HomeMy WebLinkAboutGRD2022-00006 Cut Fill - GRD Inspections - 4/21/2026 INSPECTION CARD
O Mason County
615 W. Alder St.
Building 8, Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
PERMIT# GRD2022-00006 PROJECT ADDRESS 52 N Cooper Hawk PI Hoodsport, WA 98548
PARCEL# 422050060000 PROJECT DESCRIPTION Cut and Fill
OWNER CITY OF TACOMA-TACOMA PUBLIC ADDRESS 3628 S 35TH ST PHONE 1.253.888.5412
CONTRACTOR ADDRESS PHONE
CONTRACTOR LICENSE LENDER
INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments
BLD-Final Inspection
Mason County
Mason County - Division of Community Development
615 W. Alder St.
OH 0 Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
GRD2022-00006 GRADING
PROJECT DESCRIPTION: CUT AND FILL ISSUED: 01/10/2025
SITE ADDRESS: 52 N COOPER HAWK PL HOODSPORT
EXPIRES: 07/09/2025
PARCEL: 422050060000
APPLICANT: CITY OF TACOMA-TACOMA PUBLIC OWNER: CITY OF TACOMA-TACOMA PUBLIC
UTILITIES UTILITIES
3628 S 35TH ST 3628 S 35TH ST
TACOMA,WA 98409 TACOMA,WA 98409
1.253.888.5412
FEES: Paid Due
Planning Commercial Review $380.00 $0.00
Fee
Grading Permit Fee $210.00 $0.00
Grading Plan Review Fees $60.00 $0.00
Totals : $650.00 $0.00
REQUIRED INSPECTIONS
BLD-Final Inspection
CONDITIONS
k OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
Printed by:Annie Wilson on:01/10/2025 11:16 AM
Page 1 of 3
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
GRADING GRD2022-00006
* ALL CLEARING,CUTTING, GRADING, EXCAVATING, TERRACING, FILLING AND SIMILIAR WORK WILL BE
REGULATED BY THE REQUIREMENTS PURSUANT TO THE MASON COUNTY GRADING PERMIT STANDARDS
ADOPTED BY RESOLUTION 141-96 and MASON COUNTY CODE, TITLE 14, CHAPTER 14.44.
* Access Roads to the site must not be degraded as a result of work.
* ALL SURFACE WATER AND POTENTIAL RUNOFF WILL BE CONTROLLED ON SITE AND SHALL NOT ADVERSLY
AFFECT ANY ADJACENT PROPERTIES NOR INCREASE THE VELOCITY FLOW ENTERING OR ABUTTING TO ANY
STATE OR COUNTY CULVERTING/DITCHING SYSTEM OR ROAD WAY
* Temporary Erosion control measures must be implemented to prevent water quality degradation of adjacent waters or
wetlands.
* All culverts shall be maintained in perpetuity to ensure that drainage will not overflow.
* All upland areas disturbed or newly created by construction activities shall be seeded,vegetated or given some other
equivalent type of protection against erosion.
* All fills shall be compacted to a minimum of 90 percent of maximum density.
* Retaining walls needed to support a surcharge such as structures, roads,or to support slopes, shall require a separate
building permit and approval prior to construction of the retaining wall.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
* All other necessary permits from Mason County,Washington State and/or Federal Agencies that are required for this
proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION.
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
* Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to
the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of
the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In
addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* Approved per dimensions and setbacks on submitted site plan.Setbacks are measured from the furthest projection of the
structure.
............................ ...... . .... ........ .. ...................... .... ....... ................................ .. .. ................ .. ........ ........ .. .. .. ...... .................... ........ ...... ............
Printed by:Annie Wilson on:01/10/2025 11:16 AM
Page 2 of 3
Mason County
Mason County - Division of Community Development
615 W. Alder St.
F Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
GRADING GRD2022-00006
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By: 6nyl ', t- V3 1 I S D
Contractor or Authorized Agent: Date: ` D
Printed by:Annie Wilson on:01/10/2025 11:16 AM
Page 3 of 3
r h�� MASON COUNTY PERMIT
y DEPARTMENT OF COMMUNITY DEVELOPMENT
BUILDING• PLANNING• FIRE MARSHAL
WWW.CO.MASON.WA.US (360)427-9670 Shelton ext. C,'/i `
Mason County Bldg. 8, (360)275-4467 Belfair ext.352 V
615 W. Alder Street, Shelton,WA 98584 (360)482-5269 Elma ext. 352 f ,
J �
6,5 072022
LAND MODIFICATION PERMIT (Grading Permit) VV A
OWNER INFORMATION: CONTRACTOR INFORMATION:
NAME:Tacoma Public Utilities NAME:No Contractor has Been hired
MAILING ADDRESS:3628 S.35th St. MAILING ADDRESS: ,
CITY:Tacoma STATE:WA ZIP:98409 CITY: STA
PHONE:.(253)502-8381 CELL:(253)232-3847 PHONE: CELL:
EMAIL:jchenry@cityoftacoma.org EMAIL :______________________________________________
L&I REG# EXP._/_/
PARCEL INFORMATION:
PARCEL NUMBER(12 DIGIT NUMBER) 42205-00-60000 FIRE DISTRICT
LEGAL DESCRIPTION(ABBREVIATED):
SITE ADDRESS 52 N.Cooper Hawk Pl. CITY Hoodsport
DIRECTIONS TO SITE ADDRESS From Hwy 101 North:Turn left onto W.Skokomish Valley Rd.for 5.6mi. Turnlbear right slight right onto NF-23 for 1.8mi. Turn left to stay onto
NF-23 for 0.5mi.Turn right onto NF-2340 for 3.1 m. Turn left onto bypass road for 0.9mi.continue straight to get back oto NF-2340 for 3.7mi.
Sharp right turn onto Mackinaw Rd.for 0.3mi. Turnibear slight right turn onto access road for 0.5mi.
IS PROPERTY WITHIN 200 FT:
SALTWATER❑ LAKE 0 RIVER/CREEK[] POND❑ WETLAND[] SEASONAL RUNOFF❑ STREAM❑
DOES PROPERTY HAVE SLOPE(S)WITHIN 300 FT OF THE PROJECT-GREATER THAN 14% YESD NO❑
WILL TIMBER BE CUT AND SOLD IN PARCEL PREPARATION? YES ❑ NO 9
TYPE OF JOB: EXCAVATION ❑ FILLING ❑ GRADING.9 CUTTING ❑ OTHER ❑
TOTAL SIZE OF PARCEL 228.38 ACRES/SQ FT SIZE OF AREA TO BE EFFECTED-8,000 ACRES/SQ FT
ESTIMATED AMOUNTY OF CUBIC YARDS-'400
DOES THE SITE HAVE SLOPES 14%OR GREATER YES NO❑
DESCRIBE SCOPE OF WORK This project includes the construction of Debris Removal Ramp to enhance and improve debris removal processes. The project will include the
construction of a Mechanically Stabilized Earth(MSE)Block wall otherwise know as Concrete Segmental Retaining Wall System,grading and filling
of approximately 260 cubic yards of material,cast-in-place concrete and the installation of proprietary pre-cast concrete ramp panels.
WILL FILL BE BROUGHT ON SITE? IF YES,SITE ADDRESS:TBD
WILL EXCAVATED MATERIAL BE TAKEN OFF SITE?IF YES,SITE ADDRESS: NO
DOES FILL CONTAIN POTENTIAL HAZARDOUS MATERIALS? YES❑ NO El
HAS A SOILS REPORT BEEN COMPLETED ON SITE?IF YES,INCLUDE A COPY. YES❑ NO El
WILL PROPSAL RESULT IN REDIRECTION OF ANY SURFACE WWATER RUNOFF? YES 0 NO 0
WILL WORK ALTER WHERE STORMWATER OF GROUND WATER ENTERS OR EXISTS THE SITE? YES❑ NO El
WILL QUALITY,QUANTITY OR VELOCITY OF STORM/GROUND WATER BE ALTERED? YES❑ N09
WILL THE RUNOFF BE COLLETED/CONTROLLED BY INTERCEPTORS,CURTAIN DRAINS OR OTHER DEVICES? YES❑ NO
WILL THE LAND BE REPLANTED UPON COMPLETION? YES❑ NO
WILL THE PROPOSAL RESULT IN SLOPES STEEPER THAN THOSE CURRENTLY ON SITE? YES❑ NO El
IS THE SITE WITHIN 200 FT OF A DESIGNATED SHORELINE OR A WETLAND? YES El NO❑
OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative,or contractor. I further
declare that.l am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary
parties,including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the
information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for
review and inspection.This permit/application becomes null&void if work or authorized construction is not commenced within 180
days or if construction work is suspended for a period of 180 days.PROOF OF CONTINUATION OF WORK IS BY MEANS OF
INSPECT N. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
X `' 6/21/2022
Signature of Appli_ nt Date
XJason C. Henry OWNER/REPRESENTATIVE/CONTRACTOR
Print Name (CIRCLE TO INDICATE)
• � �� MASON COUNTY PERMIT NO._ ('d 222 - 3O
DEPARTMENT OF COMMUNITY DEVELOPMENT
` t BUILDING• PLANNING• FIRE MARSHAL
_ �t (WWW.CO.MASON.WA.US 360)427-9670 Shelton ext. 5
Mason County Bldg. 8, (360)275-4467 Belfair ext.352 ` V
615 W.Alder Street, Shelton,WA 98584 (360)482-5269 Elma ext. 3522O
Barra?
LAND MODIFICATION PERMIT (Grading Permit) 615 try,
AI
OWNER INFORMATION: CONTRACTOR INFORMATION:
NAME:Tacoma Public Utilities NAME:No Contractor has Been hired
MAILING ADDRESS:3628 S.35th St. MAILING ADDRESS:
CITY:Tacoma STATE:WA ZIP:98409 CITY: STATE: ZIP:
PHONE:.(253)502-8381 CELL:(253)232-3847 PHONE: CELL:
EMAIL:jchenry@cityoftacoma.org EMAIL
L&I REG#
PARCEL INFORMATION:
PARCEL NUMBER(12 DIGIT NUMBER) 42205-00-60000 FIRE DISTRICT
LEGAL DESCRIPTION(ABBREVIATED):
SITE ADDRESS 52 N.Cooper Hawk Pl. CITY Hoodsport
DIRECTIONS TO SITE ADDRESS From Hwy 101 North:Turn left onto W.Skokomish Valley Rd.for 5.6mi. Tum/bear right slight right onto NF-23 for 1.8mi. Turn left to stay onto
NF-23 for 0.5mi.Turn right onto NF-2340 for 3.1 m. Turn left onto bypass road for 0.9mi.continue straight to get back oto NF-2340 for 3.7mi.
Sharp right turn onto Mackinaw Rd.for 0.3mi. Tum/bear slight right turn onto access road for 0.5mi.
IS PROPERTY WITHIN 200 FT:
SALTWATER❑ LAKE 0 RIVER/CREEK[] POND❑ WETLAND[] SEASONAL RUNOFF❑ STREAM❑
DOES PROPERTY HAVE SLOPE(S)WITHIN 300 FT OF THE PROJECT-GREATER THAN 14% YESQ NO❑
WILL TIMBER BE CUT AND SOLD IN PARCEL PREPARATION? YES ❑ NO
TYPE OF JOB: EXCAVATION ❑ FILLING ❑ GRADING.[a CUTTING ❑ OTHER ❑
TOTAL SIZE OF PARCEL 228.38 ACRES/SQ FT SIZE OF AREA TO BE EFFECTED-8,000 ACRES/SQ FT
ESTIMATED AMOUNTY OF CUBIC YARDS~400
DOES THE SITE HAVE SLOPES 14%OR GREATER YES NO❑
DESCRIBE SCOPE OF \WORK This project includes the construction of Debris Removal Ramp to enhance and improve debris removal processes. The project will include the
construction of a Mechanically Stabilized Earth(MSE)Block wall otherwise know as Concrete Segmental Retaining Wall System,grading and filling
of approximately 260 cubic yards of material,cast-in-place concrete and the installation of proprietary pre-cast concrete ramp panels.
WILL FILL BE BROUGHT ON SITE? IF YES,SITE ADDRESS:TBD
WILL EXCAVATED MATERIAL BE TAKEN OFF SITE?IF YES,SITE ADDRESS: NO
DOES FILL CONTAIN POTENTIAL HAZARDOUS MATERIALS? YES❑ NO E]
HAS A SOILS REPORT BEEN COMPLETED ON SITE?IF YES,INCLUDE A COPY. YES❑ NO 9
WILL PROPSAL RESULT IN REDIRECTION OF ANY SURFACE WWATER RUNOFF? YES❑ NO 9
WILL WORK ALTER WHERE STORMWATER OF GROUND WATER ENTERS OR EXISTS THE SITE? YES❑ NO El
WILL QUALITY,QUANTITY OR VELOCITY OF STORM/GROUND WATER BE ALTERED? YES❑ NOD
WILL THE RUNOFF BE COLLETED/CONTROLLED BY INTERCEPTORS,CURTAIN DRAINS OR OTHER DEVICES? YES❑ NO El
WILL THE LAND BE REPLANTED UPON COMPLETION? YES❑ NO 0
WILL THE PROPOSAL RESULT IN SLOPES STEEPER THAN THOSE CURRENTLY ON SITE? YES ❑ NO 9
IS THE SITE WITHIN 200 FT OF A DESIGNATED SHORELINE OR A WETLAND? YES 0 NO❑
OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below. I declare that I am the owner,owners legal representative,or contractor. I further
declare that.l am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary
parties,including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the
information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for
review and inspection.This permittapplication becomes null&void if work or authorized construction is not commenced within 180
days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF
INSPECT N. INACTIVITY OF F THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
X 4e • 6212022
Signature of Appf t Date
XJason C.Henry OWNER/ REPRESENTATIVE/CONTRACTOR
Print Name (CIRCLE TO INDICATE)