HomeMy WebLinkAbout2025-058 - Res. Adoption of the Six-Year Transportation Improvement ProgramRESOLUTION NO. O55-25 Adoption of the Six -Year Transportation Improvement Program WHEREAS, in compliance with 136-15 WAC, Mason County has prepared the attachment Six - Year Transportation Improvement Program for the period January 1, 2026, through December 31, 2031; and, WHEREAS, the Board of County Commissioners hereby certifies that the priority array of potential projects on this County's road system, including bridges, was prepared by the County Engineer during the preparation of the said Six -Year Transportation Improvement Program; and, WHEREAS, the Board of County Commissioners reviewed the current bridge condition report as prepared by the County Engineer on 59191-. !b Off, 2025; and, WHEREAS, the Board of County Commissioners finds that the proposed 2026-2031 Six -Year Transportation Improvement Program is consistent with the County Comprehensive plan; and, WHEREAS, the Board of County Commissioners has held a public hearing on this 16th day of September 2025. NOW, THEREFORE, BE IT RESOLVED, that the attached Six -Year Transportation Improvement Program for 2026 through 2031 be adopted, which is hereby incorporated and made part of this Resolution. BE IT FUTHER RESOLVED that the County Engineer is hereby directed to distribute copies of the Six -Year Transportation Improvement Program for 2026-2031 to all required agencies. ADOPTED this ik day of P IZY 2025. ATTEST: U -/1tiL 0/9.ni Ile MCKENZIE SMITH, Clerk of the Board APPROVED AS TO FORM: TIM WHITEHEAD, Ch. DPA cc: Commissioners Public Works Community Development County Road Admin. Board WSDOT BOARD OF COUNTY COMMISSIONERS MASON COUNTY, WASHINGTON SHARON TRASK, Chair PATTARZWELL, Vice Chair RANDY NEATHERLIN, Commissioner Agency:Mason County 8/5/2025 Co. No.:23 Co. Name:Mason County Hearing Date:9/16/2025 Adoption Date: 9/16/2025 City No.- - -MPO/RTPO:Peninsula Amend Date:-Resolution No.: 2025-058 Project Identification Project Costs in Thousands of Dollars A. Federal Aid No.B. Bridge No.Fund Source Information Federal Funding Phase Federal Federal State Start Fund Cost by Fund State Local Total (mm/dd/yy)Code Phase Source Funds Funds Funds CRP PE 0 ELFENDAHL PASS RD RW 0 Rd. No.: 80610 CN 7/1/2026 STP 825 332 1157 1157 N/A From: MP 1.85 To: MP 4.85 STP PAVING PROJECT (BELFAIR TAHUYA NORTH THREE MILES) Total 2026 Project Cost $ 1,157,000 TOTALS 825 0 332 1157 1157 0 0 0 CRP PE 0 CLOQUALLUM ROAD SAFETY IMPROVEMENT PROJECT RW 0 Rd. No.: 10000 CN 7/4/2026 HSIP 1211 189 1400 1400 N/A From: MP 1.52 To: MP 5.89 SAFETY ENHANCEMENT (SHOULDERS, GUARDRAIL) Total 2026 Project Cost $ 1,400,000 TOTALS 1211 0 189 1400 1400 0 0 0 CRP PE 0 ROCK CREEK ROAD (GRAVEL CONVERSION)RW 0 Rd. No.: 10480 CN 7/4/2026 90 90 90 N/A From: MP 0.00 To: MP 1.10 GRAVEL CONVERSION TO CHIP SEAL Total 2026 Project Cost $ 90,000 TOTALS 0 0 90 90 90 0 0 0 CRP PE 0 0 WEBB HILL ROAD (GRAVEL CONVERSION)RW 0 Rd. No.: 57530 CN 8/1/2026 100 100 100 N/A From: MP 1.79 To: MP 3.00 GRAVEL CONVERSION TO CHIP SEAL Total 2026 Project Cost $ 100,000 TOTALS 0 0 100 100 100 0 0 0 CRP PE 0 EELLS HILL ROAD (GRAVEL CONVERSION) RW 0 Rd. No.: 40850 CN 8/1/2026 80 80 80 N/A From: MP 1.28 To: MP 2.30 GRAVEL CONVERSION TO CHIP SEAL Total 2026 Project Cost $ 80,000 TOTALS 0 0 80 80 80 0 0 0 CRP PE 0 TAHUYA POST OFFICE BRIDGE RW 0 Rd. No.: 70390 N. SHORE ROAD CN 8/1/2026 200 200 200 N/A From: MP 14.88 To: MP 14.90 RAISE SUPERSTRUCTURE Total 2026 Project Cost $ 200,000 TOTALS 0 0 200 200 200 0 0 0 CRP PE 2/1/2026 FBRB 2685 300.81 2985.81 2985.81 LITTLE SKOOKUM INLET TRIBUTARIES FISH PASSAGE RW 2/1/2026 FBRB 300 200 500 500 Rd. No.: 15500 AND 16630 CN N/A From: MP To: MP FIVE CULVERT REPLACEMENTS ON LYNCH AND PHILLIPS ROAD Total 2026 Project Cost $ 3,485,810 TOTALS 0 2985 500.81 3485.81 3485.81 0 0 0 C. Project Title Pr o j e c t Ph a s e Federally Funded Projects OnlyExpenditure Schedule F. Describe Work to be Done E. Beginning MP or road - Ending MP or road 4th thru 6th3rdTo t a l L e n g t h E E 09 4 1.20 E 09 3 1.10 E 08 6 Six Year Transportation Improvement Program From 2026 to 2031 07 2 4.37 E 08 1 3.00 Nu m b e r Pr i o r i t y Cl a s s Fu n c t i o n a l 2nd1st D. Street/Road Name of Number R/W Required Date (mm/yy) En vir Ty pe 1.02 E 09 5 0.02 E Phase PE - Preliminary Engineering RW - Right of Way CN - Construction Funding STP - Surface Transportation Program HSIP - Highway Safety Improvement Program RATA - Rural Arterial Trust Account BROS - Bridge Replacement Project TP - Transportation Partnerships TAP - Transportation Alternatives Program FBRB - Brian Abbot Fish Barrier Removal Board FLAP - Federal Lands Access Program EM - Federal Emergency Management Act and State Emergency Management funds 08 7 1 of 9 Project Identification Project Costs in Thousands of Dollars A. Federal Aid No.B. Bridge No.Fund Source Information Federal Funding Phase Federal Federal State Start Fund Cost by Fund State Local Total (mm/dd/yy)Code Phase Source Funds Funds Funds CRP PE 4/1/2026 RATA 18 2 20 20 BEAR CREEK DEWATTO IMPROVEMENT PROJECT (ROCK PIT)RW 6/1/2026 RATA 0 20 20 20 Rd. No.: 79800 CN 8/1/2026 RATA 558 42 600 600 6/1/2024 From: MP 0.43 To: MP 1.02 RE-ALIGN ROAD AROUND ROCK PIT Total 2026 Project Cost $ 640,000 TOTALS 0 576 64 640 640 0 0 0 CRP PE 10 10 10 NEIGHBORHOOD ROADWAY SAFETY GRANTS RW 0 CN 0 Total 2026 Project Cost $ 10,000 TOTALS 0 0 10 10 10 0 0 0 CRP PE 4/1/2026 15 15 15 JOHNS PRAIRIE RD/ SR 3 INTERSECTION RW 6/1/2026 40 40 40 Rd. No.: 91720 CN From: MP 3.60 To: MP 3.77 INTERSECTION IMPROVEMENT Total 2026 Project Cost $ 55,000 TOTALS 0 0 55 55 55 0 0 0 CRP PE 4/1/2026 0 RATA 45 5 50 50 BEAR CREEK DEWATTO CULV. REPLACEMENT MP 6.18 RW 0 Rd. No.: 79800 CN 8/1/2026 RATA 405 45 450 450 From: MP 6.14 To: MP 6.21 CULVERT REPLACEMENT Total 2026 Project Cost $ 500,000 TOTALS 0 450 50 500 500 0 0 0 CRP PE 4/1/2026 CDBG 100 100 100 BLEVINS RD EVERGREE ESTATES WATER EXTENSION RW 0 Rd No.: 50990 CN 7/1/2026 CDBG 451.764 451.764 451.764 From MP 0.00 To: MP 0.22 WATER LINE EXTENSION Total 2026 Project Cost $ 551,764 TOTALS 0 551.764 0 551.764 551.764 0 0 0 CRP PE 4/1/2026 RATA 18 2 20 20 BEAR CREEK DEWATTO (TIGER) IMPROVEMENT PROJECT RW 6/1/2026 20 20 20 Rd No.: 79800 CN 8/1/2026 RATA 913.5 81.5 995 995 From MP 1.53 To: MP 1.96 RE-ALIGN ROAD Total 2026 Project Cost $ 1,035,000 TOTALS 0 931.5 103.5 1035 1035 0 0 0 CRP PE 0 COQUALLUM ROAD IMPROVEMENT PROJECT RW 0 Rd. No.: 10000 (WIVEL HILL)CN 6/1/2026 RATA 1000 200 1200 1200 From: 6.6 7.8 ROAD RE-ALIGNMENT AND PAVING PROJECT Total 2026 Project Cost $ 1,200,000 TOTALS 0 1000 200 1200 1200 0 0 0 CRP PE 1/1/2026 50 50 50 Belfair Connector - Log Yard Road E.RW 10/1/2026 50 50 50 Rd. No.: CN 0 From: SR3 To: Belfair Freight Corridor Design for new construction Total 2026 Project Cost $ 100,000 TOTALS 0 0 100 100 100 0 0 0 Federally Funded Projects Only Pr o j e c t Ph a s e C. Project Title En vir Ty pe R/W Required Date (mm/yy) D. Street/Road Name of Number 1st 2nd 3rd 4th thru 6thE. Beginning MP or road - Ending MP or road F. Describe Work to be Done Fu n c t i o n a l Cl a s s Pr i o r i t y Nu m b e r 07 8 0.59 E To t a l L e n g t h Expenditure Schedule 07 08 09 17 18 19 9 E E 08 11 0.07 E 17 10 0.17 E 07 13 0.43 D C E 09 12 0.22 07 14 1.20 Phase PE - Preliminary Engineering RW - Right of Way CN - Construction Funding STP - Surface Transportation Program HSIP - Highway Safety Improvement Program RATA - Rural Arterial Trust Account BROS - Bridge Replacement Project TP - Transportation Partnerships TAP - Transportation Alternatives Program FBRB - Brian Abbot Fish Barrier Removal Board FLAP - Federal Lands Access Program EM - Federal Emergency Management Act and State Emergency Management funds 09 15 0.00 2 of 9 A. Federal Aid No.B. Bridge No. Fund Source Information Federal Funding Phase Federal Federal State Start Fund Cost by Fund State Local Total (mm/dd/yy)Code Phase Source Funds Funds Funds CRP 2019 PE 6/1/2026 50 50 50 Belfair Connector - Romance Hill RW 7/1/2026 50 50 50 Rd. No.: 86500 CN 0 From: SR3 To: Belfair Freight Corridor Design for new construction Total 2026 Project Cost $ 100,000 TOTALS 0 0 100 100 100 0 0 0 CRP PE 0 SKOKOMISH VALLEY ROAD RECONSTRUCTION RW Rd. No.: 41640 CN 8/1/2026 FLAP 1600 1600 1600 From: MP 3.8 To: MP 4.6 Road reconstruction partner w/ Mason Cons Dist $8M total project cost Total 2026 Project Cost $ 1,600,000 TOTALS 0 1600 0 1600 1600 0 0 0 CRP PE 0 RASOR ROAD EXTENSION RW 5/2/2026 150 150 150 Rd. No.: 62400 CN 0 From: MP TBD To: MP TBD EXTEND RASOR ROAD TO RASOR LANE Total 2026 Project Cost $ 150,000 TOTALS 0 0 150 150 150 0 0 0 CRP PE 4/1/2026 40 40 40 WSDOT / COUNTY INTERSECTION FEASIBILITY RW 0 Rd. No.: CLIFTON, OBH/ SR300, N. BAY/ SR 3 CN 0 From: MP To: MP Total 2026 Project Cost $ 40,000 TOTALS 0 0 40 40 40 0 0 0 CRP PE FBRB 182 182 182 LYNCH ROAD CULVERT REPLACEMENT RW Rd. No. 15500 CN From: MP. 2.27 To: MP. 2.27 PE. FOR CULVERT REPLACEMENT Total 2026 Project Cost $ 182,000 TOTALS 0 182 0 182 182 0 0 0 CRP PE UNCLE JOHNS CREEK LOWER CULVERT REPLACEMENT RW Rd. No.: 23500 AGATE LOOP ROAD CN 6/1/2027 FBRB 2580 2580 2580 From: MP 0.64 To: MP 0.64 CULVERT REPLACEMENT Total 2026 Project Cost $ 2,580,000 TOTALS 0 2580 0 2580 0 2580 0 0 CRP PE 0 MCREAVY ROAD SAFETY ENHANCEMENT PROJECT RW 0 Rd. No.: 97670 CN 8/1/2028 HSIP 1400 1400 1400 From: MP 2.55 To: 6.41 SAFETY ENHANCEMENT (SHOULDERS, GUARDRAIL) Total 2026 Project Cost $ 1,400,000 TOTALS 1400 0 0 1400 0 0 1400 0 CRP PE DECKERVILLE ROAD IMPROVEMENT PROJECT RW Rd. No.: 00800 CN 8/1/2028 STP 1300 1300 1300 From: MP 0.0 To: 3.80 HMA OVERLAY Total 2026 Project Cost $ 1,300,000 TOTALS 1300 0 0 1300 0 0 1300 0 16 0.00 3.80 Fu n c t i o n a l Cl a s s Pr i o r i t y Nu m b e r Expenditure Schedule Federally Funded Projects Only Pr o j e c t P h a s e C. Project Title En vir Ty pe R/W Required Date (mm/yy) D. Street/Road Name of Number 1st 2nd 3rd 4th thru 6thE. Beginning MP or road - Ending MP or road F. Describe Work to be Done To t a l L e n g t h 09 TB D 09 18 0.00 TB D 08 17 0.80 08 20 0.00 19 0.00 Phase PE - Preliminary Engineering RW - Right of Way CN - Construction Funding STP - Surface Transportation Program HSIP - Highway Safety Improvement Program RATA - Rural Arterial Trust Account BROS- Bridge Replacement Project TP - Transportation Partnerships TAP - Transportation Alternatives Program FBRB - Brian Abbot Fish Barrier Removal Board FLAP - Federal Lands Access Program EM - Federal Emergency Management Act and State Emergency Management funds 09 21 0.00 08 23 08 22 3.86 3 of 9 Project Identification Project Costs in Thousands of Dollars A. Federal Aid No.B. Bridge No. Fund Source Information Federal Funding Phase Federal Federal State Start Fund Cost by Fund State Local Total (mm/dd/yy)Code Phase Source Funds Funds Funds CRP PE 9/1/2027 BROS 150 150 150 CHAPMAN COVE BRIDGE REPLACEMENT RW 9/1/2027 BROS 150 150 150 Rd. No.: 23500 AGATE LOOP ROAD CN 8/1/2028 BROS 4000 4000 4000 From: MP 0.49 To: 0.49 BRIDGE REPLACEMENT Total Project Cost $ 4,300,000 TOTALS 4300 0 0 4300 0 300 4000 0 CRP PE 0 TRAILS ROAD IMPROVEMENT PROJECT RW 0 Rd. No.: 62310 CN 8/1/2027 1025 1025 1025 From: MP 0.0 To: MP 1.6 HMA OVERLAY Total Project Cost $ 1,025,000 TOTALS 0 0 1025 1025 0 1025 0 0 CRP PE 9/1/2028 BROS 150 150 150 HLIBOKI BRIGDE REPLACEMENT RW 9/1/2028 BROS 150 150 150 Rd. No. 10290 BULB FARM ROAD CN 8/1/2029 BROS 3000 3000 3000 From: MP 0.35 To MP 0.35 BRIDGE REPLACEMENT Total Project Cost $ 3,300,000 TOTALS 3300 0 0 3300 0 0 300 3000 CRP PE 0 HIGHLAND ROAD IMPROVEMENT PROJECT RW 0 Rd. No. 04450 CN 8/1/2027 STP 865 135 1000 1000 From: MP 4.62 To: MP 7.92 HMA OVERLAY Total Project Cost $ 1,000,000 TOTALS 865 0 135 1000 0 1000 0 0 CRP PE 0 HIGHLAND ROAD IMPROVEMENT PROJECT RW 0 Rd. No. 04450 CN 8/1/2031 STP 865 400 1265 1265 From: MP 0.00 To: MP 4.62 HMA OVERLAY Total Project Cost $ 1,265,000 TOTALS 865 0 400 1265 0 0 0 1265 CRP PE 12/1/2027 BROS 221 73.5 294.5 294.5 EVERS BRIDGE IMPROVEMENT PROJECT RW 0 Rd. No.90100 MATLOCK BRADY RD CN 8/1/2028 BROS 614.25 204.75 819 819 From: MP 23.05 To: MP 23.05 Strip existing timber surface and re-apply protective coating Total Project Cost $ 1,113,500 TOTALS 835.25 0 278.25 1113.5 0 294.5 819 0 CRP PE 12/1/2027 BROS 199.5 66.5 266 266 MISSION CREEK 3 BRIDGE IMPROVEMENT PROJECT RW 0 Rd. No. 84110 STEELHEAD RD CN 8/1/2028 BROS 600 200 800 800 From: MP 0.04 To: MP 0.04 Construct footing and pier wall and replace the North approach Total Project Cost $ 1,066,000 TOTALS 799.5 0 266.5 1066 0 266 800 0 CRP PE 12/1/2027 BROS 56.25 18.75 75 75 VANCE CREEK DIV BRIDGE IMPROVEMENT PROJECT RW 0 Rd. No. 41640 SKOKOMISH VALLEY RD CN 8/1/2028 BROS 400 150 550 550 From: MP 4.56 To: MP 4.56 Replace damaged concrete girder Total Project Cost $ 625,000 TOTALS 456.25 0 168.75 625 0 75 550 0 2nd 3rd 4th thru 6thE. Beginning MP or road - Ending MP or road F. Describe Work to be Done 09 24 0.00 Fu n c t i o n a l Cl a s s Pr i o r i t y Nu m b e r To t a l L e n g t h Expenditure Schedule Federally Funded Projects Only Pr o j e c t Ph a s e C. Project Title En vir Ty pe R/W Required Date (mm/yy) D. Street/Road Name of Number 1st 09 26 0.00 07 25 1.60 07 28 4.62 07 27 3.30 09 30 0.00 Phase PE - Preliminary Engineering RW - Right of Way CN - Construction Funding STP - Surface Transportation Program HSIP - Highway Safety Improvement Program RATA - Rural Arterial Trust Account BROS - Bridge Replacement Project TP - Transportation Partnerships TAP - Transportation Alternatives Program FBRB - Brian Abbot Fish Barrier Removal Board FLAP - Federal Lands Access Program EM - Federal Emergency Management Act and State Emergency Management funds 07 29 0.00 08 31 0.00 4 of 9 Project Identification Project Costs in Thousands of Dollars A. Federal Aid No.B. Bridge No. Fund Source Information Federal Funding Phase Federal Federal State Start Fund Cost by Fund State Local Total (mm/dd/yy)Code Phase Source Funds Funds Funds CRP PE 1/1/2027 BROS 100 100 100 HARSTINE ISLAND BRIDGE IMPROVEMENT PROJECT RW 0 Rd. No. 3000 CN 8/1/2029 BROS 900 900 900 From: MP 0.12 To: MP 0.40 Repair spalding on columns Total Project Cost $ 1,000,000 TOTALS 1000 0 0 1000 0 100 0 900 CRP PE 1/1/2029 20 20 20 SAND HILL ROAD IMPROVEMENT PROJECT RW 0 Rd. No. 86070 TOP HILL TO BCD CN 8/1/2030 1400 1400 1400 From: MP 1.22 To: MP 5.79 HMA OVERLAY Total Project Cost $ 1,420,000 TOTALS 0 0 1420 1420 0 0 0 1420 CRP PE 1/1/2026 20 20 20 BEAR CREEK DEWATTO RD IMPROVEMENT PROJECT RW 0 Rd. No. 79800 TAHUYA BLACKSMITH TO CN 8/1/2031 RATA 1000 200 1200 1200 From: MP 8.45 To: MP 10.35 DEWATTO HOLLY HMA OVERLAY AND ROAD RE-ALIGNMENT Total Project Cost $ 1,220,000 TOTALS 0 1000 220 1220 20 0 0 1200 CRP PE 1/1/2027 20 20 20 BELFAIR TAHUYA RD IMPROVEMENT PROJECT RW 0 Rd. No. 97500 DEWATTO RD TO CN 8/1/2028 1400 1400 1400 From : MP 7.48 To: MP 11.75 N. SHORE RD HMA OVERLAY Total Project Cost $ 1,420,000 TOTALS 0 0 1420 1420 0 20 1400 0 CRP PE 4/1/2030 BROS 720 180 900 900 STRETCH ISLAND BRIDGE REPLACEMENT RW 4/1/2030 BROS 100 20 120 120 Rd. No. 64500 ECKERT ROAD CN 4/1/2031 BROS 6835.2 1708.8 8544 8544 From: MP 0.14 To: MP 0.21 Replace the 356' bridge Total Project Cost $ 9,564,000 TOTALS 7655.2 0 1908.8 9564 0 0 0 9564 CRP PE 0 CLIFTON AND SR 300 INTERSECTION IMPROVEMENT RW 0 Rd. No. 86750 & 98250 CN 8/1/2031 HSIP 3000 3000 3000 From: MP 0.20 Construct a roundabout at the intersection Total Project Cost $ 3,000,000 TOTALS 3000 0 0 3000 0 0 0 3000 CRP PE BROCKDALE AND BASTONE CUT-OFF INTERSECTION IMPROVEMENT RW Rd. No. 90090 & 51300 CN 8/1/2031 HSIP 2000 2000 2000 From: MP 0.00 Construct a roundabout at the intersection Total Project Cost $ 2,000,000 TOTALS 2000 0 0 2000 0 0 0 2000 CRP PE AGATE ROAD IMPROVEMENT PROJECT #4 RW Rd. No. 23910 CRESTVIEW TO PICKERIN CN 8/1/2029 1110 1110 1110 From: MP 3.78 To: MP 6.65 County crew to prepare shoulders contract HMA overlay 12' lanes & 5' shoulders Total Project Cost $ 1,110,000 TOTALS 0 0 1110 1110 0 0 0 1110 Phase PE - Preliminary Engineering RW - Right of Way CN - Construction Funding STP - Surface Transportation Program HSIP - Highway Safety Improvement Program RATA - Rural Arterial Trust Account BROS - Bridge Replacement Project TP - Transportation Partnerships TAP - Transportation Alternatives Program FBRB - Brian Abbot Fish Barrier Removal Board FLAP - Federal Lands Access Program EM - Federal Emergency Management Act and State Emergency Management funds Fu n c t i o n a l Cl a s s Pr i o r i t y Nu m b e r C. Project Title D. Street/Road Name of Number 4th thru 6thE. Beginning MP or road - Ending MP or road F. Describe Work to be Done 0.00 To t a l L e n g t h Expenditure Schedule Federally Funded Projects Only Pr o j e c t Ph a s e En vir Ty pe R/W Required Date (mm/yy) 1st 2nd 3rd 07 32 08 34 1.90 08 33 4.57 09 36 0.07 08 35 4.27 07 37 0.00 07 39 2.87 17 38 0.00 5 of 9 Project Identification Project Costs in Thousands of Dollars A. Federal Aid No.B. Bridge No.Fund Source Information Federal Funding Phase Federal Federal State Start Fund Cost by Fund State Local Total (mm/dd/yy)Code Phase Source Funds Funds Funds CRP PE 0 MASON LAKE ROAD IMPROVEMENT PROJECT 1 RW 0 Rd. No. 52210 SR3 TO MCEWAN PRAIRIE CN 8/1/2031 800 800 800 From: MP 0.00 To: MP 1.42 Overlay the road 12' wide lanes & 5' wide shoulders Total Project Cost $ 800,000 TOTALS 0 0 800 800 0 0 0 800 CRP PE 0 MASON LAKE ROAD IMPROVEMENT PROJECT 2 RW 0 Rd. No. 52210 TO TRAILS ROAD CN 8/1/2031 STP 994.75 155.25 1150 1150 From: MP 7.83 To: MP 10.13 Overlay the road 12' wide lanes & 5' wide shoulders Total Project Cost $ 1,150,000 TOTALS 994.75 0 155.25 1150 0 0 0 1150 CRP PE 0 OLD BELFAIR HYW IMPROVEMENT PROJECT RW 0 Rd. No. 98250 TO COUNTY LINE CN 8/1/2029 STP 865 135 1000 1000 From: MP 2.60 To: MP 3.86 HMA 12' lanes & 5' shoulders Total Project Cost $ 1,000,000 TOTALS 865 0 135 1000 0 0 0 1000 CRP PE 0 PICKERING ROAD IMPROVEMENT PROJECT RW 0 Rd. No. 28850 HARSTINE BR TO CN 8/1/2031 STP 865 300 1165 1165 From: MP 3.37 To: MP 6.28 AGATE RD HMA OVERLAY Total Project Cost $ 1,165,000 TOTALS 865 0 300 1165 0 0 0 1165 CRP PE 0 SOUTH ISLAND DRIVE IMPROVEMENT PROJECT II RW 0 Rd. No. 35230 MP 1.0 TO HARSTINE ISLAND RD S CN 8/1/2030 STP 865 135 1000 1000 From: MP 1.0 To: MP 3.3 HMA OVERLAY Total Project Cost $ 1,000,000 TOTALS 865 0 135 1000 0 0 0 1000 CRP PE 0 SOUTH ISLAND DRIVE IMPROVEMENT PROJECT I RW 0 Rd. No. 35230 CN 8/1/2031 RATA 700 72 772 772 From: MP 0.00 To: MP 1.00 HMA 12' lanes & 2' shoulders. 1' gravel shoulders; correct horizontal curves Total Project Cost $ 772,000 TOTALS 0 700 72 772 0 0 0 772 CRP PE 8/1/2027 150 150 150 COLE ROAD RAILROAD CROSSING IMPROVEMENT PROJECT RW 0 Rd. No. 15830 CN 0 From: MP 1.41 To: MP 1.41 REPLACE RAIL ROAD CROSSING Total Project Cost $ 150,000 TOTALS 0 0 150 150 0 150 0 0 CRP PE 8/1/2027 150 150 150 NEW ROAD CONSTRUCTION COLE RD TO CRAIG RD RW 0 Rd. No. CN 0 From: MP To: MP NEW ROAD CONSTRUCTION Total Project Cost $ 150,000 TOTALS 0 0 150 150 0 0 0 150 17 40 Fu n c t i o n a l Cl a s s Pr i o r i t y Nu m b e r To t a l L e n g t h Expenditure Schedule Federally Funded Projects Only Pr o j e c t Ph a s e C. Project Title R/W Required Date (mm/yy) D. Street/Road Name of Number 1st 2nd 3rd 07 41 2.30 En vir Ty pe 4th thru 6thE. Beginning MP or road - Ending MP or road F. Describe Work to be Done 1.42 08 43 2.91 07 42 1.26 08 44 2.30 07 46 0.00 08 45 1.00 47 0.63 Phase PE - Preliminary Engineering RW - Right of Way CN - Construction Funding STP - Surface Transportation Program HSIP - Highway Safety Improvement Program RATA - Rural Arterial Trust Account BROS - Bridge Replacement Project TP - Transportation Partnerships TAP - Transportation Alternatives Program FBRB - Brian Abbot Fish Barrier Removal Board FLAP - Federal Lands Access Program EM - Federal Emergency Management Act and State Emergency Management funds 6 of 9 Project Identification Project Costs in Thousands of Dollars A. Federal Aid No.B. Bridge No. Fund Source Information Federal Funding Phase Federal Federal State Start Fund Cost by Fund State Local Total (mm/dd/yy)Code Phase Source Funds Funds Funds CRP PE 8/1/2030 150 150 150 NEW ROAD CONSTRUCTION CRAIG RD TO RYAN RD RW 0 Rd. No.: CN 0 From: MP To: MP NEW ROAD CONSTRUCTION Total Project Cost $ 150,000 TOTALS 0 0 150 150 0 0 0 150 CRP PE 8/1/2032 150 150 150 NEW ROAD CONSTRUCTION MANOR RD TO GOLDEN PHEASANT RD RW 0 Rd. No. CN 0 From: MP To: MP NEW ROAD CONSTRUCTION Total Project Cost $ 150,000 TOTALS 0 0 150 150 0 0 0 150 CRP PE 4/1/2030 150 150 150 NEW ROAD CONSTRUCTION KAMILCHE LANE TO MANOR RD RW 0 Rd. No. CN 0 From: MP To: MP NEW ROAD CONSTRUCTION Total Project Cost $ 150,000 TOTALS 0 0 150 150 0 0 0 150 CRP PE 8/1/2026 FBRB 1.25 1.25 1.25 BEEVILLE ROAD CULVERT REPLACEMENT RW 0 Rd. No. 01650 PETERSON CREEK CN 0 From: MP 1,14 To: MP 1.20 CULVERT REPLACEMENT Total Project Cost $ 1,250 TOTALS 0 1.25 0 1.25 1.25 0 0 0 CRP PE 8/1/2030 150 150 150 NEW ROAD CONSTRUCTION RYAN RD TO BREWER RD RW 0 Rd. No. CN 0 From: MP To: MP NEW ROAD CONSTRUCTION Total Project Cost $ 150,000 TOTALS 0 0 150 150 0 0 0 150 CRP PE 0 MATLOCK BRADY ROAD SAFETY ENHANCEMENT PROJECT RW 0 Rd. No.: 90100 MATLOCK TO EVERS CN 8/1/2030 HSIP 1800 1800 1800 From: MP 16.67 To: MP 23.04 SHOULDER PAVING Total Project Cost $ 1,800,000 TOTALS 1800 0 0 1800 0 0 0 1800 CRP PE 1/1/2027 RTGP 400 400 400 MCEWAN PRAIRIE EXTENTION TO SR 101 RW 1/1/2028 RTGP 400 400 400 Rd. No.: 51800 CN 0 From: MP 2.45 To: MP 4.55 Road,bridges, roundabouts Rural Surface Transportation Grant Program Total Project Cost $ 800,000 TOTALS 800 0 0 800 0 400 400 0 CRP PE 1/1/2027 RTGP 400 400 400 RASOR ROAD EXTENSION TO SR 3 RW 1/1/2028 RTGP 400 400 400 Rd. No.: 62400 CN 0 From: MP 2.36 To: MP 4.36 Road, roundabouts Rural Surface Transportation Grant Program Total Project Cost $ 800,000 TOTALS 800 0 0 800 0 400 400 0 Phase PE - Preliminary Engineering RW - Right of Way CN - Construction Funding STP - Surface Transportation Program HSIP - Highway Safety Improvement Program RATA - Rural Arterial Trust Account Expenditure Schedule Federally Funded Projects Only Pr o j e c t Ph a s e En vir Ty pe R/W Required Date (mm/yy) Cl a s s Pr i o r i t y Nu m b e r To t a l L e n g t h C. Project Title D. Street/Road Name of Number 08 48 1.00 1st 2nd 3rd 4th thru 6thE. Beginning MP or road - Ending MP or road F. Describe Work to be Done Fu n c t i o n a l 50 0.54 49 0.70 09 51 0.06 07 53 6.37 52 0.68 55 2.00 07 54 2.10 BROS - Bridge Replacement Project TP - Transportation Partnerships TAP - Transportation Alternatives Program FBRB - Brian Abbot Fish Barrier Removal Board FLAP - Federal Lands Access Program EM - Federal Emergency Management Act and State Emergency Management funds 7 of 9 Project Identification Project Costs in Thousands of Dollars A. Federal Aid No.B. Bridge No. Fund Source Information Federal Funding Phase Federal Federal State Start Fund Cost by Fund State Local Total (mm/dd/yy)Code Phase Source Funds Funds Funds CRP PE 0 BOLLING ROAD (GRAVEL CONVERSION) RW 0 Rd. No.: 10510 CN 8/1/2028 40 40 40 From: MP 0.00 To: MP 0.28 GRAVEL CONVERSION TO CHIP SEAL Total Project Cost $ 40,000 TOTALS 0 0 40 40 0 0 40 0 CRP PE 1/1/2027 RTGP 800 800 800 CLOQUALLUM ROAD EXTENTION TO SR 101 RW 1/1/2028 RTGP 500 500 500 Rd No.: 10000 CN 0 From: MP 1.47 To: MP 1.53 On / Off ramps to SR 101 Rural Surface Transportation Grant Program Total Project Cost $ 1,300,000 TOTALS 1300 0 0 1300 0 800 500 0 CRP PE 0 NORTH SHORE ROAD (GRAVEL CONVERSION) RW 0 Rd. No.: 70390 BURMA ROAD CN 8/1/2027 300 300 300 From: MP 19.76 To: MP 25.48 GRAVEL CONVERSION TO CHIP SEAL Total Project Cost $ 300,000 TOTALS 0 0 300 300 0 300 0 0 CRP PE 8/1/2027 150 150 150 LYNCH ROAD RAILROAD CROSSING IMPROVEMENT PROJECT RW 0 Rd. No. 15500 CN 0 From: MP 0.73 To: MP 0.73 REPLACE RAIL ROAD CROSSING Total Project Cost $ 150,000 TOTALS 0 0 150 150 0 150 0 0 CRP PE 0 DEEGAN ROAD WEST CULVERT REPLACEMENT RW 0 Rd. No.: 06110 CN 8/1/2031 2000 2000 2000 From: MP 0.20 To: MP 0.30 Total Project Cost $ 2,000,000 TOTALS 0 0 2000 2000 0 0 0 2000 CRP PE 0 MATLOCK BRADY ROAD SAFETY ENHANCEMENT PROJECT RW 0 Rd. No.: 90100 EVERS TO SHAFER CN 8/1/2031 HSIP 1100 1100 1100 From; MP 23.05 To: MP 26.26 Total Project Cost $ 1,100,000 TOTALS 1100 0 0 1100 0 0 0 1100 CRP PE 1/1/2027 150 150 150 SIMMONS EXTENTION TO LYNCH RD RW 0 Rd. No.: 15240 NEW ROAD CN 0 From; MP To: MP Total Project Engineering Cos $ 150,000 TOTALS 0 0 150 150 0 150 0 0 Phase PE - Preliminary Engineering RW - Right of Way CN - Construction Funding STP - Surface Transportation Program HSIP - Highway Safety Improvement Program RATA - Rural Arterial Trust Account BROS - Bridge Replacement Project TP - Transportation Partnerships TAP - Transportation Alternatives Program FBRB - Brian Abbot Fish Barrier Removal Board FLAP - Federal Lands Access Program EM - Federal Emergency Management Act and State Emergency Management funds Fu n c t i o n a l Cl a s s Pr i o r i t y Nu m b e r To t a l L e n g t h Expenditure Schedule Federally Funded Projects Only Pr o j e c t Ph a s e C. Project Title En vir Ty pe R/W Required Date (mm/yy) D. Street/Road Name of Number 57 0.06 09 56 0.28 F. Describe Work to be Done 1st 2nd 3rd 4th thru 6thE. Beginning MP or road - Ending MP or road 08 58 5.72 08 60 0.10 07 59 0.00 61 3.21 09 62 1.00 07 8 of 9 Project Identification Project Costs in Thousands of Dollars A. Federal Aid No.B. Bridge No. Fund Source Information Federal Funding Phase Federal Federal State Start Fund Cost by Fund State Local Total (mm/dd/yy)Code Phase Source Funds Funds Funds CRP PE 0 ARCADIA ROAD SAFETY IMPROVEMENT PROJECT RW 0 Rd. No.: 91100 COLLIER TO LYNCH RD CN 8/1/2031 SS4A 1700 1700 1700 From; MP 1.82 To: MP 7.04 Total Project Cost $ 1,700,000 TOTALS 1700 0 0 1700 0 0 0 1700 TOTALS 80.27 40901.95 12557.51 15853.86 69313 12698 8011 11909 36696 E. Beginning MP or road - Ending MP or road F. Describe Work to be Done Fu n c t i o n a l Cl a s s Pr i o r i t y Nu m b e r To t a l L e n g t h Expenditure Schedule Federally Funded Projects Only Pr o j e c t Ph a s e C. Project Title En vir Ty pe R/W Required Date (mm/yy) D. Street/Road Name of Number 1st 2nd 3rd 4th thru 6th Phase PE - Preliminary Engineering RW - Right of Way CN - Construction Funding STP - Surface Transportation Program HSIP - Highway Safety Improvement Program RATA - Rural Arterial Trust Account BROS - Bridge Replacement Project TP - Transportation Partnerships TAP - Transportation Alternatives Program FBRB - Brian Abbot Fish Barrier Removal Board FLAP - Federal Lands Access Program EM - Federal Emergency Management Act and State Emergency Management funds 08 63 1.00 9 of 9