Loading...
HomeMy WebLinkAboutCOM2026-00033 SEPTIC LOAD CAPACITY - COM Letters / Memos - 6/5/2026 _______ C3COL1 / / 3 cO QP ao& Cp - ®oa` 3 6/5/2026 Septic Load Capacity To Whom It May Concern, In response to your request, please see below the current distribution of employees assigned to each area and associated septic system at our facility: • [Building A—Septic System A]: 5 • [Building B—Septic System A]:4 • [Building C—Septic System A]: 6 • Building D—Septic System B]: 14 The total number of employees onsite is approximately 29 with personnel distributed across these areas as noted above. Please let me know if any additional information or clarification is needed Sincerely, David Hughes General Manager Jensen Infrastructure JENSENINFRASTRUCTURE 3260 E Johns Prairie Rd. I Shelton, WA 98584 1 253 884 4008 1 www.jenseninfrastructure.com