Loading...
HomeMy WebLinkAboutGRD2021-00015 Grade for multiple homes - GRD Inspections - 4/21/2026 , .. INSPECTION CARD Mason County 615 W. Alder St. Bldg. 8, Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us PERMIT# GRD2021-00015 PROJECT ADDRESS Next to 251 e Wheelwright St N Allyn, WA 00000 PARCEL# 122205067005 PROJECT DESCRIPTION GRADING PERMIT FOR FUTURE CONSTRUCTION OF 12 HOMES. OWNER HOUSING KITSAP ADDRESS 2244 NW BUCKLIN HILL RD PHONE 1.360.535.6134 CONTRACTOR ADDRESS PHONE CONTRACTOR LICENSE LENDER INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments BLD-Final Inspection Mason County irMason County - Division of Community Development 615 W. Alder St. Bldg.8 `'��•,, Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us F 1-00015 GRADING ESCRIPTION: GRADING PERMIT FOR FUTURE ISSUED: 10/17/2022 TION OF 12 HOMES. ESS: NEXT TO 251 E WHEELWRIGHT ST N ALLYN EXPIRES: 04/15/2023 PARCEL: 122205067005 APPLICANT: HOUSING KITSAP OWNER: HOUSING KITSAP 2244 NW BUCKLIN HILL RD 2244 NW BUCKLIN HILL RD SILVERDALE,WA 98383 SILVERDALE,WA98383 1.360.535.6134 FEES: Paid Due Planning Commercial Review $380.00 $0.00 Fee Grading Plan Review Fees $60.00 $0.00 Planning Stormwater Review $300.00 $0.00 Grading Permit Fee $120.00 $0.00 Technology Surcharge $3.60 $0.00 Totals : $863.60 $0.00 REQUIRED INSPECTIONS BLD-Final Inspection CONDITIONS " OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. Printed by:Ariane Paysse on:10/17/2022 10:38 AM Page 1 of 2 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us GRADING GRD2021-00015 * ALL CLEARING,CUTTING, GRADING, EXCAVATING, TERRACING, FILLING AND SIMILIAR WORK WILL BE REGULATED BY THE REQUIREMENTS PURSUANT TO THE MASON COUNTY GRADING PERMIT STANDARDS ADOPTED BY RESOLUTION 141-96 and MASON COUNTY CODE, TITLE 14, CHAPTER 14.44. Access Roads to the site must not be degraded as a result of work. " Application acknowledges that the structure is only permitted for a use consistent with the current zoning of the parcel. Sewer Cap for future use will need to have a cleanout stub installed. As-built information will need to be provided when work is complete. " A professional archaeological survey of the project area shall be conducted prior to ground-disturbing activities. A Declaration of Covenants Associated with Privately Maintained Storm Drainage Facilities (O&M) Must be executed and recorded with Mason County Auditor's Office prior to permit final Inspection. * ALL SURFACE WATER AND POTENTIAL RUNOFF WILL BE CONTROLLED ON SITE AND SHALL NOT ADVERSLY AFFECT ANY ADJACENT PROPERTIES NOR INCREASE THE VELOCITY FLOW ENTERING OR ABUTTING TO ANY STATE OR COUNTY CULVERTING/DITCHING SYSTEM OR ROAD WAY All culverts shall be maintained in perpetuity to ensure that drainage will not overflow. Temporary Erosion control measures must be implemented to prevent water quality degradation of adjacent waters or wetlands. * Compliance with an approved Storm Water Plan shall be subject to an on site inspection, or inspections, by the engineer of record or an authorized representative. Said inspection(s) shall be performed in accordance with the approved plan, and prior to any modification that would make a determination of compliance impossible. Inspection reports shall be submitted to verify all engineering requirements have been completed in accordance with the approved storm water plan. Reports shall be submitted to the Mason County Department of Community Development prior to each corresponding inspection and final permit approval. Copies of all special inspection reports shall be made available at time of inspection. * All applicable recommendations and specifications shall be applied to the development on this site. Any deviation requires stamped written approval from the registered design professional responsible for the report and may require special inspection by same. Structures and /or land modifications (grading, cuts, fills, etc.) required in the geotechnical report may require a separate permit. Resubmitted Stormwater Drainage Report stamped by Ronald Johnson, dated 6/21/2022 Plan Set stamped by Michael Wnek, dated 5/4/2021 and Ronal Johnson, dated 6/22/2022 I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: ffr(al?e Al?aci5se Contractor or Authorized Agent_ �l�(J / Date: 0 /7 7 / Printed by:Ariane Paysse on:10/17/2022 10.38 AM Page 2 of 2