Loading...
HomeMy WebLinkAbout2026-013 - Res. County Road Project 2075 MASON COUNTY COMMISSIONERS RESOLUTION NO: aQQJLD-Ot 3 COUNTY ROAD PROJECT NO. 2075 WHEREAS,on Mason County Road No.79800,known locally as the Bear Creek Dewatto Road and more specifically located in Sec. 1,2,3,and 4.T.23N,R 2W,WM at approximately mile post 5.37 to mile post 8.45;work defined as"construction"in the BARS Manual,Page 1I-63,et seq,is •determined to be necessary and proper; and, THEREFORE,BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their intention to: Roadway Improvement Project:asphalt overlay,shoulder improvements,and roadway striping. SAID WORK is to be performed by Contract and/or County Forces in accordance with Washington State Standard Specifications for Road and Bridge Construction as adopted by Mason County(RCW 36.77.020 and/or RCW 36.77.065 and WAC 136-18). BE IT FURTHER RESOLVED that the described County Road Project is necessary and proper,and the estimated costs of said project are herewith set out as follows: Engineering: S -10,000- Right of Way S -0- Construction S 1,179,000 The-County Road project herein described in HEREBY DECLARED to be a public necessity,and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law,provided and in accordance with RCW 36.75.050,36.80.080 and 36.80.070. ADOPTED this Aft,day ofQ _2026. BOARD OF COUNTY COMMISSIONERS MOUNTY,WWNcDN Pat Tarzwel�l.,Chair ATTEST: _____ /' YYY;I1Ik'1Nxt0 Raj y Neatherlinli a Chair McKenzie S1iith,Clerk of the Board Sharon Trask,Commissioner APPROVED AS TO FORM: Tim�Whiteh�ea , A cc: Co.Commissioners Engineer JOURNAL: Pub[.It: 04/23/2026