HomeMy WebLinkAboutSEP2005-00025 - SEP Determinations - 3/31/2005 ON.STATE MASON COUNTY
�P5 MC �� DEPARTMENT OF COMMUNITY DEVELOPMENT
o
S° y= Planning Division
7 N Y Y P O Box 279, Shelton,WA 98584
(360)427-9670
1864
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-350)
SEP2005-00025
Description of Proposal: CONSTRUCT A 6' X 40' PIER (DOUGLAS FIR), A 4' X 35'
ALUMINUM RAMP, AND TWO FLOATS (6' X 20' & 6' X 25')
FULLY ENCLOSED IN EXTRUDED POLYETHYLENE,
PLOYSTYRENE FLOATATION. PIER AND FLOATS TO HAVE 2'
GRATING. EIGHT ACZA PILES WILL BE DRIVEN TO SUPPORT
STRUCTURE
Proponent: DAN NORDSTROM
Site Address(If Assigned): 7261 E STATE ROUTE 106 UNION
Directions to Site:
Parcel Number: 322335000017
Legal Description: SUNNY BEACH TR 14 W 100 E 125' NLY OF RM & TAX 894*
Lead Agency: Mason County
The Lead Agency for this proposal has determined that it does not have a probable significant
adverser impact on the environment. An Environmental Impact Statement (EIS) is not required
under RCW 43.21 C.030(2)(c). This decision was made after review of a completed
Environmental Checklist and other information on file with the Lead Agency. This information is
available to the public upon request. MITIGATED MEASURES ARE ATTACHED.
Please contact Tammi Clark at ext. 295 with any questions.
This DNS is issued under 197-11-340(2), the Lead Agency will not act on this proposal for 14
days from the date below. Comments must be submitted to Tammi Clark, C/O Mason County
DCD, Planning Division, PO Box 279, Shelton WA 98584 by 4/14/2005.
tic - 3/3 r�oS
Authorized Local Government Official Date
Epp b69,1� 0 C-
&n� Lei hm,n, CortSU.t hvJ Q S ACE
W Drk)- miry l e WV'r6j-0
e..
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-350)
SEP2005-00025
CONDITIONS OF THIS DETERMINATION
1) Residential developers and individuals shall be required to control erosion during
construction. Removal of vegetation should be minimized and any areas disturbed should
be restored to prevent erosion and other environmental
impacts.X
2) The pier, ramp, float, and associated moorings shall be located to avoid shading of
eelgrass and other aquatic vegetation.X
3) Floatation for the structure shall be entirely enclosed and contained to permanently prevent
the breakup or loss of the floatation material into the water.
X
4) Debris or deleterious material resulting from construction shall be removed from the beach
area and project site and shall not be allowed to enter waters of the State.
X
5) Water quality is not to be degraded to the detriment of the aquatic environment as a result
of this project. X
6) Recreational piers shall be no higher than 11 feet above mean higher high water. Piers
and docks shall have at least an eight foot span between pilings.
X
7) The surface of floating structures shall be a minimum of eight inches about the surface of
the water.X
8) All floating structures shall include intermittent supports which run parallel to the shoreline
to keep structures off the tidelands at low tide.X
MASON CO. ENVIRONMENTAL CHECKLIST
Page 1
A. BACKGROUND
1. Name of proposed project, if applicable: DER gAvv, p v FLOA-F
2. Name of applicant: DAN NoRD5'TgoM
3. Address and phone number of applicant and contact person:
APPLACAr-m : 36A) 90111 AVE BELLE VQC_1W'4 9$004-; (ws) L-50- C)51f1
CoNTPrer : MARiNTc SttRVEYS 'r i 5 XS5Z5AAEN (AmY
5
a► SNAGS?'EAD waY IbRT-T�tSaNt), wA `18308 j (3&0)3g5-`f°}3
4. Date checklist prepared: aq- J Ar, u6R t( �-oo s
5. Agency requesting checklist: OorSbN COu";y,,
6. Proposed timing or schedule (including phasing, if applicable):
l69 Tu L( - /'f 5 E P TE M i3F_I;
7. Do you have any plans for future expansion, or further activity related to
or connected with this proposal? If yes explain.
8. List any environmental information you know about that has been
prepared, or will be prepared, directly related to this proposal.
i310U)Gt <At_ EvA�._uA-q-loN
9. -Do you know whether applications are pending for governmental
approvals of other proposals directly affecting the property covered by
your proposal? If yes, explain.
N�
10. List any government approvals or permits that will be needed for your
.proposal, if known.
S E C1 /o - U S A C E► H PA - W b FL✓, SE PA -M Asoiy eouN i"K.
C-N VI?oNVAl1P_N i 4l 7Et2Vt/��T - i4 yawl LOuM Tj�lll DrNG
l E+?n&►T- Mt\-5bp1 COuNT�/.
SJko(eLiu 5a1)Jh,n hu 1 bevelupavrif Ptva,LfCa4n11
MASON CO. ENVIRONMENTAL CHECKLIST
Page 2
11. Give a brief, complete description of your proposal, including the
proposed uses and the size of the project and site. There are several
questions later in this checklist that ask you to describe certain aspects of
your proposal_ You do not need to repeat those answers on this page.
(Lead agencies may modify this form to include additional specific
information on project description.)
(�' x 4'-0' Fi XED t�tF.t� Ctw5ri tc,—E-D o F J)W&L,q-S F111Z,
&W M tP4uAA . IZ�t r�P, hN D —1L✓o Ft-OfkTS ( 0 ' x
TTHAT- CONSt S f of FULLY EMCLo5ejo /N EXTl2uD >✓D
PouyETH (LEN E- , �oLYSj` Y REra� FLDA1 AnDpJ • Pie,? Ar4D
F L'D A'C) Ta P�vE. d ' Gt� T t r►G 8 A c-i:A t�i LDS L✓1 L-L a>✓DP-\V erl
Th SLAPPoRT ST-Rtic �€ . T �S W%t,L 3e_ rat pN
RE c Rtc N-VI D ( 5 Jk-*D b(f orq A t_ D ETPt\L-S.
12. What is the location of the proposal. Give sufficient information for a
person to understand the precise location of your proposed project,
including a street address, if any, and section, township, and range, if
known. If a proposal would occur over a range of area, provide the range
or boundaries of the site(s). Provide a legal description, site plan, vicinity
map, and topographic map, if reasonably available. While you should
submit any plans required by the.agency, you are not required to
duplicate maps or detailed plans submitted with any permit applications
related to this checklist.
73a3 EAST STATE— 12ourE loco uMrorl, L&/A
S>:c 33 , T aaNl, R 03 W
B. ENVIRONMENTAL ELEMENTS:
1_ ,EARTH:
a. General description of the site (circle one): lat, rolling, hilly, steep
slopes, mountainous, other
b. What is the steepest slope on the site (approximate percent slope)?
577
C. What general types of soils are found on the site (for example, clay, sand,
gravel, peat, muck)? If you know the classification of agricultural soils,
specify them and note any prime farmland.
GRAvEt_, S kr4tb I2ac,k
MASON CO. ENVIRONMENTAL CHECKLIST
Page 3
d. Are there surface indications or history of unstable soils in the immediate
vicinity? If so, describe.
No
e. Describe the purpose, type, and approximate quantities of any filling or
grading proposed. Indicate source of fill.
f. Could erosion occur as a result of clearing, construction, or use? If so,
generally describe.
N0
g. About what percent of the site will be covered with impervious surfaces
after project constructions (for example, asphalt or buildings)?
NIA
h. Proposed measures to reduce or control erosion, or other impacts to the
earth, if any:
NIA
2. AIR:
a. What types of emissions to the air would result from the proposal (i.e.
dust, automobile, odors, industrial wood smoke) during construction and
when the project is completed? If any, generally describe and give
approximate quantities, if known.
BARGE- 71b S'rE Ml&i+ f t'WE- Foec FMi5SiopiS j)uR1NG
C6-t45T iZ"kMDnl . ONCE PA FyT- I S CoMPLET-C-D, /Jo ADD);Iorlq L
EN��SSroNS /�R� /k.Nrl ci aA-�.
MASON CO. ENVIRONMENTAL CHECKLIST
Page 4
b. Are there any off-site sources of emissions or odor that may affect your
proposal? If so, generally describe.
No
C. Proposed measures to reduce or control emissions or other impacts to air,
if any: NIA
3. WATER:
a. Surface:
1) Is there any surface water body on or in the immediate vicinity of the
site (including year-round and seasonal streams, saltwater, lakes, ponds,
wetlands)? If yes, describe type and provide names. If appropriate, state
what stream or river it flows into.
ftoot7 CA-tqP�L
i
2) Will the project require any work over, in, or adjacent to (within 200
feet) the described waters? If yes, please describe and attach available
plans.
Blol.oGkcPt\— EVAu.LArt-roil.
3) Estimate the amount of fill and dredge material that would be place in
or removed from surface water or wetlands and indicate the area of the
site that would be affected. Indicate the source of fill material.
NfA
4) Will the proposal require surface water withdr
awals rawals or diversions?
Give general description, purpose, and approximate quantities if known.
N��
MASON CO. ENVIRONMENTAL CHECKLIST
Page 5
5) Does the proposal lie within a 100-year floodplain? If so, note location
on the site plan. No
6) Does the proposal involve any discharges of waste materials to surface
waters? If so, describe the type of waste and anticipated volume of
discharge.
b. Ground:
1) Will ground water be withdrawn, or will water be discharged to ground
water? Give general description, purpose, and approximate quantities, if
known. N
0
2) Describe waste material that will be discharged into the ground from
septic tanks or other sources, if any (for example, Domestic sewage:
industrial, containing the following chemicals.. . .; agricultural, etc.).
Describe the general size of the system, the number of such systems, the
number of houses to be served (if applicable), or the number of animals
or humans the system(s) are expected to serve.
C. Water Runoff (including storm water):
1) Describe the source of runoff(including storm water) and method of
collection and disposal, if any (include quantities, if known). Where will
this water flow? Will this water flow into other waters? If so, describe.
2) Could waste materials enter ground or surface waters? If so, generally
describe. No
MASON CO. ENVIRONMENTAL CHECKLIST
Page 6
d. Proposed measures to reduce or control surface, ground, and runoff
water impacts, if any:
N]A
4. PLANTS:
a. Check or circle types of vegetation found on the site:
✓eciduous tree: alder, maple, aspen, other
✓evergreen tree: fir, cedar, pine, other
shrubs
_ grass
— pasture
crop or grain
✓wet soil plants- cattail, buttercup, bullrush, skunk cabbage, other
ater plants: water lily, eelgrass, milfoil, other — UL-y}
other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
Iq 1A
C. List threatened or endangered species known to be on or near the site.
d. Proposed landscaping, use of native plants, or other measures to
preserve or enhance vegetation on the site, if any:
t4AT�V� S�R�135 � �� f C,q"Ir �Yl�or� (3�tticy� .
MASON CO. ENVIRONMENTAL CHECKLIST
Page 7
5. ANIMALS
a. Circle any birds and animals which have been observed on or near the
site or are known to be on or near the site:
birds: hawk,Q ero ea le on bir other _ . . . . . . . . _ .
mammals: deer bear, elk, beaver, other . _ . . . . . . . _
fish: bass, salmon trout, herring shellfish ther . . . . . .
b. List any threatened or endangered species known to be on or near the
site. CO I1y00lC.
� 1b a b CANA-L S vl nn M" C ti tiA,t SA-LVtoN,
/14Ai?BLP_D MuR2E LEi, 3�}L� F►4G�E 13LjL - T(24L&T.
( 5EF- 510 LoGICAL E VA-LU -i7onJ)
C. Is the site part of a migration route? If so, explain.
Yq_51 5#�LrA0Iy MIGRA(17-, AUr,JG &oD CA-NAL .
( 502- a•E•)
d. Proposed measures to preserved or enhance wildlife, if any:
5EX-- t3.1
6. ENERGY AND NATURAL RESOURCES:
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be
used to meet the completed project's energy needs? Describe whether it
will be used for heating, manufacturing, etc.
N JA
b. Would your project affect the potential use of solar energy by adjacent
properties? If so, generally describe.
C. What kinds of energy conservation features are included in the plans of
this proposal? List other proposed measures to reduce or control energy
impacts, if any: N'A
MASON CO. ENVIRONMENTAL CHECKLIST
Page 8
7. ENVIRONMENTAL HEALTH:
a. Are there any environmental health hazards, including exposure to toxic
chemicals, risk of fire and explosion, spill, or hazardous waste, that could
occur as a result of this proposal? If so, describe.
f0TEP4T1#4L_ fUg-L 5?11,L FRo► A MooRED b6Ai.
1) Describe special emergency services that might be required.
N 1�
2) Proposed measures to reduce or control environmental health hazards,
if any:
K>✓ti� 8a�i W>=.t.L MA-�NT�}!r-IE17.
b. Noise.
1) What types of noise exist in the area which may affect your project (for
example: traffic, equipment, operation, other)? -
2) What types and levels of noise would be created by or associated with
the project on a short-term or a long-term basis (for example: traffic,
construction, operation, other)? Indicate what hours noise would come
from the site
. Sff0AT`—T'C:-P-(-N CoNSrR�c-r�o,.l Du2i�G DA`�UGy► /'bu�eS.
3) Proposed measures to reduce or control noise impacts, if any:
8. LAND.AND SHORELINE USE-
a. What is the current use of the site and adjacent properties?
S1NG-l-E... F'Ann i Ull' f2i�Si BEN Vr�c i rorJ HorA_�_; S el
MASON CO. ENVIRONMENTAL CHECKLIST
Page 9
b. Has the site been used for agriculture? If so, describe.
No
c. Describe any structures on the site.
ONE, FiDrAEI
d. Will any structures be demolished? If so, what?
0
e. What is the current zoning classification of the site?
l2v�(� L TAW -r 4ES1oC—NT1AL
f. What is the current comprehensive plan designation of the site?
g. If applicable, what is the current shoreline master program designation of
the site?
(A R 13 PIrt
h. Has any part of the site been classified as an "environmentally sensitive"
area? If so, specify.
}�oo'p CANAL.
i. Approximately how many people would reside or work in the completed
project?
j. Approximately how many people would the completed project displace?
k. Proposed measures to avoid or reduce displacement impacts, if any:
7q[A
MASON CO. ENVIRONMENTAL CHECKLIST
Page 10
I. Proposed measures to ensure the proposal is compatible with existing
and projected land uses and plans, if any:
COMPUPrNGE l•✓►T14 LoC.AL / SI ATFy FIF-DEeAL 12E6t.tLPn1 04S.
WD FW I%ST MhJ1JPGEMEr4'_ PQACTI CES CONAPLICrNCE .
9. HOUSING:
a. Approximately how many units would be provided, if any? Indicate
whether high, middle, or low-income housing.
b. Approximately how many units, if any, would be eliminated? Indicate
whether high, middle, or low-income housing.
N 1A
C. Proposed measures to reduce or control housing impacts, if any:
10. AESTHETICS:
a. What is the tallest he of any proposed structure(s), not including
antehnas;.what is the principal exterior building material(s) proposed?
Lf,2 " ADWoE 3LAL14HIC kD .
b. What views in the immediate vicinity would be altered or obstructed?
No N'I✓.
C. Proposed measures to reduce or control aesthetic impacts, if any:
Nf�
MASON CO. ENVIRONMENTAL CHECKLIST
Page 11
11. LIGHT AND GLARE
a. What type of light or glare will the proposal produce? What time of day
would it mainly occur?
NIA
b. Could light or glare from the finished project be a safety hazard or
interfere with views?
H(fit
C. What existing off-site sources of light or glare may affect your proposal:
N f�
d. Proposed measures to reduce or control light and glare impacts, if any:
12.
RECREATION:
a. What designated and informal recreational opportunities are in the
immediate vicinity?
3o►4TI NG, Su//&AAA 1 Ad& FISHING.
b_ Would the proposed project displace any existing recreational uses? If
so, describe.
No/ 0N0/ ENHA-"CF-MrUnti OF RP-c2EA-nor,iA-L. U39S.
C.
Proposed measures to reduce -
or control impacts on recreation,n, including
recreation opportunities to be provided by the project or applicant, if any:
o/k
MASON CO. ENVIRONMENTAL CHECKLIST
Page 12
13. HISTORIC AND CULTURAL PRESERVATION:
a. Are there any places or objects listed on, or proposed for, national, state,
or local preservation registers known to be on or next to the site? If so,
generally describe. p4D
b. Generally describe any landmarks or evidence of historic, archaeological,
scientific, or cultural importance known to be on or next to the site.
NIk
C. Proposed measures to reduce or control impacts, if any:
NIA
14. TRANSPORTATION:
A. Identify public streets and highways serving the site and describe
proposed access to the existing"street system. Show on site plans, if any.
STr -T'P— RW► , ro Co (5E-F—
b. Is site currently served by public transit? If not, what is the approximate
distance to the existing street system.' Show on site plans, if any.
IUIA
C. How many parking spaces would the completed project have? How many
would the project eliminate?
NJA
d. Will the proposal require any new roads or streets, or improvements to
existing roads or streets, not including driveways? If so, generally
describe (indicate whether public or private).
N 'N
MASON CO. ENVIRONMENTAL CHECKLIST
Page 13
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe.
Iq'A
f. How many vehicular trips per day would be generated by the completed
project? If known, indicate when peak volumes would occur.
I'v /A
g_ Proposed measures to reduce or control transportation impacts, if any:
N /A
15. PUBLIC SERVICES:R ICES:
a. Would the project result in an increased need for public service (for
example: fire protection, police protection, health care, schools, other)?
.If so, generally describe:
f,4
b. Proposed measures to reduce or control direct impacts on public
services, if any:
f-I
16. UTILITIES:
MASON CO_ ENVI
RONMENTAL CHECKLIST
Page 14
a_ Circle utilities currently v_ i able at the site: electricit natural gas,
Ovate , refuse servic telephone, sanitary sewer, septic system other:
b. Describe the utilities that are proposed for the project, the utility providing
the service, and the general construction activities on the site or in the
immediate vicinity which might be needed:
NIA
C. Signature:
The above answers are true and complete to the best of my knowledge. I
understand th
at the lead agency is relying on them to make its Y 9 it decision.
Signature:
Date Submitted: 28 b S
ESA LISTED SALMONIDS CHECK
LIST
Applicant Information Project Information
Name l7Arl NORD5iFZoM Name NofDSTRoM FlER, IZArv%P� FLOA
Phone L-AS) 4-50 - 054-1 Location -+3a3 E SR P& UNic
Description SEC 53, 1a201 9 03 vV
/D0' PIER, RAMP r FLOAT"
This worksheet was designed to help project proponents, and government agencies, identify
when a project needs further analysis regarding adverse effects on ESA (Endangered Species
Act) listed salmonids. Salmonids are salmon, trout and chars, e.g. bull trout. For our purposes,
"ESA Listed Salmonids" is defined as fish species listed as endangered, threatened or being
considered for listing.
If ESA listed species are present or ever were present in the water shed where your project will
be located, your project has the potential for affecting them, and you need to comply with the
ESA. The questions in this section will help determine if the ESA listings will impact your
project.
The Fish Program Manager at the appropriate Department of Fish and Wildlife (DFW) regional office can provide
Information for the following two questions.
I. Are ESA listed salmonids currently present in the watershed in which your project will be
located? YES X, NO Please describe. /foob CANAL SUMMER CNiAm HAVE
ExISiFtb /N TAt yp, r $koKCMieft gweW)e , 8Lif-ARE UkELr EXTNC. THE UNIoN P. SLP +"S
00 E,AS WG Popuua. Cont. FALk-t: SW-Am AW CtfW004 14AI/E SPA 14ED IN Ai•l 3 t2►v
µ.5r ABE s-rF- 5• QE Aizz. i�u.- T R��T /N T1 i} 5 " r j pt N � dF TH>`
4sam6nid
s 0 EREA cM FPi22—sS'Frll �R•t&Er 5oLW-b Ct+AN0--, A-"C
2. Has there eve�en anted stock present in this watershed? ( SEE 8•Cr
YES NO Uncertain Please describe.
r
NouT� CAN+�t-- SU�^ruE�2 Clpv�.+n , t �kr 5 �� C14JNnle t BLAU--Ruvt;_
If you answered "yes" to either of the above questions, you should complete the remainder
of this checklist.
April 2003
- 1 -
i
PROJECT SPECIFICES: The questions in this section are specific to the project and
vicinity.
1. Name of watershed: ''bpi CP M AL
2. Name of nearest waterbody: ROD CAr4 AL.
3. What is the distance from this project to the nearest body of water:
0 M 1 bob C FA�,N ik L- Often a buffer between the project and a
stream can reduce the chance of a negative impact to fish.
4. What is the current land use between the project and the potentially affected water body
(parking lots,farmland,etc.)?
St NGt_E FAtAI t_K 129_S1 J1;_r4C-Z
5. Is the project above a:
p J
* natural permanent barrier(waterfall) YES NO
* natural temporary barrier(beaver pond) YES NOC_
* man-made barrier(culvert, dam) YES NO
* other(explain):
12AY"P IV F'toil,.
6. If yes, are there any resident salmonid populations above the blockage?
YES NO Don't know
7. What percent of the project will be impervious surface (including pavement &roof area)?
-2 -
FISH MIGRATION: The following questions will help determine if this project could
interfere with migration of adult and juvenile fish.
Both increases and decreases in water flows can affect fish migration.
1. Does the project require the withdrawal of:
a. Surface water? YES NO X
Amount
Name of surface water body
b. Ground water? YES NO
Amount
From where
Depth of well
2. Will any water be rerouted: YES NO
If yes, will this require a channel change?
3. Will there be retention or detention ponds? YES NO X
If yes, will this be an infiltration pond or a surface discharge to either a municipal storm
water system or a surface water body?
If to a surface water discharge,please give the name of the waterbody.
4. Will this project require the building of new roads? YES NO
Increased road mileage may affect the timing of water reaching a stream and may impact fish habitat.
5. Are culverts proposed as part of this project? YES NO
6. Will topography changes affect the duration/direction of runoff flows?
YES NO If yes, describe the changes.
7. Will the project involve any reduction of the floodway or floodplain by filling or other
partial blockage of flows? YES NO If yes, how will the loss of flood
storage be mitigated by your project?
-3-
1
WATER QUALITY: The following questions will help determine if this project could
Adversely impact water quality. Such impacts can cause problems for listed species.
Water quality can be made worse by runoff from impervious surfaces,altering water temperature,discharging
contaminants,etc.
1. Do you know of any problems with water quality, in any of the streams, within this
watershed? YES NO ')( If yes, describe.
2. Will your project either reduce or increase shade along or over a waterbody?
YES )�, NO
(S .)
Removal of shading vegetation or the building of structures such as docks or floats often results in a change in shade.
3. Will the project increase nutrient loading or have the potential to increase nutrient
loading or contaminants (fertilizers, other waste discharges, or runoff) to the waterbody?
YES NO X
4. Will turbidity be increased because of construction of the project or during operation of
the project? YES �_ NO
�l uE D,2%vl,-4G 'pu2►PtG Coal srfz\.tcnot.l.
In-water or near water work will often increase turbidity.
5. Will your project require long term maintenance, i.e. bridge cleaning, highway salting,
and chemical sprays for vegetation management, clearing of parking lots?
YES NO _� If yes,please describe.
-4-
VEGETATION: The following questions are designed to determine if the project will
affect riparian vegetation, thereby, adversely impacting salmon.
1. Will the project involve the removal of any veget
ation from the stream banks:
YES NO
If yes, please describe the existing conditions, and the amount and type of vegetation to be
removed.
2. If any vegetation is removed, do you plan to re-plant?
YES NO if yes, what types of plants will you use?
N (A
-5-