Loading...
HomeMy WebLinkAbout37-82 - Res. CRP 879 - Beeville RoadMASON COUNTY COMMISISONERS RESOLUTION No. 37-82 COUNTY ROAD PROJECT No. 879 - Revision WHEREAS, on Mason County Beeville Road Sec. 26, T.21N., R.6W., W.M. as "construction" in the BARS necessary and proper, and Road No. 0165 known locally as the Road, and more specifically located in SW 4 , M.P. 3.17 to M.P. 3.18 , work defined Manual, Page I1-63, et seq, is determined to be WHEREAS, this project is identified county annual road program. as # 3 on the officially adopted THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their intention to remove the existing Palmer Bridge structure and replace it with culverts. and that said work is to be performed by (day labor) 0400mpTO in accordance with the Washington State Standard Specifications for Road and Bridge Construction as adopted by Mason County. BE IT FURTHER RESOLVED that the above described County Road Project is necessary and proper, and the estimated costs of said project are herewith set out as follows; Engineering $ 417.04 Right -of -Way Road Construction 8,340.78 Bridge Construction Engineer's Estimate in detail is on file in the office of the County Engineer. The County Road Project herein described is HEREBY DECLARED to be a public .- necessity, and the County Road Engineer is HEREBY ORDERED AND AUTHORIZED to report and proceed thereon as by law, provided, and in accordance with WAC 136-18. ADOPTED this 26th day of ATTEST; Clerk of the Board April 19 82 BOARD OF COUNTY COMMISSION OF MESON COUNTY, WASHINGTON Chairman 5,&° (CRP Form No. 1) cc: ✓t-o. Commissioners Engineer JOURNAL - Publ. lt., April 29, 1982 (Bill Road Dept.)