Loading...
HomeMy WebLinkAboutLake Limerick Island Erosion Plan - PLN General - 5/14/2025'REV: 6/28/25 VERBAGE AND CONTOUR LINES(PARADISE/ALLEN) as z 0 r W RANGE 3W TOWNSHIP 21N SECTION 27 PARCEL 321275100289 34 SLOPE WITH PLANTINGS TYP. SLT FENCE 360' BMP C233 REMOVE EXISTING SAND BAGS SOIL W/JUTE NET NATNE PLANTINGS THE CLUBHOUSE ISLAND PARK AT THE INN EXISTING BORDER OF NATNE NATNE BULRUSH AND SEDGE REMAIN UNDISTURBED AS MUCH POSSBLE H 0 20 1" 40 20' LANDSCAPE PLANT MATERIAL LEGEND D (PARK, LAKE, AND OPEN SPACE) SIZE BOTANICAL / COIEMON NAMES CONDITION SPACING QUANTITY REIIAW(S 60 TEES n E, ACER CIRCINATUM / VINE MAPLE 1.75' CAL (2) !: _ EXISTING TREES TO REMAIN As SHOWN (3) EXISTING TREES TO REMAIN 0 - ''� A PLICATA 'EXCELSA' / ESTERN RED CEDAR 6' - 7'HT. AS SHOWN (3) STAKE & GUY ONE GROWING SE NURSERY GROWN, UN CUT LEAF ��J,L ") i ��/!1' -*. ,. �I�11i` . EUDOTSUGA MENZIESII / OR DOUGLAS FIR PICEA SFTCHENSIS / SITKA SPRUCE 6' - 7'HT. As SHOWN (3) STAKE & GUY ONE GROWING SE - NURSERY GROWN, UNCUT LEAF a.- A......___ SHRUB& MAHONIA AQUIFOLIUM / 18' - 21' 5' O.C. (52) OREGON GRAPE CORNUS STOLONIFERA 'KELSEYI' / 2 GALLON 8' O.C. (34) DWARF RED -TWIG DOGWOOD ill RED FLOWERING NEUMRANT / RIBES SANGUICUR 2 GALLON 8' O.C. (24) ��. 4 OCEAN SPRAY PLANT . / HOLODISCUS DISCOLOR 2 GALLON-8' O.C. - (3) SALAL/GALTHERIA SHALLON 0 OREGON GRAPE/ MAHONIA COMP GAL 3' O.C. (56) GROUNDCOVERS I �� �� I ARCTOSTAPHYLOS UVA-URSI / KINNIKINNICK 1 GAL 18" O.C. AS Ron HOLD 16' FROM BORDERS, SHI AND TREES EXISTING SEDGE AND BULRUSH SAVE AS MUCH AS CONSTRL w v.l I WILL ALLOW ER ASON ER UBS, CTION SYNTHETIC FILTER FABRIC, E.O.S.=100 TO 50, SECURED TO POSTS MIN. 4" DEEP TRENCH FOR FABRIC EMBEDMENT POST AT 6'-0" 0.C. TO BE 2" X 2" WOOD SILT FENCE —EXISTING GROUND 12"- 3'MIN Ole __ NM10POW 2'MIN 14-1 0 MAX--1,1 5" MIN DIA. ROUGH CUT WOOD RAIL -UNTREATED TYP. CRMCAL AREA SIGN. 1 SIGN PER EVERY 100 FEET. 6" MIN DIA. SQUARE OR ROUND ROUGH CUT - U NTREATED TIP. % MINUS ROCK BACKFILL, COMPACT TINE SOIL 153.5' CIE 1=111=111=11 LEGBD 1. SHRUB CIR W PEFI PLAN 2. EARTH WATERING BARN (RAKE 9(OOTH PROR TO SEEM° N HYDROEEED AREAS AT E31:1 OF PLANT EE3TAB IBLIENT P670D FOR ALL REMANSIG BASNS) 3. FRIBH GRADE 4. 7 GRAM PLANT TABLETS 1GAL -3,5GAL -6 15GAL -9,24GAL -12 5. ROOTBALL (BET CROWN +1- 3" ABOVE IanCmom 6. COMPACT® BACKFLL MD( (PER PL.AERNO EFW= N TEW 7. UNDISTURBED NATNE SOL 8. CUT NFO 131.13PE TO CFEJITE LEVET MEIN SHRUB PLANTING — SLOPE SECTION A -IIIIIIIIIIIIIIIIIIIIIIII—III SECTION B CALL 48 HRS BEFORE YOU 811 PROJECT REF: THESE PLANS ARE APPROVED FOR CONFORMANCE WITH THE MASON COUNTY PLANNING DEPARTMENT REQUIREMENTS. APPROVED BY: DATE APPROVED - CONTRACTOR NOTE CONTRACTOR IS RESP❑NSIBLE FOR LAYING OUT 4' WIDE PATHWAY AT MIN 12:1 WALKWAY GRADE WITH MIN 3:1 SIDE SLOPE PLANTING ON ALL SLOPE ABOVE PATHWAY AREAS. 152' 151' 150' 149' 148.5' 153.5' PATH GRADE 12:1 152' 151' 150' 149' H.W.M LAKE (4) LOW WATER LEVEL VICINITY MAP PROJECT PURPOSE THE CURRENT C❑NDITI❑N OF THE SH❑RELINE IS IN A CONSTANT STATE OF ER❑SI❑N. THE PROJECT PURPOSED IS TO RESTORE AND STABILIZE THE SH❑RELINE ABOVE THE HIGH WATER MARK WITHIN THE SWIMMING AREA SH❑RELINE BY: 1. CREATING TWO (2) 12:1 GRADE PATHWAYS TO ELIMINATE FOOT TRAFFIC DIRECTLY OVER THE EMBANKMENT 2. GRADE THE STEEP SLOPE WHERE INFLUENCED BY THE 12:1 WALKWAY CUT TO A APPR❑XIMATE 3:1 GRADE, STABILIZE WITH PLANTINGS AND PROTECT BY FENCING TO DIRECT TRAFFIC AWAY FROM BANK TO THE DESIGNATED PATHWAYS. 3. ADDING FENCING, SIGNAGE, AND PLANTINGS WITH ADDITIONAL TEMPORARY BEST MANAGEMENT PRACTICES (BMPS) TO ACHIEVE THIS PROJECT PURPOSE. C❑NSTRUCTI❑N SEQUENCE 1. HAVE MEETING BETWEEN CONTRACTOR AND PROJECT MANAGER ❑NSITE PRI❑R TO C❑NSTRUCTI❑N. 2. FURNISH AND INSTALL SILT FENCING ALONG HIGH WATER MARK AT AREAS OF ❑PERATI❑N 3. CONSTRUCT PR❑TECTIVE TEMPORARY C❑NSTRUCTI❑N ACCESS AS NEEDED. 4. THE WORK AREA SHALL BE GRADED, SHAPED AND ❑THERWISE DRAINED IN SUCH A MANNER AS TO MINIMIZE S❑IL ER❑SI❑N, SILTATI❑N OF DRAINAGE CHANNELS AND DAMAGE TO EXISTING PROPERTY OUTSIDE THE LIMITS OF THE WORK AREA. SILT FENCES, STRAW WATTLES AND/OR OTHER BMPS WILL BE NECESSARY TO ACC❑MPLISH THIS END. 5. BEGIN SITE GRADING OF PATHS, FILLING SLOPES ALONG THE ISLAND SHORE LINE. INSTALLATI❑N OF JUTE NETTING, PLANTINGS AND ER❑SI❑N CONTROL MEASURES SHALL BE CONSTRUCTED PER THESE PLANS AND DETAILS. 6. MULCH OR COVER IMMEDIATELY AFTER BEING CONSTRUCTED. THE AREA BEING PROPOSED FOR PATH AND MITIGATI❑N MUST BE COMPLETED AND SECURED TO ENSURE NO ER❑SI❑N OR SEDIMENT SHALL FAIL IN WINTER C❑NDITI❑NS. 7. INSTALL ALL PLANTINGS, MULCH, FENCING AND SIGNS. 8. ALL QUESTIONS, INQUIRES OR CHANGES MUST BE C❑❑RDINATED WITH PROJECT MANAGER CRITICAL AREA SIGN SPLIT RAIL FENCE SEE DETAIL I I �I Ieillll II1 II 1EI EIIEI 11_11 II I II 11LF E11 I III I I=1 III -III I I -I I I -I 11=. N 11 11 k 11-111-111-111 = I E I M I N I EI 1 I-1 I -I 11=11 I-1. . 1 E111 1 E11 I I E11 1 E 1 E11 E11 11 -111 1 I N 1111 E111-11 E11 E11 N i ! 11 E111 1 I EH I1 I EI 11-111 11 E1111. MIHIE1II- IE1Ir1EIIEIIEII 1II IEmIIE IEIEIII=11 _ 111 I I I I N I I-11 EI 11-I I IJ 1 EI I H I EI 11 III III -I I EI I I=1 I I-111=111=1 I E.. I I I 1 I I N 1 I--11 �I I I I �I I C I I �I I IJ I. I �I I IJ 1 1 111=1 I I-1 11=1 I I=11 �I 11=1 I IJ I I �I I I-J. STRAW WATTLE W/W❑❑D STAKE BMP C235 FILL SALVAGED FROM PATH CUT STAPLED JUTE NET BMP C122 TRAW WATTLE W/W❑❑D STAKE BMP C235 SILT FENCE BMP C233 J W 4 DRAWN BY: DANIEL G. RICHTER DESIGNEDIAPPROVED: RICHARD ALLEN LLCC LK. DAM COMMITEE DATE: 5114/2025 JOB: LLCC PLAN LLIEP SHEET NO. CRITICAL AREA FENCE DETAIL CONCEPTUAL CROSS SECTION OF SWITCHBACK LAKE ACCESS N. T. S CONCEPTUAL CROSS SECTION OF CUT/FILL MITIGATION N. T. S 1