Loading...
HomeMy WebLinkAboutBLD2026-00696 - BLD CD Environmental Health Review - 8/24/2026 -" - Site-Plan' U-. Town&Country,A Diction Of P ER MAB I LT. 18'2,Wghway 89 Suite C•Lyme sd,WA 9003)-3181 P10880 060011 After Doing Site Plan:t-Septic and drainfield (]Lot size Dives North Arrow ow i Circle PuyelluP:t253)e40A552•Cheinfn:1388)..'eat Property dimensions )]Sewer lines )I.�Elevation of property AdtNinOslo Headquarters:(425)143-1555 Pf Exti bltlin isn ui s FAx:(425))4-78•840-824-asst bb,, g rL7 Setbacks of proposed 8 existing buildings FI Bodie50101 r er COMredofa Lie.r:TewNCPFOegLT Proposed building Main road with name f(7 Floorplan pemtedn.can,lace000x.convpemadn Z1 Easements FJ Access to proposed building $2 Slopes&Contours(5'increments) Building Proud Curie: Job Nae: y4Lts.5/- / Job Site Address: <r 4,b,A4 . Tax AccountN: 3„ZoA,g y/ q 6��T t Legal Desc Ption G S APPROVED MASON COUNTY DCD PLANNING /95.)t"1 SITE PLAN REQUIRED TO BE ON SITE CHANGES SUBJECT TO APPROVAL By. (0O4 FWhV% Dote.07/14/2026 EH Setbacks Disclaimer: A.) Drainfield/Reserve requires 10'setback from footing/foundations Mason County does not require a survey to obtain a B.)Septic tank(s)requires 5'setback from all foot)ng/foundatlons - building permit.As a result,site plans may not reflect C.)No foundation/Perimeter Drains within 30ft,downgradlent of accurate data.It is the applicant's responsibility to Drainfield/Reserve area comply with setback requirements. N e-sI D.)No Cut Bank�s)�greater than 5ft and over 45 degrees)within 50ff,d4sngradientnf-Bfanfield/Reserve area PLANNING SETBACKS E.)Us approved mitigation from section C1-0 of the department of ecolog's"Criteria For Sewage Works Design,"when sewer Setbacks measured from farthest transp lines are within 106 of water supply f es. _ _ — projection of structure Front: 25' Rear: 20' Side: 20' - ' Side: 7'ADV2026-00077 7.' *Subject to EH Setbacks A EH APPROVED I Rhonda Thompson 08/24/2026 / v I Please be sure to Approved side y rd I protect and/or sleeve t any sewage transport'°' - 1oar 10 setback reduction to lines or RV dumps in C 17'ADV2026-0007 r � I the vicinity - I K' i Ia I $0 / '= 2d` 5eWw Inc--0 �ClnjDOe L-4 o4-5rt.- gep\;c, 1x51 A 7�o S1" �r61Dtp5eC' rp lG i�G`t�nl�! Nv 10 7Gf Fe.�nWW'l>LN /)ym/Oo` EX/ ')'7Nt7 13)cO poID115eJ3ur'/x,415 7 Ze, f cdpose A eZ5 c 70- 1V(.n(evj p�opvse ' DO NOT SIGN INCOMPLETE SITE PLAN! Customer has verified and approved the location of the building,orientation of the building to the North,and verifies that Grid White-Customer Copy Plain White-Office Copy all utilities are shown on this drawing in the correct location. CUSTOMER SIGNATURE LEADS / r'5 t, , 02012 Penns-Bill®industries FR-34 15/2022 1111111 11111 11111111