Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SWG2025-00189 - SWG As-Built - 4/28/2026
Mason County OSS Installation Report pg. 1 MASON COUNTY PUBLIC HEALTH APPLICANT! PERMIT INFORMATION Permit Number SWG 2025-00189 Parcel # 61902-51-00050 Applicant Name Becky Reiser Subdivision (Name/Div/Block/Lot) Applicant Address 2041 Little Hanaford Rd City, State, Zip Centralia,WA 98531 Installer Name House Brothers Site Address 91 W Huckleberry Ct Designer Name Becky Reiser INSTALLATION CHECKLIST © Full System Installation ❑Tank(s)Only ❑ Drainfield Only ❑ Repair ❑Other System Type pressure retreatment Type >5 ft.from foundation? - - ` , - - ❑ N/A ®YES ❑ NO >50ft.fromwells? - - - - - - - - - - - - - - --- - - - ❑ I ❑ >50ft.fromsurfacewater? - - - - - - - - - -�` - - - ❑ 0 ❑ z >�ti Cleanout between building and tank? - - - - - - - - - - - ❑ Q ❑ CJ Tank baffles present? - - - - - _ - - - - - - - - - - - ❑ ii I— 24" access risers over each compartmen - - - - - - - - - - - - ❑ © ❑ W Effluent filter installed?- - - - - - - - - - - - - - - - - - - - - • �� - - ❑ © ❑ Septic tank capacity(working) 1200 gal Manufacturer HB Precast 0 D-box water level and speed levelers used? - - - - - - - - - - - - - - - © N/A ❑YES ❑ NO DO Manifold/D-box accessible from surface?- - - - - - - - - - - - - - - - - 0 ❑ ❑ mZ Check valves installed? - - - - - - - - - - - - - - - - - - - - - - - - -- Ii ❑ ❑ 0Q 2 Transport Line Size 1.5" Schedule/Class Schedule 40 Bedrooms installed (check one) ❑ 2 0 3 ❑4 ❑ 5 ❑6 ❑Commercial/Other >10 ft. from foundation?- - - - - - - - - - -- - - ❑ N/A DYES O N 0 >100ft.fromwells?-- - - - - - - - - - - - - - - 0 ® ❑ W >100ft.fromsurfacewater? - - - - - - - -c - - - - - jM� ❑ yr Y M >10 ft.from potable water lines?- - - - - - - ff �n - 0' ® ❑ z >5 ft.from property lines and easement �AS0�-COUNTY ENVIRONII��I��� �u ® ❑ > 30 ft.from downgradient curtain/foundation drains. - - - -O - HEAL❑ ® ❑ Drainfield level and observation ports present - - - - - - = ❑ 0 ❑ ❑ Graveless chambers or 0 Clean gravel used? (check one) Proper cover installed over drainfield?- -- - - - - - - - - - - - - - - -- ❑ © ❑ Pump tank setbacks consistent with septic tank?-- - ---- - - - - - - ❑ N/A I YES ❑ NO Z Pump tank capacity (flood) 1250 gal Manufacturer HB Precast z 24" access riser(s)and accessible from surface?- - -- - - - - - - - -- ❑ II ❑ H Alarm or Control Panel Installed? - - - - - - - - - - - - - - - - - - - ' - ❑ II Control Panel equipped with Timer/ ETM/Counter - - - - - - - - - - ❑ 0 ❑ d Pump installed in ❑ Bucket or ® On Block or ❑ Other Pump Make/Model Liberty 290 © Floats or ❑ Transducer Tank draw down 2 in/min Pump capacity S y gpm Squirt Height 5 ft Pump on time Ii 5 r✓I.A O n Pump off time I1ov rs o Daily flow set at 360 gpd Updated 8121/2018 Mason County OSS Installation Report pg. 2 Parcel# 61902-51-00050 ABANDONMENT RECORD Were existing septic components abandoned as part of this project? -- - - -- - - - - -- - -- ❑ YES ❑N NO If yes, please describe: Were all components pumped out and properly abandoned per WAC246-272A-0300? - - - - - - -- ❑ YES ❑■ NO RECORD DRAWING This Is a permanent record and must be accurate and descriptive enough to re-locate In the need of maintenance activities and future development Typical Record Drawings contain: Drainfield&manifold orientation&layout,Septic/pump tank location.North arrow,reserve drainfieid,existing and proposed buildings,location of wells,waterlines, wells,observation ports,cleanouts,and other maintenance access points. Incomplete Record Drawings may create additional delays in final installation approval and related permits. FEB 0 5 2n2 MASON COUNTY ENVIRONMENTAL HEALTH ❑ Record Drawing Attached CERTIFICATION OF INSTALLATION INSTALLER DESIGNER/ENGINEER I certify that I installed the system in accordance with I certify that the system has been installed in accor- the septic design stamped"APPROVED"by Mason dance with the septic design stamped"APPROVED"by County Public Health and that any deviations shown Mason County Public Health and that any deviations here have been cleared/approved by both the designer shown here have been cleared/approved by both and Mason County Public Health and meet all State myself and Mason County Public Health and meet a/l and Mason County Codes. State and Mason County Codes I further certify that all information contained on this I further certify that all information contained on this fori and attached Record Drawing is accurate. form and attached Record Drawing is accurate. 12/16/25 SiraAature of Installer Date Joe House ��.• .�� Printed Name of Signee .. of W H/ • MASON COUNTY PUBLIC HEALTH The undersigned approves this Installation Report and Record Drawing on behalf of Mason County Public 5100369 •';� Health: Q,' Becky J. Rieger (� G 02.04.2026 EXPIRES 07/13/" Signature f E v mental Health Specialist Date (stamp, signature and date) THIS FORM MAY BE SCANNED AND AVAILABLE FOR PUBLIC VIEW ON THE MASON COUNTY WEB SITE Updated 6/21/2018 Environmental Design, LLC. Septic Design® Wetlands e Site Planning @Excavation 2041 Little Hanaford Road, Centralia, WA 98531 Phone:(360)219-3343 February 04, 2026 Dear Davis Family, Congratulations on the completion of your On-Site Wastewater System. Environmental Design, LLC is pleased to present you with the Record Drawings of your system and some general information about your new system. Enclosed in this packet you will find the following: o General Information About Your System o Septic System Maintenance & Recommendations o Contact Information for you Designer, Installer and Local Health Jurisdiction o Record Drawings o Pictures of During and After Installation We have also included an insert from the Department of Health about Pressure Distribution Systems. A copy of your Record Drawings have been submitted to Mason County for their records. It has been a pleasure working with you and we hope this information finds you well. If questions or concerns arise please do not hesitate to contact us. Sincerely, &c4 ,469e Licensed Designer Wetland Specialist • About Your System Your system is called a Pressure Distribution Bed Drainfield.This means that you have two tanks, a pump,a panel and a bed with laterals. From the house the effluent will travel to the Septic Tank where it will be treated and travel into the Pump Chamber.The Pump is set up to a control panel that has been programmed to come on and pump for a certain amount of time.As the pump comes on it pumps the treated effluent through a Transport Line to the Laterals in the drainfield.The Drainfield consist of PVC lines that are covered with a gravelless technology known as a chamber.The PVC lines have small holes spaced out at a set dimension that allows the treated effluent to be disposed into the chamber and continue its treatment process in the soil.At the end of each Lateral is a Clean-Out to be used for Operation and Maintenance.There is also an Observation Port which is used to check the system during Routine Maintenance and for observation when troubleshooting the system if issues arise. Septic System Maintenance & Recommendations Now that the system is installed it is important now to learn how to maintain and keep a healthy system. The first step in keeping a system healthy is knowing what is good for it and what is not. Here are a few things to keep in mind with your septic system: 1. Know the location of the drainfield and the components of the system. It is important that you,the homeowner, know where these are located so the system parts are not driven over (unless they have been designed and installed with that in mind), is not built over and for maintenance purposes. Some Drainfield systems can be landscaped on, however; the use of landscape plastics to keep weeds from growing should not be used. 2. Watch your water consumption.There are many water saving devices and appliances on the market today to help with this. It has been seen that too much wastewater in the system can cause system failure so it is important to be aware of how much is going into the system. 3. Inspect your Septic Tank and Pump Chamber at least once a year.This inspection can be done by the homeowner or by a Septic Professional.When inspecting the tank not only does everything want to be checked to see if it is functioning well, but also this is a good time to hose off the effluent filter. 4. Pumping the system. It is recommended that a Septic Tank be pumped every 3 to 5 years.This is important to keeping your septic healthy and knowing if it is functioning properly. A Septic Professional will also be able to help you with your pumping schedule. 5. Limit use of garbage disposals.This places solids in the septic tank that are hard to break down. 6. Do NOT use septic additives, dispose of hot tub water, or put strong chemicals down the drain as use of these can disrupt the growing of the good bacteria in the system. 7. Do NOT flush solids such as diapers,tampons, cigarette butts, condoms,grease and coffee grounds as these can cause harm to the system. 8. Direct water from downspouts and roofs away from the septic tanks and drainfield. It is recommended that a pumping schedule be contracted with a Pumping Professional.This will help to sustain the life of your system.There are also Septic Professionals which offer Operation and Maintenance programs,which is a service that will include the inspection of your system and the repair if needed. It is important to ask what is included in this service as each can vary. 1 11 :• • •1 111 , 5S • (,� ti+-.t.��'.u"ya. "i- �*` n• "'���-yam,^�+L. 1. �,���� �.� ?E--"..r qty G'.•. s .t •`��#' � '`�'�`' a "`'�"'�`"�-,�tc.��s`;',�`�",.°' .L� 'u�'�`�'��p.y�2.S . .:-td' ` '�n�„ F �` •�S, �����'n.P`f'�� �.� .L'736.a•R�v.C„ '^w.,t r ra ,t �''�- � �'"4��s r.:' �i• .�, 1. n-, .c a-5 v. �. _i'. t;fx' .'r'g tl .� w•r r+ '� �V' +y1Y, +A" ,Y�t Y,'5.'?.� - Nr �-. `z ,,y�� 1 y i,a. I' _t .7. �t1 t"�acer�"'Y.• "'ate ''•,cti `Z�-�t(' 'q� .rrr �.# f� � x 4 ✓Se -0d' �bc(cp t t72.'•1.,..4 _�E t� y�..?i v� �4��' .✓ �f, ,.�� s �. > -FY`\� Y -"".'3 v.i ak3 r i= o rte. (6�! ti, t s"mss y\�aa c t,��gt,�y, i�! �I$ �L` v` f jf j•. _ �t ..u�a.,..y a. si^,,3�s•�' .,�� 'r�-qtr,r x`'^ `.�7 .�r`c y �3fik. '--•� ry' ,b. wt` ?i^-�2`t�,,,,3r-'� ,a-r ''�-ir'k to 7 � '� ���4 y�'''+•�`�`tt' ,.a�, .C� � � �.a�'a r.$`";-.KtKTr sti �'as ``9`�s^,t. ` y.x c r'� L'' .�*•r.�'�e�' x Ft `a„ .. ry }:..�s:r�a".,'s ,..v- �'(w'q°..i✓t,Y. r »: r � v ,mss 3�.'h e-si�g,., � � 'f s-�.+�'�.d'�•a.��'�l v,,stN x/y�'!1�r ,.+4�f' t•ti.�.7 n rx y��t'4 �t�X'�•s�-��.w`+r-,Z,•4 ,_�t�; �� '�-dr r -' Pik cr� S � � r'6 b*J'• i'rr4�iq z ^T a -a� 3� <•�y`Z �-.� � �s� <,�rdr.Ti -�`j YYpr s� �31i.+ti t Y� �'� �3 Y�">$i L°v ,�Jt'` \ i''•._ �o`,,, pfd �yyy3 p° Tay yx7(,✓�y�� �id.J4'� r �y r �. `.,�� „�c e � y+(�- t! h� Y I'^•�� 3 4 fgJr."Q9 !MLI 1 `*,"�',,�` 'd�',,SF.- s i.E.•'YnT:.t�rpr�z � l�cri 'riy+,�h'.-. 4;f�-,�a�i-��� �''e ''� 'r-C..-s.r,..-4:..r'P' - . 118.1 7' Environmental Design, LLC. 'RECORD DRAWING Septic Design e Wetlands • Mapping �,- 2041 Little Hanaford Road• { Centralia, Wa. 98531 S ,(.360)219-3343 EXISTING GARAGE ' LEGEND . HUB EIEV / N. . ® TEST P1T PROPOSED 3-BEDROOM ' ./ Q. EXISTING WELL RESIDENCE _ • Q PROPOSED WELL S - 1PW /- • ,. a C POWER PWR EXISTING SEPTIC TANK . ``r• STUMP EXISTING PUMP CHAMBER / �����1VIR�NME 0 20 40 ©N G0 jaw 1" = 20 FT RECORD INFORMATION i'- TANK MANUFACTURER: HB PRECAST TANK SIZE: 1200 GALLONS PUMP CHAMBER SIZE: 1250 GALLONS PUMP MANUFACTURER: LIBERTY • /-'' O MODEL # AND SIZE: 290 - ELECTRICAL PANEL: RHOMBUS MODEL: IFS FLOATS: SJE RHOMBUS #2731 EFFLUENT FILTER: ORENCO 4" BIOTUBE ,�poF / , 'o DRAWDOWN: 2 INCHES / 1 MIN N. ' TIMER SETTINGS: 1.5 MIN ON / 4 HRS OFF _ - . - • - • - INSTALLER: HOUSE BROTHERS EXISTING 10 x 38 FT BED SYSTEM -. ': .Fr:• 5100369 '•7 Becky J.Rieger 5. I 02 04.2026 PROPOSED RESERVE AREA / �E ' . - . - . - . - CLIENT NAME: RON DAVIS ' MAILING ADDRESS: 91 W HUCKLEBERRY COURT ELMA,WA 98541 EXISTING DRIVEWAY �' • O.. � / PHONE NUMBER: 253.882.5110 SITE ADDRESS: 91 W HUCKLEBERRY COURT,ELMA • - PARCEL NUMBER:61902-51-00050 S-T-R:0249N-06W / PERMIT NUMBER: DRAFTED BY: BJR JOB NUMBER:2025-002 PAGE 1:OF1. / M- REVIEWED BY: BJR DATE:02.04.2026