Loading...
HomeMy WebLinkAboutBLD2025-01226 Replace Deck - BLD Inspections - 5/6/2026 0Department of Community Development MASON COUNTY 615 W.Alder St.Bldg 8,Shelton,WA 98584 COMMUNITY DEVELOPMENT 360-427-9670 ext.352 Permit Assistance Center,Building,Planning www.MasonCountyWA.gov INSPECTION CARD AND CERTIFICATE OF OCCUPANCY** To schedule an inspection call or visit https:/Imasoncountywa.gov/departments/community_development/building/inspections/index.php Permit Number BLD2025-01226 Date Issued 12/04/2025 Issued By Project REMOVING CURRENT DECK AND REPLACING IN SLIGHTLY LARGER FOOTPRINT. Site Address 30 E FAIRWAY DR Applicant MCKENNEY MICHAEL F Contractor Contractor Phone 2021 Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type Permit Type CARPORTIDECK/COVERED Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. **THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.** PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks - p, Slab Footing Perimeter Point load Footing Footing Interior Footing Decks/Porches `T�.% Foundation Stem Walls Other Rough-In Groundwork Plumbing Framing - ,y Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing Underfloor Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other S� �w (-7 O O J ! ,4d -VAl. a-�o �,�•eA^� .,�- �1 3-?'d610f ' 1 t INSPECTION RESULTS Pagel MASON COUNTY Department of Community Development COMMUNITY DEVELOPMENT 615 W Alder St, Shelton, WA 98584 Permit A�srstance Center,Budding,Planning (360) 427-9670 ext. 352 Application# BLD2025-01226 Application Type CARPORT/DECK/COVERED Owner MCKENNEY MICHAEL F Parcel# 122205500028 Site Address 30 E FAIRWAY DR ALLYN, WA 98524 Inspector Inspection Type Date Status Comments 1-7-26 DED 1)Plans do not accurately depict what is being built onsite. Plans show deck being built flush with home, but footings onsite extend the deck out beyond the home and Dave Dobson FOOTING INSPECTION 01/07/2026 FAIL measurements do not match what is on plans. All changes to plans must be addressed by the engineer of record and be submitted to the Building Department for revision. 2)All footings must be a minimum of 12" below grade to bottom, on undisturbed native soils for frost depth requirements. Mason County Mason County - Division of Community Development 615 W. Alder St. G4 Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov F 5-01226 CARPORT/DECK/ COVERED ESCRIPTION: REMOVING CURRENT DECK AND ISSUED: 12/04/2025 IN SLIGHTLY LARGER FOOTPRINT. ESS: 30 E FAIRWAY DR ALLYN EXPIRES: 06/02/2026 PARCEL: 122205500028 APPLICANT: MCKENNEY MICHAEL F OWNER: MCKENNEY MICHAEL F 30 E FAIRWAY DR 30 E FAIRWAY DR ALLYN,WA 98524 ALLYN,WA 98524 360-917-4261 VALUATIONS: FEES: Paid Due Uncovered Deck 1000.00 $17,000.00 Plan Check Fee $189.65 $0.00 State Fee-Residential $6.50 $0.00 Technology Surcharge $9.63 $0.00 Planning Residential Review $275.00 $0.00 Fee Building Permit Fee $291.77 $0.00 Total: $17,000.00 Totals : $772.55 $0.00 REQUIRED INSPECTIONS Setback Inspection Framing Inspection Footing Inspection BLD-Final Inspection CONDITIONS " All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. Printed by:Anna Schaffran on:12/04/2025 12:02 PM Page 1 of 3 Mason County • Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov CARPORT/DECK/ COVERED BLD2025-01226 * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance contact the Mason County Public Works Department prior to construction at Ext 450 * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the farthest projection of the structure. Front setbacks are measured from the front lot line or road easement boundary, whichever is closer. * All other necessary permits from Mason County, Washington State, Federal Agencies, and/or other agencies/groups that are required for this proposed development and construction must be obtained PRIOR TO DEVELOPMENT AND CONSTRUCTION. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED. * The foundation/footing must be placed on undisturbed,firm-native soil. Proper frost depth, minimum 12 inches, shall be observed below grade in undisturbed soils. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. * Disclaimer: Mason County does not require a survey to obtain a building permit. As a result, site plans may not reflect accurate data. It is the applicant's responsibility to comply with setback requirements. * All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. Printed by:Anna Schaffran on:12/04/2025 12:02 PM Page 2 of 3 Mason County Mason County - Division of Community Development 615 W. Alder St. �IQN`CpO Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov CARPORT/DECK/ COVERED BLD2025-01226 I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other sta a/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: Date: ! . /o uT l 2,S' Printed by:Anna Schaffran on:12/04/2025 12:02 PM Page 3 of 3 INSPECTION RESULTS Pagel MASON COUNTY Department of Community Development 0 COMMUNITY DEVELOPMENT 615 W Alder St, Shelton,WA 98584 Permit A idr,6.Piamm�g (360) 427-9670 ext. 352 Application# BLD2025-01226 Application Type CARPORT/DECK/COVERED Owner MCKENNEY MICHAEL F Parcel# 122205500028 Site Address 30 E FAIRWAY DR ALLYN, WA 98524 Inspector Inspection Type Date Status Comments 2-20-26 DED 18"x18"x10"footing to be added between existing posts. Provide photos at framing inspection) 1-7-26 DED Dave Dobson FOOTING INSPECTION 02/20/2026 FAIL 1)Plans do not accurately depict what is being built onsite. Plans show deck being built flush with home, but footings onsite extend the deck out beyond the home and measurements do not match what is on plans. All changes to plans must be addressed by the engineer of record and be submitted to the Building Department for revision. 2)AII footings must be a minimum of 12" below grade to bottom, on undisturbed native soils for frost depth requirements. INSPECTION RESULTS Pagel MASON COUNTY Department of Community Development COMMUNITY DEVELOPMENT' 615 W Alder St, Shelton, WA 98584 Permit Assistance Center,Building,Planning (360)427-9670 ext. 352 Application # BLD2025-01226 Application Type CARPORT/DECK/COVERED Owner MCKENNEY MICHAEL F Parcel # 122205500028 Site Address 30 E FAIRWAY DR ALLYN, WA 98524 Inspector Inspection Type Date StatusjL Comments 3-9-26 DED D Dave Dobson FRAMING INSPECTION 03/09/2026 FAIL Blocking required above beam, between all joists. Framing and Final inspection can be conducted in one site visit. Make correction, complete the project, and then call for Final inspection.