Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SWG2025-00472 - SWG Application / Design - 12/29/2025
• MASON w COUNTY 415 N 6TH STREET,SHELTON,WA 98584 SHELTON:360-427-9670,EXT 400 ,. . , BELFAIR:360-275-4467,EXT 400 Public Health & Human Services ELMA:360-482-5269,EXT 400 FAX:360-427-7787 On-Site Sewage System Permit: SWG2025-00472 APPLICANT COLLAZO CHRIS Phone: Address: 20014 45TH LN E SPANAWAY, WA 98387 OWNER COLLAZO CHRIS Phone: Address: 20014 45TH LN E SPANAWAY, WA 98387 SEPTIC DESIGNER PAULA JOHNSON* Phone: 360-898-2255 Address: 171 E VUECREST DRIVE UNION,WA 98592 Site Address: 420 E Herron Dr Primary Parcel Number: 220185400036 Permit Description: 3BR SFR Nuwater Permit Submitted Date: 12/29/2025 Permit Issued Date: 01/06/2026 Issued By: Jeff Wilmoth Current Permit Fees Paid: $555.00 (additional fees may be required upon installation of system). Permit Expiration Date: 01/05/2029 (based on date of inspection) Permit Conditions: 1 Approval of this septic permit does not approve the building location. Building location is subject to approval from all applicable departments and regulations. 2 Proposed development subject to zoning requirements and approval by the planning department staff per Mason County Title 17. 3 Permit must be installed by a Mason County Certified Installer unless prior written authorization from Mason County is obtained. 4 Drain field installation not to exceed designed upslope and downslope depth specified on design form. 5 Installer is responsible for obtaining Mason County installation approval prior to backfill of system components. 6 Installer is responsible for obtaining Septic Designer/Engineer installation approval prior to backfill of system components. 7 Mason County Asbuilt Form, Record Drawing, and Installation fee must be submitted for final installation approval. THIS PERMIT MUST BE ONSITE DURING INSTALLATION OF OSS. PROPERTY OWNERS ARE RESPONSIBLE FOR DETERMINING AND MARKING ALL PROPERTY LINE AND EASEMENT LOCATIONS. THIS PERMIT MAY BE REVOKED IF THE SITE CONDITIONS HAVE CHANGED SINCE THE SITE WAS INSPECTED AND DESIGN APPROVED. FINAL INSTALLATION APPROVAL IS REQUIRED PRIOR TO TEMPORARY OR FINAL OCCUPANCY OF ANY RELATED STRUCTURES. For Final Inspection visit: masoncountywa.gov/health/environmental/onsite/oss-inspection-request.php or call: 360-427-9670, extension 400. • DESIGN FORM—PAGE ONE Assessor's Parcel Number: 2 2 0 1 8 - 5 4 - 0 0 0 3 6 A design will be reviewed when 3 copies of each of the following are submitted: ''Completed design form that has been signed and dated. "Scaled layout sketch,including all applicable items on checklist. v Scaled plot plan,including all applicable items on checklist. 'd Cross-section sketch,including all applicable items on checklist. This form may be scanned and available for public view on the Mason County Web site.Maximum paper size:: 11 X 17" 1-r f r ie i a ,d s t .,.. gg ..,.... �$$,,�t� tgg 4 k, u'� .,a A�.;w...^r'..'k.'�, :`r. <' r'ib7PEry ' Designer's Name: Arrow Septic Designs, Inc Permit Number: SWG aaa.5- �a 360 Schoene Enterprises Designer's Phone Number: (360)898-2255 Applicant's Name: 171 E Vuecrest Dr 420 E Herron Dr Designer's Address: Mailing Address: Union, WA 98592 Shelton WA 98584 City State Zip City State Zip Designer's Email paulaj@hctc.com NW rgINIMW. �. y. dn Cags.a<>.. a ,.. ,,. ,.. Y ga w....,;,_a;5M4iiilzu�MS ^'ate-.. Treatment Device ❑Glendon O Sand Filter O Mound O Sand Lined Drainfield O Recirculating Filter ID AN NuWater BNR-500 Q Gthet500 gal pre-trash Treatment Level(check all that apply): ❑A CB 0C ❑BLi 0 BL2 O BL3 CI E CI N Drainfield Type ❑Gravity Iiii Pressure Cif Trench O Bed O Sub Surface Drip Septic Tank/Drainfield Specifications Laterals Number of Bedrooms 3 Schedule/Class 40 Daily Flow:Operating Capacity 270 gpd Length Avg 40 ft Daily Flow:Design Flow 360 gpd Diameter 1.25 in Septic Tank Capacity(working) NuWater BNR-500 gal Number 5 Receiving Soil Type(1-6) 4 Separation 9 ft Receiving Soil Appl.Rate 0.6 gpd/ft2 Orifices Required Primary Area 600 ft2 Total Number of Orifices 40 Designed Primary Area 600 ft2 Diameter 3/16 in Designed Reserve Area 600 ft2 ` • Spacing 60 in Trench/Bed Width 3 ft Manifold Trench/Bed Length 200 ft Schedule/Class 40 Elevation Measurements Length header ft Original Drainfield Area Slope 5 % Diameter 1.25 in New Slope,If Altered 5 % Preferred manifold configuration used? [ Yes O No Depth of Excavation Up-slope 10 in Transport Pipe from Original Grade Down-slope 8 in Schedule/Class 40 Designed Vertical Separation 12+ in Length 50 ft Gravel-based Drainfield Required? ❑Yes lid No Diameter 2 in Pump Required? Ife Yes O No Dosing and Pump Chamber Pump/Siphon Specifications Number of doses/day 4 Diff.in Elevation Between Pump&Uppermost Orifice 12 ft Dose quantity 90 gal Drainfield Squirt Height/Selected Residual(head) 2 ft Chamber Capacity(flood) 1,000 gal Uppermost Orifice gHigher O Lower than Pump Shutoff Pump controls:Please check those required. Capacity @ Total Pressure Head 23.6 gpm 1e Timer O Bt'apse Meter ❑event Counter Calculated Total Pressure Head 15.71 ft If Timer: Pump on 2 minutes ,pump off 6 hours Comments Y.;• p p ft? 0-r. ` / g ,f.4,, 4 - w Revised:4/14/2025 .V�,O MACOitI COUi1�T1'ENVIRO�i��C�'TAL Hc,','�Ty DESIGN FORM—PAGE TWO Assessor's Parcel Number:2 2 0 1 8 - 5 4 -- 0 0 0 3 6 Permit Number: SWG Sc .1'' Y. ty_ �sn K & '�4 '� 3y..�. )ES '}�7 71 iT�i.l J >5 xs av > �". a 3�"� s K - AW .ci b l S _.. : 'Kr .f - 33Y�}17 ,;4„:= ,,:4 1 .e t_rr, .. ..d:... .T.. L'^:� ,.,.A ..•o..w.rk: S.ag..i. Scaled Plot Plan Scaled Layout Sketch Cross-Section Sketch t Test hole locations lg Drainfield orientation and layout Reference depth from original grade: Ft Soil logs g Trench/bed dimensions and g Septic tank g Property lines critical distances within layout r$ Drainfield cover ❑ Existing and proposed wells g D-Box/Valve box locations Reference depth from original grade within 100 ft of property li4 Septic tank/pump chamber and restrictive strata: ❑ Measurements to cuts,banks,and locations ur Laterals,trench/bed,top and surface water and critical areas 6I Observation port location bottom ❑ Location and orientation of 121 Clean-out location 0 Curtain drain collector curtain drain and all absorption El Manifold placement 0 Sand augmentation components g Orifice placement Other cross-section detail: g Location and dimension of Lateral placement with distance g Observation ports/clean-outs primary system and reserve area to edge of bed Other Information O Buildings g Audible/visual alarm referenced Yes No g Direction of slope indicator li Scale of drawing shown on scale 0 Cz Design staked out g Waterlines bar 0 g Recorded Notices attached g Roads,easements,driveways, p Elevation benchmark and relative 0 Cr Waiver(s)attached parking elevations of system components Elf 0 Pump curve attached g North arrow and scale drawing 0 Evaluation of failure shown on scale bar Non-residential justification 0 g Waste strength ❑ g Flow s' .c DE81 .:re A Ar zze r�r c 'vi `�r r The undersigned designer must be notified by ins ' . jat& Yes 0 No 5100349 •:i -Z� Signature o PAULA JOY JOHNSON - Date 'S.8ti 1Egial 'Vt The undersigned has reviewed this design on behalfason o Pu Health and determined it to be in compliance with state and local - ite re ulations: E vir tal Health Specialist Date CAUTION: DESIGN APPROVAL IS VALID •NLY UNDER THE FOLLOWING CONDITION: ✓ The design is stamped"Approved"by Mason County Public Health. c� ,/ The Onsite Sewage Permit has not expired,the Permit Expiration Date is: I —S-.2 ( i ✓ Drainfield site conditions have not been altered to adversely affect conditions of design approval. Please Note: The system must be installed by a certified installer, unless prior authorization is obtained from Mason County Public Health. An Installation Fee is required. This form may be scanned and available for public view on the Mason County Web site. Revised:4/14/2025 • t ---S 1' 9e_ 2 TIMBERLAKE NO1. 6 11 SECTION 18TWP. 20N , R2W, W.M. MASON COUNTY , WASHINGTON- \ oAO ..jt_ • .7.';: 1 : 5O 52 + N. to r._.`.•; 1 1 i. a -70 -0:#4 ,� \`' ,Mi .: •Ce p/ �: .,. yia A' lt.'. lot'.'k^,"4',:9 4'ie r P;,+ ��• _F 7..fY '�;.q•/: ti ri q7. ., a,,• 4, 4` , • -4- >-,-,0,,,,..-.4;:-<,mot.. ^'r o I /: �?.}.. P •,1 41 -°''w• 3T '�;?. /i'il, 3 SCALE I'b 100' i 4 ,cs.' t •l� D yd yr, es a 0 d•t --w'w4- vtg9 i o-•tax.omwnKi/ .��'�,rrh �' �-. ,p8 F,yr>i- .» !d bV 3A' <....""/"t0. • I.,r?.IYIU.!. S' r4Q,,yoiv ko ieu res .i ./6i;ed. • .5414 F`,..`5, .` I 1't 0',.;• Ji .f- .te yam- •�w� 8ti J/ .1.. 1:,O �_= rje i • \,:i' ' li • rfr'yiti 4. '°+/ t't' yldu"•,, asasiYt/ d0"D• J/`sue lF Q•f:zz., -`\ .-•,. lLe lLsy l31 t0� 001 F 1 . \ ?5 • [rose - .•:Vrv',,, p Q� .A 1!ti C a 0101 , 4' .,.--, ' 1 — l, 1 N`I 8 'v`,S ---- 1 $ 90 t'''''' 6 S • :�.l: \, \ -,,,,,,,,„f y ' Q gJiv.t�l1 h'i gle 41.1- ei;jle....n �n\-- � ::.J \ti 4,1 .. A�Ai: :o. �1 : a ,YEfRON�'g< _elftY"",,iY/N -_... /,7A d •---"0: r,.. .. /�Fs�" ifs:-1 § Yv Zy ,4.a 2f es; ,ry ��_aervx�.r2'>74 dA• `v_rR__._._ b. A4 y s a•J y b, ., ... iF .... -I... li ._',sear- rtv G o h.0. 4 0' 1)6'di )1 • z3r 1''' 1 i x: ra a's 1:� i-A'1' N r st •� r �:s is. ''•'.t. -- --- {:i Qf 'a ,T aft x+v'•,:s-le.i ,4; 5 ,~< t%a" . ! if 'J:; \ I vp y :.. it:• >N H Vii, �, i:.. Yl., , -...1.k7+,.,, 0lay5 evil y w 4 kit a si�6 e:s 17 /,, 3 it .4 `1 is ;..a\`Nl t � ,,S'"_-tt +e' 19 tl�C,+:,' 40 ib`p`, .,b0.„ ,;q .e.w. `a,.:4 {'alt _ .. . `s' CO n 1 4 .f/ ikW' f O 'T1 : c.f. d of [t ¢t9 i3V���2q e t....4'..-, /;tyE ° > I ' /i :a _tt ,r•Jl t 1 sis 10 t,,0 '-r-•w ?1 9....s ft I71l ,;,••.,,...... ..fV" ,;e —i ,t q`- n.•. *,' ep a�R, \��: §if A� y't „ a �rg4 zz 1 I.?s & '%.....„44,...:.'..`:.e....9.:,. ItoS�fn."F : ,a.r ;, P u�uU y ;.: p sq Rl f /t� y :.Q rN7 �.`ti ,er.0 n 4eP'4. i .v N' 1t ' •-.s,,1,00-sm. `^4.y.. r " ;.;4't112Y 0nm":u S4yii E?,-�! C' 4;,,� '- a7 - Jl Y et' .1 "',. ,} •S,,,s, ,i•i/B t,70'1.,,t. ' .0.14 i?.2/ 1 5tl` t :6 Fza tom"• •z. i ^.'$;e`r��i}Qt¢t .niria^i.'fl�9 Prd • .w$ 1ft�tl5/.9 'fin,j� it t \ 1 t a O i `` I �`t1'10 { >l Atl 9•.•3.`:At o ,-ry ... _≥ :�, / f Qt4, f'"144•'�j ' r'1 "`, 6,4-% i .1i1 \ m a� - ,\ I `)�•�y��`z,S,d,,JP�v•4%7 .,3�' l4 _.�rY a 4101�3 _t\lt, - / :tea,r ny'1 3 1) 'b �",,•,, t a �' / 11 lily`- a. `et',�.>'',p'.$ -••70„ ` '/eisi' \ ,... .n f ..o:w l≥a. Zr. t .fo d;? m, �'•?,1,-—gym ...sir! �`.` ,,,,,,iii r 3,'itay, {y —` z ‘,..,:....,,,..",,0.- ,t� ✓7rEer Sz / 7 ( yip'q t. c� a1 '\ 7., r ?X:bn fisple pm [surd.3'...1y0,."--- '- • Cib/acote No 2077. '`\ '<y4 ,J OW SHEET 3 OF 4 SHEETS \• CW9/9 CL -S1--')<-1--(2.1 H11 v'3H 1d1N3WN0al/IN 3 J�1Nf100 NOSb'W ..Ea.o1sna4asigosz. 9e 9 0 Nbf . k NOSNHor A0r vinvd .�- � rZ; �•- 64C0C3G , ,,a r' Rion,:. 1 0 ' .` g d d .: - ...?.---.. . . ' 9C:.4t%'..• • ,,,,4:if . DSIV ....'''''."--- CI V QVILVS+1 MIM3 pNo' / I Sz / xog IO=IQo3 anivA0 / raqtcretio&and uorrep 000`t so V / �,L x�i nip Dos xxs3Emnx d ® Og ' xu4?•Tmirasd•aoUTEO 00B CD i's,,,-9_. - Gam' (1 o)-%'o �nousato O � LV ins?A o?PnF io r aax o g ) ei, x r L7� r n 1i- c�- ci Nb r a` zQ .�. (7)1•4o aNVS Q1.ssmfd ce, .-,d,rwQ- Q.1...5joae A- 4NV9 --•� 3N, C\-110-7 V\pc) Lz-a ;z . NauoydwQ)0N(1 nv► \ 3d05 Q cl cad S w0'e9 l-�73 t`' 9 j a/.5 V- i‘„0)2- z z(91003 + Q Ctb9 5• \ \ W.' V Q NQ?k1344 3 QS \ ,05 \ \ \ • 7-77 (5 a 9tVpiaLtsi g ai-maal.pr.- ''' \ \II' i Ned 10ld -3, e ,:* oz ot 0 f 03 J 02= tot • '31 G1 49i• •9 9 G?Z-863 (09 E) . M !A uo!peS—sso1� . pia}�c .gyp su6isea o days MOJJV • • . Pairi tga3 J. Pe Pam +,'Z` •L— smi'• t-..-j--".... "'.."X 23 / 4:040 yam 51;• . 4* v0-+ S ( Cr' " �iFd .Zi %do • ttlighS u P• Ed p;u. 5 Pa 'Y U was. vO-Pee =PS b ;ad iCSIMASCI0 U met ikd tz 90 O2 IMPW �,, ,, PAL oa taw 'Wile P .3 eL y�7,3y 7VL $� . s m 4 > .r oi '•,,, ,3WN0�1AN3AiNN0o NOSY .oZ .os ,o 1 trl n cj, od it- . st: = .I mos • .. ar��Esans �1.� ° no�D�I p{ar;ura.�fl pa�fl�a '•• N0SNH9 .9r V•1(ldd ..t '." ' ...i ji ' ' CuA 9:114 . . .. .,.... ® , ♦ A a ;O 's{k".;:-`? " r • •• s• I • •1.elet.. Q0.1.47 1S`- „al • ..T. • � �O 1 o£ I Q SrV.34:171 ,i c)7'- 4at,,,1 1�� ,6) 5%.1 b ,P}'? GJ • I 3N1'1 • �, rnx J ,OJT ��d lboasNyVi...Z Ka; rraggo 1�-,' dk), }Lam x og loVINo1 3n1 lx N £ ' 1 „off • Length Length Orifice # Distance from Distance from Lateral# (In.) (Ft.) Spacing Orifices Feeder Line(In.) Cleanout(In.) 1 180 15 :" 60 „,F.-':3,;;,,,' 30 30 2 600 ,.':',"';'601',";',..'. 2 ( 60 ': 10 30 30 3 600 '% 50 '.`. 60 10 ' 30 30 4 600 :--,.. .•.:;,50.:::,,-,' 60 10 30 30 5 420 ''''.:1=-:.:35,7-;:':"..:, 60 7: '.' 30 30 Total Lateral Length 200 Total#Orifices':, 40 I GPM= 23.6 Dynamic Head Calculations Selected residual pressure: • 2 ft. Length(Ft.) #Orifices Transport Pipe 50,. 40 0.50 ft. Feeder Total Lateral Line Length Lateral#1 15 30. 45 3 0.03 ft. Lateral#2 50 2 52 10 0.29 ft. Lateral#3 50 11 61 10 0.34 ft. Lateral#4 50 20:: 70 10 0.38 ft. Lateral#5 35 :29 p7 0.18 ft.pTotal Elevation Lift ;) . t. Total Dynamic Head J , 5;A:iSr'40414Ntli COUNYA�ENVIRONMENTAL HEALTH ft. • SECURED LID WITH GAS TIGHT SEAL THREADED UIJIDN . 24•DIAMETER - ACCESS RISER : SERVICE FINISH GRADE jam_--.._ _ _ VALVE• _ , r FROM aEPTIC ['- 1 - • —.•ro DRAINFIELD TANK61-_ l STORAGE - ANTI SIPHON • VALve - '—HIGH WATER ALARM LEVEL ---p. NORMAL VW OFF WORKING VOLUME FLOAT DIDI . "4"\....cp----7-* -�-- - FOR FLOAT MOIJKrtNG ENCLOSED PUMP - '-Q SEDIMENT gip• .CHECK VALVE• %-----"M r =-_-....: '` •. �Jti'1\V! SEDIMENTS •-4--.,MI.{! ..%CPart' 51003491 • pump CHAMBER J-/ct' PAULA JOY JOHNSON• C1L1 1:l ISEt5 D'eSiGli K T,. _ 'AS NEEDED Septic T� t meet standards required by WAC chapter 246-272C a and FIGURE 2 manufacturer must be on Dept of Health list of registered sewage tanks. sto -- .---.. W A noH Publication#337-022 . • 'Page 35 of 65 _ 7 °ti•DI M p s r •• Bronze construction available(139 series) High head version available(145 series) x� W. F . • Double shaft seal versions available for added protection Flow-Mate on models 140/145. For more information,see Technical Data Sheets FM2782,FM2783. In high head dewatering or effluent applications where pumping `. o r c PUMP PERFORMANCE CURVE performance is critical, this robust -» 3A:r� , ' - MODEL 11401145 family of pumps is known for reliability, n durability and performance. These f �, }} .. s73 pumps are especially suited for harsh L I x � '��������� environments.Zoellel's coot run design i " � and corrosion-resistant,powder coated a ■�.������� 3 epoxy finish add up to a long-lasting, .. iE ■■1'■.■���� `-Q trouble-free product. ' 53 '"■■■■■.■ APPLICATIONS: 4 • STEP or onsite applications " .c .• • Water transfer g- ■■■■'����� Z • Light commercial dewatering 2 �■■■"`■■■� Z} —IF , n SPECIFICATIONS: ® • 1-1/2"NPT discharge0:-....-r ' ■■.■■„`\■. • 1/2 HP through 1 HP 4 MADE IN THE USA ■■■■■��..`■ • Available in automatic or nonautomatic ILEA MAMMY OFUS.COYT18T : 5 vs ,m 1p • Model 137,139,140:1/2"(12 mm)spherical solids ����� ■� capacity with vortex impeller to a m a w ® n w ® im a • Model 145:3/4"(19 mm)spherical solids capacity with l'''76 0 03 '80 z" 220 T;. 152656 vortex impeller ROYIPERMU ., 4 7;:1 Ym X r.,Y ya {{;; y G 4.:15T--415204t, � $ o4t / 7 f / W ,e-, A.:;:1,,,•0 .� v x L Lj PUMP PERFORMANCE CURVE MODEL 151/152/153 Dose-Mate _ This is our fastest growing line of effluent 14— 153 pumps.The 150 series is truly a workhorse . 4 designed for reliability under extreme . _ 12— 4D conditions in an effluent environment. _ -, a 150 seriespumpcurvescoverawiderange - - to- 152 of applications. They are well suited to - so applications with low pressure pipe(LPP) .. } 8_ 151 and enhanced flow STEPsystems.Zoelter's ` 0 25 cool run design and corrosion-resistant, ' o powder coated epoxy finish, in addition 1-- 6- 20 to the hermetically sealed,ail-filled motor 15 and non-clogging vortex impeller add up to 4- a long-lasting,trouble-free product. 10 �� 2 APPLICATIONS: �-� 5 • STEP or onsite applications o ----,—, MADE IN THE�USSAA 10 20 30 40 50 60 70 80 90 100 • Light commercial dewatering GALLONS SPECIFICATIONS' LITERS o ao 60 1zo 160 200 210 2ao azo aso • 1-1/2"NPT discharge ../ FLOW PER MINUTE 014508 g ter' • 3/1O HP through 1/2 HP , P p• Available in nonautomatic or with a variable level ' ° k 2 1 piggyback mechanical switch '°"'j' ` • 1/2"(12 mm)spherical solids capacity with vortex MAS " AN r thermoplastic impeller 0lll a For more information,see Technical Data Sheet FM2784. oUAirYFj� 4'140 .f./ ,..,tie ©All rights reserved. ZOELLER PUMP CO. 1502-778-2731 18OO-928-W1) nC�ump . . 9 © , .i �. • ! . txca i boWA;�!9 31O blt�5�8itt/1114 7 'i0 2;966.1• ,(5 rani Wan tom . . At W1;FCS1 l Art:•Ir,TGgfl()IL • wAT[RT(GI7T Nlt?TSIP rvc E 7B'IG'•Crl._,.. ... ._ _ P19CP AND rGRC14 PCti5M • 1 LIP WI Y/ATCRTIC41T . ' . I(AGC4NIANPRCCn5f •\ PwAt u9)run1Lpllrir4bPf3 .. GRAM �� nal. s erl• .. .: .- _ \\ • • • rp� i anrF r1nNuFi�LtutrtY�J+`Y^•' •---. --'-';' _.-_ � . MAX CT 1Th()P GQYFdt - . Y. .. F •- .1 �• u i01p,VAPACtrt. $. .0 riurl ., 1 Na&�ATr�'.N 6:,ccr9`3 - .. I.'•�rYc-Ai10p_()I : . cfri,1.I))r 1?TAG.ILCX ATP "' •. ' . . ' - ` • - •.. • ` . ,I Uf N1N4• _ r• 1 • •Il IN'alaf PJ9LP 9A:_. _ ._. YA'1.INP.. - 1401.......-. ) +3; ) A<C1J1raAN()1u51R5. .. .. n , f1) cA ; LII O +! CA3T A atnl C.AJKI'T r • • I)khDM1iMLNJC 1✓`L NAaT'CC'J9(AC0l( ALH(,41lf ALiAlelr .C. 1.)R(01110 VJ1rPf:•TgiIII L�.�,1.0� 1111,(J'1AFIG€( WIVR ItCC[59CSPrNtvriL ti POI TG (r,^'� .. - !•. TANK P(.PJ CIWTICNI:iY^: (L .- +n W • I txL1AQ itr Tr<LNIrB t AJl4 1 `'��• 'I)Rc31'Ay0TAis041) 11UM{)f2ilr15trC;101 1R -- • id • (AfArRlpy,{(AT!. 3)I4 TQ 1916 V+D•1)119 9 PO AIYP)n(�I)Al 9ICI 00.0 { = -�' .. • • .,-..,..i.;.;.,. - . P14tRe04NeeTlp),_e Au6TIrrC"N0109(JCiYrL+RW)'i..ti 4 I` CIRr.;.,. .'III' • G'. Cn. f Cf,t Ai}nk`r('A9 r0 Wq-P r LA141!L rMovCMpir•4)R RT., L�g • ,• = .Tor ii F 1 r • o N • • a d)ACGG5i)V()RIgI'ItovrNLYC5MU5T:OCCrnraP\YIiT)� - L(kf41-t4P"l1POR41(1Lt (4I"CI)PP • - Z ,� ., 1141:• - s•4 a 4 ��. ),ACLt,9.., ptl.p,A1)I)LIDVMN,T"f:glA$Iunf}LY(YJUi11)-� -..T "�-�: - .. ...1,r r(�r TO VA 1197?N1)ANtIC iiiAICP 5=11 ePCI IrIC LOM40 _ ti J -M''•. o r« p i 1 q i' � c► '1 wWae� 1 .• •ohAl5.AN0 GAar:>;T°rNQre') ..„.• • A., 0101. �1 -:. W:�'? . ....Crr � .. �' lM/ C!1) / I)tSEa1h.A*ij'1 49AGr9PUk IyLt1 L3u.Ae1 AA••-,. N 'v'- � •A•'12'TID6s. • I mil' �i 0-• b ,.. I0CFG(J e,*(kihrrat•rITTINI,s NU.IT et tit it1l1, y �" .�l'lttlCY.,o.JU Nil _ .: '. 4' ,,,.:;. M . . . . -C ^ "°'r -.'r AT gUYTQRI.UP.-_� - �f :•;11091•r rlCe ti rte_ins )Y� . wnTe'tistsl C(?rld7(IC R1 �TTnN;NVtlfut9r` µ YP1L:rrY CONE:aC CPI()UR nRCDMPAGTrP-✓1,901 .•: tesY�.. 2)21)10 AT 1)1lt1W i0t13 t 1(00111 et2,AYAfN1 MUC1 AC kis. �y U5LV 1311, liti w41 10 P4C III,N4IN.T0iJ,GG it)' 0V or grow 4.CIIl .:( :..I • PAM vAcf 6 III: ea l� . • f.kd 1 .7.'-'÷'..�. 0101.._.._...... ......_...._................_...._..- r 13AFFI,�NptF:$ 1 [ YiRA(P CKI CODING.At.4Q !td91 ALLA7fQN CN aTRWCTION;i ._. _..__..� _ _ _ 0101 , •:1)• _011 .,_:... �ry[I ��- Y, LYA In feC7:LbkCtt:li`iii.1•ANK 6ri Alt^+IVCI.eoTrOM 64 t}Nn1G3 Yh 9trtlf•:?ANYh-mum rmeNt AY LPrn g:r.i.Wl)nLtO.16.iivei 61,61i imr.MOtltl.iWJ 1:M h1 '�^"" `- • ' ii i ..1 LCIIL,A\ATC YAHK IV 1.0.4.131) Al JIIfA I w WAIL)111),A)1 ±P.^.RI l I VII. a� ii171IAIJ. O114ML4�it1414/4,1RPC@PtiYdR 14.4)PM(n°iitd;'=PI:.PCCTVI`Y[::C.Ni[M0+'tA1A 214;)iCt;TAT(? CPTIG.7AN�:;rnp.,)Cstlfh4Pbtt76611?^IlU?8PrN1'sh),Irn. 11)lAll!till CfI01PAPN5P0110L•r:CCIO%:5i.UIts M �.. •i I)IW A'1 1(11 uL IC11 d i IlQI!31LArt1h O1,(90 1 ikW.11'I ui e. ,-Loilil)T. 3III LI A T rrlr rlURe OM:4r) ( • ... . s.. 311,,6TAI){1A17014:0IJrfiR.V.i.or,KX IJINrruaxotyi.)11)031y'SD:ww:I;:OilAlt3iCEB. �1PI.I.,0•AllP01,,iittptvi:,L 1.11.6T11nYf•A.1¢4.11g1MNL71CI:))!14.4•ARt(N'4! C M:0PMTOWit? •• i AI IIUTA[C(cf.5'r C1r GY-Ill-i ANC A1'Pr,.(44t,P`C A''=11 1Ui4f,rI Y LGi.N J.)! LNCl)011..,, hNp:liI.4U'.:�r7k00L11)1,W l'YQ L3lL I,i(At1YC,Rr+)IN•0 Ci^?T.iICl:r •(Lri 1II • 4 .5)U.!K!N:APr17L,lAL 'i LIAC(iiLI.,(M Yuiii'11!CP!J(/))IlV 1..ANF:Nil i.O.Mrlci G J.UTAL(OnNrIll ILOIL 9.NIITAL'.IT9l)r iVAM•1)9034 OR 194)1) 110.P:1 (.1 �itVMr1'nCr/IU P of . I RI'i 44 I1\s61 I'IIA1F`1.tir:WY 1111 11LYdo('VIII 5 1NCI.C9 IN:Vi4M111 k(11401 it (•1913 LIIIy TIP• I)111Lt144 Nil)OIL LI,)9 MAY Pt FWYLI NC M 111I(04 11).3 I O, Q.. 1092LY:IH 1A 11A1 MIWMistd(t?U cG'CR 4OF'- '- Il L Ii (21)J 4P,VA 1(11111(1.0 AND Ter rot'eENTCr N'y 1120'14111)Al LEAJY • ; Cl IY4CL'r1(ARfP-.eAC m,.0$114010:PY UPNGIWIPC"1'J 121.Pf1'(211'0R6011'5°ttclPI0RCRi113.•. y'FPlJk1 JJJYCLN7[kW A'i1 A 14 I PGM ANY 11r. Q• x ,.I-.:.. /ll''1l L(1W1t't 1111 cVR/AQP 1,014411,1)P IVW!UIt10.1 Nesm C\vn(YR 117.VAR(73 TAUT .. • 4 . JI ---0101......._..__... ....................._ ...... 0101 ......01.01. ,if g- I i LID VENT(typ) DUAL PORT AERATOR WATERTIGHT --\RISERS en?) 1 r. 1•PVC(fYP) 0 1/2'PVyyTMAsTIc 41 36- iM.AX rc " T-1 \ — Y COUPLING I I &REDUCER 5 6' II- --- —.--------":y''—t ...... .. .._.......... ---3-R--r—Til —1/4" ' 2'TEE I 1'PVC SLUDGE I 12' RETURN LINE i - 2•PVC J TRASH CHAMBER }� DIGESTER CHAMBER CLARIFIER OPERATING CAPACITY:417 GALLONS OPERATING CAPACITY:421 GALLONS CHAMBER FLOOD CAPACITY:490 GALLONS FLOOD CAPACITY:494 GALLONS 160 GALLONS FLOOD:191 GAL. 65' $g. 1 I se 53' )' e gib : 36• a o 0 0 0 1'X1/2" { Aph;) e o o TEE0 o0 �7,� �,,ga 0 e \ 4148 -144/ t • ;.o o o e o n•I -; -. ? ) 1• DIFFUSER EARS(2) ), �N�/� l r / PARALEL TO TANK WALL 4. R(R„, riti 1 /A 5,t;': \ y e'3�.'�rs. ��/VP `. SLUDGE RETURN 3' (��i`iy SIDE VIEW % �j 1S'TAPER // r=7.4 ft STONE-FREE NATIVE SOIL OR COMPACTED SAND I INSTALLATION INSTRUCTIONS OVER STONY SOIL 1)Excavate tank hole with vertical walls to 1 foot larger than tank on all sides. 2)If bottom of hole is stony,install 3'of compact sand&level 4. 9'-2' jf out with screed. __ ____ _ \ 3)Install tank in center of hole,keeping 1 it void space on P 7 all sides. I 24•RISERS[TYP) 24'BLOWER I 4)As tank is filling with water,fill in void space with compact ± I SING cos I granular(sandy)soil free of large clumps of clay. I I NTOP OPLI 5)Install rest of system,&affix risers to adapters with i I I waterproof adhesive. a,$• 6)Perform watertightness test in field as required by local / I I i I I jurisdiction. II I I 7)Upon approval to backfill,carefully backfill with native I i 12'RISER I I I soils over top of tank. TRASH CHAMBER I I DIGESTER I I CL BEJEsl 8)Final grade the surface to avoid chaneffing surface L i L i L__J water toward tank. . T_OP VIEW T=282 ='-> -_-_:-;a AEROBIC TREATMENT TANK DETAIL FOR �.y ,�� " NuWA TER BNR-500 TREATMENT UNIT I'r� 4 ....., 1>♦ _- ENVIRO-FLO, INC REVISED: 3IQ1/12 ` • Wastewater Treatment Technologies .t-..,...........,...,..„,,-.-:...,.- P.O.BOX 321169,Flowood,MS 39232 scam • _=___ (877)836-8476 (601)845-4796 fax 1" = 1.4 it www.enviro-flo-net - —ED Qsr„rs:,cea TF+o.�4me"er�:SYs+Y3+i'.ma 114`;''St". ,srac• ir ,.., _ , Vii:..„, , ........ ',...,.... Fi r- I f . dyl i 4I 1 E I-0 1 . ff13"45) i/' II I ! I PARTS MST NuWater NR Assembly, Diagram I fl DUAL PORTAERATCR M.POLY DIFFUSER BAR(21 s..3/8-RUBBER 90'W1 CLAMPS(2) iii-r PVC(3.1)2"SECTION) C..3/8"BARBED AD FTOR X 1 f2"NPT(2) O.1"SUP CAP D.112"SLIP X 1/2"NPT ADAPTOR P.11r CLEAR PVC MDSE(OPTIONAL SI E. 1-STREET X.132"NPT BUSING(3) 0.V2"PVC PIPE(BY INSTALLER) F.112.'90°•ELBOW(S) ti 1"PVC PEPS MY FFiSTALLER) G.1"X 1"X Ott"TEE S.2"PVC PIPE(SYINSTALLERI H.1'90'ELBOW(3} T.i/8"BARBED ADAPTOR TO 11S IVPT(2E I,2"X 1".BU;�'`II1IG U.1Y� STREET X v4"ITT 613911. (2) .1.2`SANITARY TEE t+.7 f2'PVO COUPLER(2) ,{' #. J a 3 ' IC.1 PVC CROSS W.7'C`Ii3PLER(BY IIVSTA R'' � k F L.1"COUPLER(BY INSTALLER) ;,,,,,:k ' a 1 „ E--- 17 eii 26 �. °�sora cot,1VA� � � ��� iLed zizsi�z NV/RONMENTAL e �j 4-r o �� � HEAL�N Cluout Septic Owi , Sue. .o A NuWater BNR Pretreatment y,,f ti INSTALLATION& MAINTENANCE : Pressure Distribution Systems .e PAULA JOY JOHNSON ..1.11 88151 EginNf4 .t 1. Install Laterals with contour of the ground. WIRES `% ` 2. Install trench bottoms level. z--zs 3. Install locator tape or rebar at each end of all drainfield laterals. 4. Install observation ports as indicated on the plot plan. One required at distal end of each lateral in drainfield with bottom extending to the drainrock/native soil interface. Glue "T"to bottom so Observation Port cannot be easily removed from ground. Install removable cap on top of port at final grade level. 5. Install drainfield during dry weather and soil conditions; any soil smearing must be eliminated by hand raking. 6. Install threaded clean-outs at the end of all laterals (cap must extend to within six inches of finished grade and be marked with locator tape or rebar). 7. Install audio/visual high water level alarm. Redundant off switch not required. 8. Install check valve in pump outlet line to prevent system from draining back into the pump chamber. 9. Tee to Tee construction between laterals and manifold with orifices oriented at 6 o'clock. Install laterals to the manifold with the orifices at 12 o'clock, (do not glue), after pressure test and Environmental Health Dept. approval, turn orifices down (6 o'clock) and glue laterals to manifold. Orifice shields may be used with orifices in the 12 o'clock position in lieu of turning the orifices down to the 6 o'clock position. 10. Filter fabric required over drain rock prior to back filling. If the drain rock extends above natural grade, run the filter fabric at least 2 inches down the trench wall. 11. Waterlines must be a minimum of 10' to any tank or drainfield(a reduction to 5' may be obtained with a State waiver on lots that meet minimum lot size). Encase all water lines within 10' of septic transport lines and under any driveway/parking areas. 12. Divert all storm water runoff away from on-site sewage system. 13. No curtain drains allowed within 10' of the up-slope edge or 30' of the down-slope edge of the drainfield and reserve area. 14. No vehicular traffic over drainfield area or tanks. 15. Inspect floats, clean filters, and test high water level alarm every 6-12 months as needed. 16. All materials and workmanship must meet County and State regulations. 17. Deviation from this design without prior approval from the Designer and Mason County Environmental Health Department will make this design null and void. 18. All manhole lids and access, sampling or inspection ports must have locking covers and be located at ground level. 19. All pressure systems with a pump chamber outlet higher than the drainfield must have an anti-siphon valve or a 1/8"hole drilled in the discharge pipe above the pump to prevent siphoning. Ensure anti-siphon hole sprays down/away from tank opening. 20.All transport lines under driveways or parking areas must be encased to prevent crushing. 21. Homeowner is responsible for all property lines and easements. 22. Please Note: When you begin using your septic system, contact your septic installer to discuss setting up a schedule for your required Operation& Maintenance on your NuWater pretreatment system. z, gti ` ��++,t�yy fay l MASON ',. ---__. ���JJJ COUNTY ENVIRONMENTAL HEALTH