STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
P.O. Box 47 775 • Olympia. Washington 98504 77 7 5 • (360) 407-6300
June 9, 1997
REGISTERED MAIL
Ms. Edwina Bent
24 Caribou Court
Monterey,iCA 93940
Dear Ms. Bent
Enclosed is Order No. DE 97WQ-S249. If you have any questions concerning the content of the
document, please call or write Loree Randall at(360)407-6294 of the Department of Ecology, '
Southwest Regional Office, P.O. Box 47775, Olympia, Washington 98504-7775. The enclosed Order
may be appealed. The appeal procedures are described in the Order.
Sincerely,
William H. Backous, P.E.
Southwest Region Supervisor
Water Quality Programs
W HB:LR:c g(enforce\mods)
Enclosure
cc: David Grellier, Atelier Northwest, Inc.
Rick Vining,Ecology
3aa.05% /cf• 0
r
DEPARTMENT OF ECOLOGY
IN THE MATTER OF THE REQUEST BY
Ms. Edwina Bent ► ORDER
FOR TEMPORARY MODIFICATION OF ) No. DE 97WQ-S249
WATER QUALITY STANDARDS
To: Ms. Edwina Bent
24 Caribou Court
Monterey, WA 93940
Ms. Edwina Bent submitted a request for temporary modification of the water quality criteria of an
unnamed tributary to Hood Canal. Class AA waters, located in Mason County, during the period
beginning June 15. 1997, and ending September 30. 1997. for the purpose of spanning the stream with a
structure and construction of a temporary crossing at East 11170 Highway 106.
In view of the foregoing and in accordance with Revised Code of Washington(RCW) 90.48.120(2):
IT IS ORDERED that the water quality criteria specified in Washington Administrative Code (WAC)
173-201A-030(1)(c)(vi) is modified from Section 25.Township 22 N., Range 3 W., for a limited period
beginning June 15, 1997. and terminating at midnight. September 30. 1997.
This modification is subject to the following condition(s):
A) Construction Activities. The construction contractor shall use all reasonable measures to
minimize the impacts of construction activity on waters of the state. Water quality constituents
of particular concern are turbidity, suspended sediment. settleable solids. oil and grease. and pH.
Required mitigation measures include, but are not limited to. the following:
1) The natural flow of an unnamed tributary to Hood Canal shall be diverted around the
construction site. The stream diversion system shall be designed and operated so as to
not cause erosion or scour in the stream channel.
2) Proper erosion and sediment control practices shall be used on the construction site and
adjacent areas to prevent upland sediments from entering the stream channel.
3) Periodic inspection and maintenance of all sediment control structures must be provided.
Sediment control measures shall be in working condition at the end of each working day.
4) After any significant rainfall, sediment control structures shall be inspected for integrity.
Any damaged devices shall be repaired immediately.
5) Work in or near the waterway shall be done so as to minimize turbidity, erosion. other
water quality impacts. and stream bed deformation.
-
Properly dispose of all construction debris on land in such a manner that it cannot enter
into the waterway or cause water duality degradation to state waters.
-'1 Extreme care shall be taken to prevent any petroleum products. fresh cement. lime. or
concrete. cnemicais. or other toxic or deleterious materials from entering the water in
any manner.
Bl Spill Prevention and Control
In the event of a discharge of oil. fuel. or chemicals into state waters. or onto land with a
potential for entry into state waters. containment and cleanup efforts shall begin
immediately and be completed as soon as possible. taking precedence over normal work.
Cleanup shall include proper disposal of any spilled material and used cleanup materials.
2) Spills into state waters, spills onto land with a potential for entry into state waters. or
other significant water quality impacts, shall be reported immediately to the Department
of Ecology. Southwest Regional Office at (360)407-6300 (24-hour phone number).
3) If distressed or dead fish are noticed in the vicinity, the proponent shall immediately
notify the Department of Ecology, Southwest Regional Office by telephone (360)
407-6300. and take immediate action to identify and eliminate toxic sources causing the
problem. The proponent is only responsible for eliminating sources where the
proponent. or an agent of the proponent. has some responsibility.
C) Other Requirements
1) The activities must comply with all conditions contained in the Washington Department
of Fish and Wildlife Hydraulic Project Approval.
2) Loree Randall. Water Quality Inspector for the Department of Ecology, must be notified
at(360)407-6294 at least 24 hours prior to commencement of work.
3) Copies of this Order shall be kept on the lob site and readily available for reference by
Ms. Edwina Bent personnel, the construction superintendent, construction managers and
foremen. and state and local government inspectors.
41 This approval does not relieve the applicant from the responsibility of meeting
applicable regulations of other agencies.
The Department of Ecology retains continuing jurisdiction to make modifications hereto through
supplemental order, if it appears necessary to further protect the public interest during the modification
period.
Failure to comply with this Order may result in the issuance of civil penalties or other actions. whether
administrative or judicial. to enforce the terms of this Order.
This Order may be appealed. Your appeal must be filed with the Pollution Control Hearings Board. P.O.
Box 40903. Olympia. Washington 98504-0903. within thirty (30) days of your receipt of this Order. At
the same time. your appeal must also be served on the Department of Ecoiogy, cio The Enforcement
•
Officer, •
P.O. Box 47600. Olympia. Washington 98504-7600: and the Department Your appeal alone will
Olympia. Washington
Southwest Regional Office, P.O. Box 47775. Olvmp
not stay the effectiveness of this Order. Stay requests must
e.2113 RCW submitted in accordance with RCW
43.21B.320. These procedures are consistent with Chapter 4
DATED this 9th day of June
1997. at Olympia. Washington.
William H. Backous. P.E.
Southwest Region Supervisor
Water Quality Programs
•