Loading...
HomeMy WebLinkAboutBLD2023-00390 Expired SFR - BLD Inspections - 4/20/2026 MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584 COMMUNITY SERVICES SHELTON:360-427-9670,EXT 352 BELFAIR:360-275-4467,EXT 352 Budding,Planning,Env'ronmental Heath Communily 1lealth ELMA:360-482-5269,EXT 352 www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY** To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bld-inspection.php Permit Number BLD2023-00390 Date Issued 08/16/2023 Issued By {11 Project NEW SFR Site Address 860 NE TAHUYA RIVER RD Applicant HOSS WARREN&MARTHA Contractor Contractor Phone Primary Code 2018 IBC,IRC,IFC,IEC,IMC,& Type Permit Type NEW SINGLE FAMILY RESIDENCE Occupancy -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. **THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.** PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks 01- ..73 p Slab Footing Perimeter Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls V Other Rough-In Groundwork Plumbing Framing -3o-2S pe0 Groundwork Mechanical Plumbing L4/tfZ LE Groundwork Gas Pipe Mechanical -1S De0 Gas Piping -Q.25 ! Shear Wall Nailing Underfloor . , Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls $-(2- Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other MASON COUNTY INSPECTION RESULTS Pagel Department of Community Development COMMUNITY DEVELOPMENT 615 W Alder St, Shelton, WA 98584 Permit Assistance Center,Building,Planning (360)427-9670 ext. 352 Application# BLD2023-00390 Application Type NEW SINGLE FAMILY Owner HOSS WARREN & MARTHA RESIDENCE Parcel # 322127600050 Site Address 860 NE TAHUYA RIVER RD TAHUYA, WA 98588 Inspector Inspection Type Date Status Comments 4/11/25 SCS "L Per detail 27/SD-1 Simpson A-35's @ 16" OC need to be installed above top plate to rim board supporting exterior roof. IQ, Fire caulking is to be installed at all top and bottom plate penetrations. Exterior wall penetrations are to be sealed. Hold Downs nuts need to be tightened. "X" marked on stud near hold downs. Caulk and seal of exterior bottom plate not completed. Install CS-16 Strap on top plate in downstairs bathroom. Stephen Scott FRAMING INSPECTION 04/11/2025 FAIL 7. Install gas piping and have system under test for reinspection. Install gas Fireplace and vent to outside. \Install exhaust duct for bathroom fan in downstairs bathroom. Install cooking stove exhaust vent. 11. DTT2Z for deck railing needs to be installed. (Note: Homeowner explained DTT2Z will not be installed until Deck Railing is installed. He will provide pictures or building inspector can verify install at later inspection.) Please call for reinspection once the corrections have been made. 0 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov B DD2023-00390 NEW SINGLE FAMILY RESIDENCE PROJECT DESCRIPTION: NEW SFR ISSUED: 08/16/2023 SITE ADDRESS: 860 NE TAHUYA RIVER RD TAHUYA EXPIRES: 02/12/2024 PARCEL: 322127600050 APPLICANT: HOSS WARREN&MARTHA OWNER: HOSS WARREN &MARTHA 35433 26TH AVE S 35433 26TH AVE S FEDERAL WAY,WA 98003 FEDERAL WAY,WA 98003 206-979-4604 VALUATIONS: FEES: Paid Due R-3 VB Residential, one- 1700.00 $282,336.00 Building Permit Fee $2,251.20 $0.00 and two-family Technology Surcharge $75.39 $0.00 Covered Deck/Carport 293.00 $6,446.00 Plumbing Fees $140.00 $0.00 State Fee-Residential $6.50 $0.00 Plumbing Base Fee $25.00 $0.00 Building Plan Review/Change of $130.00 $0.00 Use-Onsite Sewage Planning Review Fee $240.00 $0.00 Mechanical Base Fee $30.00 $0.00 Plan Check Fee $1,463.28 $0.00 Mechanical Fees $269.00 $0.00 Plan Check Fee ($1,463.28) $0.00 Building Plan Review/Change of ($130.00) $0.00 Use- Onsite Sewage Planning Review Fee ($240.00) $0.00 Planning Review Fee $240.00 $0.00 Plan Check Fee $1,463.28 $0.00 Building Plan Review/Change of $130.00 $0.00 Use- Onsite Sewage NSF-CHECK FEE $40.00 $0.00 Total: $288,782.00 Totals : $4,670.37 $0.00 Printed by:Annie Wilson on:08/16/2023 10:04 AM Page 1 of 8 0 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2023-00390 FIXTURES (qty Mechanical Fixtures (qty Plumbing Fixtures 1.0000 Gas Outlet(s) (1-5) 1.0000 Number of Clothes Washers 1.0000 Dryer Vent(s) 1.0000 Number of Dishwashers 1.0000 Kitchen Exhaust Hood(s) 1.0000 Number of Showers 1.0000 Furnace(s) 1.0000 Number of Water Heaters and or Vent 1.0000 Heat Pump(s) 2.0000 Number of Hose Bibs 1.0000 Propane Tank(s) 2.0000 Number of Bath Tubs 1.0000 Wood/Gas/Pellet Stove(s) 2.0000 Number of Kitchen Sinks 4.0000 Spot Vent Fan(s) 3.0000 Bathroom Sink 3.0000 Number of Toilets REQUIRED INSPECTIONS Setback Inspection Rough- Plumbing Inspection Footing Inspection Mechanical Inspection Foundation Wall-Pre-Pour Inspection Gas Piping Inspection Underfloor Inspection Insulation Inspection Shearwall Inspection Connection has been verified by Health or Utilities Framing Inspection BLD-Final Inspection CONDITIONS All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. Printed by:Annie Wilson on:08/16/2023 10:04 AM Page 2 of 8 0 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2023-00390 * A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. * All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. * The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of the Mason County Fire Marshal. * Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. * All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. Printed by:Annie Wilson on:08/16/2023 10:04 AM Page 3 of 8 0 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2023-00390 * Adopted Washington State Energy Code Compliance has been approved as follows: Heat Type: Electric or other than electric, Compliance Method: Prescriptive option Marine-4C, Window(Max U- Factor):0.30, Skylight(Max U-Factor):0.50, Doors (Type/Max U-Factor):0.30 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation min. R-49, Vault Insulation R-38, and Slab Insulation R-10. 2 Heat pump 1.3 Prescriptive compliance is based on Table R402.1.1 with the following modifications: Vertical fenestration U = 0.28, Floor R-38, Slab on grade R-10 perimeter and under entire slab below grade slab R-10 perimeter and under entire slab or Compliance based on Section R402.1.4: Reduce the Total conductive UA by 5% 2.2 Compliance based on Section R402.4.1.2: Reduce the tested air leakage to 2.0 air changes per hour maximum at 50 Pascals or for R-2 Occupancies, optional compliance based on Section R402.4.1.2: Reduce the tested air leakage to 0.25 cfm/sf maximum at 50 Pascals and All whole house ventilation requirements as determined by Section M1507.3 of the International Residential Code or Section 403.8 of the International Mechanical Code shall be met with a heat recovery ventilation system with minimum sensible heat recovery efficiency of 0.65. 1 3.5 Air-source, centrally ducted heat pump with minimum HSPF of 11.0. 4 5.1 A drain water heat recovery unit(s)shall be installed, which captures wastewater heat from all and only the showers and has a minimum efficiency of 40% if installed for equal flow or a minimum efficiency of 54% if installed for unequal flow. Such units shall be rated in accordance with CSA B55.1 or IAPMO IGC 346-2017 and be so labeled. To qualify to claim this credit, the building permit drawings shall include a plumbing diagram that specifies the drain water heat recovery units and the plumbing layout needed to install it. Labels or other documentation shall be provided that demonstrates that the unit complies with the standard. 5.3 Water heating system shall include one of the following: Energy Star rated gas or propane water heater with a minimum UEF of 0.91 or Solar water heating supplementing a minimum standard water heater. Solar water heating will provide a rated minimum savings of 85 therms or 2000 kWh based on the Solar Rating and Certification Corporation (SRCC)Annual Performance of OG-300 Certified Solar Water Heating Systems or Water heater heated by ground source heat pump meeting requirements of Option 3.3 * OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance contact the Mason County Public Works Department prior to construction at Ext 450 Printed by:Annie Wilson on:08/16/2023 10:04 AM Page 4 of 8 0 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2023-00390 * When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. For more information contact Public Works, at(360)427-9670, ext. 450 or 100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled and approved. * Carbon monoxide alarms, listed as complying with UL 2075 shall be installed in accordance with manufacturer specifications and in accordance with IRC Section R315. Alarms shall be installed outside of each separate sleeping area in the immediate vicinity of the bedrooms and on each level of the dwelling. EXISTING DWELLINGS shall be equipped with carbon monoxide alarms when alterations (including addition or alteration of fuel burning appliances), repairs, or additions requiring a permit occur, or when one or more sleeping rooms are added or created. * Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * Installation of heating equipment in a single-family residence shall meet the requirements of the current WSEC R403, applicable sections of the IRC, and IMC. Heating equipment shall be sized in accordance to ICC/WSEC, Section R403.7. Heating and design load calculations for the purpose of sizing HVAC systems are required and shall be calculated in accordance with accepted practice, including infiltration and ventilation. Design calculations shall be available for inspection during inspection. Referencing IRC M1601.4, all ducts, air handlers,filter boxes, and building cavities shall be sealed. All joints of duct systems and seams shall be made substantially air tight by means of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Closure systems used with rigid fibrous glass ducts shall comply with UL181A and shall be marked 181A-P for pressure-sensitive tape, 181A-M for mastic or 181 A-H for heat-sensitive tape. Closure systems used with flexible air ducts and flexible air connectors shall comply with UL181 B and shall be marked 181 B-FX for pressure- sensitive tape or 181 B-M for mastic. Duct connections to flanges of air distribution system equipment or sheet metal fittings shall be mechanically fastened. Mechanical fasteners for use with flexible nonmetallic air ducts shall comply with UL 181 B and shall be marked 181 B-C. Crimp joints for round metal ducts shall have a contact lap of at least 1-1/2 inches (38 mm) and shall be mechanically fastened by means of at least three sheet-metal screws or rivets equally spaced around the joint. Closure systems used to seal metal ductwork shall be installed in accordance with the manufacturer's installation instructions. Duct tape is NOT permitted as a sealant on any ducts. When ducts are located in unheated spaces the ducts hall be insulated to R-8 DUCT TIGHTNESS TESTING shall be conducted by person(s)trained to perform such testing. A signed affidavit documenting test results in accordance to IECC/WSEC Section R403.3.3 shall be provided to the Mason County Building Department prior to the final occupancy inspection. Affidavit forms are available on at the WSU-Energy Program website titles, "Duct Leakage Affidavit"or"Duct Leakage Testing Results (Existing Construction)." Duct tightness testing is not required if the air handler and all ducts are located within the heated space. Printed by:Annie Wilson on:08/16/2023 10:04 AM Page 5 of 8 0 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2023-00390 The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. * WIND LOADS- Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 MPH. * By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * A permanent certificate, completed by the builder or registered design professional, shall be posted on a wall in the space where the furnace is located, a utility room, or an approved location inside the building. When located on the elctrical panel, the certificate shall not cover or obstruct the visibility of the circuit directory label, service disconnect labek, or toher reqyired Iabels.The certificate shall list the predominant R-values of insulation installed in or on ceiling/roof, walls,foundation (slab, basement wall, crawlspace wall and/or floor), and ducts outside the conditioned spaces; U-factors for fenestration; and the solar heat gain coefficient (SHGC) of fenestration. Where there is more than one value for each component, the certificate shall list the value covering the largest area. The certificate shall list the type and efficiency of heating, cooling, and service water heating equipment, duct leakage rates including test conditions as specified in WSEC Chapter 4, and air leakage results if a blower door test was conducted. Building envelope air leakage control shall be considered acceptable when tested to have an air leakage less than 5 air changes per hour when tested with a blower door in accordanve with WSEC Section R402.4.1.2. The blower door test results shall be recorded on the permanent certificate required located near the electrical distribution panel. Air leakage testing is not required for additions less than 500 square feet. Reference WSEC R402.4.1.2. Compliance certificates are available online at the WSU Energy program website titled, "WSEC 2015 Certificate" and are available in 1/4 or 1/2 sheets. * A minimum of 90 percent of all permanently installed lamps in lighting fixtures shall be high efficacy lamps in accordance with IECC/WSEC Section R404.1. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. * The foundation/footing must be placed on undisturbed, firm-native soil. Proper frost depth shall be observed below grade in undisturbed soils. * When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and approved by the Washington State Department of Transportation. For more information contact Washington State Department of Transportation, at(206)357-2620, ext. 630. * The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. Printed by:Annie Wilson on:08/16/2023 10:04 AM Page 6 of 8 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2023-00390 REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor & Industries (L&I). For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415- 4000. * All property lines shall be clearly identified at the time of foundation inspection. * Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. * Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2). * Planning Setbacks Front: 25' Sides: 20' Rear: 20' *all setbacks measured from the farthest projection of the building *subject to EH setbacks *all changes subject to approval * On-site Septic System final installation approval required prior to temporary/final occupancy of the residence. Printed by:Annie Wilson on:08/16/2023 10:04 AM Page 7 of 8 0 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov NEW SINGLE FAMILY RESIDENCE BLD2023-00390 Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered. A.) Drainfield/ Reserve requires a 1 Oft setback from all footing/foundations. B.) Septic tank(s) requires 5ft setback from all footing/foundations. C.) No foundation/ Perimeter Drains within 30ft, down gradient of Drainfield/ Reserve area. D.) No Cut Bank(s)(greater than 5ft and over 45 degrees)within 50ft, down gradient of Drainfield/Reserve area. * All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All propane tanks must meet the installation requirements and minimum setbacks as listed in the Mason County Fire Marshal's Standards for the Installation of Propane Tanks. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other l state/local law regulating construction or the performance of construction. Issued By: {7 I€V )j' ('yi Contractor or Authorized Agent: -Date: Printed by:Annie Wilson on:08/16/2023 10:04 AM Page 8 of 8 osS a3�o A105.2 Crawlspace description. Four the cavity exposed to the outside air or rigid configurations are considered: Naturally ventilated insulation below a concrete floor,such as over crawlspace,mechanically vented crawlspace,heated parking garages. plenum crawlspace and exposed floor. A105.3 Construction description. Floors are A105.2.1 Naturally ventilated crawlspaces. assumed to be either joisted floors framed on 16 inch Assumed to have 3.0 air changes per hour,with at centers,or post and beam on 4 foot by 8 foot squares. least 1.0 ft2 of net-free ventilation in the foundation Insulation is assumed to be installed under the for every 300 ft2 of crawlspace floor area. The subflooring between the joists or beams with no crawlspace is not actively heated. Floors over space between the insulation and the subfloor. unheated areas, such as garages,may only use those Insulation is assumed to be uncompressed. Exposed values which have R-0 perimeter insulation, floors also include concrete with continuous rigid A105.2.2 Mechanically ventilated crawlspaces. insulation assumed. Assume to have 1.5 air changes per hour,with less Perimeter insulation is assumed to extend from the than 1.0 ft2 of net-free ventilation in the foundation top of the rim joist to the crawlspace floor and then for every 300 ft2 of crawlspace floor area. The inward along the ground(on top of the ground cover) crawlspace is not actively heated. Floors over for at least 24 inches. unheated basements may only use those values which Floor coverings are assumed to be light carpet with have -0 perimeter insulation. rubber pad. A105.2.3 Heated plenum crawlspaces. Assumed to have 0.25 air changes per hour,with no foundation SECTION A106 vents. Heated supply air from central furnace is ON-GRADE SLAB FLOORS blown into a crawlspace and allowed to enter the A106.1 General. Table A106.1 lists heat loss living space unducted via holes cut into the floor. coefficients for heated on-grade slab floors,in units A10 . .4 Exposed floors. Assumes no buffer space, of Btu/h x °F per lineal foot of perimeter. and a covering of 1/2 inch TI-11 on the exterior of TABLE A106.1 DEFAULT F-FACTORS FOR ON-GRADE SLABS Insulation type R-0 R-5 R-10 R-15 Unheated Slab Uninsulated slab 0.73 -- -- -- 2 ft Horizontal(No thermal break) -- 0.70 0.70 0.69 4 ft Horizontal(No thermal break) -- 0.67 0.64 0.63 2 ft Vertical -- 0.58 0.54 0.52 4 ft Vertical -- 0.54 0.48 0.45 Fully insulated slab -- -- 0.36 -- Heated Slab Uninsulated slab 0.84 -- -- -- Fully insulated slab -- 0.74 0.55 0.44 R-5 Center(With perimeter insulation) -- -- 0.66 0.62 R-10 Center(With perimeter insulation) -- -- -- 0.51 3 ft Vertical -- -- 0.78 -- 2018 Washington State Energy Code AE-31 /255 6' l 2e Z - rn APPENDIX F crbWA≥N CONTROL METHODS provisions contained in this appendix are not mandatory unless specifically referenced in the adopting ordinance. User note: About this appendix:Appendix F contains provisions that are intended to mitigate the transfer of radon gases from the soil into dwelling units.Radon is a radioactive gas that has been identified as a cancer-causing agent.Radon comes from the natural breakdown of uranium in soil,rock and water. SECTION AF101 SECTION AF103 SCOPE REQUIREMENTS AF101.1 General. This appendix contains requirements for AF103.1 General.The following construction techniques are new construction in jurisdictions where radon-resistant con- intended to resist radon entry and prepare the building for struction is required. post-construction radon mitigation, if necessary (see Figure Inclusion of this appendix by jurisdictions shall be deter- AF103). These techniques are required in areas where desig- nated by the jurisdiction. mined through the use of locally available data or determina- tion of Zone 1 designation in Figure AF101 and Table AF103.2 Subfloor preparation. A layer of gas-permeable AF101(1). material shall be placed under all concrete slabs and other floor systems that directly contact the ground and are within the walls of the living spaces of the building, to facilitate SECTION AF102 future installation of a subslab depressurization system, if DEFINITIONS needed. The gas-permeable layer shall consist of one of the following: AF102.1 General.For the purpose of these requirements,the terms used shall be defined as follows: 1. A uniform layer of clean aggregate, not less than 4 DRAIN TILE LOOP. A continuous length of drain tile or inches (102 mm) thick. The aggregate shall consist of material that will pass through a 2-inch (51 mm) sieve perforated pipe extending around all or part of the internal or and be retained by a'/4 inch(6.4 mm)sieve. external perimeter of a basement or crawl space footing. 2. A uniform layer of sand(native or fill), not less than 4 RADON GAS. A naturally occurring, chemically inert, inches (102 mm) thick, overlain by a layer or strips of radioactive gas that is not detectable by human senses. As a geotextile drainage matting designed to allow the lat- gas, it can move readily through particles of soil and rock, eral flow of soil gases. and can accumulate under the slabs and foundations of homes where it can easily enter into the living space through con- 3. Other materials, systems or floor designs with demon- struction cracks and openings. strated capability to permit depressurization across the entire subfloor area. SOIL-GAS-RETARDER.A continuous membrane of 6-mil AF103.3 Soil-gas-retarder.A minimum 6-mil(0.15 mm)[or (0.15 mm) polyethylene or other equivalent material used to 3-mil (0.075 mm) cross-laminated] polyethylene or equiva- retard the flow of soil gases into a building. lent flexible sheeting material shall be placed on top of the SUBMEMBRANE DEPRESSURIZATION SYSTEM. A gas-permeable layer prior to casting the slab or placing the system designed to achieve lower submembrane air pressure floor assembly to serve as a soil-gas-retarder by bridging any relative to crawl space air pressure by use of a vent drawing cracks that develop in the slab or floor assembly, and to pre- air from beneath the soil-gas-retarder membrane. vent concrete from entering the void spaces in the aggregate SUBSLAB DEPRESSURIZATION SYSTEM (Active). A base material. The sheeting shall cover the entire floor area system designed to achieve lower subslab air pressure rela- with separate sections of sheeting lapped not less than 12 tive to indoor air pressure by use of a fan-powered vent draw- inches (305 mm). The sheeting shall fit closely around any ing air from beneath the slab. pipe, wire or other penetrations of the material. Punctures or tears in the material shall be sealed or covered with additional SUBSLAB DEPRESSURIZATION SYSTEM(Passive).A sheeting. system designed to achieve lower subslab air pressure rela- tive AF103.4 Entry routes. Potential radon entry routes shall be to indoor air pressure by use of a vent pipe routed closed in accordance with Sections AF103.4.1 through through the conditioned space of a building and connecting AF103.4.10. the subslab area with outdoor air,thereby relying on the con- vective flow of air upward in the vent to draw air from AF103.4.1 Floor openings. Openings around bathtubs, beneath the slab. showers, water closets, pipes, wires or other objects that 2018 INTERNATIONAL RESIDENTIAL CODE® 861 APPENDIX F penetrate concrete slabs,or other floor assemblies,shall be AF103.4.10 Crawl space access.Access doors and other filled with a polyurethane caulk or equivalent sealant openings or penetrations between basements and adjoining applied in accordance with the manufacturer's recommen- crawl spaces shall be closed, gasketed or otherwise filled dations. to prevent air leakage. • AF103A.2 Concrete joints. Control joints, isolation joints, AF103.5 Passive submembrane depressurization system. construction joints, and any other joints in concrete slabs or In buildings with crawl space foundations, the following between slabs and foundation walls shall be sealed with a caulk components of a passive submembrane depressurization sys- or sealant. Gaps and joints shall be cleared of loose material tem shall be installed during construction. and filled with polyurethane caulk or other elastomeric sealant Exception: Buildings in which an approved mechanical applied in accordance with the manufacturer's recommenda- lions. crawl space ventilation system or other equivalent system is installed. AF103.4.3 Condensate drains. Condensate drains shall AF103.5.1 Ventilation. Crawl spaces shall be provided be trapped or routed through nonperforated pipe to day- P light, with vents to the exterior of the building. The minimum net area of ventilation openings shall comply with Section AF103.4.4 Sumps. Sump pits open to soil or serving as R408.1. the termination point for subslab or exterior drain tile loops shall be covered with a gasketed or otherwise sealed AF103.5.2 Soil-gas-retarder. The soil in crawl spaces lid. Sumps used as the suction point in a subslab depres- shall be covered with a continuous layer of minimum 6- surization system shall have a lid designed to accommo- mil (0.15 mm)polyethylene soil-gas-retarder.The ground date the vent pipe.Sumps used as a floor drain shall have a cover shall be lapped not less than 12 inches (305 mm)at lid equipped with a trapped inlet, joints and shall extend to all foundation walls enclosing the crawl space area. AF103.4.5 Foundation walls. Hollow block masonry foundation walls shall be constructed with either a contin- AF103.5.3 Vent pipe. A plumbing tee or other approved uous course of solid masonry, one course of masonry connection shall be inserted horizontally beneath the grouted solid, or a solid concrete beam at or above fm- sheeting and connected to a 3- or 4-inch-diameter (76 or ished ground surface to prevent the passage of air from the 102 mm)fitting with a vertical vent pipe installed through interior of the wall into the living space. Where a brick the sheeting. The vent pipe shall be extended up through veneer or other masonry ledge is installed, the course the building floors, and terminate not less than 12 inches immediately below that ledge shall be sealed. Joints, (305 mm)above the roof in a location not less than 10 feet cracks or other openings around all penetrations of both (3048 mm) away from any window or other opening into exterior and interior surfaces of masonry block or wood the conditioned spaces of the building that is less than 2 foundation walls below the ground surface shall be filled feet(610 mm)below the exhaust point, and 10 feet(3048 with polyurethane caulk or equivalent sealant. Penetra- mm) from any window or other opening in adjoining or tions of concrete walls shall be filled, adjacent buildings. AF103.4.6 Dampproofing. The exterior surfaces of por- AF103.6 Passive subslab depressurization system.In base- tions of concrete and masonry block walls below the mentor slab-on-grade buildings,the following components of ground surface shall be dampproofed in accordance with a passive subslab depressurization system shall be installed Section R406. during construction. AF103.4.7 Air-handling units. Air-handling units in AF103.6.1 Vent pipe. A minimum 3-inch-diameter (76 crawl spaces shall be sealed to prevent air from being mm) ABS, PVC or equivalent gas-tight pipe shall be drawn into the unit. embedded vertically into the subslab aggregate or other permeable material before the slab is cast.A"T"fitting or Exception:Units with gasketed seams or units that are equivalent method shall be used to ensure that the pipe otherwise sealed by the manufacturer to prevent leak- opening remains within the subslab permeable material. age. Alternatively, the 3-inch (76 mm) pipe shall be inserted AF103.4.8 Ducts.Ductwork passing through or beneath a directly into an interior perimeter drain tile loop or through slab shall be of seamless material unless the air-handling a sealed sump cover where the sump is exposed to the sub- system is designed to maintain continuous positive pres- slab aggregate or connected to it through a drainage sys- sure within such ducting.Joints in such ductwork shall be tem. sealed to prevent air leakage. The pipe shall be extended up through the building Ductwork located in crawl spaces shall have seams and floors, and terminate not less than 12 inches (305 mm) joints sealed by closure systems in accordance with Sec- above the surface of the roof in a location not less than 10 tion M1601.4.1. feet(3048 mm)away from any window or other opening into the conditioned spaces of the building that is less than AF103.4.9 Crawl space floors.Openings around all pen- 2 feet (610 mm) below the exhaust point, and 10 feet etrations through floors above crawl spaces shall be (3048 mm) from any window or other opening in adjoin- caulked or otherwise filled to prevent air leakage. ing or adjacent buildings. 862 2018 INTERNATIONAL RESIDENTIAL CODE• e � APPENDIX F AF103.6.2 Multiple vent pipes. In buildings where inte- rior footings or other barriers separate the subslab aggre- gate or other gas-permeable material, each area shall be fitted with an individual vent pipe. Vent pipes shall con- nect to a single vent that terminates above the roof or each individual vent pipe shall terminate separately above the roof. AF103.7 Vent pipe drainage.Components of the radon vent pipe system shall be installed to provide positive drainage to the ground beneath the slab or soil-gas-retarder. AF103.8 Vent pipe accessibility. Radon vent pipes shall be accessible for future fan installation through an attic or other area outside the habitable space. Exception: The radon vent pipe need not be accessible in an attic space where an approved roof-top electrical sup- ply is provided for future use. AF103.9 Vent pipe identification.Exposed and visible inte- rior radon vent pipes shall be identified with not less than one label on each floor and in accessible attics. The label shall read: "Radon Reduction System." AF103.10 Combination foundations. Combination base- ment/crawl space or slab-on-grade/crawl space foundations shall have separate radon vent pipes installed in each type of foundation area. Each radon vent pipe shall terminate above the roof or shall be connected to a single vent that terminates above the roof. AF103.11 Building depressurization.Joints in air ducts and plenums in unconditioned spaces shall meet the requirements of Section M1601. Thermal envelope air infiltration require- ments shall comply with the energy conservation provisions in Chapter 11.Fireblocking shall meet the requirements con- tained in Section R302.11. AF103.12 Power source. To provide for future installation of an active submembrane or subslab depressurization sys- tem,an electrical circuit terminated in an approved box shall be installed during construction in the attic or other antici- pated location of vent pipe fans.An electrical supply shall be accessible in anticipated locations of system failure alarms. 2018 INTERNATIONAL RESIDENTIAL CODE® 863 rlaFiDj•?14 ac 4. . • '+AR+�-•� t �`-., a � ll���L���7�;�� -art,. '! R��W q k. i y' j�l� �e .��s *1 ' �f' .�s,°'!yv �is A^`w9 �bli -1°. . f•e a9•� r�/" yy/r'viti i.f ��� �- ��� ,'�,�8�arwnt�4e ,S qx �'�..r� Awe�$l_6<'.C •a� ��� �35B �,'` �����s At4�Y -qa '�`'�'* Ess '••yG� .�� t # a 4 aGa._ • s� •. a/� bpi °x•91 a° x1s '• f s� G ra �v. 1 '�Na+rVM. •- r4% • . �� "mr a a�a esfagw: •k"�1is�ow`°.sIe r' ap d .1 , �I�/. aa��g� `-. `•<98 ', � � ffia:sit.r••-�°Iaa R'#ac„w�a�. o`I� ..k a JB� +fr�i�; �g;�1t133a5 ���b.g. . .Par Mi �14yWDta�ES 9t r.y...,t � aFfw]•. ...a saagd.,$8 's.ealr'u18ui�o�l4::sb,10srayw.iiigG�G•rs�rah •'mDte *',a,... t'{fi''71�:ra��� y rc. twx fi 9r a ..s t w I awe i� CllNr;�i11.a•�AVIV-49LM_->kiw,. •r�y > aim sn a^es`a:�i.s�,�rrr�' ',.:'B i.iaEiN#,� it—al �s� #�Mvi.�Gl+..s• ♦� Pt if•.;,�„ y•wi'at�XM '' i♦iNMlr +a�iri'�ziwttei/� .r.KJG�.fJwe/a .'G<i°..t t¢a�l►�yw/�r•t� q�.EFXN/ r SM2, i w .•••. Y w ! ♦ np ssr�.+srrswMl��1���+. �I��ids..,Ri,.l,,< e>�l,xw.:, •�„�,Ikld �� � rEl��a,p1D9t bM11wE•14�A�i� Mi"-aeD.4�l�1�q���aa�•,Via.:s.i•, ii, .•� I�iiDIMI lrLP.*-• a .t_It_- E !i. Iltr "low tirtr�i�iirrgf r. i 1 w.• a�. 9) .•:.'R• raaln 4111liiD.9E �"'�E • ,�irp•o�4$a ter.a:a«.�s.r ltMDlM+ttNpi�iE' i;"�1 r•w y�a$r^ .'',..,,�. +r�fr'N�Bir •Mriw �� a.��•; �•�E ►.k�x.s• 1.' • 1 4 APPENDIX F TABLE AF1 01(1) HIGH RADON-POTENTIAL(ZONE 1)COUNTIES' ALABAMA CONNECTICUT Morgan Wabash Trego Hillsdale Watonwan Calhoun Fairfield Moultrie Warren Wallace Jackson Wilkin Clay Middlesex Ogle Washington Washington Kalamazoo Winona Cleburne New Haven Peoria Wayne Wichita Lenawee Wright Colbert New London Piatt Wells Wyandotte St.Joseph Yellow Medicine Coosa Pike White Washtenaw Franklin GEORGIA Putnam Whitley KENTUCKY MISSOURI Jackson Cobb Rock Island Adair MINNESOTA Andrew Lauderdale De Kalb Sangamon IOWA Allen Becker Atchison Lawrence Fulton Schuyler All Counties Barren Big Stone Buchanan Limestone Gwinnett Scott Bourbon Blue Earth Cass Madison Stark KANSAS Boyle Brown Clay Morgan IDAHO Stephenson Atchison Bullitt Carver Clinton Talladega Benewah Tazewell Barton Casey Chippewa Holt Blaine Vermilion Brown Clark Clay Iron CALIFORNIA Boise Warren Cheyenne Cumberland Cottonwood Jackson Santa Barbara Bonner Whiteside Clay Fayette Dakota Nodaway Ventura Boundary Winnebago Cloud Franklin Dodge Platte Butte Woodford Decatur Green Douglas COLORADO Camas Dickinson Harrison Faribault MONTANA Adams Clark INDIANA Douglas Hart Fillmore Beaverhead Arapahoe Clearwater Adams Ellis Jefferson Freeborn Big Horn Baca Custer Allen Ellsworth Jessamine Goodhue Blaine Bent Elmore Bartholomew Finney Lincoln Grant Broadwater Boulder Fremont Benton Ford Marion Hennepin Carbon Chaffee Gooding Blackford Geary Mercer Houston Carter Cheyenne Idaho Boone Gove Metcalfe Hubbard Cascade Clear Creek Kootenai Carroll Graham Monroe Jackson Chouteau Crowley Latah Cass Grant Nelson Kanabec Custer Custer Lemhi Clark Gray Pendleton Kandiyohi Daniels Delta Shoshone Clinton Greeley Pulaski Kittson Dawson Denver Valley De Kalb Hamilton Robertson Lac Qui Parle Deer Lodge Dolores Decatur Haskell Russell Le Sueur Fallon Douglas ILLINOIS Delaware Hodgeman Scott Lincoln Fergus El Paso Adams Elkhart Jackson Taylor Lyon Flathead Elbert Boone Fayette Jewell Warren Mahnomen Gallatin Fremont Brown Fountain Johnson Woodford Marshall Garfield Garfield Bureau Fulton Kearny Martin Glacier Gilpin Calhoun Grant Kingman MAINE McLeod Granite Grand Carroll Hamilton Kiowa Androscoggin Meeker Hill Gunnison Cass Hancock Lane Aroostook Mower Jefferson Huerfano Champaign Harrison Leavenworth Cumberland Murray Judith Basin Jackson Coles Hendricks Lincoln Franklin Nicollet Lake Jefferson De Kalb Henry Logan Hancock Nobles Lewis and Clark Kiowa De Witt Howard Marion Kennebec Norman Madison Kit Carson Douglas Huntington Marshall Lincoln Olmsted McCone Lake Edgar Jay McPherson Oxford Otter Tail Meagher Larimer Ford Jennings Meade Penobscot Pennington Missoula Las Animas Fulton Johnson Mitchell Piscataquis Pipestone Park Lincoln Greene Kosciusko Nemaha Somerset Polk Phillips Logan Grundy LaGrange Ness York Pope Pondera Mesa Hancock Lawrence Norton Ramsey Powder River Moffat Henderson Madison Osborne MARYLAND Red Lake Powell Montezuma Henry Marion Ottawa Baltimore Redwood Prairie Montrose Iroquois Marshall Pawnee Calvert Renville Ravalli Morgan Jersey Miami Phillips Carroll Rice Richland Otero Jo Daviess Monroe Pottawatomie Frederick Rock Roosevelt Ouray Kane Montgomery Pratt Harford Roseau Rosebud Park Kendall Noble Rawlins Howard Scott Sanders Phillips Knox Orange Republic Montgomery Sherburne Sheridan Pitkin La Salle Putnam Rice Washington Sibley Silver Bow Prowers Lee Randolph Riley Steams Stillwater Pueblo Livingston Rush Rooks MASS. Steele Teton Rio Blanco Logan Scott Rush Essex Stevens Toole San Miguel Macon Shelby Saline Middlesex Swift Valley Summit Marshall St.Joseph Scott Worcester Todd Wibaux Teller Mason Steuben Sheridan Traverse Yellowstone Washington McDonough Tippecanoe Sherman MICHIGAN Wabasha Weld McLean Tipton Smith Branch Wadena Yuma Menard Union Stanton Calhoun Waseca Mercer Vermillion Thomas Cass Washington (continued) 2018 INTERNATIONAL RESIDENTIAL CODE® 865 APPENDIX F TABLE AF101(1)--contlnued HIGH RADON-POTENTIAL(ZONE 1)COUNTIES' NEBRASKA Morris Columbiana Lehigh Union Fairfax Crawford Adams Somerset Coshocton Luzerne Walworth Falls Church Dane Boone Sussex Crawford Lycoming Yankton Fluvanna Dodge Boyd Warren Darke Mifflin Frederick Door Burt Delaware Monroe TENNESEE Fredericksburg Fond du Lac Butler NEW MEXICO Fairfield Montgomery Anderson Giles Grant Cass Bemalillo Fayette Montour Bedford Goochland Green Cedar Colfax Franklin Northampton Blount Harrisonburg Green Lake Clay Mora Greene Northumberland Bradley Henry Iowa Colfax Rio Arriba Guernsey Perry Claiborne Highland Jefferson Cuming San Miguel Hamilton Schuylkill Davidson Lee Lafayette Dakota Santa Fe Hancock Snyder Giles Lexington Langlade Dixon Taos Hardin Sullivan Grainger Louisa Marathon Dodge Harrison Susquehanna Greene Martinsville Menominee Douglas NEW YORK Holmes Tioga Hamblen Montgomery Pepin Fillmore Albany Huron Union Hancock Nottoway Pierce Franklin Allegany Jefferson Venango Hawkins Orange Portage Frontier Broome Knox Westmoreland Hickman Page Richland Furnas Cattaraugus Licking Wyoming Humphreys Patrick Rock Gage Cayuga Logan York Jackson Pittsylvania Shawano Gosper Chautauqua Madison Jefferson Powhatan St.Croix Greeley Chemung Marion RHODE ISLAND Knox Pulaski Vernon Hamilton Chenango Mercer Kent Lawrence Radford Walworth Harlan Columbia Miami Washington Lewis Roanoke Washington Hayes Cortland Montgomery Lincoln Rockbridge Waukesha Hitchcock Delaware Morrow S.CAROLINA Loudon Rockingham Waupaca Hurston Dutchess Muskingum Greenville Marshall Russell Wood Jefferson Erie Perry Maury Salem Johnson Genesee Pickaway S.DAKOTA McMinn Scott WYOMING Kearney Greene Pike Aurora Meigs Shenandoah Albany Knox Livingston Preble Beadle Monroe Smyth Big Horn Lancaster Madison Richland Bon Homme Moore Spotsylvania Campbell Madison Onondaga Ross Brookings Perry Stafford Carbon Nance Ontario Seneca Brown Roane Staunton Converse Nemaha Orange Shelby Brule Rutherford Tazewell Crook Nuckolls Otsego Stark Buffalo Smith Warren Fremont Otoe Putnam Summit Campbell Sullivan Washington Goshen Pawnee Rensselaer Tuscarawas Charles Mix Trousdale Waynesboro Hot Springs Phelps Schoharie Union Clark Union Winchester Johnson Pierce Schuyler Van Wert Clay Washington Wythe Laramie Platte Seneca Warren Codington Wayne Lincoln Polk Steuben Wayne Corson Williamson WASHINGTON Natrona Red Willow Sullivan Wyandot Davison Wilson Clark Niobrara Richardson Tioga Day Ferry Park Saline Tompkins PENNSYLVANIA Deuel UTAH Okanogan Sheridan Sarpy Ulster Adams Douglas Carbon Pend Oreille Sublette Saunders Washington Allegheny Edmunds Duchesne Skamania Sweetwater Seward Wyoming Armstrong Faulk Grand Spokane Teton Stanton Yates Beaver Grant Piute Stevens Uinta Thayer Bedford Hamlin Sanpete Washakie Washington N.CAROLINA Berks Hand Sevier W.VIRGINIA Wayne Alleghany Blair Hanson Uintah Berkeley Webster Buncombe Bradford Hughes Brooke York Cherokee Bucks Hutchinson VIRGINIA Grant Henderson Butler Hyde Alleghany Greenbrier NEVADA Mitchell Cameron Jerauld Amelia Hampshire Carson City Rockingham Carbon Kingsbury Appomattox Hancock Douglas Transylvania Centre Lake Augusta Hardy Eureka Watauga Chester Lincoln Bath Jefferson Lander Clarion Lyman Bland Marshall Lincoln N.DAKOTA Clearfield Marshall Botetourt Mercer Lyon All Counties Clinton McCook Bristol Mineral Mineral Columbia McPherson Brunswick Monongalia Pershing OHIO Cumberland Miner Buckingham Monroe White Pine Adams Dauphin Minnehaha Buena Vista Morgan Allen Delaware Moody Campbell Ohio NEW Ashland Franklin Perkins Chesterfield Pendleton HAMPSHIRE Auglaize Fulton Potter Clarke Pocahontas Carroll Belmont Huntingdon Roberts Clifton Forge Preston Butler Indiana Sanborn Covington Summers NEW JERSEY Carroll Juniata Spink Craig Wetzel Hunterdon Champaign Lackawanna Stanley Cumberland Mercer Clark Lancaster Sully Danville WISCONSIN Monmouth Clinton Lebanon Turner Dinwiddie Buffalo a. The EPA recommends that this county listing be supplemented with other available State and local data to further understand the radon potential of a Zone 1 area. 866 2018 INTERNATIONAL RESIDENTIAL CODE® APPENDIX F TYPICAL SUBSLAB DEPRESSURIZATION PASSIVE RADON SYSTEM VENTED PASSIVE RADON SYSTEM THROUGH SUMP ATTIC ATTIC LIVING AREA LIVING AREA GRADE GRADE GRAVEL * GRAVEL BASEMENT BASEMENT POLYETHYLENE SUMP POLYETHYLENE • SLAB * SHEETING SLAB COVER SHEETING :GRAVEL:'::::'•':: ''':: GRAVEL':::': SUMP PIT PASSIVE RADON SYSTEM USING SUBMEMBRANE DEPRESSURIZATION SYSTEM DRAIN TILE LOOP FOR CRAWL SPACE ATTIC ATTIC LIVING AREA GRADE LIVING AREA GRAVEL BASEMENT SLAB POLYETHYLENE * SHEETING CRAWL SPACE PERFORATED GRAVEL;:'.:. :'' GRADE POLYETHYLENE DRAIN TILE GRAVEL SHEETING DRAIN TILE LOOP FIGURE AF103 RADON-RESISTANT CONSTRUCTION DETAILS FOR FOUR FOUNDATION TYPES 2018 INTERNATIONAL RESIDENTIAL CODE® 867