HomeMy WebLinkAboutBLD2025-01236 Windows - BLD Inspections - 4/28/2026 Department of Community Development
MASON COUNTY 615 W.Alder St.Bldg 8,Shelton,WA 98584
COMMUNITY DEVELOPMENT 360427-9670 ext.352
Permit Assistance Center,Building,Planning www.MasonCountyWA.gov
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY**
To schedule an inspection call or visit
https://masoncountywa.gov/departments/community_developmenVbuilding/inspections/index.php
Permit Number BLD2025-01236 Date Issued 11/24/2025 Issued By
Project CHANGING OUT 2 WINDOWS
Site Address 520 SE CRESCENT DR
Applicant Ringering,Kelvin
Contractor
Contractor Phone
2021 Primary Code UPS IBC,IRC,IFC,IEC,IMC,& Type
Permit Type ADDITION OR REMODEL- Occupancy
RESIDENTIAL
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
**THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building
Department Building Official: Community Services Designee
Concrete Setbacks Slab
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing 3.
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls -3,a(P �n Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building
Manufactured Setbacks Setup
Home
Concrete Foot/Runners Final
Other
MASON COUNTY
INSPECTION RESULTS Pagel
Department of Community Development
COMMUNITY DEVELOPMENT 615 W Alder St, Shelton, WA 98584
Permit Assistance Center,Building,Planning (360)427-9670 ext. 352
Application# BLD2025-01236 Application Type ADDITION OR REMODEL- Owner NETTLE REID B & KELLY A
RESIDENTIAL
Parcel# 319045000026 Site Address 520 SE CRESCENT DR SHELTON, WA
98584
Inspector Inspection Type Date Status Comments
4-28-26 DEC
PROVIDE L&I FINAL INSPECTION RESULTS.
Drew Carlson BLD-FINAL INSPECTION 04/28/2026 FAIL EMAIL RESULTS AND INCLUDE PERMIT#, NAME ON PERMIT AND ADDRESS.
DREWC@MASONCOUNTYWA.GOV
PROJECT WILL FINAL WHEN I CONFIRM RECEIPT OF EMAIL
!� f1
7�� T
Mason County
Mason County - Division of Community Development
615 W. Alder St.
�i�N`C1� Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
B DD2025-01236 ADDITION OR REMODEL-
RESIDENTIAL
PROJECT DESCRIPTION: CHANGING OUT 2 WINDOWS ISSUED: 11/24/2025
SITE ADDRESS: 520 SE CRESCENT DR SHELTON
EXPIRES: 05/23/2026
PARCEL: 319045000026
APPLICANT: Ringering, Kelvin OWNER: NETTLE REID B &KELLY A
19111 Old Ranch Ln SW 13730 15TH AVE NE, UNIT A303
Rochester,WA 98579 SEATTLE,WA 98125
3605453082
VALUATIONS: FEES: Paid Due
Project Valuation (BID, 5200.00 $5,200.00 Technology Surcharge $5.06 $0.00
ESTIMATION..) State Fee-Residential $6.50 $0.00
Plan Check Fee $97.00 $0.00
Building Permit Fee $156.00 $0.00
Total: $5,200.00 Totals : $264.56 $0.00
REQUIRED INSPECTIONS
Framing Inspection BLD-Final Inspection
Insulation Inspection _ T
CONDITIONS
" All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
.------—------ ------------- ------------------------ -------—---------------------------
Printed by:Genie Mcfarland on:11/24/2025 03:49 PM
Page 1 of 4
Mason County
� r Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
ADDITION OR REMODEL- RESIDENTIAL BLD2025-01236
A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit
application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the
responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that
Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement
of any development activities. *NOTE if Stormwater Management option "A" was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel
Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the
development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other,
parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final
inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater
management system have been installed as approved on the stormwater site plan. Under the requirements of Mason County
Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior
approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed.The Building
Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit
expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being
taken.
* Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site
plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
----------------------------------------------------------- -----------..-
Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Code 14.28 and 14.17.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED.
-------------------------------- ------ --- ---------
Printed by:Genie Mcfarland on:11/24/2025 03:49 PM
Page 2 of 4
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
ADDITION OR REMODEL- RESIDENTIAL BLD2025-01236
* Carbon monoxide alarms, listed as complying with UL 2075 shall be installed in accordance with manufacturer
specifications and in accordance with IRC Section R315.
Alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms and on each level
of the dwelling.
EXISTING DWELLINGS shall be equipped with carbon monoxide alarms when alterations(including addition or alteration of
fuel burning appliances), repairs, or additions requiring a permit occur, or when one or more sleeping rooms are added or
created.
* Before renovating or remodeling activities in pre-1978 residential buildings or child occupied facilities and to ensure your
compliance with applicable Washington lead regulations, contact the WA State Department of Commerce Lead Paint
Program at; (360) 586-5323 or email Ibpinfo@commerce.wa.gov. Visit www.commerce.wa.gov/lead for further information.
* Disclaimer: Mason County does not require a survey to obtain a building permit.As a result, site plans may not reflect
accurate data. It is the applicant's responsibility to comply with setback requirements.
* Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* All other necessary permits from Mason County, Washington State, Federal Agencies, and/or other agencies/groups that
are required for this proposed development and construction must be obtained PRIOR TO DEVELOPMENT AND
CONSTRUCTION.
* Adopted Washington State Energy Code Compliance has been approved as follows:
Heat Type: Electric or other than electric, Compliance Method: Prescriptive option Marine-4C, Window(Max U-
Factor):0.30, Skylight(Max U-Factor):0.50, Doors (Type/Max U-Factor):0.30 or less, Wall insulation R-20+5ci, Floor
insulation R-30, Ceiling Insulation min. R-60, Vault Insulation R-38, and Slab Insulation R-10.
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the farthest projection of the
structure. Front setbacks are measured from the front lot line or road easement boundary, whichever is closer.
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee(refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
Printed by:Genie McFarland on:11/24/2025 03:49 PM
Page 3 014
C Mason County
Mason County - Division of Community Development
615 W. Alder St.
NCO
8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
ADDITION OR REMODEL- RESIDENTIAL BLD2025-01236
Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to
the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of
the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In
addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: ' ' Date: / / - 2 `/ ` Z5
Printed by:Genie Mcfarland on:11/24/2025 03:49 PM
Page 4 of 4