A•D•A ENGINEERING
IN-1937 ARMSTRONG, DeGROOT& ASSOCIATE$
SE-13.0
ENGINEERS AND SURVEYORS
HERBERT A.ARMSTRONG P.O. BOX 847
PETER C. DeGROOT A'D'A POU(371 NW LINDVIG WAY)
LSBO,WASHINGTON 98370
PHONE(206)779-6633
Serving You Since 7960 BAINBRIDGE ISLAND 842-6123
FAX 779-7031
February 13, 1996 F E B 141993
Attention: Mr. Larry Waters (',F NERAL R ERVI CES
Mason County Building Inspector
P.O. Box 186
Shelton, Washington 98584
Subject: Collins Lake Community Club, Water System Improvement Project,Reservoir
and Pumphouse
Dear Mr. Waters:
Please find the following inspection reports and testing results related to the construction of the
reservoir and pumphouse for well# 3 for the Collins Lake Community Club. This information is
provided at your request. Included are soil test results, reinforcing steel inspection, concrete test
results and weld inspection including x-ray examination.
I personally inspected the reinforcing steel when it was tied in place prior to the concrete pour.
The materials and the installation were satisfactory and consistent with the plans, specifications
and the approved shop drawings.
This should provide a complete construction documentation report for the construction of the
reservoir and pumphouse. If you have any further questions please give me a call at 360-779-
6633.
Very Truly Yours
9�—�&- --
Robert B. Gatz,P.E.
RBG
cc: Mr. Tom Thies, Collins Lake Community Club
Ms. Jeanean Warner, Collins Lake Community Club
Mr. Vic Paolino,RECD
Mr. Herb Armstrong,ADA
i
GENERAL TESTING LABORATORIES, INC.
18970 THIRD AVENUE NE, P.O. BOX 1586, POULSBO, WA 98370
RECEIVED
F E B 1 2 1996
February 9, 1996 A.D.A. ENGINEERING
A D A Engineering
P.O. Box 847
Poulsbo, WA 98370
ATTN: Mr. Herb Armstrong
RE: X-Ray Inspection
Collins Lake Water Tank
Dear Herb,
As requested, P M Testing performed an X-Ray welding examination as a sub-contractor
for General Testing Laboratories. The enclosed report presents the results of this inspection on
the three areas of the tank examined.
After minor rework, all of the welds in all three areas were determined to be satisfactory.
General Testing will retain the X-Ray film for this project in our files.
Should you have any questions, please do not hesitate to contact our office. Thank you.
Sincerely,
GENERAL TESTING LABORATORIES, INC.
Gregory W. Smith
Staff Engineer
GWS/jp
Enclosure
Quality Assurance for Nortlnvest Construction
360-779-9196
EL—XAA I N;;i iGN RE�GRT
J got No. 37588 �Report No . 35556
Customer_General Testing Laboratories Date 1/2/96
ESTIN _. _ _ _
P.O. Box 1586
Poulsbo, WA 98370
4630 16TH ST. E.
SUITE B-18 D a. No. P . 0. No John Hart
TACONLk. WA 98424
206 922 1321 Specification ASME Sec. V
Acceptance AWWA D100-84
Collins Lake
Part No . Water System Tank Material Fe Procedure PMT 003
Iridium 192 l_ I Cobalt 60 = X-Ray KVP
WELD VIEW rdt suc LAU Up1 BURR �,R UnOfR wnNiR RnoRo wui nrE
NO. NO. Miry Iha f1w Ulm rm, 'at w1 " wof coot REMARKS rNICA. our.
V-1 A-B / .375
V-lA A-B Surface
V-2 A-B X g
V-2 A-B
(R-1)
4x10 3x7. 1X10. 4Y,X17 . 7X17 14X17 70MM
FILM L- I
4
Inspected By Summaryprelim Final
��.II
NDT Level Qty. Insp . 3 3
Received By Qty. Rei . 1 0
Date _ Qt;; . �cc . 2 3
ORIGINAL
R E L TESTING LAB ORA TORIES, INC.
18970 THIRD AVENUE NE, P.O. BOX 1586, POULSBO, WA 98370
DEC 2 81995
A.D.A. ENGINEERING City/County
Permit#
CONCRETE TEST REPOR T
CLIENT ADA REPORT NO. 1
PROJECT Collins Lake Water Tank PROJECT NO. B8501
CONTRACTOR Hule Boring & Tank
DATE CONCRETE SAMPLED 11/16/95 INSPECTOR Jim Comnick
CONCRETLE SUPPLIER, Lone Star
LOCATION OF CONCRETE PLACEMENT Base of Tank
LOCATION SAMPLED 2nd lift
NO. YARDS PLACED 27 OF 66 TRUCK SAMPLED 182 TIME SAMPLED 9:45
MIX DATA INVOICE NO. 568905
CEMENT 5.5 SK TYPE I & II MAX. SIZE AGGREGATE 7/8 "
ADMIXTURES --- AMOUNT -- OZ/YD
Air AMOUNT 4 OZ/YD
SLUMP 2.75 " AIR CONTENT 4 - 6 % CONCRETE TEMP. 62 °
REQUIRED SLUMP 4 - 5" " REQUIRED AIR 3 - 6 % AIR TEMP 44
WEATHER Cloudy
REQUIRED 28 DAY STRENGTH 3,000 PSI
COMPREHENSIVE STRENGTH TEST RESULTS
CYLINDER LAB IDIAMETER AREA SQ. DATE AGE UNITLOADI REMARKS
NUMBER NUMBERI INCHES IN. TESTED (DAYS) (PSI)
1 A 6 28.27 11/23/95 7 3,550
1 B 6 28.27 12/14/95 28 4,950
1 C 6 28.27 12/14/95 28 5,030
1 D 6 28.27 12/14/95 28 4,920
CERTIFIED BY: ��-��� DATE: L Z/'- �5
Laboratory Manager, General Testing Laboratories
Quality Assurance for Northwest Construction
360-779-9196
. II
AL General Testing Laboratories, Inc. ORIGINAL
18970 3rd Avenue NE, P.O. Box 1586, POUlSbO, Washington 98370
The HART Company
MOISTURE-DENSITY RELATIONS OF SOILS REPORT
Client ADA ENGINEERING Report No. 2
Project COLLINS LAKE Project No. B8501
Contractor -- Test No.
Date Sampled 1 1/2 8/9 5 Date Tested_ 1 1/2 9/9 5 Date Reported__ 1 1/3 0/9 5
FIELD DATA:
Source of Material NATIVE
Location Sampled STATION 18+50
Area Representing --
Dept. or Elevation Sample Taken------- Vertical Limits --
MOISTURE % OF DRY WEIGHT
LABORATORY:
Max. Density Dry 125.8 (CORRECTED 136.0)Lbs./Cu. Ft.
Opt Moisture 1 1 .4 % 126
Dry Den., (Min. for_95_% Comp.) -- Lbs./Cu. Ft.
IA
FIELD VALUES: I ]24
Max. Dry Wt. -- Opt. Moist --
Field Dry Den. -- Field Moist --
Rock in Fill -- %
Density taken -- Day -- after Fill was placed a 122
Soil: Type & Color DARK BROWN SANDY SOIL L '
W/GRAVEL m
Test Specifications WSDOT 609 F-
120
Cylinder 4 " Hammer 5 Lbs.
Drops 12 3 Layers
25 Blows/Layers
Tested by DR 1 ]8
116
6 9 12 1 ]8
CERTIFIED BY: Gt LAB MANAGER
GREGORY W. SMITH, P.E. , STAFF ENGINEER
DATE' - JOB NO 50�
• • General Testing Laboratories, Inc. 8
18970 3rd Ave. N.E., P.O. Box 1586 PROJECT
Poulsbo, Washington 98370 „4.5
LOCATION -
(206) 779-9196 /-/5 g�t'
TO A . CONTRACTOR OWNER
WEATHER J TEMP. �(� °at q 30 AM
�L a 7 °at PM
PRESENT AT SI E
NOV 3 O
THE FOLLOWING WAS NOTED: A.D.A. ENGINEERING
> r .7 L - ;QP >� ,l�� �QM �/� � , l s n,�z 5/ Id- Al 94 ' Ze
l' /L/5 0ce A) Z/2uti%-AZ � z 4! cV ,�J,r G �� o
3 0 oo P-5l Co /?61-7'`0-
p Lv"4e YaC,
'�l,Q9oS< <Slu� y 3/�
r
�rl� (n // �!L-�� ��1 ��rL c� c'�r3-S� �7�Z l�e%�-i3OKrsSie�v' ��� �.•.r� ,
COPIES X
f G D SIGNED
j RECYCLED PAPER
PNOOUCT N1 W_&olon,Mm 0101.To O.W M40W TOLL PREP I-0OD775dJA0 aP" Contents:40%Pre-Consumer•1 o%Post-Consumer
1
GENERAL TESTING LABORATORIES INC
.8970 THIRD AVEN(JE NE' P O 9.BOAC 1585
POULSBO, W�SHINGTON .................'
(3fi0) 779-9196 Fax. (360) 779-4320
November 14, 1995 UnMI VAL
GTL Project No.: B8501 '
MEMO RECEIVED
TO: Mr. Bob Gates NOV 1 5 1995
C/O ADA Engineering A.D.A. ENUNL�.-,�w;G .
P.O. Box 847
Poulsbo, WA 98370
FROM: Gregory W. Smith
SUBJECT: Collins Lake
Dear Bob,
As per your request, I visited the Collins Lake Tank site on November 13, 1995.
The subgrade soils exposed in the tank footing excavation will support the designed 4500
PSF loading. Also, the rebar was in-place and consisted of 418 bars on two foot centers
each way. Should you have any questions, please do not hesitate to contact me.
Thanks.
Greg
GWS/jp
Quality Assurance for Northwest Construction
ORIGINAL
General Testing Laboratories, I1WE C F. I V n *
18970 3rd Avenue NE, P.O. Box 1586, POUIS110, Washingarn 98370
The HART Company NOV - 6 199
A.D.A. EN(JjNu :,- IiN 3
MOISTURE-DENSITY RELATIONS OF SOILS REPORT
Client A D A ENGINEERING Report No. I
Project COLLINS LAKE Project No. B8501
Contractor ---- Test No. 95- 10-66 19
Date Sampled 10/ 19/95 Date Tested 10/20/95 Date Reported 10/20/95
FIELD DATA:
Source of Material NATIVE
Location Sampled ON-SITE
Area Representing R.OADWAf
Dept. or Elevation Sample Taken -- Vertical Limits --
F�:��MOI�ST�URE � OF DRY WEIGHT
_...T RY:
Max. Density Dry 107 .2 Lbs./Cu. Ft.
Opt Moisture 16. 1 % 110
Dry Den., (Min. for 95 % Comp.) 9 7 .5 Lbs./Cu. Ft.
CORRECTED MAX. DRY DENSITY - 128.5
FIELD VALUES: �- 108
Max. Dry Wt. Opt. Moist %,
Field Dry Den. Field Moist %�
Rock in Fill % U
Density taken Day after Fill was placed i l00
Soil: Type & Color BROWN S IL T Y SAND WI TH GRAVE L ,,
Test Specifications _ WSDOT_ 609 F —9,�—4 T,
-
104
Cylinder 4 Hammer 5 Lbs. s
Drops 12 3 Layers
yl
25 Blows/Layers 102
Tested by MARK BRANDY
100
101 t13 16 ]9 22
CERTIFIED BY: LAB MANAGER
GREGORY W. SMITH, STAFF ENGINEER
Gen Testing Laboratories, Inc -
l
18970 Third Avenue-NE, P.O. Box 1586, Poulsbo, WA 98370
Phone 360-779-9196 • Fax 360-779-4320
To: Bob Gatz, ADA
From: Gregory W. Smith, General Testing Laboratories, Inc.
Date: Tuesday, October 24, 1995
Subject: Collins Lake Water System, GTL Project No.: B8501
On 10/19/95 1 visited the site at 9:00 AM to observe subgrade conditions at the
proposed water tank pad, found gravelly silty sand which, with proper preparation will
support the design loadings of 4500 PSF.
Also obtained a proctor sample to be run in lab for use during backfill testing at the site.
Backfill testing is to be on an as-requested basis