HomeMy WebLinkAboutREV2026-00024 - BLD CD Environmental Health Review - 3/4/2026 EH Setbacks NOT AN APPROVED SEPTIC DESIGN
A.) Drainfield/Reserve requires 10'setback from footing/foundations Must use SWG 2024-00063 for septic installation
B.)Septic tank(s) requires 5'setback from all footing/foundations
C.) No foundation/Perimeter Drains within 30ft, downgradient of
Drainfield/Reserve area Q\
D.) No Cut Bank(s)(greater than 5ft and over 45 degrees)within
50ft,down gradient of Drainfield/Reserve area
E.)Use approved mitigation from section C1-9 of the department of
ecology's"Criteria For Sewage Works Design,"when sewer
transport lines are within 1 Oft of water supply lines.
43.36'
EH APPROVED
Rhonda Thompson 03/24/2026 PRO POS D pier pads only
L11.02' . M.H.
/ I . t
L
/ / RESERVE 1 SCALE: 1" = 20'
APPLICANT INFO:
HENLEY WA 17 LLC
D A N E L s x. 441 E PANORAMA DR
SHELTON,WA 98584
MIN 4 �: .� PARCEL:32021-56-02004
SITE PLAN DESIGN CONTACT:
O SOUTH SHORE CONST.
." I PO BOX 963
'�{ 3ELFAIR,WA 60-536-0418 98528
j •'�:'" ; ' 5OUTHSHOREBELFAlR@GNIAIL.COIVI