Loading...
HomeMy WebLinkAboutBLD2025-01389 - BLD CD Environmental Health Review - 1/7/2026 . 4 LG.a:i & 3 - Gc)c)le> ."-esuC (CCa5 - Q 13 NOT AN APPROVED SEPTIC DESIGN EH APPROVED • Must use SWG 2025-00183 for septic installation Rhonda Thompson 01/07/2026 I EH Setbacks A.) Drainfield/Reserve requires 10'setback from footing/foundations B.)Septic tank(s)requires 5'setback from all footing/foundations C.)No foundation/Perimeter Drains within 30ft,downgradient of Drainfield/Reserve area D.)No Cut Bank(s)(greater than 5ft and over 45 degrees)within 50ft,down gradient of Drainfield/Reserve area E.)Use approved mitigation from section C1-9 of the department of ecology's"Criteria For Sewage Works Design,"when sewer 310 transport lines are within 10ft of water supply lines. 'sting Garage Z Existing Jam`• •S 1:11- . \, Existing Parking with 1 Addil'gnal 4) `\1 Car Parking for ADU 6,A\ A '•\ I Well Radius O \\ 3ti` ,,v` J__- ` " ` \ /� New \\ 5bd for ,�,oN\ Existing Primary SFR \ ` main :1,0 3bd \„/ \ home ti m �l `.. and .•'\ ADU ------Existing Parking„. -,\ fiePCc Existing Shed j9°� -- Tanks \.� rn z ---____ \\ \ 2bd '1 44 Deck \ f. Nr, Proposed ADU 24'x40'2bd/lba MFH \\ c;›, ,. \l 4x4 Netm� 253' C is. \N \ ' ,/ , z Q rcolh "-mm: Natwe. Pinnacle construction 4464 W SR 108 SHELTON, WA 98584 01521 i:.0�0r? -rascal ep=ia'sre Rachel 110 West A Street, Sheltsn,WA 360-780-3890 ric_ Fare New Manufactured Acme for Ally 1":30' 12/05/2025 8