
TP - Transportation Partnerships
TAP - Transportation Alternatives Program
FBRB - Brian Abbot Fish Barrier Removal Board
FLAP - Federal Lands Access Program
EM - Federal Emergency Management Act and
State Emergency Management funds
Six Year Transportation Improvement Program
From 2027 to 2032
To
t
a
l
L
e
n
g
t
h
3rd 4th thru
6th
Expenditure Schedule
Federally
Funded
Projects Only
Pr
o
j
e
c
t
Ph
a
s
e
07 1
C. Project Title En
vir
Ty
pe
R/W
Required
Date
(mm/yy)
D. Street/Road Name of Number
1st 2ndFu
n
c
t
i
o
n
a
l
Cl
a
s
s
Pr
i
o
r
i
t
y
Nu
m
b
e
r
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
3.30 E
07 2 0.00 E
E0950.80
E
07 4 1.20
Project Identification Project Costs in Thousands of Dollars
A. Federal Aid No. B. Bridge No. Fund Source Information
Federal Funding
Phase Federal Federal State
Start Fund Cost by Fund State Local Total
(mm/dd/yy)Code Phase Source Funds Funds Funds
CRP PE 2/1/2027 FBRB 2613 106.81 2719.81 2719.81
LITTLE SKOOKUM INLET TRIBUTARIES FISH PASSAGE RW 2/1/2027 FBRB 350 150 500 500
Rd. No.: 15500 AND 16630 CN 0 6/1/2024
From: MP To: MP
FIVE CULVERT REPLACEMENTS ON LYNCH AND PHILIPS ROAD
Total 2027 Project Cost $ 3,219,810 TOTALS 0 2963 256.81 3219.81 3219.81 0 0 0
CRP PE 0
BEAR CREEK DEWATTO IMPROVEMENT PROJECT (ROCK PIT)RW 0
Rd. No.: 79800 CN 8/1/2027 RATA 576 64 640 640 6/1/2024
From: MP 0.43 To: MP 1.02
RE-ALIGN ROAD AROUND ROCK PIT
Total 2027 Project Cost $ 640,000 TOTALS 0 576 64 640 640 0 0 0
CRP PE
BROS
0
BEAR CR DEWATTO RD IMPROVEMENT PROJECT RW 0
Rd. No.: 79800 CN 8/1/2027 1200 1200 1200 6/1/2024
From: MP 5.37 To: MP 8.45
HMA OVERLAY
Total 2027 Project Cost $ 1,200,000 TOTALS 0 0 1200 1200 1200 0 0 0
CRP PE 0
DECKERVILLE RD IMPROVEMENT PROJECT RW 0
Rd. No.: 00800 CN 8/1/2027 1300 1300 1300 6/1/2024
From: MP 0.55 To: MP 3.79
HMA OVERLAY
Total 2027 Project Cost $ 1,300,000 TOTALS 0 0 1300 1300 1300 0 0 0
CRP PE APPLIED FOR 2R RAP FUNDING 0
CLOQUALLUM RD IMPROVEMENT PROJECT 2R RW 0
Rd. No.: 10000 WIVEL TO HIGHLAND CN 8/1/2028 RAP 1530 170 1700 1700
From: MP 7.80 To: MP 12.77
HMA SHOULDERS AND CHIP SEAL
Total 2028 Project Cost $ 1,700,000 TOTALS 0 1530 170 1700 0 1700 0 0
CRP PE APPLIED FOR 2R RAP FUNDING 0
OLD BELFAIR HIGHWAY IMPROVEMENT PROJECT 2R RW 0
Rd.: 98250 CN 8/1/2029 RAP 540 60 600 600
From: MP 2.60 To: MP 3.89
HMA SHOULDERS AND CHIP SEAL
Total 2029 Project Cost $ 600,000 TOTALS 0 540 60 600 0 0 600 0
E
07 7 0.59 E
2nd 3rd 4th thru
6th E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
08 6
Phase
PE - Preliminary Engineering
RW - Right of Way
CN - Construction
Funding
STP - Surface Transportation Program
HSIP - Highway Safety Improvement Program
RATA - Rural Arterial Trust Account
BROS - Bridge Replacement Project
TP - Transportation Partnerships
TAP - Transportation Alternatives Program
FBRB - Brian Abbot Fish Barrier Removal Board
FLAP - Federal Lands Access Program
EM - Federal Emergency Management Act and
State Emergency Management funds
08 9 3.24 E
E
07 11 1.29 E
08 10 4.97
08 8 3.08 E
Fu
n
c
t
i
o
n
a
l
Cl
a
s
s
Pr
i
o
r
i
t
y
Nu
m
b
e
r
To
t
a
l
L
e
n
g
t
h
Expenditure Schedule
Federally
Funded
Projects Only
Pr
o
j
e
c
t
Ph
a
s
e
C. Project Title En
vir
Ty
pe
R/W
Required
Date
(mm/yy)
D. Street/Road Name of Number
1st
Project Identification Project Costs in Thousands of Dollars
A. Federal Aid No. B. Bridge No. Fund Source Information
Federal Funding
Phase Federal Federal State
Start Fund Cost by Fund State Local Total
(mm/dd/yy)Code Phase Source Funds Funds Funds
CRP PE APPLIED FOR 2R RAP FUNDING 10 10 10
SHELTON SPRINGS RD IMPROVEMENT PROJECT 2R RW 0
Rd.:50810 CN 8/1/2029 RAP 360 40 400 400
From: MP 0.00 To: MP 0.89
HMA SHOULDERS AND CHIP SEAL
Total 2029 Project Cost $ 410,000 TOTALS 0 360 50 410 10 0 400 0
CRP PE APPLIED FOR LRP FUNDING 0
EELLS HILL RD IMPROVEMENT PROJECT LOCAL ROAD PROGRAM RW 0
Rd. No.: 40850 CN 8/1/2029 LRP 750 750 750
From: MP 0.00 To: MP 5.61
GRAVEL CONVERSION TO CHIP SEAL
Total 2026 Project Cost $ 750,000 TOTALS 0 750 0 750 0 0 750 0
CRP PE 0
ARCADIA ROAD SAFETY IMPROVEMENT PROJECT RW 0
Rd. No.: 91100 COLLIER TO LYNCH RD CN 8/1/2030 HSIP 1700 1700 1700
From; MP 1.82 To: MP 7.04
HMA SHOULDERS AND SAFETY IMPROVEMENTS
Total Project Cost $ 1,700,000 TOTALS 1700 0 0 1700 0 0 0 1700
CRP PE 0
RAZOR ROAD EXTENSION RW 5/2/2028 150 150 150
Rd. No.: 62400 CN 0
From: MP TBD To: MP TBD
EXTEND RASOR ROAD TO RASOR LANE
Total 2026 Project Cost $ 150,000 TOTALS 0 0 150 150 0 150 0 0
CRP PE 4/1/2028 40 40 40
WSDOT / COUNTY INTERSECTION FEASIBILITY RW 0
Rd. No.: CLIFTON, OBH/ SR300, N. BAY/ SR 3 CN 0
From: MP To: MP
Total 2026 Project Cost $ 40,000 TOTALS 0 0 40 40 0 40 0 0
LYNCH ROAD CULVERT REPLACEMENT PE 8/1/2028 FBRB 182 182 182
Rd. No. 15500 RW 0
CN 0
From: MP. 2.27 To: MP. 2.27
PE. FOR CULVERT REPLACEMENT
Total 2026 Project Cost $ 182,000 TOTALS 0 182 0 182 0 182 0 0
Phase
PE - Preliminary Engineering
RW - Right of Way
CN - Construction
Funding
STP - Surface Transportation Program
HSIP - Highway Safety Improvement Program
RATA - Rural Arterial Trust Account
BROS - Bridge Replacement Project
TP - Transportation Partnerships
TAP - Transportation Alternatives Program
FBRB - Brian Abbot Fish Barrier Removal Board
FLAP - Federal Lands Access Program
EM - Federal Emergency Management Act and
State Emergency Management funds
R/W
Required
Date
(mm/yy)
D. Street/Road Name of Number
1st 2nd 3rd 4th thru
6th E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
En
vir
Ty
pe
08 17 0.00
16 0.00
TB
D09150.00
08 14 5.22
Fu
n
c
t
i
o
n
a
l
Cl
a
s
s
Pr
i
o
r
i
t
y
Nu
m
b
e
r
To
t
a
l
L
e
n
g
t
h
Expenditure Schedule
Federally
Funded
Projects Only
Pr
o
j
e
c
t
Ph
a
s
e
C. Project Title
E
09 13 5.61
D
C
E
08 12 0.89
Project Identification Project Costs in Thousands of Dollars
A. Federal Aid No. B. Bridge No. Fund Source Information
Federal Funding
Phase Federal Federal State
Start Fund Cost by Fund State Local Total
(mm/dd/yy)Code Phase Source Funds Funds Funds
UNCLE JOHNS CREEK LOWER CULVERT REPLACEMENT PE 0
RW 0
Rd. No.: 23500 AGATE LOOP ROAD CN 6/1/2030 FBRB 2580 2580 2580
From: MP 0.64 To: MP 0.64
CULVERT REPLACEMENT
Total Project Cost $ 2,580,000 TOTALS 0 2580 0 2580 0 0 0 2580
CRP PE 0
MCREAVY ROAD SAFETY ENHANCEMENT PROJECT RW 0
Rd. No.: 97670 CN 8/1/2032 HSIP 1400 1400 1400
From: MP 2.55 To: 6.41
SAFETY ENHANCEMENT (SHOULDERS, GUARDRAIL)
Total Project Cost $ 1,400,000 TOTALS 1400 0 0 1400 0 0 0 1400
CRP PE 9/1/2028 BROS 150 150 150 0
CHAPMAN COVE BRIDGE REPLACEMENT RW 0
Rd. No.: 23500 AGATE LOOP ROAD CN 0
From: MP 0.49 To: 0.49
BRIDGE REPLACEMENT
Total Project Cost $ 150,000 TOTALS 150 0 0 150 0 150 0 0
CRP PE 9/1/2029 BROS 150 150 150
HLIBOKI BRIGDE REPLACEMENT RW 0
Rd. No. 10290 BULB FARM ROAD CN 0
From: MP 0.35 To MP 0.35
BRIDGE REPLACEMENT
Total Project Cost $ 150,000 TOTALS 150 0 0 150 0 0 150 0
CRP PE 12/1/2029 BROS 221 73.5 294.5 294.5
EVERS BRIDGE IMPROVEMENT PROJECT RW 0
Rd. No.90100 MATLOCK BRADY RD CN 0
From: MP 23.05 To: MP 23.05
Strip existing timber surface and re-apply protective coating
Total Project Cost $ 294,500 TOTALS 221 0 73.5 294.5 0 0 294.5 0
CRP PE 12/1/2029 BROS 200 200 200
MISSION CREEK 3 BRIDGE IMPROVEMENT PROJECT RW 0
Rd. No. 84110 STEELHEAD RD CN 0
From: MP 0.04 To: MP 0.04
Construct footing and pier wall and replace the North approach
Total Project Cost $ 200,000 TOTALS 200 0 0 200 0 0 200 0
09 18 0.00
Expenditure Schedule
Federally
Funded
Projects Only
Pr
o
j
e
c
t
P
h
a
s
e
C. Project Title En
vir
Ty
pe
R/W
Required
Date
(mm/yy)
D. Street/Road Name of Number
1st 2nd 3rd 4th thru
6th E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Fu
n
c
t
i
o
n
a
l
Cl
a
s
s
Pr
i
o
r
i
t
y
Nu
m
b
e
r
To
t
a
l
L
e
n
g
t
h
Phase
PE - Preliminary Engineering
RW - Right of Way
CN - Construction
Funding
STP - Surface Transportation Program
HSIP - Highway Safety Improvement Program
RATA - Rural Arterial Trust Account
BROS - Bridge Replacement Project
TP - Transportation Partnerships
TAP - Transportation Alternatives Program
FBRB - Brian Abbot Fish Barrier Removal Board
FLAP - Federal Lands Access Program
EM - Federal Emergency Management Act and
State Emergency Management funds
07 22 0.00
09 23 0.00
09 21 0.00
08 19 3.86
09 20 0.00
Project Identification Project Costs in Thousands of Dollars
A. Federal Aid No. B. Bridge No. Fund Source Information
Federal Funding
Phase Federal Federal State
Start Fund Cost by Fund State Local Total
(mm/dd/yy)Code Phase Source Funds Funds Funds
CRP PE 12/1/2029 BROS 56.25 18.75 75 75
VANCE CREEK DIV BRIDGE IMPROVEMENT PROJECT RW 0
Rd. No. 41640 SKOKOMISH VALLEY RD CN 0
From: MP 4.56 To: MP 4.56
Replace damaged concrete girder
Total Project Cost $ 75,000 TOTALS 56.25 0 18.75 75 0 0 75 0
CRP PE 1/1/20231 BROS 100 100 100
HARSTINE ISLAND BRIDGE IMPROVEMENT PROJECT RW 0
Rd. No. 3000 CN 0
From: MP 0.12 To: MP 0.40
Repair spalding on columns
Total Project Cost $ 100,000 TOTALS 100 0 0 100 0 0 0 100
CRP PE 0
SAND HILL ROAD IMPROVEMENT PROJECT RW 0
Rd. No. 86070 TOP HILL TO BCD CN 8/1/2032 1400 1400 1400
From: MP 1.22 To: MP 5.79
HMA OVERLAY
Total Project Cost $ 1,400,000 TOTALS 0 0 1400 1400 0 0 0 1400
CRP PE 20 20 20
BELFAIR TAHUYA RD IMPROVEMENT PROJECT RW 0
Rd. No. 97500 DEWATTO RD TO CN 8/1/2030 1400 1400 1400
From : MP 7.48 To: MP 11.75 N. SHORE RD
HMA OVERLAY
Total Project Cost $ 1,420,000 TOTALS 0 0 1420 1420 0 20 0 1400
CRP PE 4/1/2032 BROS 100 100 100
STRETCH ISLAND BRIDGE REPLACEMENT RW 0
Rd. No. 64500 ECKERT ROAD CN 0
From: MP 0.14 To: MP 0.21
Replace the 356' bridge
Total Project Cost $ 100,000 TOTALS 100 0 0 100 0 0 0 100
CRP PE 0
CLIFTON AND SR 300 INTERSECTION IMPROVEMENT RW 0
Rd. No. 86750 & 98250 CN 8/1/2032 HSIP 100 100 100
From: MP 0.20
Construct a roundabout at the intersection
Total Project Cost $ 100,000 TOTALS 0 0 100 100 0 0 0 100
Fu
n
c
t
i
o
n
a
l
Cl
a
s
s
Pr
i
o
r
i
t
y
Nu
m
b
e
r
Phase
PE - Preliminary Engineering
RW - Right of Way
CN - Construction
Funding
STP - Surface Transportation Program
HSIP - Highway Safety Improvement Program
RATA - Rural Arterial Trust Account
BROS - Bridge Replacement Project
TP - Transportation Partnerships
TAP - Transportation Alternatives Program
FBRB - Brian Abbot Fish Barrier Removal Board
FLAP - Federal Lands Access Program
EM - Federal Emergency Management Act and
State Emergency Management funds
07 25 0.00
07 29 0.00
09 28 0.07
En
vir
Ty
pe
R/W
Required
Date
(mm/yy)
D. Street/Road Name of Number
1st 2nd 3rd 4th thru
6th E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
To
t
a
l
L
e
n
g
t
h
Expenditure Schedule
Federally
Funded
Projects Only
Pr
o
j
e
c
t
P
h
a
s
e
C. Project Title
08 27 4.27
08 26 4.57
08 24 0.00
Project Identification Project Costs in Thousands of Dollars
A. Federal Aid No. B. Bridge No. Fund Source Information
Federal Funding
Phase Federal Federal State
Start Fund Cost by Fund State Local Total
(mm/dd/yy)Code Phase Source Funds Funds Funds
CRP PE 0
COLE ROAD RAILROAD CROSSING RW 0
Rd. No. 15830 CN 8/1/2032 150 150 150
From: MP 1.41
REPLACE RAILROAD CROSSING
Total Project Cost $ 150,000 TOTALS 0 0 150 150 0 0 0 150
CRP PE 0
AGATE ROAD IMPROVEMENT PROJECT #4 RW 0
Rd. No. 23910 CRESTVIEW TO PICKERING CN 8/1/2030 1110 1110 1110
From: MP 3.78 To: MP 6.65
County crew to prepare shoulders contract HMA overlay 12' lanes & 5' shoulders
Total Project Cost $ 1,110,000 TOTALS 0 0 1110 1110 0 0 0 1110
CRP PE 0
MASON LAKE ROAD IMPROVEMENT PROJECT 1 RW 0
Rd. No. 52210 SR3 TO MCEWAN PRAIRIE CN 8/1/2031 800 800 800
From: MP 0.00 To: MP 1.42
Overlay the road 12' wide lanes & 5' wide shoulders
Total Project Cost $ 800,000 TOTALS 0 0 800 800 0 0 0 800
CRP PE 0
PICKERING ROAD IMPROVEMENT PROJECT RW 0
Rd. No. 28850 HARSTINE BR TO CN 8/1/2031 STP 865 300 1165 1165
From: MP 3.37 To: MP 6.28 AGATE RD
HMA OVERLAY
Total Project Cost $ 1,165,000 TOTALS 865 0 300 1165 0 0 0 1165
CRP PE 0
SOUTH ISLAND DRIVE IMPROVEMENT PROJECT II RW 0
Rd. No. 35230 MP 1.0 TO HARSTINE ISLAND RD S CN 8/1/2030 STP 865 135 1000 1000
From: MP 1.0 To: MP 3.3
HMA OVERLAY
Total Project Cost $ 1,000,000 TOTALS 865 0 135 1000 0 0 0 1000
CRP PE 0
SOUTH ISLAND DRIVE IMPROVEMENT PROJECT I RW 0
Rd. No. 35230 CN 8/1/2031 RATA 700 72 772 772
From: MP 0.00 To: MP 1.00
HMA 12' lanes & 2' shoulders. 1' gravel shoulders; correct horizontal curves
Total Project Cost $ 772,000 TOTALS 0 700 72 772 0 0 0 772
Expenditure Schedule
Federally
Funded
Projects Only
Pr
o
j
e
c
t
Ph
a
s
e
C. Project Title En
vir
Ty
pe
R/W
Required
Date
(mm/yy)
D. Street/Road Name of Number
1st 2nd 3rd 4th thru
6th E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Fu
n
c
t
i
o
n
a
l
Cl
a
s
s
Pr
i
o
r
i
t
y
Nu
m
b
e
r
To
t
a
l
L
e
n
g
t
h
0.003017
Phase
PE - Preliminary Engineering
RW - Right of Way
CN - Construction
Funding
STP - Surface Transportation Program
HSIP - Highway Safety Improvement Program
RATA - Rural Arterial Trust Account
BROS - Bridge Replacement Project
TP - Transportation Partnerships
TAP - Transportation Alternatives Program
FBRB - Brian Abbot Fish Barrier Removal Board
FLAP - Federal Lands Access Program
EM - Federal Emergency Management Act and
State Emergency Management funds
08 33 2.91
08 35 1.00
08 34 2.30
17 32 1.42
07 31 2.87
Project Identification Project Costs in Thousands of Dollars
A. Federal Aid No. B. Bridge No. Fund Source Information
Federal Funding
Phase Federal Federal State
Start Fund Cost by Fund State Local Total
(mm/dd/yy)Code Phase Source Funds Funds Funds
CRP PE 8/1/2031 150 150 150
NEW ROAD CONSTRUCTION COLE RD TO CRAIG RD RW 0
Rd. No. CN 0
From: MP To: MP
NEW ROAD CONSTRUCTION
Total Project Cost $ 150,000 TOTALS 0 0 150 150 0 0 0 150
CRP PE 8/1/2030 150 150 150
NEW ROAD CONSTRUCTION CRAIG RD TO RYAN RD RW 0
Rd. No.: CN 0
From: MP To: MP
NEW ROAD CONSTRUCTION
Total Project Cost $ 150,000 TOTALS 0 0 150 150 0 0 0 150
CRP PE 8/1/2032 150 150 150
NEW ROAD CONSTRUCTION MANOR RD TO GOLDEN PHEASANT RD RW 0
Rd. No. CN 0
From: MP To: MP
NEW ROAD CONSTRUCTION
Total Project Cost $ 150,000 TOTALS 0 0 150 150 0 0 0 150
CRP PE 4/1/2030 150 150 150
NEW ROAD CONSTRUCTION KAMILCHE LANE TO MANOR RD RW 0
Rd. No. CN 0
From: MP To: MP
NEW ROAD CONSTRUCTION
Total Project Cost $ 150,000 TOTALS 0 0 150 150 0 0 0 150
CRP PE FBRB 0
BEEVILLE ROAD CULVERT REPLACEMENT RW 0
Rd. No. 01650 PETERSON CREEK CN 8/1/2031 FBRB 4000 4000 4000
From: MP 1,14 To: MP 1.20
CULVERT REPLACEMENT
Total Project Cost $ 4,000,000 TOTALS 0 4000 0 4000 0 0 0 4000
CRP PE 8/1/2031 150 150 150
NEW ROAD CONSTRUCTION RYAN RD TO BREWER RD RW 0
Rd. No. CN 0
From: MP To: MP
NEW ROAD CONSTRUCTION
Total Project Cost $ 150,000 TOTALS 0 0 150 150 0 0 0 150
Phase
PE - Preliminary Engineering
RW - Right of Way
CN - Construction
Funding
STP - Surface Transportation Program
HSIP - Highway Safety Improvement Program
RATA - Rural Arterial Trust Account
BROS - Bridge Replacement Project
TP - Transportation Partnerships
TAP - Transportation Alternatives Program
FBRB - Brian Abbot Fish Barrier Removal Board
FLAP - Federal Lands Access Program
EM - Federal Emergency Management Act and
State Emergency Management funds
En
vir
Ty
pe
R/W
Required
Date
(mm/yy)
D. Street/Road Name of Number
1st 2nd 3rd 4th thru
6th E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
41 0.68
09 40 0.06
37 1.00
39 0.54
38 0.70
36 0.63
Fu
n
c
t
i
o
n
a
l
Cl
a
s
s
Pr
i
o
r
i
t
y
Nu
m
b
e
r
To
t
a
l
L
e
n
g
t
h
Expenditure Schedule
Federally
Funded
Projects Only
Pr
o
j
e
c
t
Ph
a
s
e
C. Project Title
Project Identification Project Costs in Thousands of Dollars
A. Federal Aid No. B. Bridge No. Fund Source Information
Federal Funding
Phase Federal Federal State
Start Fund Cost by Fund State Local Total
(mm/dd/yy)Code Phase Source Funds Funds Funds
CRP PE 0
MATLOCK BRADY ROAD SAFETY ENHANCEMENT PROJECT RW 0
Rd. No.: 90100 MATLOCK TO EVERS CN 8/1/2032 HSIP 1800 1800 1800
From: MP 16.67 To: MP 23.04
SHOULDER PAVING
Total Project Cost $ 1,800,000 TOTALS 1800 0 0 1800 0 0 0 1800
CRP PE 0
MCEWAN PRAIRIE EXTENTION TO SR 101 RW 1/1/2030 100 100 100
Rd. No.: 51800 CN 0
From: MP 2.45 To: MP 4.55
Road,bridges, roundabouts
Total Project Cost $ 100,000 TOTALS 0 0 100 100 0 0 0 100
CRP PE 400 400 400
RASOR ROAD EXTENSION TO SR 3 RW 1/1/2031 100 100 100
Rd. No.: 62400 CN 0 0
From: MP 2.36 To: MP 4.36 0
0
Total Project Cost $ 500,000 TOTALS 0 0 500 500 0 400 0 100
CRP PE 0 0
BOLLING ROAD (GRAVEL CONVERSION) RW 0
Rd. No.: 10510 CN 8/1/2029 40 40 0 40
From: MP 0.00 To: MP 0.28 0
GRAVEL CONVERSION TO CHIP SEAL 0
Total Project Cost $ 40,000 TOTALS 0 0 40 40 0 0 40 0
CRP PE 800 800 800
CLOQUALLUM ROAD EXTENTION TO SR 101 RW 1/1/2030 100 100 100
Rd No.: 10000 CN 0
From: MP 1.47 To: MP 1.53
On / Off ramps to SR 101
Total Project Cost $ 900,000 TOTALS 0 0 900 900 0 800 0 100
CRP PE 0
NORTH SHORE ROAD (GRAVEL CONVERSION) RW 0
Rd. No.: 70390 BURMA ROAD CN 8/1/2030 300 300 300
From: MP 19.76 To: MP 25.48
GRAVEL CONVERSION TO CHIP SEAL
Total Project Cost $ 300,000 TOTALS 0 0 300 300 0 0 0 300
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
08 47
44
Phase
PE - Preliminary Engineering
RW - Right of Way
CN - Construction
Funding
STP - Surface Transportation Program
HSIP - Highway Safety Improvement Program
RATA - Rural Arterial Trust Account
5.72
Fu
n
c
t
i
o
n
a
l
Cl
a
s
s
Pr
i
o
r
i
t
y
Nu
m
b
e
r
To
t
a
l
L
e
n
g
t
h
Expenditure Schedule
Federally
Funded
Projects Only
Pr
o
j
e
c
t
Ph
a
s
e
C. Project Title En
vir
Ty
pe
R/W
Required
Date
(mm/yy)
D. Street/Road Name of Number
1st 2nd 3rd 4th thru
6th
BROS - Bridge Replacement Project
TP - Transportation Partnerships
TAP - Transportation Alternatives Program
FBRB - Brian Abbot Fish Barrier Removal Board
FLAP - Federal Lands Access Program
EM - Federal Emergency Management Act and
State Emergency Management funds
2.00
46 0.06
09 45 0.28
07 43 2.10
07 42 6.37
Project Identification Project Costs in Thousands of Dollars
A. Federal Aid No. B. Bridge No. Fund Source Information
Federal Funding
Phase Federal Federal State
Start Fund Cost by Fund State Local Total
(mm/dd/yy)Code Phase Source Funds Funds Funds
CRP PE 0
LYNCH ROAD RAILROAD CROSSING IMPROVEMENT PROJECT RW 0
Rd. No. 15500 CN 8/1/2030 150 150 150
From: MP 0.73 To: MP 0.73
REPLACE RAIL ROAD CROSSING
Total Project Engineering Cost $ 150,000 TOTALS 0 0 150 150 0 0 0 150
CRP PE 0
DEEGAN ROAD WEST CULVERT REPLACEMENT RW 0
Rd. No.: 06110 CN 8/1/2032 2000 2000 2000
From: MP 0.20 To: MP 0.30
Total Project Cost $ 2,000,000 TOTALS 0 0 2000 2000 0 0 0 2000
CRP PE 0 0
MATLOCK BRADY ROAD SAFETY ENHANCEMENT PROJECT RW 0
Rd. No.: 90100 EVERS TO SHAFER CN 8/1/2032 HSIP 1100 1100 1100
From; MP 23.05 To: MP 26.26
HMA SHOULDERS
Total Project Cost $ 1,100,000 TOTALS 1100 0 0 1100 0 0 0 1100
CRP PE 1/1/2028 50 50 50
SIMMONS EXTENTION TO LYNCH RD RW 0
Rd. No.: 15240 NEW ROAD CN 0
From; MP To: MP
Total Project Cost $ 50,000 TOTALS 0 0 50 50 0 50 0 0
CRP PE 0
ARCADIA ROAD SAFETY IMPROVEMENT PROJECT RW 0
Rd. No.: 91100 COLLIER TO LYNCH RD CN 8/1/2031 SS4A 1700 1700 1700
From; MP 1.82 To: MP 7.04
Total Project Cost $ 1,700,000 TOTALS 1700 0 0 1700 0 0 0 1700
CRP PE 1/1/2032 50 50 50
Belfair Connector - Log Yard Road E.RW 10/1/2032 50 50 50
Rd. No.: CN 0
From: SR3 To: Belfair Freight Corridor
Design for new construction
Project Cost $ 100,000 TOTALS 0 0 100 100 0 0 0 100
CRP 2019 PE 6/1/2032 50 50 50
Belfair Connector - Romance Hill RW 7/1/2032 50 50 50
Rd. No.: 86500 CN 0
From: SR3 To: Belfair Freight Corridor
Design for new construction
Project Cost $ 100,000 TOTALS 0 0 100 100 0 0 0 100
$ 41,838,310 84.90 11406.59 15895.00 14536.72 41838.31 9760 3492 2510 26077TOTALS:
09 51 1.00
07 50 3.21
09 53 0.00
09 54
Fu
n
c
t
i
o
n
a
l
Cl
a
s
s
Pr
i
o
r
i
t
y
Nu
m
b
e
r
C. Project Title
D. Street/Road Name of Number
E. Beginning MP or road - Ending MP or road
F. Describe Work to be Done
Phase
PE - Preliminary Engineering
RW - Right of Way
CN - Construction
Funding
STP - Surface Transportation Program
HSIP - Highway Safety Improvement Program
RATA - Rural Arterial Trust Account
BROS - Bridge Replacement Project
TP - Transportation Partnerships
TAP - Transportation Alternatives Program
FBRB - Brian Abbot Fish Barrier Removal Board
FLAP - Federal Lands Access Program
EM - Federal Emergency Management Act and State Emergency
Management funds
08 52 1.00
08 49 0.10
07 48 0.00
To
t
a
l
L
e
n
g
t
h
Expenditure Schedule
Federally
Funded
Projects Only
Pr
o
j
e
c
t
Ph
a
s
e
En
vir
Ty
pe
R/W
Required
Date
(mm/yy)
1st 2nd 3rd 4th thru
6th
0.00