HomeMy WebLinkAbout2025-055 - Res. Amending Res. 2024-029 Development review Public Works Fee ScheduleRESOLUTION NO. ab€2.5- 055
A RESOLUTION AMENDING RESOLUTION NO. 2024-029 DEVELOPMENT REVIEW
FEES AND BELFAIR TRAFFIC MITIGATION FEES IN THE
PUBLIC WORKS FEE SCHEDULE
WHEREAS, on May 7, 2024, the Mason County Board of Commissioners adopted Resolution No.
2024-029 establishing fees for Public Works permits, GIS services, and franchise agreements; and
WHEREAS, the Department of Public Works has identified the need to recover costs associated
with the review of development -related proposals, including but not limited to pre -approval reviews
(PAR), construction permits, stormwater and drainage compliance, access and traffic impacts, and
field reviews; and
WHEREAS, staff recommend the addition of a Development Review and Belfair Traffic Mitigation
Fees as a standard cost -recovery practice consistent with other jurisdictions; and
WHEREAS, the proposed fees will be paid by the applicant, and will offset staff time and
administrative processing costs; and
WHEREAS, this amendment aligns with the County's goal of maintaining transparent and up-to-
date service fees in a format that can be reviewed and updated independently of the County Code;
and
WHEREAS, this amended Fee Schedule will continue to be reviewed annually and updated as
needed;
NOW, THEREFORE, BE IT RESOLVED, that the Mason County Board of Commissioners
hereby amends Resolution No. 2024-029 to include Development Review and Belfair Traffic
Mitigation Fees, as set forth in the revised Public Works Fee Schedule attached hereto as Exhibit A
and incorporated herein by reference.
BE IT FURTHER RESOLVED, that Resolution No. 2024-029 is hereby replaced in its entirety by
this amended resolution.
DATED this lb day of 5epfenf ber- , 2025.
ATTEST:
act -au. 0/6m
-
McKenzie, Smith, Clerk of the Board
APPROVE AS TO FORM:
Tim Whitehead; eh: DPA
BOARD OF COUNTY COMMISSIONERS
MASON COUNTY, WASHINGTON
Sharon Trask, Chair
Pat Tarzwell, Vice Chair
lii
Randy eather) mmissioner
PUBLIC WORKS FEE SCHEDULE
ADOPTED BY RESOLUTION NO. a20a5*-0'5
UTILITY PERMIT FEES AND REQUIREMENTS
&
CABLE FRANCHISE FEES
Permit and Franchise Fees
Price Each
Utility Franchise
$400.00
Cable Franchise
$400.00
Master Road Use Permit
$400.00
Private Line Utility Occupancy Permit
$200.00
*Utility Permit - Category 5 Right of Way Use
$125.00
**Utility Permit Extension
$ 35.00
Franchise/ MRUP Renewal
$300.00
Franchise/MRUP Amendment
$250.00
Amend Private Line Permit
$100.00
Transfer Franchise/MRUP
$100.00
Transfer Private Line Permit
$100.00
*In addition, an inspection fee of $0.25/ foot will be assessed,
**One month, with no change in scope of work.
Additional Requirements
A Minimum performance bond for any Utility Permit or Private Line Utility Occupancy Permit
is $500.
Minimum performance bond for Utility Franchise and Master Road Use Permit is $25,000.
All Utility Franchise Agreements, Master Road Use Permits, Private Line Occupancy Permits
and Utility Permits require indemnification for the County. This will be evidenced by an
insurance certificate showing a minimum of $2,000,000 general liability coverage and
naming Mason County as an additional insured party under the policy.
PUBLIC WORKS FEE SCHEDULE
ADOPTED BY RESOLUTION NO. a 025- 055
RIGHT OF WAY PERMITS
Permit Fees
Price Each
Category 1 — Unopened Rights of Way
$300.00
Category 2 —Unopened Right of Way
$300.00
Category 3 — Trail Permit
$ 50.00
Category 4 — Road Approach/Encroachment Permit
$200.00
Category 5 — Utility Permits
$125.00
Lineal Ft. Work
$ 0.25/per ft.
Permit Extension
$ 35.00
Category 6 — Overweight Moving Permits
$ 10.00
Monthly Over Dimensional Moving Permit
$ 10.00
Yearly Over Dimensional Moving Permit
$ 30.00
Category 7 —Road Use Permit (excludes special use permits)
$100.00
Road Closure Postings
$100.00
* Road Closure Publication
$200.00
Additional Requirements
The amount of the maintenance bond or surety shall be ten percent (10%) of the estimated
construction cost of the improvements requiring maintenance, or five thousand dollars
($5,000.00) whichever is greater. The construction cost of the facilities requiring maintenance
shall be estimated by a professional engineer and is subject to approval of the County Engineer.
*For permits requiring a road closure to be published in the newspaper per RCW. The applicant may
be required to pay the publication cost before the permit can be issued.
PUBLIC WORKS FEE SCHEDULE
ADOPTED BY RESOLUTION NO. AD -ass
GIS MAP PRICES
Custom and Existing Map Orders
Mason County GIS Staff can provide custom mapping services for your mapping needs.
The billing rate is $72.50/hr, with a minimum 1/2-hour charge ($36.25).
The Mason County GIS Department sells prints of all existing maps based on size. See chart
below for print sized and prices. The GIS staff typically provides the recommended printing
size during the ordering process. The GIS Department will not be responsible for any
dissatisfaction, misuse or misinterpretation of a map if the customer requests the map printed
at a non -recommended size.
Digital copies (PDF) of existing maps can be made available on CD for either pick-up at the
GIS office or they can be mailed to the customer. Those requesting digital copies of a map(s)
through the mail will be charged a 1/2-hour labor, plus shipping, materials and any applicable
sales tax. Many existing maps are available for free download from the "Maps Online"
section of the County website.
To get the lower price for the additional copies, the order must be for the same asap, at the
same size and printed at the same time.
MAP SIZE
PRICE
(1st copy)
PRICE
for Additional
Copies
11 x 17" --or smaller
$1.00
$0.25
17" x 22"
$16.50
$1.50
18" x 24"
$16.75
$1.50
22" x 24"
$17.00
$2.00
22" x 34"
$17.50
$2.50
24" x 36"
$17.75
$3.00
28" x 40"
$18.00
$4.00
36" x 36"
$18.25
$4.50
34" x 44"
$18.50
$5.00
36" x 48"
$20.00
$6.50
41" x 50"
$25.00
$8.00
Lamination of 11" x 17" or smaller is $0.50 per map
Pricing for Available Mans
Map Name
Size
Price Each
Addressing Districts
36" x 36"
$18.25
Allyn Urban Growth Area Zoning
17" x 22"
$16.50
Belfair Urban Growth Area Zoning
17" x 22"
$16.50
Belfair Water District
22" x 34"
$17.50
Belfair Sewer Connection Zones
34" x 44"
$18.50
County Commissioner Districts
36" x 36"
$18.25
Development Areas (County Zoning) Map Panels
41" x 50"
$25.00
Election Precincts - County
36" x 36"
$18.25
Election Precincts in the 10th Congressional Districts
36" x 36"
$18.25
Fire Districts
36" x 36"
$18.25
Future Land Use
26" x 36"
$17.75
Oakland Bay Clean Water District
34" x 44"
$18.50
County Parks
34" x 44"
$18.50
Port Districts
36" x 36"
$18.25
Public Utility (PUD) Districts
36" x 36"
$18.25
Assessor Revaluation Areas
36" x 36"
$18.25
Road Atlas - small
12" x 7.75"
$26.59
Road Atlas - large
11" x 17"
$30.26
Road Map
41" x 50"
$25.00
School Districts
36" x 36"
$18.25
Shoreline Environment Designations
36" x 36"
$18.25
Storm and Surface Water Utility (5 maps)
17" x 22"
$16.50
Urban Growth Areas
36" x 48"
$20.00
USGS Quad Index Grid
36" x 36"
$18.25
Zip Code Areas
36" x 36"
$18.25
The GIS Department strongly recommends printing existing maps on the size of paper they were originally designed for.
PUBLIC WORKS FEE SCHEDULE
ADOPTED BY RESOLUTION NO. aDR26-06 6
Development Reviews
These fees cover the review and evaluation of development -related submittals by the Public Works Department.
It includes analysis of site plans, infrastructure designs, grading and drainage compliance, stormwater
management, access and traffic impacts, and field inspections. The reviews ensures that proposed developments
comply with applicable County standards and regulations, support public safety, and protect public
infrastructure. Staff time spent on technical reviews, coordination with other departments, and processing of
related permits and approvals is recovered through these fees.
Development Review Fee
Price Each
BUILDING PERMITS:
Commercial Building Permit
$100.00
Residential Building Permit
$100.00
Grading Permits
$100.00
PLANNING PERMITS:
Boundary Line Adjustments
$100.00
Short Subdivisions
$100.00
Large Lot Subdivisions
$200.00
Plat Subdivisions
$200.00
Preapplication Conference
$100.00
Large Projects- Hourly Fee
$100.00/hrly
Belfair SEPA Mitigation Fee
Per Trip
Belfair Traffic Mitigation Based on 5% Annual Increase Total Fee
$1,215.51
2026
$1,276.28 .
2027
$1.340.09
2028
$1,407.09
2029
$1,477.44
2030
$1,551.31