Loading...
HomeMy WebLinkAboutBLD2026-00480 - BLD CD Environmental Health Review - 6/29/2026 Q - c IO A _ EH APPROVED b4ifo") Rhonda Thompson 06/29/2026 I , flat... r I' EH Setbacks A.) Drainfield/Reserve requires 10'setback from footing/foundations B.)Septic tank(s)requires 5'setback from all footing/foundations C.)No foundation/Perimeter Drains within 30ft,downgradient of Drainfield/Reserve area D.)No Cut Bank(s)(greater than 5ft and over 45 degrees)within 50ft,down gradient of Drainfield/Reserve area E.)Use approved mitigation from section C1-9 of the department of ecology's"Criteria For Sewage Works Design,"when sewer transport lines are within 10ft of water sup lines. tJ iPF y.Y 19 is " ley, " / ioc