Loading...
HomeMy WebLinkAboutShoreline Exemption - SHX Letters / Memos - 2/28/1995 GARY YANDO,DIRECTOR ST qtF� o A° N u DEPARTMENT OF COMMUNITY DEVELOPMENT ►}- 0 T i PLANNING-SOLID WASTE- UTILITIES a� N Y y BLDG. III • 426 W. CEDAR • P.O. BOX 578 1864 SHELTON, WA 98584 • (206)427-9670 February 28, 1995 Robert B. Gatz, P. E. ADA Engineering P.O. Box 847 Poulsbo, WA 98370 RE: Collins Lake Community Club, Water Improvement System. Dear Mr. Gatz: During review of your request for a Shoreline Exemption from a Substantial Development Permit, staff discovered that Collins Lake is not designated as a Shoreline of the State and is not subject to review under the Mason County Shoreline Master Program. Therefore, a Shoreline Exemption is not necessary for installation of the water system. The proposal is subject to SEPA review and a checklist will be required. If you have any questions or I can be of further assistance, please give me a call . Thank you. Sincerely, Grace Miller, Planner DEPT. OF COMMUNITY DEVELOPMENT Recycled WATER AND SEWAGE, PERMITS, PLANNING, BULKHEADS, ROADS, PLATTING AND LAND SURVEYING A•D•A ENGINEERING ARMSTRONG, DeGROOT&ASSOCIATES ENGINEERS AND SURVEYORS HERBERT A.ARMSTRONG P.O. BOX 847 PETER C. DeGROOT A•D'A POU(� NW LINDVIG WAY) LSBO,WASHINGTON 98370 PHONE(206)779-6633 Serving You Since 1960 y�= "= ; �-•�..'a BAINBRIDGE ISLAND 842-6123 Z, FAX 779-7031 FEB 14 - r February 9, 1995 f995 MASpN Co PLANNING DEPf. Attention: Grace Miller Mason County Planning Department P.O. Box 578 Shelton, Washington 98584 Subject: Collins Lake Community Club, Water System Improvement Project, Shoreline Management Permit Exception Dear Ms. Miller: On behalf of the Collins Lake Community Club Board we are hereby requesting that a exception be granted, so that a Shoreline Substantial Development Permit is not required for the construction of the water system improvements. Attached is a map which shows the Collins Lake Plat and existing water system. The project consists of construction of a new reservoir, well and pump house and upgrading the watermains to provide fire flow. The project includes construction of new watermains thru out the Plat. The new pipe will be located in the same right of right of ways or easements as the existing watermain. In 99% + of the route, the watermain will be located further than 200' away from the 100 year flood elevation of Collins Lake. At the location between Division 3 and Division 2 the watermain is located on a easement which is approximately 150' away from the lake. Where the watermain will cross the inlet and outlet streams of the lake, we will be crossing above the culverts in the road fills. There will be no open cut of the streams. We have spoken to Doris Small of Washington Department of Fish and Game about the crossing's. She has provided a verbal determination that a Hydraulic Project Approval, HPA, is not required for the project. The construction project is funded by Farmers Home Administration grants and loans. FmHA and Department of Health and Mason County Engineering Department will be reviewing the construction plans and specifications. Best Management practices will be required to protect the lake from construction site erosion. WSN 8E JN 95-1937 1 The impacts caused by this project to the lake and its shorelines are very minimal and that is why we are requesting a exception to the Shoreline Permit Requirement. If you have any questions or comments regarding this request or the project please give me a call at (360)-779-6633. We are sending you under separate cover a SEPA, environmental checklist for review and action. Very Truly Yours Robert B. Gatz, P.E. RBG attach. cc: Mr. Tom Thies, President Collins Lake Board Mr. George Burrows, Collins Lake Mr. Herb A. Armstrong, ADA WSN 8E JN 95-1937 2