HomeMy WebLinkAboutBLD2025-01294 - BLD CD Environmental Health Review - 1/20/2026 as\a, -- 1 - gGoa
SDa-aa5 - o tacILI
• APPROVED
---
- MASON COUNTY DCD PLANNING
SITE PLAN REQUIRED TO BE ON SITE
Ex) i)lif' CHANGES SUBJECT TO APPROVAL
101 914,4 By: fte14141.BOrk Date:12/17/2025
Disclaimer:
Mason County does not require a survey to obtain a
building permit.As a result,site plans may not reflect
•
• accurate data.It is the applicant's responsibility to
&YI lr I3 SS comply with setback requirements.
0
kNfv\ •
RR5 Zoning
W' a 1.5 ,,, Front Yard Setback.25'.
Aft Side&Rear Yard Setbacks.Residential dwelling
\ . and accessory structures is 20'.
r �� L OR 10%width of lot if not more than 100'wide
Ete40111, . OR approved ADV
/ ... 5' 'min • lis,..
1-1 x 5l� 10' n 4" with
reserve
b yd
•
tb' x'1 r
QV cout,
11 E LteAldLA .
T
E.,5;tiOrinza renev,y.ed
• Cmru V.4„‘
•
Q
Exl'ilfhC
--'OrI vt W,1( EH APPROVED
1 Rhonda Thompson 01/20/2026
II EH Setbacks
`! +�~ A.) Drainfield/Reserve requires 10' setback from footing/foundations
a �„!V B.) Septic tank(s) requires 5' setback from all footing/foundations
C.) No foundation/Perimeter Drains within 30ft, downgradient of
Drainfield/Reserve area
D.) No Cut Bank(s) (greater than 5ft and over 45 degrees)within
- ------- 50ft, down gradient of Drainfield/Reserve area
E.) Use approved mitigation from section C1-9 of the department of
ecology's "Criteria For Sewage Works Design," when sewer
transport lines are within 10ft of water supply lines.