HomeMy WebLinkAbout2026-038 - County Road Project (CRP) 2076 Finch Creek Road Improvement Project MASON COUNTY
COMMISSIONERS RESOLUTION NO: aoa 0 033
COUNTY ROAD PROJECT NO. 2076
WHEREAS,on Mason County Road No.45140,known locally as the Finch Creek Road and
more specifically located in Sec. 12,T.22N,R 4W,WM at approximately mile post 0.00 to mile post
0.23;work defined as"construction"in the BARS Manual,Page 11-63,et seq,,is determined to be
necessary and proper; and,
THEREFORE,BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS
that it is their intention to:
Roadway Improvement Project:asphalt overlay,shoulder improvements,and roadway striping.
SAID WORK is to be performed by Contract and/or County Forces in accordance with Washington
State Standard Specifications for Road and Bridge Construction as adopted by Mason County(RCW
36.77.020 and/or RCW 36.77.065 and WAC 136-18).
BE IT FURTHER RESOLVED that the described County Road Project is necessary and
proper,and the estimated costs of said project are herewith set out as follows:
Engineering: S -5,000-
Right of Way S -0-
Construction $ 115,000
The County Road project herein described in HEREBY DECLARED to be a public necessity,and
the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed
thereon as by law,provided and in accordance with RCW 36.75.050,36.80.080 and 36.80.070.
ADOPTED this \5N day of 2026.
fitrnte
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY,WASHINGTON
Pat Tarzwell,Chair
ATTEST:
X'CQJ1J\7C Q çyjir Rand Neatherlin,Vice Chair
McKenzie Smi T,Cler:of the Board
atk
Sharon Trask,Commissioner
APPROVED AS TO FORM:
Tim �.h,.ad Ch
cc: Co.Commissioners
Engineer
JOURNAL: Publ.It: 09/10/2026