Loading...
HomeMy WebLinkAboutBLD2026-00286 - BLD CD Environmental Health Review - 4/17/2026 a5 - EXISTING WELL ON ADJACENT LOT LEGEND BLD2026-00286 AT WEST 50 SADLER HILL ROAD EL+3C2.00' ., *NOT AN APPROVED SEPTIC DESIGN* —— -- PROPERTY LINE CA I IBER Use approved septic design for septic system installation SEPTIC DESIGN 10'NO-BUILDZONE Feasibility-New Construction-Repair — 30'STORMWATER ZONE 165 Tupleo Way Poulsbo,WA 98370 L360.509.7900 AT TIME OF INSTALLATION.THE INSTALLER SHALL VERIFY THE s WELL SETBACK TO GUEST HOUSE SEWAGE TANKS •EL*289.00' . _. / c... - 4 M d-] �� ��� A / PLAN NOTES / / 1.THIS IS NOT A SURVEY. SITE FEATURES. PROFESSIONAL STAMP 3� 3e°po TOPOGRAPHY ELEVATIONS.AND BENCHMARKS ARE BASED ON DATA PROVIDED BY THE / ��� �� � ) S� OWNER.STATE AND LOCAL GIS DATA.AND ARE / INTENDED ONLY FOR THE REVIEW AND - / CONSTRUCTION OF THE PROPOSED ONSITE / _ \ . > APPROVED WASTEWATER TREATMENT SYSTEM DESIGN.CALI '` (,_ N I / j - I / MASON COUNTY DCD PLANNING THATBERCENSEDPROFESSIONALLAN SEPTIC DESIGN LLC IDNDS OC, e SITE PLAN REQUIRED TO BE ON SITE SURVEYOR ALWAYS BE USED TO SET t @y J-1 CHANGES SUBJECT TO APPROVAL CORNERS.ESTABLISH LOT LINES AND- /< rr 4' 5 / ryc,� \'�j VALIDATE ELEVATIONS. y 21097126 q By: ff 41� Date:03/31/2026 CSRICHARD L BAZZEi, / / 2.PRESCRIPTPIE FLOW CONTROL MEASURES '!CENSED RESIGNER / ^ / PRESCRIPTIVE FLOW CONTROL MEASURES ARE 1CSZSSSX ttti cSiiXC Disclaimer: TO BE DESIGNED BY LICENSED INDIVIDUALS IN / / Mason County does not require a survey to obtain a ACCORDANCE WITH APPLICABLE STATE AND /O building permit.AS a result,site plans may not reflect LOCAL REGULATIONS THE DEPICTION OF THE RE`/IE'NSTAh1P -PITC� � / accurate data. It is the applicant's responsibility to ILLUSTRATIVE ATV THIS AND DIP PLANNING DESIGN IS FRR . +328.00'( ILLUSTRATIVE PLANNING PURPOSES ONLY �q�,,// /^ comply with setback requirements. AND SHALL NOT BE CONSTRUED AS A FINAL \ \V/ ?Pj^ \> / I RR5 Zoning SOLUTION TO STORMWATER MANAGEMENT t I PA < ��� t' / ;NSET SD J Front Yard Setback. 25'. \,�� '�� . ;:332 �/ Side& Rear Yard Setbacks. Residential dwelling \ ! and accessory structures is 20'. I� �/ OR 10% width of lot if not more than 100' wide ®-- OR approved ADV \\ \\ XS- Project: - \ / EH SETBACKS Seth Homan / A)Drainfield/Reserve requires 10'setback from footing/foundations B)Septic tank(s)requires 5'setback from all footing/foundations C)No foundation/perimeter/curtain drains within 30'down-gradient or 10'up-gradient ;.., of drainfield or designated reserve drainfield area \ D)No cut(s),bank(s)(greater than 5'&over 45 degrees)within 50'down-gradient of / drainfield/designated reserve drainfield area / ti1, E)No septic components within 10'of pressurized water line(s).Sewer transport line Date: April 26,2024-_ may only be within 10'of a pressurized water supply line if approved by the local Sheet Name health officer and the line is constructed JAW section C1-9 of the DoE"Criteria For Sewage Works Design". - Overall Site Plan / IEHPROVED 3-bedroom SFR \ / \ �.Anderson 04/17/2026 Sheet Number SITE PLAN ®-2 •328.00' =90'-0 0 5' 10' 20' PAGE 2 OF 5 LEGEND PROPERTY LINE SEPTIC CALIBER DESIGN — — 10'NO-BUILD ZONE Feasibility-New Construction-Repair PROPERTY LINE 15-0 X 30'-0"RECREATIONAL -- - - --- 30 STORMWATER ZONE 165 Tupleo Way VEHICLE Poulsbo,WA 98370 TN 1�TFST CL=_vc t.360.509,7900 SEPTIC TANQ z TEST HOLE / SC-4 :SEE SCIL E/AW AT'CN PROF LES TRANSPORT LINE TO BE SLEEVED PROPERTY CORNER Co,� BELOW DRIVEWAY V;L EAC ---. WATER SUPPLY WELL �RCTECT�VE BARRIER / - . - .- -a ��� WATER LINE cO- q POWER LINE- _ o CLEANOUT Frygr \, NCO PLAN NOTES WELL PROPOSED THREE 1.THIS IS NOT A SURVEY SITE FEATURES, PROFESSIONAL STAMP BEDROOM PRIMARY CO TOPOGRAPHY.ELEVATIONS.AND BENCHMARKS R 100-0" DWELLING SEPTIC 1 ARE BASED ON DATA PROVIDED BY THE TANK SD-3 OWNER,STATE AND LOCAL GIS DATA.AND ARE INTENDED ONLY FOR THE REVIEW AND CONSTRUCTION OF THE PROPOSED ONSITE NASTEWATER TREATMENT SYSTEM DESIGN. CALIBER SEPTIC DESIGN LLC RECOMMENDS THATALICENSEDPROFESSIONALLAND ` I ti „'+� SURVEYOR ALWAYS BE USED TO SET � CORNERS.ESTABLISH LOT LINES,AND VALIDATE ELEVATIONS. 8r' 21037126 1 RICHARD L BA22E,.. POWER LINE 2.PRESCRIPTIVE FLOW CONTROL MEASURES :ICEWSED t1FSIGt+ER PRESCRIPTIVE FLOW CONTROL MEASURES ARE TO BE DESIGNED BY LICENSED INDIVIDUALS IN ACCORDANCE WITH APPLICABLE STATE AND POWER METER 10'NO BUILD ZONE LOCAL REGULATIONS THE DEPICTION OF THE [ I-PIT ON THIS SEPTIC DESIGN IS FOR RE'/IEN STAMP EXISTING I ILLUSTRATIVE AND PLANNING PURPOSES ONLY DECOMPOSED AND SHALL NOT BE CONSTRUED AS A FINAL ��Q STUMP SOLUTION TO STORMWATER MANAGEMENT �Q� // PRIMARY DRAiNFIELD 2 f33-X 65' 2.145 SQ.FT 1 SD-4 THZ' RESERVEDRAINFIELD SOIL EVALUATION PROFILES / Y! \ 133 X 65 2.145 SQ.FT. / . SOIL EVALUATION DATE.MARCF'2022 PROPOSED DRIVEWAY REQUIRED TO MAINTAIN A 10'-0' / THE 1 0-5" organic overburden SET BACK FROM ONSITE SEPTIC SYSTEM COMPONENTS / (PRIMARYI 5"-33" GFSL w%pockets of EG / Rest at 33" w/till TH/1 z ,y / TN e2 0.5" organic overburden Project: / (PRIMARY) 5"-31" FSL . // / \ Rest at 30" w/till Seth Homan m \ / / TH3 THP3 0-6" organic overburden { \ / // \ (RESERVE) 6"-27" FSL / � Rest at 27" w/till / / 10 64 0-3" organic overburden / (RESERVE) 3"-27" FSL Rest at 27" w/till Date: April 26,2024 rH4` \ /� 10'NO BUILD ZONE Sheet Name \ PROPERTY LINE Inset Sheet Number INSET PLAN S®�3 s' • zo' N PAGE 3 OF 5