HomeMy WebLinkAboutBLD2025-01389 - BLD CD Environmental Health Review - 1/7/2026 . 4 LG.a:i & 3 - Gc)c)le> ."-esuC (CCa5 - Q 13
NOT AN APPROVED SEPTIC DESIGN EH APPROVED
• Must use SWG 2025-00183 for septic installation Rhonda Thompson 01/07/2026
I
EH Setbacks
A.) Drainfield/Reserve requires 10'setback from footing/foundations
B.)Septic tank(s)requires 5'setback from all footing/foundations
C.)No foundation/Perimeter Drains within 30ft,downgradient of
Drainfield/Reserve area
D.)No Cut Bank(s)(greater than 5ft and over 45 degrees)within
50ft,down gradient of Drainfield/Reserve area
E.)Use approved mitigation from section C1-9 of the department of
ecology's"Criteria For Sewage Works Design,"when sewer
310 transport lines are within 10ft of water supply lines.
'sting Garage
Z Existing Jam`•
•S 1:11-
. \,
Existing Parking with 1 Addil'gnal 4)
`\1 Car Parking for ADU 6,A\ A '•\
I
Well Radius
O \\
3ti`
,,v` J__- `
" ` \
/�
New \\
5bd
for ,�,oN\ Existing Primary SFR \
`
main :1,0 3bd \„/ \
home ti m �l `..
and .•'\
ADU ------Existing Parking„. -,\
fiePCc
Existing Shed j9°� -- Tanks \.�
rn z ---____
\\
\
2bd '1 44 Deck \ f.
Nr,
Proposed ADU
24'x40'2bd/lba MFH \\ c;›,
,. \l
4x4 Netm�
253' C is.
\N \ '
,/
,
z Q
rcolh "-mm: Natwe. Pinnacle construction
4464 W SR 108 SHELTON, WA 98584 01521 i:.0�0r? -rascal ep=ia'sre Rachel 110 West A Street, Sheltsn,WA
360-780-3890
ric_ Fare
New Manufactured Acme for Ally 1":30' 12/05/2025 8