HomeMy WebLinkAboutBLD2025-00068 - BLD Permit / Conditions - 6/8/2026 1� 615 W.Alder St.Bldg 8,SHELTON,WA 98584
MASON COUNTY SHELTON:360-427-9670,EXT 352
COMMUNITY SERVICES BELFAIR:360-275-4467,EXT 352
Building Planning Environmental Health,CommunityHWth ELMA:360-482-5269,EXT 352
www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY**
To schedule an Inspection call or visit http:llwww.co.mason.wa.us/community-serviceslbid-inspectio . h
Permit Number BLD2025-0b068 Date Issued •0410412025 Issued By
'Project NEW 2 BDR,2 BATH MANUFACTURED HOME
Site Address 321 N MOUNTAIN VIEW DR
Applicant IMPORTANT BUSINESS PORTFOLIO LLC a�
Contractor BILL MCTURNAL TESTING/CONS LLC a �
Contractor Phone 1.360.280.2236
Primary Code 2018 IBC,IRC,IFC,IEC,IMC,& TypeUP
Permit Type MANUFACTURED HOME Occupancy
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
**THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.**
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building Building Official: Community Services Designee
Department
Concrete Setbacks Slab
Footing Perimeter Point load Footing
•Footing Interior Footing Decks/Porches
Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building
Manufactured Setbacks ? T Setup
Home .! (
Concrete Foot/Runners Final ( - g..2
Other
F I q(zc5., 04 9-
6�
(,_g_Z� J 2sL
INSPECTION RESULTS Pagel
MASON COUNTY Department of Community Development _
COMMUNITY DEVELOPMENT 615 W Alder St,Shelton,WA 98584
Permit Assistance center,Building,Planning (360)427-9670 ext.352
Application# BLD2025-00068 Application Type MANUFACTURED HOME Owner IMPORTANT BUSINESS
PORTFOLIO LLC
Parcel#. 422095400083 Site Address 321 N MOUNTAIN VIEW DR HOODSPORT,
WA 98548
Inspector Inspection Type. Date Status : Comments , r
8-19-25-JQ
A<Marriage wall pier on the left side marked with "X"the wedges are loose please
tighten
Perimeter pier stands at the left front are not plumb please address piers cannot
Joshua
Quarders SET-UP INSPECTION 08/19/2025 FAIL
3 eviate-over 1/2"from top to bottom areas circled on approved pier plan.
. Installer tag is not filled out please address before final inspection
4.address numbers to be installed on dwelling before final inspection
Call for reinspection when corrections have been made
MASON COUNTY INSPECTION RESULTS Pagel
Department of Community Development
COMMUNITY DEVELOPMENT 615 W Alder St,Shelton,WA 98584
Permit Assistance Center,Building,Planning (360)427-9670 ext.352
Application# BLD2025-00068 Application Type MANUFACTURED HOME Owner IMPORTANT BUSINESS
PORTFOLIO LLC
Parcel# 422095400083 Site Address 321 N MOUNTAIN VIEW DR HOODSPORT,
WA 98548
sary `":�u
Inspector Inspection Type Date � .Status Comments
6-4-26-JQ
Fill holes in front yard at the septic tank(install risers)and cover
The front porch is not stable-install full depth blocking at all joists on top of beams.
Joshua BLD-FINAL INSPECTION 06/04/2026 FAIL Remove the facia bricks being used as a first step at the font landing and replace
Quarders with a proper step.
Please send photos and video of corrected items when completed
jquarders@masoncountywa.gov
1
Mason County
Mason County - Division of Community Development
615 W.Alder St.
C. r Building 8
Shelton,WA 98584 rX'� www360-427-9670 ext 352
www.masoncountywa.gov
BLD2025-00068 MANUFACTURED HOME
PROJECT DESCRIPTION: NEW 2 BDR,2 BATH MANUFACTURED ISSUED: 04/04/2025
HOME
SITE ADDRESS: 321 N MOUNTAIN VIEW DR HOODSPORT EXPIRES: 10/01/2025
PARCEL: 422095400083
APPLICANT: IMPORTANT BUSINESS PORTFOLIO LLC OWNER: IMPORTANT BUSINESS PORTFOLIO LLC
7002 BAILEY ST SE 7002 BAILEY ST SE
LACEY,WA 98513 LACEY,WA 98513
360.529.1110
CONTRACTOR: BILL MCTURNAL TESTING/CONS LLC
PO BOX 12048
OLYMPIA,WA 98508
1.360.280.2236
GENERAL CONTRACTOR'S LICENSE: BILL MCTURNAL TESTING/CONS LLC License: BILLMMT815RE
PO BOX 12048 Expires: 01/11/2026
OLYMPIA,WA 98508
1.360.280.2236
FEES: Paid Due
Building Plan Review/Change of $140.00 $0.00
Use-Onsite Sewage
Planning Residential Review $275.00 $0.00
Fee
Modular/Manufactured Home $275.00 $0.00
Fee-2nd half collected at ready
to issue
Technology Surcharge $11.00 $0.00
State Fee-Residential $6.50 $0.00
Modular/Manufactured Home $275.00 $0.00
Fee- 1st half collected at
submittal
Totals : $982.50 $0.00
REQUIRED INSPECTIONS
Printed by:Amber Selby on:04/04/2025 11:35 AM
Page 1 of 5
• Mason County
Mason County - Division of Community Development
615 W.Alder St.
C, Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MANUFACTURED HOME BLD2025-00068
Setback Inspection Connection is to be verified by Health or Utilities
Footing Inspection BLD-Final Inspection
------------------------------------------------------ -- - - - -- - .-- - _ —:- -- ---- - - - - ---
Set-Up Inspection
CONDITIONS
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an,
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
contact the Mason County Public Works Department prior to construction at Ext 4501
.............................................................................................................•
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site,then approval will not be granted. In addition, a re-inspection fee(refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
--------------------------------------------------------------------------------------------------------------
* If you are installing a manufactured structure and no longer have the installation manual, you must use the instructions of
the most current 24 CFR.
.......................................... ---...----------------------------------.-_..
* This permit is for the placement and installation of the manufactured home only and does not imply approval or review for
any other items indicated on the plot plan. -
* By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed. -
* REQUIRED INSPECTIONS (Footing Inspection-prior to pour(set-up manual must be on-site), Set-up Inspection-prior to
skirting, Final Inspection-prior to occupancy). I hereby assume all responsibility for the scheduling of my required
inspections. If the required inspections are not requested, inspected and signed off(approved)by the inspector in the
prescribed order, I understand that reinspection fees and an hourly investigation fee pursuant to the current fees adopted by
the Mason County Building Dept., and will be assessed in addition to my original permit fees to resolve any questionable
practices or problems that have been discovered. Until resolution of any/all problems no occupancy(Final Inspection)will be
granted for the residence.
OWNER/CONTRACTOR(indicate which)
--------- ---------------- -- -- --- -------- --- -- ---------- ---- ----- - -- -- ------.-....
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any.
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
------------- -------------------------------------------------------------------------------------------
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections'indicated on the plans. Once the plans are marked
"APPROVED",they shall not be changed or altered without authorization from the Building.Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
----------- ---------------------------------------------------------------------------------------------------.
* Disclaimer: Mason County does not require a survey to obtain a building permit.As a result, site plans may not reflect
accurate data. It is the applicant's responsibility to comply with setback requirements.
Printed by:Amber Selby on:04/04/2025 11:35 AM
Page 2 of 5
Mason County
Mason County'- Division of Community Development
3q 615 W.Alder St.
aH Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MANUFACTURED HOME BLD2025-00068
* A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit
application. Design,sizing, placement, inspection and maintenance of stormwater management systems shall be the
responsibility of the owner/agent of the developed parcel. It'is the owner/agent/contractor's responsibility to ensure that
Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement
of any development activities. *NOTE if Stormwater Management option"A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots,The Small Parcel
Stormwater Site Plan"constitutes an approved plan based on the criteria listed on the application/worksheet. If the
development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other,
parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final
inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater
management system have been installed as approved on the stormwater site plan. Under the requirements of Mason County
Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior
approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the farthest projection of the
structure. Front setbacks are measured from the front lot line or road easement boundary,whichever is closer.
* Pressure treated wood manufactured after January 1,2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
-----------------------------------------------------------------•--------------•-------------------- ------
* The installation permit shall be displayed in clear view of the site access road.The approved site plan and other applicable
instructions, including installation instructions, shall be available in this location OR placed in the location specified by WAC
296-150M. Support configuration shall be clearly marked in the installation instructions.
* All property lines shall be clearly identified at the time of foundation inspection.
----------------------------------------------------------------------------------- ----
* All.construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
------------------------------------------------ ----------------------------------'------------------------.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
..............................................................................................•---------._..-.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection�fee(refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
---------------------------- -----------------------------------------------------------------------------•---
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed.The Building
Official may grant one or more extension of 180 days, upon the receipt of.a written extension request prior to permit
expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being
taken.
Printed by:Amber Selby on:04/04/2025 11:35 AM
Page 3 of 5
Mason County
Mason County - Division of Community Development
615 W.Alder St.
�ON.r Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MANUFACTURED HOME BLD2025-00068
* Any retailer, manufacturer or contractor who installs a manufactured structure warrants that the manufactured structure is
installed in accordance with the State Installation code, chapter 296-150M WAC.All installers hired to do installation work
shall be certified manufactured structure installers and shall be present to supervise the installation of all on-site work.An
Installer Tag shall be posted on site giving the certification number and signature of the certified installer responsible for "`
each major part of the installation. RCW43-63B.090
An approved Installer certification tag shall be placed on the end of the manufactured home directly above or below the HUD
certification tag or temporarily located in plain site within three feet of the home's front entry. There shall be one certification
tag for each certified installer accounting for the work that each installer performed or installed. Certification number and
signature of the certified installer responsible for each major part of the installation. WAC365-210
-------------------------------------------------------------------------------------------------------------.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Code 14.28 and 14.17.
..............__........-----------.....------------------------...----------.....---------------------------
* The foundation/footing must be placed on undisturbed,firm-native soil. Proper frost depth, minimum 12 inches, shall be
observed below grade in undisturbed soils.
- -------------------------------------------------------------------------------------------------------------
* All other necessary permits from Mason County,Washington State, Federal Agencies, and/or other agencies/groups that
are required for this proposed development and construction must be obtained PRIOR TO DEVELOPMENT AND
_CONSTRUCTION.-------------------------------------------- ------------------.....-----.............---.._.
* Contractor registration laws are governed under RCW-18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division.There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982.The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
----------------------------------------------------------------------------------------------------------------
* All changes to"approved"building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
-------------------------------------------------------------------------------------------------------------.
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled-to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The
•owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection.This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED.____ _
Whenparcel development requires direct access to state road(s), a Road Access Permit or A* p qApproval must be granted and
approved by the Washington State Department of Transportation. For more information contact Washington State
Department of Transportation, at(206)357.2620, ext. 630.
* When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For any construction which is proposed to be located within 25'of,a Mason
County road right of way, it is suggested to contact that office to review future planned work which may affect your project.
For more information contact Public Works, at(360)427-9670,ext.450 or 100 W Public Works Dr. Shelton. The building
permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled
and approved.
..............................................................................................................
* Retaining walls needed to support a surcharge such as structures, roads,or to support slopes, shall require a separate
building permit and approval prior to construction of the retaining wall.
Printed by:Amber Selby on:04/04/2025 11:35 AM
Page 4 of 5
Mason County
Mason County - Division of Community Development
3Q 615 W.Alder St.
R6 Building 8
Shelton,WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MANUFACTURED HOME BLD2025-00068
Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered.
A.) Drainfield/Reserve requires a 1 Oft setback from all footing/foundations.
B.)Septic tank(s)requires 5ft setback from all footing/foundations.
C.) No foundation/Perimeter Drains within 30ft, down gradient of Drainfield/Reserve area.
D.) No Cut Bank(s)(greater than 5ft and over 45 degrees)within 50ft, down gradient of Drainfield/Reserve area.
-- ------------- -------- ----------------------------------------------------------------------------------
* PLANNING SETBACKS
Setbacks measured from farthest projection of structure
Front: 25'
Rear: 20'
Side: 9' (north)
Side: 5'ADV2025-00019(south)
*Subject to EH Setbacks
----------------------------------------------------------------------------------------------------------
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work°will be complied with whether
specified herein or not. T e granting of it does not presume to give authority to violate or cancel
the provisions ny of er state/ al a gulating construction or the performance of construction.
Issued B .
Contractor or Authorized Agent: Date: Z,Q
Printed by:Amber Selby on:04/04/2025 11:35 AM
Page 5 of 5