Loading...
HomeMy WebLinkAboutBLD2000-01263 Cancelled Propane - BLD Permit / Conditions - 9/26/2000 MASON COUNTY PERMIT ASSISTANCE CENTER Plhonpec(360)427(96704ext. 352 Mason County Bldg. 3 426 W. Cedar P.O Box 186 Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2000-01263 OWNER- MICHAEL OLSON CONTRACTOR: RECEIVED: 09/26/2000 SITE ADDRESS: 1141 NE COLLINS LAKE DR TAHUYA ISSUED: 09/26/2000 PARCEL NUMBER: 223315100002 03/26/2001 LEGAL DESCRIPTION: COLLINS LAKE#2 TRACT 2 ..�. PROJECT DESCRIPTION: DIRECTIONS TO SITE: VAX e? 61 PROPANE TANK BELFAIR TAHUYA RD TO LW INS LAKE DR. TAHUYA RIGHT AT FIRE STATION (COLLIOL`A'K ). RIGHT AROUND LAKE General Information Construction & Occupancy Information Square Footage Information No. of Bedrooms: Type of Constr.: Type of Use: Insp. Area: No. of Bathrooms: Occ. Group: Lot Size: Deck: Type of Work: Fire Dist.: No. of Stories: Occ. Load: Building: Valuation: Building Height: Occ. Status: Basement: Manufactured Home Information Setback Information Shoreline & Planning Information Make Length: Ft. Front-. Ft. Shoreline: Ft Water Body: Rear: Ft. Slope: Ft, SEPA?: Side 1: Model: Width: Ft. Ft. Shoreline Desig.: Year: Serial No.: Side 2: Ft. Comp. Plan Desi .: Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Gas Outlets 1 Mechanical Fee KS 09/26/200 $21.30 54683 Propane Tank 1 Mechanical Base Fee KS 09/26/200 $23 50 54683 Total $44.80 BLD2000-01263 Please refer to the following pages for conditions of this permit. 1 of 2 CASE NOTES FOR BLD2000-01263 f CONDITIONS FOR BLD2000-01263 1) PURSUANT TO 1997 UNIFORM BUILDING CODE, ALL SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY. MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS. A REINSPECTION FEE, BASED ON RATES AS ADOPTED BY THE JURISDICTION AND THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF OWNER/CONTRACTOR FAILS ,�TOO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS. X 4�"l5 2) If the tank size is between 125 and 500 gallons you must follow these guidelines: 1. Tank is to be 10 feet from any buidling, public way or property line. 2. If the tank is exposed to probable vehicular damage, provide prote tive bo lards. 3. A weeds, grass, brush, trash and other combustible material shall be kept a minimum of 10 feet away from LP containers. X /VIA cP0CA 3) Fuel piping shall be inspected after the installation of gas piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the time of inspection the test pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances attached to the piping shall not be used until the final inspection has been approved by the building inspector. 4) The placement of small propane tanks are not normally subject to a permit review by the Planning Department; however, propane tanks are subject to Planning Department regulations. Such regulations primarily consist of setbacks from shorelines and features considered to be critical areas (streams, wetlands, slopes, etc.) If you think such fe ' .9.1_4res_exi§Lo.p or nearby your property, please contact the Planning Department so that exact setback requirements can be determined. This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. OWNER OR AGENT: LfG M DATE: BLD2000-01263 Please refer to the following pages for conditions of this permit. 2 of 2 i CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b _ ( Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING Attic OTHER Groundwork date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by I c I! FORM MUST BE COMPLETED IN INK PERMIT NO.: PLEASE PRESS HARD MASON COUNTY PLUMBING/MECHANICAL PERMIT APPLICATION 426 W.Cedar/P.O.Box 186,Shelton,WA 98584 Shelton(360)427-9670 Belfair(360)275-4467 Elma 360 482-5269 Seattle 206 464-6968 APPLICANT INFORMATION CONTRACTOR INFORMATION Owner X4:C-ktt'-- eX:5cDAJ Contractor Name Mailina Address r. 0 - ' Mailing Address City State VA Zip Code City State Zip Code Phone( )�?�=83f�Other Ph.( Ph.( Other Ph.( Lien/Title Holder Contractor Reg. # Address Expiration SEPTIC INFORMATION-Connect to New Septic Existing Septic k Connect to Sewer System Name of Sewer System PARCEL INFORMATION-12 digit Tax Parcel No. 3.z / /_L/ �r�c�7�'2 Fire District Z_ Legal Description LOT- 0- Site Address(Please include street parne, street number and city) Directions to site &>AQ TO L A'T 6CElg '-'A SZY �tJ 70 p 1Z /FT A-?' �� -57Ar=/U a0c -cszi s cf+4:�E WP ) !� FED'Ae—bok; 4 44 F- IE your property within 200' of the following: Body of Water(Name) CUB te-Y7 !� e-Ah;�E Saltwater Lake X River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs TYPE OF JOB New Add Alt Repair Other Use of Building Location of Fixtures/Units 1st Floor 2nd Floor Basement Garage Closet PLUMBING FIXTURES(Show Number of each) MECHANICAL UNITS Fuel Type: Electric Type of Fixture No. of Fixtures Fees LPG 7, Natural Gas Heatpump Toilets Type of Unit No. of Units Fees Bath Basins Furna Bath Tubs Heatpumps Showers Vent Fans Water Heater Propane Tank Z Laundry Wsher Gas Outlets ► so _ Sinks Wood/Gas/Pellet giove Dishwasher Direct Vent? Other Other Other Other Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL A FLOOR PLAN AND PLOT PLAN MAY BE REQUIRED DEPENDING ON THE TYPE OF FIXTURE/UNIT. NOTICE: THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structures for review and inspection of this project. Acknowledgment of such is by signature below: OWNER AFFIDAVIT-I certify that I am exempt from the requirements of the CONTRACTOR'S AFFIDAVIT-I certify that I am currently registered as a Contractor Registration Law RCW 18.27 and am aware of the ordinance contractor in the State of Washington and that I am aware of the ordinance requirements for which this permit is issued and that all work will be done in requirements regulating the work for which this permit is issued and all work conformance therewith. No changes shall be made without first obtaining shall be done in conformance therewith. No changes shall be made without approval. first obtaining approval. Date X Date FOR OFFICIAL USE BEYOND THIS POINT Accepted by Date Submittal Amount Due Receipt No. DEPAf.U. M VTRLRE11fEW:' APPROVED CJENI�i3. �M1IDiTIQN CU[JES'.. Building Department 1�-a —D d M �se�C( � Occ Group Type Constr. Planning Department Other Other E Permit Fee Site Inspection Plan Review Fee UFC Plan Review Fee Plumbing&Base Fee Other Mechanical&Base Fee Other Wood/Gas/Pellet Stove Fee Pre-Paid at Submittal ( ) Violation Fee TOTAL FEES