Loading...
HomeMy WebLinkAboutBLD2000-01181 Cancelled MFG Home - BLD Permit / Conditions - 10/24/2000 Inspection Line (360)427-7262 NoMASON COUNTY PERMIT ASSISTANCE CENTER Phone: (360)427-9670, ext. 352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Shelton, WA 98584 t RESIDENTIAL BUILDING PERMIT BLD2000-01181 OWNER: MIKE JOHNSON 275-3434 CONTRACTOR: RECEIVED: 09/12/2000 SITE ADDRESS: 50 NE MOUNTAIN VIEW PL TAHUYA ISSUED: 04/03/200/03/2001 PARCEL NUMBER: 223315200059 EXPIRES: LEGAL DESCRIPTION: COLLINS LAKE#3 BLK: LOT: 59 PROJECT DESCRIPTION: DIRECTIONS TO SITE: MANUFACTURED HOME BELFAIR TAHUYA TO COLLINS LK DR LEFT ON MT VIEW PL General Information Construction & Occupancy Information Square Footage Information No. of Bedrooms: 3 Type of Constr.'- Type of Use: SF Insp. Area: No. of Bathrooms: 2 Occ. Group: Lot Size: Deck: Type of Work: NEW Fire Dist.: 2 No. of Stories: 1 Occ. Load: Building: Valuation: $63,411 Building Height: Occ. Status: Basement: Manufactured Home Information Setback Information Shoreline & Planning Information Make REDMAN Length: 66 Ft. Front: E 198.0 Ft, Shoreline: Ft. Water Body: Rear: W 140.0 Ft. Slope: Ft. SEPA?: Model:4664Q Width: 28 Ft. Side 1: N 35.0 Ft. Shoreline Desig.: Year:2001 Serial No.: Side 2: S 70.0 Ft. I Com . Plan Desi .: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Mobile Home Submittal KLW 09/12/200 $175.00 54512 Ef€Plan Review CEW 09/26/200 $50.00 BELFAI Building State Fee TLG 09/26/200 $4.50 BELFAI Mobile Home Issuance TLG 09/26/200 $175.00 BELFAI limning Review Fee AHB 09/28/200 $38.00 BELFAI Total $442.60 P BLD2000-01181 Please refer to the following pages for conditions of this permit. 1 of 3 Inspection Line (360)427-7262 MASON COUNTY PERMIT ASSISTANCE CENTER Phone: (360)427-9670, ext. 352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Shelton, WA 98584 1014 RESIDENTIAL BUILDING PERMIT BLD2000-01181 OWNER: MIKE JOHNSON 275-3434 CONTRACTOR: RECEIVED: 09/12/2000 /03/200 SITE ADDRESS: 50 NE MOUNTAIN VIEW PL 04 TAHUYA ISSUED: PARCEL NUMBER: 223315200059 T EXPIRES: /03/2001 LEGAL DESCRIPTION: COLLINS LAKE#3 BILK: LOT: 59 E7(P1RAT��N PROJECT DESCRIPTION: DIRECTIONS TO SITEA) V��� BY MANUFACTURED HOME BELFAIR TAHUYA TQ L N5_L-14- VFT ON MT VIEW PL General Information Construction & Occupancy Information Square Footage Information No. of Bedrooms: 3 Type of Constr. Type of Use: SF Insp. Area: No. of Bathrooms: 2 Occ. Group: Lot Size: Deck: Type of Work: NEW Fire Dist.: 2 No. of Stories: 1 Occ. Load: Building: Valuation: $63,411 Building Height: Occ. Status: Basement: Manufactured Home Information Setback Information Shoreline & Planning Information Make REDMAN Length: 66 Ft. Front: E 198.0 Ft. Shoreline: Ft. Water Body: Rear: W 140.0 Ft. Slope Ft. SEPA?: Model:4664Q Width: 28 Ft. Side 1: N 35.0 Ft. Shoreline Desig.: Year:2001 Serial No.: Side 2: S 70.0 Ft. Comp. Plan Desi .: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Mobile Home Submittal KLW 09/12/200 $175.00 54512 "Plan Review CEW 09/26/200 $50.00 BELFAI Building State Fee TLG 09/26/200 $4.50 BELFAI Mobile Home Issuance TLG 09/26/200 $175.00 BELFAI fining Review Fee AHB 09/28/200 $38.00 BELFAI Total $442.50 BLD2000-01181 Please refer to the following pages for conditions of this permit. 1 of 3 CASE NOTES FOR BLD2000-01181 CONDITIONS FOR BLD2000-01 1 81 1) This application is subject to Buffer and Landscaping requirements as established under Mason County Ordinance 1.03.036.X *4 2) The use, handling and storage of hazardous rpaterials or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of the Mason County Fire Marshal. X 22* 3) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X 4) Proposed structure or any portion thereof greater than 30" in height from grade line, must maintain a minimum of 5'setback from all property lines, easements and 10' from all County and State Road right of ways. X n-i'� 5) PURSUANT TO 1997 UNIFORM BUILDING CODE, ALL SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY. MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS. A REINSPECTION FEE, BASED ON RATES AS ADOPTED BY THE JURISDICTION AND THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS. X � 6) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X -7) The approved plot plan is required to be on-site for inspection purposes. If inspection is called for and plot plan is not on site, Approval WILL NOT be granted. In addition, a Re-Inspection fee in the amount of$42.00 per hour(minimum 1 hour) will be charged and must be collected by this department prior to any further inspections being performed or approval granted. X ')-04�- BLD2000-01181 Please refer to the following pages for conditions of this permit. 2 of 3 8) REQUIRED INSPECTIONS (Footing Inspection-prior to pour, Set-up Inspection-prior to skirting, Final Inspection-prior to occupancy). I hereby assume all responsibility for the scheduling of my required inspections. If the required inspections are not requested, inspected and signed off(approved) by the inspector in the prescribed order, I understand that reinspection fees and an hourly investigation fee pursuant to the 1997 UBC, and will be assessed in addition to my original permit fees to resolve any questionable practices or problems that have been discovered. I further understand that this investigation will be scheduled as time allows. Until resolution of any/all problems no occupancy (Final Inspection)will be granted for the residence. OWNER/CONTRACTOR(indicate which) Signature X 2ni 9) All mobile/manufactured home landings or decks must be freestanding (self supporting). The largest landing or deck allowed without drawings or a building permit MUST be under 30" in height from surrounding grade. NO second story decks, or decks above 30" can be built without a permit. Any landing or deck that is 30" or more in height from walking surface to finish grade requires a Permit. Any landing or deck that has 4 or more risers requires a handrail. X 10) The installation permit shall be displayed in clear view of the site access road. The approved site plan and other applicable instructions, including installation instructions, shall be available in this location OR placed in the location specified by WAC 296-150M-655. Support configuration shall be clearly marked in the installation instructions. 11) All property lines shall be clearly identified at the time of foundation inspection. X_ �' 12) Approved per dimensions and setbacks on submitted site plan. X 13) Proposed structure or portions thereof with an projection over 30" in height from grade line, must maintain a 5'separation distance between adjacent structures and that furthest projection. X `mK/L 14) All upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). X Q22 I This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. OWNER OR AGENT: DATE: d BLD2000-01181 Please refer to the following pages for conditions of this permit. 3 of 3 - 1 File Edit Options `,'Vindoty Help [� o7: E..,it r1.r, op".n To Do CBE EEL ti � ` -/ .. cla_c Edit Proi— Grrup Add cl.nc Parcel Activity Peoplo Fco; Valuation C:on ition �"�..r1•.d s r i r :LD 2000-01181 Status I PJarrle: MIKE JOHNSON Updated: 10!24.110 TVtt - 1 :address: 50 NE MOUNTAIN VIEW PL TAHUYA Description. Master # ULD2000-01181 Project: consar. r1cc. h,1,�,PJUF,�,C:TUF'EC� Hi_�P;1E Area.u_.. Motile Directions to Site: PI1_1rnkiinl BELF.AIF: T.µ.HI 1 TO :_ -!LLIPJ' Ll- DF' LEFT i=1PJ h;1T '',1IE'+1':+ PL Type of Use: hvlanufactured Hurn MechaniCai '��� Type of\A/ork: P'J�vv hriteline c Inspection Area: Setbacks Flnaled: ] issued: 110t3i1=10 Fire District: E;(piration: k/a?131 Received: Total '%/aluation: j$63,411.00 Printing Caseu -' epor CttlOiD _.... A Start 'hdotework.Fopu j r" ERMIT-I .- Nn-yell-delivere... fAicrasoft E trel C ,� i m -♦ Copyright m 1997-1999 Tidemark Computer Systems Inc. 12/12/00 0 All Rights Reserved. -� File Edit Clptiorr: Windot,•J Help oo° Exit nav op. To Do � QBE H per, �I ,•may, '• :LL ''O tY� l� �b7" r 3 Close Edit Project Group Add Crone 1 pw.:C Activity Peopl¢ Fees ,°.,luotion i.;orjt nns .. . F!•>t,. 1 2000-01181 Status I E X Narne: MIRE JOHNSON Updated: 10 24I00 TW Address: 50 NE MOUNTAIN VIEW PL TAHUYA Description-,: Master # BLD2000-D1181 Project: In-t htlAPJI_1FAi=Tt1RE[i Hr-)h:lE Mobile Directions to Site: Plumbing BELFr.IP TAHU'r`A TO COLLINS LK DR LEFT 01%] P:,1T VIEW PL Type of Use: Hrrrri Mechanical Type of Work: l-,oreline Setbacks Inspection Area: Finaled: °"" " Irsur3d' 10/3_t 10 Fire District: Expiration: J�',TI Received: -_/12,'L10 Total Valuatiom 1$63,411.00 PnriFlrrq ase"' urrrmary" report or ,, `, " ,`, , t .►taFt °.,_ PE41MU. -Pl.�- *ve;U e r�jeret pjalr�atlo.. i 't Pegasm M,il _ 1`� -� / /yam �- �✓�/ T i Copyright©1997-1999 Tidemark Computer Systems Inc. 1/16/01 All Rights Reserved. i Building Permit # 2G�` /l /� MASON COUNTY BUILDING 111 426 W. CEDAR SHELTON, WASHINGTON 98584 (360) 427-9670 CORRECTION NOTICE Job Location rz-% v/c c -- Y11-1 L This structure has been inspected by Mason County Building Department and the following VIOLATION of County Laws and Ordinances has been fund: Items Listed below must be corrected to gain code compliance cv L vY r �D C N 0'r You are hereby notified that the above corrections shall be made BEFORE PROCEEDING WITH ANY FURTHER WORK ❑ Call for re-inspection when corrections are made before continuing ❑ Make corrections, items will be checked on next inspection OK to L-,(:� %,C- ��� �;y S This is not a complete nspection Department y' Cep Date %— /`7-�I Inspector Ln moos COVT M4 *V T 1 ,, - , T A ,$, 1 CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date b Set Up date by INSULATION date by BG/SLAB Insulation Final Floors date FRAMING by date by date by Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by T � s✓� 1 FORM MUST BE COMPLETED IN INK PLEASE PRESS HARD MASON COUNTY PROJECT SITE INFORMATION r �� Case 0✓ e No. Name I�1 �JC)� � PARCEL N BER r13 5? O0��S'c? Da e 2- SHOW THE FOLLOWING ON SITE PLAN Show Dire c I , E, W in relation to the site plan Lot Dimensions Fences Existing Structures Driveways Structure Setbacks Shorelines Water Lines Topography Well Location (including adjacent) Drainage Plan Names of Streets Easements Names of Fronting Streets Septic System r DRAW SITE PLAN BELOW Include adjacent properties if on shoreline or within 100 feet of adjacent property line. adjacent property line4 Fadjacent property line I I I I I I I I I I I � I I I I ` I I I tNJ V VI G I\ I iC? l 3 I 1 I I adjacent ro ert line- I E-adjacent property line SAMPLE SITE PLAN �`� adja t property lined _ _ Fadjacent property line D 36- rw.scavE ao ,I SEALO.J Al_ HOnn trI- C2EeK \ � I Grid.EnJ PRoPostn smpt:c 1 _ ISO' �I I R I VACArvT 3o I I(C PM1oPosCD \ \ I A6RiCLLLTu..tiAL So I I I , Bo'—mot /oo' I \ I I � I I\ c--eLL I I � /00' — > A I adjacent property line4 Fadjacent ro ert' line TOPOGRAPHY PROFILE(Show a side view of property. Show slopes, cuts and fills. If possible include height and the degree of slopes. See sample topography profile.) SAMPLE TOPOGRAPHY PROFILE dtstonca. fin rur_-wMt d iS't'an Cr_ tAL 5iopd to¢ Signature Date Washington Home Center, Inc. Floor Plan Ridgedale Discovery 4664Q-Michael A Johnson And Betty Johnson 4664Q -3 Bed 2 Bath Approx 1804 Sq Ft (13 ) 6 00 o TB�Vd Momtng Room 1 U 4" Dining Room Fatuity 121r14'1�10( 14) Masteroom Bed#23Bedroom 1a s" 13'2` 16 1 Vitreous China Sink w/Popup&Overflow 8 Maple Breadboard W/Additional Bank Of Drawers 15 Skylight 24"x48" 2 Optional Interior Door 9 Fluorescent Light-Ceiling Mount(Each) 16 Additional Exterior GFI Outlet 3 Over Head Ceiling Light-Bedroom 10 In-Con Media Jack(Allows Up To 4 Phone Lines+Ca 4 Wire Both Baths For Light Strips 11 Additional 30x4O Vinyl Vertical Slider Bed#3 End W 5 Frostless Hose Bib 12 Add Vertical 30x40 Window Moming Rm End Wall 6 Residential Steel Door(In-Swing)Exch Std 13 Sliding Glass Door WNertical Blinds Exch WfWindov 7 Both Additional Ext Receps To Have Own Circuit 20a 14 Utility.Full OH Cabinet Over Washer&Dryer Specifications subject to change. (c)19%softseil, Inc. Sep/ 5/2000 1/16/01 Information Summary for Case #: BLD2000-01181 3:46:36 PM Activity Hold Updated Activity Description Date 1 Date 2 Date 3 Disp. Level By Updated BLDA010 Application Received 9/7/00 9/12/00 DONE No Hold KLW 9/12/00 BLDB110 Building Plan Review 9/12/00 9/26/00 DONE No Hold TLG 9/26/00 BLDB130 Planning Review 9/20/00 9/28/00 DONE No Hold AHB 9/28/00 House will be located farther to the west than existing house; new deck will be on west side as well. AHB BLDB135 Addressing 9/12/00 9/13/00 DONE No Hold GMM 9113/00 BLDB138 Planning Pre-Review 9/13/00 9/20/00 DONE No Hold MMS 9/20/00 BLDB200 Environmental Health Review 9/12/00 9/19/00 HOLD No Hold CEW 9/19/00 need satis pumpers report,see ocndition,bedrooms and plot map match BLDB210 Water Adequacy 9/12/00 9/19/00 DONE No Hold CEW 9/19/00 replacement BLDB201 EH More Info Letter 9/19/00 DONE No Hold CEW 9/19/00 BLDB200 Environmental Health Review 9/26/00 9/26/00 DONE No Hold CEW 9/26/00 rec satis pumpers report BLDA100 Approved for Issuance 10/3/00 No Hold KS 10/3/00 BLDA500 Issue Building Permit 10/3/00 DONE No Hold KS 1013/00 BLDC200 Mobile Home Set Up 12/15/00 12/15/00 PASS No Hold KLW 12/15/00 OK TO OCC TEMP 90 DAYS Condition Cond. Staf Changed Updated Code Title Hold Status Changed By Tag Updated By 0046 Buffer+Landscaping Requirements 0 Not Met 9/20/00 MMS This application is subject to Buffer and Landscaping requirements as established under Mason County Ordinance 1.03.036.X 4999 Flammable+Combustible Liquids 0 Not Met 9/20/00 MMS The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of the Mason County Fire Marshal.X 5019 MCPW Development Requirements 0 Not Met 9/20/00 MMS Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance,either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road,Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X 5025 Sideyard Setback 0 Not Met 9/20/00 MMS Proposed structure or any portion thereof greater than 30"in height from grade line, must maintain a minimum of 5' setback from all property lines,easements and 10'from all County and State Road right of ways. X 12/12/00 Information Summary for Case #: BLD2000-01181 4:02:27 PM Activity Hold Updated Activity Description Date 1 Date 2 Date 3 Disp. Level By Updated BLDA010 Application Received 9/7/00 9/12/00 DONE No Hold KLW 9/12/00 BLDB110 Building Plan Review 9/12/00 9/26/00 DONE No Hold TLG 9/26/00 BLDB130 Planning Review 9/20/00 9/28/00 DONE No Hold AHB 9/28/00 House will be located farther to the west than existing house; new deck will be on west side as well. AHB BLDB135 Addressing 9/12/00 9/13/00 DONE No Hold GMM 9/13/00 BLDB138 Planning Pre-Review 9/13/00 9/20/00 DONE No Hold MMS 9/20/00 BLDB20o Environmental Health Review 9/12/00 9119/00 HOLD No Hold CEW 9/19/00 need satis pumpers report,see ocndition, bedrooms and plot map match BLDB210 Water Adequacy 9/12/00 9119/00 DONE No Hold CEW 9/19/00 replacement BLDB201 EH More Info Letter 9/19/00 DONE No Hold CEW 9/19/00 BLDB200 Environmental Health Review 9/26/00 9/26/00 DONE No Hold CEW 9/26/00 rec satis pumpers report BLDA100 Approved for Issuance 10/3/00 No Hold KS 10/3/00 BLDA500 Issue Building Permit 10/3/00 DONE No Hold KS 10/3/00 Condition Cond. Stat. Changed Updated Code Title Hold Status Changed By Tag Updated By 0046 Buffer+Landscaping Requirements 0 Not Met 9/20/00 MMS This application is subject to Buffer and Landscaping requirements as established under Mason County Ordinance 1.03.036.X 4999 Flammable+Combustible Liquids 0 Not Met 9/20/00 MMS The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of the Mason County Fire Marshal.X 5019 MCPW Development Requirements 0 Not Met 9/20/00 MMS Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance,either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road,Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X 5025 Sideyard Setback 0 Not Met 9/20/00 MMS Proposed structure or any portion thereof greater than 30"in height from grade line,must maintain a minimum of 5' setback from all property lines,easements and 10'from all County and State Road right of ways. X 1002 POST ADDRESS 0 Not Met 9/26/00 TLG PURSUANT TO 1997 UNIFORM BUILDING CODE, ALL SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY.MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS. A REINSPECTION FEE, BASED ON RATES AS ADOPTED BY THE JURISDICTION AND THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS. X 1/16/01 Information Summary for Case #: BLD2000-01181 3:46:36 PM ` Condition Cond. Stat. Changed Updated , Code Title Hold Status Changed By Tag Updated By 1002 POST ADDRESS 0 Not Met 9/26/00 TLG PURSUANT TO 1997 UNIFORM BUILDING CODE, ALL SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY.MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS. A REINSPECTION FEE, BASED ON RATES AS ADOPTED BY THE JURISDICTION AND THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS. X 1011 MH FILL 0 Not Met 9/26/00 TLG THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED,NATIVE SOIL. X 1012 PLOT PLAN REQUIRED ON SITE 0 Not Met 9/26/00 TLG The approved plot plan is required to be on-site for inspection purposes. If inspection is called for and plot plan is not on site,Approval WILL NOT be granted. In addition,a Re-Inspection fee in the amount of$42.00 per hour(minimum 1 hour)will be charged and must be collected by this department prior to any further inspections being performed or approval granted. X 5007 MOBILE/MANUFACTURED SPECS. 0 Not Met 9/26/00 TLG REQUIRED INSPECTIONS(Footing Inspection-prior to pour,Set-up Inspection-prior to skirting, Final Inspection-prior to occupancy). I hereby assume all responsibility for the scheduling of my required inspections. If the required inspections are not requested, inspected and signed off(approved)by the inspector in the prescribed order, I understand that reinspection fees and an hourly investigation fee pursuant to the 1997 UBC,and will be assessed in addition to my original permit fees to resolve any questionable practices or problems that have been discovered. I further understand that this investigation will be scheduled as time allows. Until resolution of any/all problems no occupancy(Final Inspection)will be granted for the residence. OWN ER/CONTRACTOR(indicate which)Signature X 5013 Mobile/Manufactured Landings/Deck 0 Not Met 9/26/00 TLG All mobile/manufactured home landings or decks must be freestanding(self supporting). The largest landing or deck allowed without drawings or a building permit MUST be under 30"in height from surrounding grade. NO second story decks,or decks above 30"can be built without a permit.Any landing or deck that is 30"or more in height from walking surface to finish grade requires a Permit. Any landing or deck that has 4 or more risers requires a handrail. X 5055 Manuf. Home Document Location 0 Not Met 9/26/00 TLG The installation permit shall be displayed in clear view of the site access road. The approved site plan and other applicable instructions, including installation instructions,shall be available in this location OR placed in the location specified by WAC 296-150M-655. Support configuration shall be clearly marked in the installation instructions. 5510 Property Lines Not Met 9/26/00 TLG All property lines shall be clearly identified at the time of foundation inspection. X 0200 Site Plan 0 Not Met 9/28/00 AHB Approved per dimensions and setbacks on submitted site plan.X 5026 Structure Setback 0 Not Met 9/28/00 AHB Proposed structure or portions thereof with an projection over 30"in height from grade line,must maintain a 5' separation distance between adjacent structures and that furthest projection.X 0060 Erosion Protection 0 Not Met 9/28/00 AHB All upland areas disturbed or newly created by construction activities shall be seeded,vegetated or given an equivalent type of erosion protection(silt fencing or straw matting).X Fees Fee Trans. Create Created Type Description Code Revenue Account No. Date By Amt.Due MHSF Mobile Home Submittal 322.10 9/12/00 KLW $175.00 Fee EHPR EH Plan Review 346.50.00 9/26/00 CEW $50.00 STFE Building State Fee 386.00.05 9/26/00 TLG $4.50 MHBL Mobile Home Issuance 322.10 9/26/00 TLG $175.00 Fee PLRV Planning Review Fee 369.00 9/28/00 AHB $38.00 Case People Listing Role Type Name/Address Company Name Hold Primary APL MIKE JOHNSON Y NE 50 MT VIEW PL TAHUYA WA 98588 12/12/00 Information Summary for Case #: BLD2000-01181 4:02:27 PM Condition Cond. Stat. Changed Updated Code Title Hold Status Changed By Tag Updated By 1011 MH FILL 0 Not Met 9/26/00 TLG THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X 1012 PLOT PLAN REQUIRED ON SITE 0 Not Met 9/26/00 TLG The approved plot plan is required to be on-site for inspection purposes. If inspection is called for and plot plan is not on site,Approval WILL NOT be granted. In addition,a Re-Inspection fee in the amount of$42.00 per hour(minimum 1 hour)will be charged and must be collected by this department prior to any further inspections being performed or approval granted. X 5007 MOBILE/MANUFACTURED SPECS. 0 Not Met 9/26/00 TLG REQUIRED INSPECTIONS(Footing Inspection-prior to pour,Set-up Inspection-prior to skirting, Final Inspection-prior to occupancy). I hereby assume all responsibility for the scheduling of my required inspections. If the required inspections are not requested, inspected and signed off(approved)by the inspector in the prescribed order, I understand that reinspection fees and an hourly investigation fee pursuant to the 1997 UBC, and will be assessed in addition to my original permit fees to resolve any questionable practices or problems that have been discovered. I further understand that this investigation will be scheduled as time allows. Until resolution of any/all problems no occupancy(Final Inspection)will be granted for the residence. OWN ER/CONTRACTOR(indicate which)Signature X 5013 Mobile/Manufactured Landings/Deck 0 Not Met 9/26/00 TLG All mobile/manufactured home landings or decks must be freestanding(self supporting). The largest landing or deck allowed without drawings or a building permit MUST be under 30"in height from surrounding grade. NO second story decks,or decks above 30"can be built without a permit.Any landing or deck that is 30"or more in height from walking surface to finish grade requires a Permit. Any landing or deck that has 4 or more risers requires a handrail. X 5055 Manuf. Home Document Location 0 Not Met 9/26/00 TLG The installation permit shall be displayed in clear view of the site access road. The approved site plan and other applicable instructions, including installation instructions,shall be available in this location OR placed in the location specified by WAC 296-150M-655. Support configuration shall be clearly marked in the installation instructions. 5510 Property Lines Not Met 9/26/00 TLG All property lines shall be clearly identified at the time of foundation inspection. 0200 Site Plan 0 Not Met 9/28/00 AHB Approved per dimensions and setbacks on submitted site plan.X 5026 Structure Setback 0 Not Met 9/28/00 AHB Proposed structure or portions thereof with an projection over 30"in height from grade line,must maintain a 5' separation distance between adjacent structures and that furthest projection.X 0060 Erosion Protection 0 Not Met 9/28/00 AHB All upland areas disturbed or newly created by construction activities shall be seeded,vegetated or given an equivalent type of erosion protection(silt fencing or straw matting).X Fees Fee Trans. Create Created Type Description Code Revenue Account No. Date By Amt.Due MHSF Mobile Home Submittal 322.10 9/12/00 KLW $175.00 Fee EHPR EH Plan Review 346.50.00 9/26/00 CEW $50.00 STFE Building State Fee 386.00.05 9/26/00 TLG $4.50 MHBL Mobile Home Issuance 322.10 9/26/00 TLG $175.00 Fee PLRV Planning Review Fee 369.00 9/28/00 AHB $38.00 Case People Listing Role Type Name/Address Company Name Hold Primary APL MIKE JOHNSON Y NE 50 MT VIEW PL TAHUYA WA 98588 File Edit Options Window Help Exit �..._ N:v: open To Do 0.E3E H ':f GEE �S7 < $ t�v R�3' close Edit Project Grc,ap Add Cbona Pareel Activity People Fcc> v. la;tier, Condition. Cis•:rJotec r r 1 111 I 7{ +Updated: 10.2 4100 TVIt general f�larne: MIKE JOHNSON Address: 50 NE MOUNTAIN VIEW PL TAHUYA Description: P%.laster# BLD2000-01181 Pro�ject: P:1�.fJi 1FrI Tt_iF:ED HI 11,,1E Area u Mobile Construction Information Occupancy Information Plurrk7ing No. of Bedroorns: - Type of Construction: �� _ Mechanical No. of Bathrooms: F-5 Occupancy Group: No. of `;tortes: 11 Occupancy Load: Shoreline _ Setbacks Building Height: �y Occupancy Status: Prirrl,_,r, -i Printinq Case Surnmary Report for BLD-2000-01181 ;Start Note-A,ork.Fbpu... PERMIT-PL__ �_, Novell-deli Lj Microsoft Excel Copyright©1997-1999 Tidemark Computer Systems Inc. 12/12/00 All Rights Reserved. File Edit Options I,•t+indoth/ Help E,:it rJru Gpcn To Do OBE LILL rlo:c Edit project Group Add l:Banc F'ortcl Adn•ety F'caplc Fe_a '•i aluatior l:ondikion, Ci-.M1l c,tcc 1 III 1 ❑ X Name: NUKE JOHNSON ltpdated: l024/00 T'Utir General Address: 50 NE MOUNTAIN VIEW PL TAHUYA Description: Master# BLD2000-01181 Project: t ons4r.is Occ. h,1 .PdlJF.Y,I:_T UP,EEl HUP:riE i't.til�. I Area Information Mobile Horne Info Plumbing Lot Size: SF Make: Mechanical Building: SF Model: Basement. SF year: 'UU1 `shoreline peels: SF Length: -,E, Setbacks Garage/Carport: SF Width: Other: � � ._� � sF Serial Number: Printing la`s mart'' epvrt for BL[l C1Ci` 81'.o' Start I Notework.Popu...1 PERMIT-PL--_ Noue ... �itcroso t Xce Copyright©1997-1999 Tidemark Computer Systems Inc. 12/12/00 All Rights Reserved. File Edit hlptions ',,Vindow Help H EE A A t. i L rJ b° cic•sc Edit F'r Ojact Group Add Clans Porccl Activity Pcopl•: Fcco •'lalaation Condition. Cas•:M1Jo*.•,c Building 1 1 1 1 1 ❑ X Narrle: MIKE JOHNSON Updated: 10./74.MO TVI! General r�.ddress 50 NE MOUNTAIN VIEW PL TAHUYA Description: l"yTaster # BLD2000-01181 Project: onstr.& . ... Ctcc h1%,P'Jt_IF ,i=TI IRED HCih;lE .Area& Mobile Plurrlbing Fixture Type (quantity klotes Mechanical Shoreline Setbacks Printing Base Dt-Jn-jmary Report for Ml"000!M1 _. ;Start Notej,/ork Popu... 14dk PERMIT'PL,- Nr velFtielivere . , +ticrosoftE:�cel Copyright©1997-1999 Tidemark Computer Systems Inc. 12/12/00 All Rights Reserved. l File Edit L ptit7rls ',,, indol,, Help Exit AJa-+ r� � �n � T�c OBE 1 Olocc Edit Projtd �3nsap Add clone Porctl Activity fe,ph F.-- �i alaytior, C—diti �_a..r!•�res r - 1 111 1 ❑ 7{ Name: MIKE JOHNSON Updated: 10+24100 T1N C-eneral Address: 50 NE MOUNTAIN VIEW PL TAHUYA Description: Plaster## BLD2000-01181 Project: Con_tr. G�.c. t:�1�.fJUFrI-::TI.IREC� HI:-It:�1E .area Mobile Plumbing tblechanical Fixture Type Quantity Pdotes E1��cttannval Shoreline 4.etbacks Printing C s;SI-rmmary Fiepork or 'D200CJ=Ct11 1 `' ;A Start ' J tduteavtork.Popu icy PERMIT-PL--- �livere. . f+iirincnft E rr�f Copyright©1997-1999 Tidemark Computer Systems Inc. 12/12/00 All Rights Reserved. File Edit Options ''.Vir-jdnv/ Help + y T J 40 Close Edit Project Droop A Clor, parcel ,, kv.-ity Noplc Fcm Voluntion Ciondirion:� Ca..hh�bas r 1 III I ❑ X PJarrle: NUKE JOHNSON Updated: 10 24/00 TLrV General Address: 50 NE MOUNTAIN VIEW PL TAHUYA Description: Master A. BLD2000-01181 Proiec:t: Constr. occ. t-vlANUFACTURED HOME Area�... Mobile PU_urlbinu Setback Diu. Feet Shoreline and Planning Into Front: FE- I 1'-+, Shoreline Desiq.: Mechanical Rear: 141-1 Water Body: Side 1: P1 - SEPA?: Side ?: �- r0 Gornp. Plan Desira : Rural Shoreline Setback: Slope Setback. Pirn Intl Cave�t_irrimary �p�rk" or" Start Notework.Pnpu...1 "PERMIT-PL• _ FJo re11•r�vl}vere... Copyright©1997-1999 Tidemark Computer Systems Inc. 12/12/00 All Rights Reserved. PERMIT NO.: BLD MASON COUNTY BUILDING PERMIT APPLICATION 7/7 426 W.Cedar/P.O.Box 186,Shelton,WA 98584 Shelton 360 427-9670 Belfair 360 215-4467 Elma 360 482-5269 Seattle 206 464-6968 APPLICANT INFORMATION CONTRACTOR INFORM TIO Owner Contractor NameC771(f 0,Kt Mailing Addr s Mailing Address City 1fr _ State/ �Zip Code_�� City State Zip Code Phone(�(,r,� 2`15�3�3�?ther Ph.( Ph.( Other Ph.( Lien/Title Holder r,,rf.,fr.;��(�',�,. Contractor Reg. # Address Expiration SEPTICIWATER SYSTEM INFORMATION-Connect to New Septic Existing Septic--)< _Connect to Sewer System Name of Sewer System Well Water System_XName of Water System PARCEL IN O MATION-12 digit Tax Parcel No. '� / S,2 / p005Q Fire District t�se►�Legal D ��iOLK DZI/ e9. L,�'7`S'y — Site Address(Please include street name, street number and city) Directions to site lid F,v 744J!T � l/#1164 1 L �''` ,-22 4U t f✓�N 011, Will timber be cut and sold in parcel preparation? (Yes/,No _NZ Is your property within 200' of the following: Body of Water(Name) N0 Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs PERMANENT RESIDENCE❑ SEASONAL RESIDENCE❑ Repair Qiher Use of Building Describe Work — No. of Bedrooms No. of Bathrooms SQUARE FOOTAGE-1st Floor loor 3rd Floor Loft Basement Deck Qaraae Attached Qlacized C5rpo+rt Attached Detached' MOBILE HOME INFORMATION-Make Model L4 to foq n Model Year 2001 Length' Width or Serial No. No. of Bedrooms 73 No. of Bathrooms Type of Heat &IL Purchase Price $ Replacement Unit ?(Yes/No) Installer Name N Certification No. NOTICE: THIS PERMIT BECOMES NULL 8,VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structures for review and inspection of this project. Acknowledgment of such is by signature below: OWNER AFFIDAVIT-I certify that I am exempt from the requirements of the CONTRACTOR'S AFFIDAVIT-I certify that I am currently registered as a Contractor Registration Law RCW 18.27 and am aware of the ordinance contractor in the State of Washington and that I am aware of the ordinance requirements for which this permit is issued and that all work will be done in requirements regulating the work for which this permit is issued and all work conformance therewith. No changes shall be made without first obtaining shall be done in conformance therewith. No changes shall be made without approval. first obtaining approval. X Date C' X Date FOR OFFICIAL USE BEYOND THIS POINT Accepted by Date Submittal Amount Due Receipt No. DEPARTMEN R!~VII»1!V ROVE p 'NIED CONDITION CODU Building Departme 9 r)4>O Occ Group Type Con ti AAd- Planning Department Environmental Health Department Public Works Department I Fire Marshal `� vU Valuation $ / ! Building Permit Fee Site Inspection Plan Review Fee EH Review Fee Plumbing& Base Fee Planning Review Fee Mechanical& Base Fee Other Wood/Gas/Pellet Stove Fee State Fee Violation Fee Pre-Paid at Submittal ( ) TOTAL FEES