Loading...
HomeMy WebLinkAboutREV2026-00049 - BLD CD Environmental Health Review - 6/23/2026 IG�JI - 5D - 6G O - O0JLL EH Setbacks -131.1 1 3�8„ A.) Drainfield/Reserve requires 10'setback from footing/foundations DRAIN FIELD B.)Septic tank(s)requires 5'setback from all footing/foundations C.)No foundation/Perimeter Drains within 30ft,downgradient of Drainfield/Reserve area D.)No Cut Bank(s) (greater than 5ft and over 45 degrees)within 50ft,down gradient of Drainfield/Reserve area E.) Use approved mitigation from section C1-9 of the department of ecology's"Criteria For Sewage Works Design,"when sewer transport lines are within 1 Oft of water supply lines. w Z z U W EH APPROVED J W Rhonda Thompson 06/23/2026 fll rn z LO z o in m m SEPTIG TANK w z 1 w g n S Z z 0 U, z U, O DATE: WELL WATER LINE p; 6/23/2026 SCALE: /4 INCH = FOOT SHEET: P-1 165'