Loading...
HomeMy WebLinkAboutBLD95-1459 Inspection Reports and Testing Results - BLD Inspections - 2/13/1996 WATER AND SEWAGE, PERMITS, PLANNING, BULKHEADS, ROADS, PLATTING AND LAND SURVEYING A•D•A ENGINEERING IN-1937 ARMSTRONG, DeGROOT& ASSOCIATE$ SE-13.0 ENGINEERS AND SURVEYORS HERBERT A.ARMSTRONG P.O. BOX 847 PETER C. DeGROOT A'D'A POU(371 NW LINDVIG WAY) LSBO,WASHINGTON 98370 PHONE(206)779-6633 Serving You Since 7960 BAINBRIDGE ISLAND 842-6123 FAX 779-7031 February 13, 1996 F E B 141993 Attention: Mr. Larry Waters (',F NERAL R ERVI CES Mason County Building Inspector P.O. Box 186 Shelton, Washington 98584 Subject: Collins Lake Community Club, Water System Improvement Project,Reservoir and Pumphouse Dear Mr. Waters: Please find the following inspection reports and testing results related to the construction of the reservoir and pumphouse for well# 3 for the Collins Lake Community Club. This information is provided at your request. Included are soil test results, reinforcing steel inspection, concrete test results and weld inspection including x-ray examination. I personally inspected the reinforcing steel when it was tied in place prior to the concrete pour. The materials and the installation were satisfactory and consistent with the plans, specifications and the approved shop drawings. This should provide a complete construction documentation report for the construction of the reservoir and pumphouse. If you have any further questions please give me a call at 360-779- 6633. Very Truly Yours 9�—�&- -- Robert B. Gatz,P.E. RBG cc: Mr. Tom Thies, Collins Lake Community Club Ms. Jeanean Warner, Collins Lake Community Club Mr. Vic Paolino,RECD Mr. Herb Armstrong,ADA i GENERAL TESTING LABORATORIES, INC. 18970 THIRD AVENUE NE, P.O. BOX 1586, POULSBO, WA 98370 RECEIVED F E B 1 2 1996 February 9, 1996 A.D.A. ENGINEERING A D A Engineering P.O. Box 847 Poulsbo, WA 98370 ATTN: Mr. Herb Armstrong RE: X-Ray Inspection Collins Lake Water Tank Dear Herb, As requested, P M Testing performed an X-Ray welding examination as a sub-contractor for General Testing Laboratories. The enclosed report presents the results of this inspection on the three areas of the tank examined. After minor rework, all of the welds in all three areas were determined to be satisfactory. General Testing will retain the X-Ray film for this project in our files. Should you have any questions, please do not hesitate to contact our office. Thank you. Sincerely, GENERAL TESTING LABORATORIES, INC. Gregory W. Smith Staff Engineer GWS/jp Enclosure Quality Assurance for Nortlnvest Construction 360-779-9196 EL—XAA I N;;i iGN RE�GRT J got No. 37588 �Report No . 35556 Customer_General Testing Laboratories Date 1/2/96 ESTIN _. _ _ _ P.O. Box 1586 Poulsbo, WA 98370 4630 16TH ST. E. SUITE B-18 D a. No. P . 0. No John Hart TACONLk. WA 98424 206 922 1321 Specification ASME Sec. V Acceptance AWWA D100-84 Collins Lake Part No . Water System Tank Material Fe Procedure PMT 003 Iridium 192 l_ I Cobalt 60 = X-Ray KVP WELD VIEW rdt suc LAU Up1 BURR �,R UnOfR wnNiR RnoRo wui nrE NO. NO. Miry Iha f1w Ulm rm, 'at w1 " wof coot REMARKS rNICA. our. V-1 A-B / .375 V-lA A-B Surface V-2 A-B X g V-2 A-B (R-1) 4x10 3x7. 1X10. 4Y,X17 . 7X17 14X17 70MM FILM L- I 4 Inspected By Summaryprelim Final ��.II NDT Level Qty. Insp . 3 3 Received By Qty. Rei . 1 0 Date _ Qt;; . �cc . 2 3 ORIGINAL R E L TESTING LAB ORA TORIES, INC. 18970 THIRD AVENUE NE, P.O. BOX 1586, POULSBO, WA 98370 DEC 2 81995 A.D.A. ENGINEERING City/County Permit# CONCRETE TEST REPOR T CLIENT ADA REPORT NO. 1 PROJECT Collins Lake Water Tank PROJECT NO. B8501 CONTRACTOR Hule Boring & Tank DATE CONCRETE SAMPLED 11/16/95 INSPECTOR Jim Comnick CONCRETLE SUPPLIER, Lone Star LOCATION OF CONCRETE PLACEMENT Base of Tank LOCATION SAMPLED 2nd lift NO. YARDS PLACED 27 OF 66 TRUCK SAMPLED 182 TIME SAMPLED 9:45 MIX DATA INVOICE NO. 568905 CEMENT 5.5 SK TYPE I & II MAX. SIZE AGGREGATE 7/8 " ADMIXTURES --- AMOUNT -- OZ/YD Air AMOUNT 4 OZ/YD SLUMP 2.75 " AIR CONTENT 4 - 6 % CONCRETE TEMP. 62 ° REQUIRED SLUMP 4 - 5" " REQUIRED AIR 3 - 6 % AIR TEMP 44 WEATHER Cloudy REQUIRED 28 DAY STRENGTH 3,000 PSI COMPREHENSIVE STRENGTH TEST RESULTS CYLINDER LAB IDIAMETER AREA SQ. DATE AGE UNITLOADI REMARKS NUMBER NUMBERI INCHES IN. TESTED (DAYS) (PSI) 1 A 6 28.27 11/23/95 7 3,550 1 B 6 28.27 12/14/95 28 4,950 1 C 6 28.27 12/14/95 28 5,030 1 D 6 28.27 12/14/95 28 4,920 CERTIFIED BY: ��-��� DATE: L Z/'- �5 Laboratory Manager, General Testing Laboratories Quality Assurance for Northwest Construction 360-779-9196 . II AL General Testing Laboratories, Inc. ORIGINAL 18970 3rd Avenue NE, P.O. Box 1586, POUlSbO, Washington 98370 The HART Company MOISTURE-DENSITY RELATIONS OF SOILS REPORT Client ADA ENGINEERING Report No. 2 Project COLLINS LAKE Project No. B8501 Contractor -- Test No. Date Sampled 1 1/2 8/9 5 Date Tested_ 1 1/2 9/9 5 Date Reported__ 1 1/3 0/9 5 FIELD DATA: Source of Material NATIVE Location Sampled STATION 18+50 Area Representing -- Dept. or Elevation Sample Taken------- Vertical Limits -- MOISTURE % OF DRY WEIGHT LABORATORY: Max. Density Dry 125.8 (CORRECTED 136.0)Lbs./Cu. Ft. Opt Moisture 1 1 .4 % 126 Dry Den., (Min. for_95_% Comp.) -- Lbs./Cu. Ft. IA FIELD VALUES: I ]24 Max. Dry Wt. -- Opt. Moist -- Field Dry Den. -- Field Moist -- Rock in Fill -- % Density taken -- Day -- after Fill was placed a 122 Soil: Type & Color DARK BROWN SANDY SOIL L ' W/GRAVEL m Test Specifications WSDOT 609 F- 120 Cylinder 4 " Hammer 5 Lbs. Drops 12 3 Layers 25 Blows/Layers Tested by DR 1 ]8 116 6 9 12 1 ]8 CERTIFIED BY: Gt LAB MANAGER GREGORY W. SMITH, P.E. , STAFF ENGINEER DATE' - JOB NO 50� • • General Testing Laboratories, Inc. 8 18970 3rd Ave. N.E., P.O. Box 1586 PROJECT Poulsbo, Washington 98370 „4.5 LOCATION - (206) 779-9196 /-/5 g�t' TO A . CONTRACTOR OWNER WEATHER J TEMP. �(� °at q 30 AM �L a 7 °at PM PRESENT AT SI E NOV 3 O THE FOLLOWING WAS NOTED: A.D.A. ENGINEERING > r .7 L - ;QP >� ,l�� �QM �/� � , l s n,�z 5/ Id- Al 94 ' Ze l' /L/5 0ce A) Z/2uti%-AZ � z 4! cV ,�J,r G �� o 3 0 oo P-5l Co /?61-7'`0- p Lv"4e YaC, '�l,Q9oS< <Slu� y 3/� r �rl� (n // �!L-�� ��1 ��rL c� c'�r3-S� �7�Z l�e%�-i3OKrsSie�v' ��� �.•.r� , COPIES X f G D SIGNED j RECYCLED PAPER PNOOUCT N1 W_&olon,Mm 0101.To O.W M40W TOLL PREP I-0OD775dJA0 aP" Contents:40%Pre-Consumer•1 o%Post-Consumer 1 GENERAL TESTING LABORATORIES INC .8970 THIRD AVEN(JE NE' P O 9.BOAC 1585 POULSBO, W�SHINGTON .................' (3fi0) 779-9196 Fax. (360) 779-4320 November 14, 1995 UnMI VAL GTL Project No.: B8501 ' MEMO RECEIVED TO: Mr. Bob Gates NOV 1 5 1995 C/O ADA Engineering A.D.A. ENUNL�.-,�w;G . P.O. Box 847 Poulsbo, WA 98370 FROM: Gregory W. Smith SUBJECT: Collins Lake Dear Bob, As per your request, I visited the Collins Lake Tank site on November 13, 1995. The subgrade soils exposed in the tank footing excavation will support the designed 4500 PSF loading. Also, the rebar was in-place and consisted of 418 bars on two foot centers each way. Should you have any questions, please do not hesitate to contact me. Thanks. Greg GWS/jp Quality Assurance for Northwest Construction ORIGINAL General Testing Laboratories, I1WE C F. I V n * 18970 3rd Avenue NE, P.O. Box 1586, POUIS110, Washingarn 98370 The HART Company NOV - 6 199 A.D.A. EN(JjNu :,- IiN 3 MOISTURE-DENSITY RELATIONS OF SOILS REPORT Client A D A ENGINEERING Report No. I Project COLLINS LAKE Project No. B8501 Contractor ---- Test No. 95- 10-66 19 Date Sampled 10/ 19/95 Date Tested 10/20/95 Date Reported 10/20/95 FIELD DATA: Source of Material NATIVE Location Sampled ON-SITE Area Representing R.OADWAf Dept. or Elevation Sample Taken -- Vertical Limits -- F�:��MOI�ST�URE � OF DRY WEIGHT _...T RY: Max. Density Dry 107 .2 Lbs./Cu. Ft. Opt Moisture 16. 1 % 110 Dry Den., (Min. for 95 % Comp.) 9 7 .5 Lbs./Cu. Ft. CORRECTED MAX. DRY DENSITY - 128.5 FIELD VALUES: �- 108 Max. Dry Wt. Opt. Moist %, Field Dry Den. Field Moist %� Rock in Fill % U Density taken Day after Fill was placed i l00 Soil: Type & Color BROWN S IL T Y SAND WI TH GRAVE L ,, Test Specifications _ WSDOT_ 609 F —9,�—4 T, - 104 Cylinder 4 Hammer 5 Lbs. s Drops 12 3 Layers yl 25 Blows/Layers 102 Tested by MARK BRANDY 100 101 t13 16 ]9 22 CERTIFIED BY: LAB MANAGER GREGORY W. SMITH, STAFF ENGINEER Gen Testing Laboratories, Inc - l 18970 Third Avenue-NE, P.O. Box 1586, Poulsbo, WA 98370 Phone 360-779-9196 • Fax 360-779-4320 To: Bob Gatz, ADA From: Gregory W. Smith, General Testing Laboratories, Inc. Date: Tuesday, October 24, 1995 Subject: Collins Lake Water System, GTL Project No.: B8501 On 10/19/95 1 visited the site at 9:00 AM to observe subgrade conditions at the proposed water tank pad, found gravelly silty sand which, with proper preparation will support the design loadings of 4500 PSF. Also obtained a proctor sample to be run in lab for use during backfill testing at the site. Backfill testing is to be on an as-requested basis