HomeMy WebLinkAboutShoreline Master Program Determination - SHR Letters / Memos - 12/27/1994 FINDINGS, CONCLUSIONS AND ORDER DENNIS LAMPHERE APPEAL The Mason County Board of Commissioners heard an appeal from Mr. Lamphere on December 13, 1994. Mr.Lamphere appealed the County determination that Lake Erdman should be regulated under the Shoreline Master Program and subsequently be designated and restricted by a conservancy designation. FINDINGS The Shorelines Act regulates shorelines of the state, defined as bodies of water over 20 acres in size. A 1953 lake Wooten guadrangle map (USGS), photo revised 1968, determined lake size as 25.8 acres. A 1957 survey by Washington State Department of Fisheries determined that the size of the lake was 20.14 acres, with the lake surface at 23.8 acres at the survey time. A 1980 survey by Roger Lovitt and Associates, Inc. P.S. determined the lake size to be 17.8 acres. Based upon Mr. Lovitt's survey,the Mason Regional Planning Council, on July 18, 1980 communicated that the lake was not subject to the Shoreline Act Regulations. In the summer of 1992 the County requested the Department of Ecology determine the ordinary high water mark so the lake size could be determined. On January 22, 1993 the Department of Ecology notified Mason County that the lake did meet the size criteria and is classified as a shoreline of the state,as such is regulated under the Shoreline Master Program. Both the appellant and the County agree that the lake level may have increased in size due to beaver activity on the lake. The Dept. of Ecology instruction for designation of Lake Erdman in the absence of designation in the Mason County Shorelines Master Program is as follows: "until an environment designation is established for the lake in the master program, the County should determine and use the most appropriate designation for a site as developments or questions arise. If a permit application is received before the program is amended, a designation can be made as part of the findings and conclusions on a permit.' The present lot sizes around the lake are 13 5-acre lots, plus 22 lots of less than 5 acres in size. There are only four or five homes on the lake at this time. The photographs and testimony indicate that Lake Erdman is in a relatively pristine state, characterized by development with very low impact on the lake's natural state. The owner of lot #7500070 is the only lakefront lot that has significant lake frontage, approximately 475'. CONCLUSIONS The Board concludes that the lake size has exceeded the 20 acre size in the majority of surveys. FINDINGS, CONCLUSIONS AND ORDER APPEAL - DENNIS LAMPHERE Page 2 The Board concludes that whether beaver actually caused the increase in the size between 1980 and 1993 is not material in the decision, because beaver activity is a natural occurrence. Additionally, the lake size prior to 1980 was documented as larger than 20 acres. The Board concludes that the covenants on the development are, in some cases, more restrictive than the Shoreline Master Program and will serve to protect the natural appearance of the lake. The Board further concludes that Lake Erdman is most appropriately designated as Rural given the fact that 35 buildable lots already exist on the lake and that only 13 of the original five acre lots are intact. ORDER The County determination that Lake Erdman is regulated under the Shoreline Master Program is upheld. The Board further orders that the designation of Conservancy is reversed and a designation of Rural is ordered. Dated this day of 1994. BOARD OF MASON COUNTY COMMISSIONERS )Ze • M.L. Faughender William 0. Hunter Laura E. Porter Chairperson Commissioner Commissioner C: Planning Dennis Lamphere J:\TRACY\LAMPHERE December 13 , 1994 To: Mason County Commissioners From: Mason County Planning Staff - - Don Brush Re: Shoreline Administrative Decision: Appeal Staff Report I. Introduction. This report evaluates an administrative appeal filed pursuant to Shoreline Master Program section 7. 12 . 040 . The decision involves the shoreline designation for Lake Erdman. II. Appellant. Dennis Lamphere. III. Location. Lake Erdman; Lot 7, Section 31, Township 23N, Range 2W. The lot is located on the southwest corner of the lake. IV. Proposal. The applicant owns a 5 acre lot which he has proposed to short subdivide into three parcels. The proposal consists of a 2 . 5 acre parcel, a 1. 12 acre parcel and a 1. 15 acre parcel . The actual upland available for the lots is actually less due to a rise in water level as a result of a beaver dam located at the outlet of the lake. V. Appeal Issue. Decision The Department of Community Development has administratively determined that the applicable shoreline designation for this proposed development is Conservancy. The minimum lot size in a Conservancy environment is 5 acres . History In the summer of 1992 Mason County received a request from a property owner living on the lake to conduct an investigation to determine whether Lake Erdman, an undesignated shoreline, met the size criteria for inclusion as a "shoreline of the state" bringing it under regulatory authority of the Shoreline Management Act. In determining the lake size an "ordinary high water mark" determination was required; the agency charged with making such determinations is the state Department of Ecology (DOE) . The site was inspected in September and again in October of 1992 by representatives of the wetland and shorelands sections of DOE and by Mason County Planning Department staff . Review of maps dating back to 1953 and 1957 indicated lake acreage exceeding the minimum 20 acre requirement. On January 22 , 1993 DOE notified Mason County that the lake did meet the size criteria and is now officially classified as a shoreline of the state. Within the DOE letter the issue of the shoreline environment (designation) was discussed as follows: Until an environment designation is established for the lake in the master program, the County should determine and use the most appropriate designation for a site as developments or questions arise. If a permit application is received before the program is amended, a designation can be made as part of the findings and conclusions on a permit. Analysis/Determination Upon receipt of the applicant' s preliminary short subdivision proposal, this department made the decision that, in terms of this proposal and land subdivisions generally at the lake, the applicable shoreline designation is Conservancy. This decision was based on the following factors: - The western end of the lake is undeveloped. The applicant' s property is one of several remaining 5 acre tracts fronting the lake. (Several other lots have already been short subdivided into smaller lots. At this time there are 20 lots fronting the lake) . - The majority of the lake is undeveloped. Setbacks from the lake for the few existing residences are deep, resulting in an "undeveloped" appearance. - There are extensive associated wetland areas at the west end of the lake including the applicant' s westerly lot. - Concern has been expressed by lake residents to preserve the "natural" character of the lake and to protect water quality. - Continued short subdividing of the lots fronting the lake will lead to an increase in density and the resultant impacts to the lake in terms of future septic system failures, removal of wetland vegetation/buffer areas, nutrient loading as a result of lawn fertilization, etc. The minimum lot size in a Conservancy designation is 5 acres. The SMP definitions of Conservancy and the next alternative designation, Rural, do not offer precise guidance with regard to this determination. The minimum lot size in a Rural designation is 20 , 000 square feet (just under 1/2 acre) . The applicant purchased the lake in 1978 and developed and established covenants which are designed to achieve many of the goals outlined in the SMP. The covenants are in many ways more restrictive than the SMP including a minimum lot size limitation of one acre. Conclusion It is this department' s determination that to preserve a semblance of the natural character the lake now possesses while still allowing a reasonable degree of development, the applicable shoreline designation, with regard to land subdivision, is Conservancy, with its density-limiting 5 acre minimum lot size. 12/94 DB F-13-94 TUE 9:50 ARAMBURU LAW OFFICE FAX N0, 2066821376 P, 02 J. RiCHARD AIRAMBURU ATTQRNEY AT LAW J. Ft CHARD AQAr:L-UmU U SITE 20'-J, COLLEGE -LUO G:iLbliv4 J CFFRCY M EGo'"S 505 MADI5ON STREET 5EATTLE, WASHINCTON 9&04 l2C'E1 1525-9515 December 13 , 1994 Board of Commissioners Mason County 426 west cedar street Shelton WA 98584 Re: Environmental Designation for Lake Erdman Under Shoreline Management Act Dear Commissioners: This office represents Andrew Bacon, the owner of a parcel of property on Lake Erdman. Mr. Bacon has asked me to write to you concerning an appeal from a decision of the Mason County planning staff regarding the appropriate environmental designation for the lake under the Shoreline Management Act. Before discussing the merits of the proposal, I note that public notice of this hearing has been very short, with notices mailed on December 6 for a December 13 hearing. Particularly during the holidays, this has made it difficult to rearrange schedules and my client will not be able to attend. It may be preferable to hold the hearing over for a period of time to allow interested participants full opportunity to be heard. With respect to the merits of the proposal, Mr. Bacon strongly supports the staff determination, as do many of his neighbors. As the report indicates, Lake Erdman was only recently added to the list of bodies of water covered by the Shoreline Management Act. Until such time as a comprehensive review and amendment of the Mason County Shoreline Master Program (MCSMP) occurs, individual decisions on environmental designations must be made. Of the possible environmental determinations for this property, there is little question but that the Conservancy designation is most appropriate. A definition of the Conservancy designation is found at §7 . 08 of the MCSMP. This definition is drawn directly from that suggested by the Department of Ecology in its Shorelines Regulations. See WAC KC-13-94 TUE 9:50 ARAMBURU LAW OFFICE FAX NO. 2066821376 P, 03 December 13, 1994 Page 2 173-16-040(4) (11) . The objective of the Conservancy environment is to "protect, Conserve and manage existing natural resources . . . in order to insure a continuous flow of recreational benefits to the public and to achieve sustained resource utilization. " Activities permitted in the conservancy zone should be those which "do not substantially degrade the existing character" of the Conservancy environment. The Conservancy environment is also the most suitable designation for those areas in which there are "severe biophysical limitations to be designated with a more intensive environment. " There is little question but that Lake Erdman meets these qualifications. Unlike other lowland lakes in western Washington, Lake Erdman has been spared the intensive, and sometimes destructive, development which has created severe environmental impacts. As staff points out, a majority of the lake is undeveloped with deep setbacks for existing development, preserving much of the natural shoreline adjacent to the lake itself. Because of the limited development around the lake, water quality in the lake remains excellent and the lake is home to a population of natural cutthroat trout. This lake is in marked contrast to other lowland lakes in Mason County and other western Washington locations, which have been developed to the water's edge with lawns, docks and other urban style developments. The lake does require the protections that Come with the Conservancy environmental designation for several reasons. First, the lake is both small (about 23-25 acres) and relatively shallow (about 35-40 feet) . These factors mean that it has a limited capability to deal with the effects of pollution and urban development. Unlike Puget Sound or larger bodies of water, the lake is not capable of flushing or diluting pollutants. Smaller lot development around the lake would inevitably bring pollution impacts to the lake from septic system drain€ields, siltation, and the introduction of nutrients. The latter aspects is one of the most serious concerns as excessive nutrients hasten the process of eutrophication, which is created because of excessive plant growth in the lake. This is nowhere better described than in the DOE's own description of lakes under the Shoreline Act and the problems which development brings to them. See WAC 173- 16-050 (7) . A copy of this section is attached hereto for your review. Please note the particular concern expressed for shallow lakes. GEC-13-94 TUE 9:51 ARAMBURU LAW OFFICE FAX NO. 2066821376 P, 04 December 13 , 1994 Page 3 The problems which will occur to Lake Erdman are similar to those described in the DOE report and are well described in the staffs Analysis and Determination. Based upon the existing character of the lake as largely undeveloped, and the threats that more intensive development will pose, the staff has correctly determined that the lake should be regulated as Conservancy under the MOSMP. We ask that the Commissioners uphold that determination and reject any appeals therefrom. If we are able to be of more assistance to you, please do not hesitate to let us know. Sin re y your , J. Richard Aramburu JRA/py cc: Andrew Bacon DEC-13-94 TUE 9:51 ARAMDURU LAW OFFICE FAX N0, 2066821376 P, 05 - — permanent open spatx u, u,un........b .-o----- -- -- .. cause of the costs involved in making these areas suit- table intersects the surtt ' able for use. Unlimited public access into them, however, gravity sea, Re plant and animal life the s to progressively rung may cause damage to the frag channels which drain a pz residing there. ��" (7) Lakes. A lake can be defined broadly as a body of The drainage system standing water located inland. Lakes originate in Several work for nature's leve ir ways. Many lakes are created each year by man, either materials from the higher by digging a lake basin or by damming a natural valley. materials to lower elevatii Natural lakes can be formed in several ways: by glaciers portion of these materir ` gouging basins and melting and depositing materials in where they may iver e form x ea g Typically, a _ such a way as to form natural dams; extinctycraterslwhich fill flows pfrom the headwate close off open ends il o Y with water; changes in the carth's crust, as can happen reaches where the gradie ' during earthquakes, forming basins which fill with wa- tion of the flowing water r stream course which iso- stream bed and a V-s. b - ter; or by changes in a river o w stream occupying all or r late parts of the old course forming lakes, called oxbow PY g •�•�• �.',:..:y -- . Proceeding downstreai .�. ._. ,�,.,:;;E.s •.-,., lakes. A lake, like its inhabitants, has a life span. This life- the valley walls me q S. time may be thousands of years for a large lake or just a eventually reachedwere and the action of the str few years for a pond. This process of a lake aging is ling to lateral meander known generally as eutrophication. It is a natural pro- cess which is usually accelerated by man's activities continues, a flood plain Human sewage, in waste, and the drainage from meanders and upon whit agricultural lands increases the nutrients in a lake which floods. Finally, when the , .y•.�::.;>�.f.,,,,,1+r ed in turn increases the growth of algae and other plants, water, the remaining s :.°�' As plants die, the chemical process of decomposition de- Extensive human use s' 7 gletes the water's supply of oxygen necessary for fish transportation, recreatsc water. and other animal life. These life forms then disappear and for drinking duction of electric pow from the lake, and the lake becomes a marsh or swamp. ''' r°: _ Shadow lakes are extremely susceptible to increases in with for the irriga r ••�>. p p the rate of eutrophication resulting from discharges of tivities directly affect t waste and nutrient-laden runoff waters. Temperature of the streams and rive occur in shallow lakes. water courses. (See A stratification does not normally occ plains. A Efficient bottom--to-surface circulation of water in these wbl�b has been or is su shallow lakes moves nutrients to the surface photosyn- r' thetic zone encouraging increased biotic productivity. corridor for water whip _ Large quantities of organic matter are produced under melt or from heavy ra these conditions. Upon decomposition, heavy demands plains are usually flat .- _.. .r are made on the dissolved oxygen content of shallow have been formed by de :.M•-.• - �� °'=; q •s arr lakes. Eventually, the oxygen level drops and some fish they are attractive p aG a next flood asses n.a .%*h.r lifo- fnrmS die. til the y p r of e can be altereG Dy man. , take The entice eCosyBtem aforest for lumber or to building levees along t •= By removing the surrounding f. : ;' ' `_ provide a building site or farm land, erosion into the lake always with provisions or l late is accelerated. Fertilizers, whether agricultural or those that will soo • used by homeowners, can enter the lake either from wa s•to causeW channel; runoff or leaching along with other chemicals that inter- ferey with the intricate balance of living organisms. The destroy the vital the and fi construction of bulkheads to control erosion and filling tats and sncrea behind th■m to enl?rRf-- individual properties can rob treme flow. (See WAC ■ 1 I '1 'i ■■ of itinio hnhints I hri Nil- This rnu� uuut Dec. 12 '94 16:57 FIREPLACE INN TEL 6049322566 P. 1 NFo\�-, L t v3%Nwl skCc�LN�l) DEC 1 l� J�01J U,*s\-( MA&'; *rl f r ►. U L v,,, U� co0-54ecz.czn2 D,a G Ise 61z 4 c 1 C _ � J -� iL C�4 1 a w� e I + I DEC: 13 '84 09:05 SUDDEN-#6(206)E35-4338 P. fool Ada ,-d orb QLf - Sr r /17T— k1a � r�-Q .�✓ t e V_ �sr I I Aol c .e JvZ S��'✓ t..� illy --� k- 4-A a 1,5 LA Ad se 04- (C�T- L-,i. :�-z-, .e ft,6 Z- d,oOV-94 0 rl q 620-4(JPA/ p S " ` Julie Wolf & Rmssel. l P. Puskarcik December 12, 1994 NE 11 Eagle Creek Lane Tahuya WA 98588 County Commissioners, We own two 5 acre lots at Lake Erdman and have been living there for six years. When we purchased our property we shared the same understanding as our neighbors, that this lake and the development around it would remain in as much a natural state as is possible~ Here are some points we would like to make regarding this hearing: 1 . Many residents very much wanted to be at this public hearing, and were awaiting notification, but could not attend, due to the short notice~ We request that the conservancy status be upheld else the decision be postponed to allow these other people to respond. 2 Some of these residents have sent brief l�tter� ex�re�sin� . � there wish that the conservancy stasis be upheld. May we read � these letters and submit them to the commissioners? � 3. Our position is that a Conservancy Status is the correct designation and should be upheld for the following reasons: a. We understand that the conservancy designation is for environments which are intended to be maintained in their existing natural character. Our lake has considerable natural � value, there are not many left like it, being in a pristine undeveloped, and undisturbed state. It supports significant wildlife and it's habitat. The entire shoreline is still in its natural state, with very few and minimal disturbances. It is intended, according to our covenants, to be maintained in its existing natural character. b. A Rural Status is not appropriate for our lake. Especially as regards minimum lot size, Conservancy Status, ( 5 acres ) , makes | a whole lot more sense then Rural which is just umder 1/'X2 acre. � It is apparent to us living at the lake that further subdividing would be unwise. Thirteen of the original twenty 5 acre lots are still 5 acres. Many of the 5 acre lots that where subdivided have had difficulty finding a suitable location for building and septic sites, despite being over an acre. This is due to such factors as our setbacks, steep slopes, septic requirements, springs, marshes, seasonal and permanent streams and restrictions � on clearing vegetation. Our vegetative buffers and setbacks are � consistent with a Conservancy environment, 25 ft for side yards, and 50 feet from the lake thus restricting the smaller lot ^ s buildability. Some of these lots are mnbuilda^ble inuch to the owners disappointment and have been put back on the market for sale. Considering our slopes, streams and wetlands, one reason to uphold the Conservancy Status is, as stated in the Shoreline Management Plan, that our area presents too severe of a biophysical limitation to be Rural or Urban. ` c. We are also concerned that overdevelopment may some day over load our resources in regards to water supply~ d. With each additional cleared site there is significant increase of flooding and soil erosion. We have seen effects of this in our lake,s water quality. e. We are concerned that too many septic systems would over load the lands ability to absorb effluent and/or leaky systems would destroy the water quality of the lake, the ground water and the Coho salmon run in the stream at the outlet of our lake. f ~ Regarding our covenants: The overall context of our covenants supports a conservancy status. A public designation must be made regardless of our covenants as the later ace changeable by a vote of the residents. The current minimum lot size stated in our- covenants has proven to be too small . g. We hope that any new development also be treated according to this conservancy status. Sincerely, Julie Wolf & Russell P. Puskarcik smpstats.doc � � � � � DEC: 12 '94 10: 19 SP#19 P. 1 23ruce and Diane !;Cobinson 1,2D NE lCavenna 23lvd Seattle, Wa. 99105 December 11 , 1994 Dear County Commissioners, we are writing in regard to Mr. Dennis Lamphere's appeal of the Commission's ruling on Laxe Eraman to limit luL iiiza. We also own property at Lake Erdman, and plan to build in the near future. We agree with the county that the minimum lot size should be five (5) acres. We purchased this land because of the clear commitment of the other owners to protect the lake and keep it as natural as possible. The lake is one of the few in the area to remain in a healthy state, and thus it was granted this Con- servancy status. It only follows then that we should limit the lot size appropriately, as dictated by this status. Although there are currently lots that are 1 . 25 acres , we do not want to have more that size, with the concurrent development and homes that would naturally follow. This ruling will also affect us, since we do own a parcel that is 5 acres. However, we feel strongly that we want to limit the development around the lake which would impact the lake and fauna in the area. We appreciate the fact that Mr. Lamphere has been caught in the transition of the status of the lake. It is unfortunate that this happened. Sincerely, Bruce H. Robinson Diane B. Robinson ( 206) 524-3039 December 11, 1994 Don Brush, Planner Department of Community Development P.O. Box 578 Shelton, WA 98584 Re: Notice of Shoreline Administrative Determination Appeal Hearing Dear Mr. Brush, Thank you for the opportunity to provide my comments to the hearing. I am working in Seattle and cannot attend. I have lived at Lake Erdman for seven years next month. I have seen many people come and go from the lake, but I am very concerned with the current movement in progress at the lake. Those who have decided to sell their property and who also own 5 (+) acres of property have pretty unanimously decided to sub-divide their lots into approximately 1 1/4 acre parcels. I suggest that Dennis Lamphere and the rest are infinitely more motivated by their personal financial interests than the overall good of the Lake Erdman community. The lake lots were originally broken down so that approximately 33 families could, theoretically, live at the lake. With the advent of sub-divided lots, that number could grow exponentially until our natural resources can no longer support the numbers of people at the lake. Of specific concern to me is the potential for increased demand on our water aquifer, which I doubt will support the kind of growth additional sub-dividing will surely create. Of additional concern is the impact of more and more septic systems on lake property and our ability to maintain a clean, unpolluted lake environment. Also, with the advent of each new lot is the exponential reduction in our natural resources of trees and greenery. Our small lake supports a wide variety of wild animals in addition to families, because of the stripping of miles of adjacent forests. I hope that you agree that we cannot allow a few individual's financial interests to outweigh the needs of a community as small as ours. I definitely believe that it is in everyone's best interest at Lake Erdman to leave the plots the size they are, and allow no further reduction below 5-acre parcels. incerely, f May E. C-11 er NE 110 Wi flower Way Tahuya, WA 98588 (206) 275-8255 DEC-12—'9d MON 09' 17 ID'AMERICAM HERITAGE TEL 1,10:206-062-2063 1t178 P01 S RLAND B. MCLEAN 29921 SE 312th Way, Black Diamond WA. 98010 (206) 886 2755 Dr 112,1994 Mr. Don Brush, Planner Department of Community Development Bldg III 426 West Cedar P.O. Box 578 Shelton, WA 98584 RE: Dennis Lamphere's appeal of Lake Erdman lot size l Dear Mr. Brush, My family, comprising the McLean Family Partnership, owns three lots in the Lakeview Estates plat surrounding Lake Erdman. They are lot numbers 16, 17 and 9A. Two of them are in excess of five acres in size. In the event of a sale it would obviously be to our financial advantage to short plat these properties. We would much prefer, however, that no further subdivision take place around this very small, twenty acre pond. In quite recent years four lots have been built on and several more residences are either under construction or about to start. The lake is already beginning to show occasional effects of this activity and further subdivision certainly won't improve the situation. Like the great majority of the Lakeview Estates Homeowners Association members, we strongly favor the present Shoreline Master Program. We hope you will continue to apply these standards as currently written. cerely ours �. Sutherland McLean t �H101 at Ja- UAL6 Z8'd ZZZ0SL298?_8 Ol IJCi, � 6JHbS:60 t7GGT-' T-T GARY YANDO,DIRECTOR SON.STgTFO o A U N U DEPARTMENT OF COMMUNITY DEVELOPMENT 2 o T z PLANNING -SOLID WASTE-UTILITIES N Y y BLDG. III • 426 W. CEDAR • P.O. BOX 578 aJ o 1864 SHELTON,WA 98584 • (206) 427-9670 December 6, 1994 Re: Notice of Shoreline Administrative Determination Appeal Hearing Dear Applicant, Agent, Agency or Concerned Citizen: The public hearing before the Mason County Commissioners for Dennis Lamphere' s appeal of an administrative decision to limit minimum lot sizes on Lake Erdman to the Shoreline Master Program Conservancy standards (minimum 5 acre lots) will be held on Tuesday, December 13, 1994 at 11:15 A.M. The hearing will be held in the Commissioners Chambers, Building I, 411 North Fifth Street, Shelton, Washington. You are welcome to attend. Any oral or written comments will be accepted at that time. A copy of the staff report is available upon Irequest . Sincerely, Don Brush, Planner Department of Community Development Recycled MASON COUNTY DEPARTMENT of COMMUNITY DEVELOPMENT Mason County Bldg. III 426 W.Cedar P.O.Box 578 Shelton,Washington 98584 ' Z b14 O p`4bS �ytiG J NC FkAr F�� %R RT C CELENTANO 4 89 SLOUGH LN SE r° ' YMro4.2 4F4 EL A 98597 yFSs9yT,�� s�o 0 MASON COUNTY DEPARTMENT of COMMUNITY DEVELOPMENT Mason County Bldg.III 426 W.Cedar P.O. Box 578 Shelton,Washington 98584 ❑L`r P&DF 985 12-07-94 19 : 39 S MAR T HA HESS Jv 14024 GREENWOOD AVE N SEAT 'LE WA 98133 UNKNOWNci�u v i19ETURN TO SENDER �'>w d�� ��� !i,+i lit lit 11,I1,si1<<lipsll1,i*till1,l,<<< ,t�iiltji}�},l �1,i!! ld MASON COUNTY DEPARTMENT of COMMUNITY DEVELOPMENT Mason County Bldg. III 426 W.Cedar P.O.Box 578 Shelton,Washington 98584 RETt1RN DL''i' P DF 985 1 —1:7 r'- •;�� 9 : -39 T•,) Fc� F! �nCl&iru.;; •LrJ No such sr� `: - GRETA MORFORD No such not.,r oail �h+t IP O IB O X 74 in a Bf1+ail in this e�ve�vr TAHUYA. WA 98588 GARY YANDO,DIRECTOR SON.STq lF O Q. .o o A o U DEPARTMENT OF COMMUNITY DEVELOPMENT i o T z PLANNING -SOLID WASTE-UTILITIES N Y BLDG. III • 426 W. CEDAR • P.O. BOX 578 18e4 SHELTON,WA 98584 • (206)427-9670 October 25, 1994 Dennis Lamphere P.O. Box 371 Gig Harbor, Wa. 98335 Re: Shoreline Appeal Mr. Lamphere: Enclosed is a receipt for your appeal fee in the amount of $200. 00. A hearing has been set for December 13 , 1994 . The time is 11: 15 to 12 : 00 A.M. If you anticipate any problems with this time please advise us . The Commissioners secretary will notify you of the hearing a week or two in advance. I will send the Commissioners a copy of all the materials you submitted previously to this office. If you have any questions in the meantime feel free to give me a call . Thank you. Respectfully, P- t Don Brush, Planner Department of Community Development DENNIS LAMPHERE P . 0. BOX 371 GIG HARBOR, WA. 98335 857-5776 October 11, 1994 Dear County Commissioners : Bill Hunter Mary Faughender Laura Porter At this time we request the scheduling of a hearing concerning the short plot of Lot 7 of Lake Erdman into three parcels . Don Brush has received a packet of information and will forward it with this letter . We are looking forward to presenting our testimony. The information we have may affect the properties of others . In scheduling the hearing, we have a planned vacation from November 1 to 25 and would not be available . A hearing some time in December is ideal for us or January of February if need be . There will be testimony by others concerning this matter and it could affect the future decisions on the Growth Management in this county. We will anticipate the scheduled appointment . A $200 . 00 check is enclosed Sincerely, GL r Dennis Lam r e DEL : ll cc : Don Brush IJ MASON CUUi J i-), COMMISSIONERS GARY YANDO,DIRECTOR yON.STgTFo o A°u DEPARTMENT OF COMMUNITY DEVELOPMENT o T z PLANNING- SOLID WASTE-UTILITIES z� N Y y BLDG. III • 426 W. CEDAR • P.O. BOX 578 of o 1864 SHELTON,WA 98584 • (206)427-9670 September 30, 1994 Dennis Lamphere Lamphere Construction Ltd. P.O. Box 371 Gig Harbor, Wa. 98335 Re: Lake Erdman, Lot 7; Proposed Short Subdivision. Mr. Lamphere: Thank you for your correspondence dated August :23, 1994 regarding the above referenced issue. As you are aware, Lake Erdman has been designated a shoreline of the state by the Department of Ecology (reference letter dated January 22, 1993 to Mason County) . Ecology stated in that letter the following: Until an environment designation is established for the lake in the master program, the County should determine and use the most appropriate designation for a site as developments or questions arise. If a permit application is received before the program is amended, a designation can be made as part of the findings and conclusions on a permit. Within the Mason County Shoreline Master Program "Conservancy" shoreline definition is the following statement: The Conservancy Environment is for those areas which are intended to maintain their existing character. The preferred uses are those which are by nature nonconsumptive of the physical and biological resources of the area. Other residents in the area have expressed a desire to maintain the existing character of the lake. This Department supports that position, and understands that you do as well . We agree that the current protective covenants established for Lake Erdman are as stringent or more stringent than the SMP regulations, with the exception of lot sizes. However, with regard to lot sizes, the best mechanism we have to "maintain . . .existing character" is through utilization of the Conservancy designation and the applicable minimum 5 acre lot size. When the SMP is amended, likely within the next 18 months, a permanent shoreline designation will be established for Lake Erdman. At that time public workshops and hearings will be conducted during which the concerns and opinions of the residents of the lake may be expressed. This decision is appealable to the Board of County Commissioners. A letter requesting an appeal hearing and a check in the amount of $200 . 00 are required. Your earlier correspondence or additional information could constitute supporting documentation. If you have any questions regarding either this determination or the appeal process, feel free to contact me at 427-9670 x294 . Thank you. Respectfully, Don Brush, Planner Department of Community Development CC: Gary Yando, DCD Jason Manassee, DCD Randy Neff, DCD RECEIVED SEP - 1 1994 MASON CO. DCD LAMPHERE CONSTRUCTION LTD. P. 0. BOX 371 Gig Harbor , Wa . 98335 206-857-5776 August 23, 1994 Gary Yando Mason County Director of Community Development P. 0. Box 578 Shelton, W. 98584 Dear Mr . Yando, In 1978 Lamphere Construction Ltd . purchased 122 acres known as Lake Erdman . At the time of purchase the actual size of the lake was under 20 acres and was 5 ' lower than it is presently. The land was surveyed, with +/- 5 acre sites, roads were developed, utilities installed and a water system designed . The septic systems were designed to be pump systems , pumping away from the lake, exceeding state regulations . Natural green native vegetation is encouraged except where homes are placed on the property with no lawns next to the lake . I have retained one of those sites . I spent allot of time and money developing and establishing written covenants that would protect the integrity of the lake and the sites surrounding it . A copy of the covenants are enclosed . As you can see, they are more restrictive than county codes . Many of the original sites have already been short plotted by their owners . The site I have retained is on the southwest corner of the lake, known as Lot 7 . It is high and dry and perkable . It is no longer a 5+ acre site because the lake has risen 4-5 feet due to a beaver dam at the north end of the lake, that has increased in size over the past several years . The new water line is shown on the map with the dotted red line . Due to the work of these industrious beaver, the lake now exceeds 20 acres and comes under government supervision . It was my original intent to divide my site into four parcels . Considering the lay of the land and the loss of some land due to the rise of the water line, I believe it would be best to divide this site into ,lust three parcels . A map of the proposed division is enclosed . Each site will have ample water front and enough room to maintain the natural integrity of this beautiful landscape with plenty of room for green belt area . The homeowners association is very active and will help to continue to maintain the covenants . A copy of one of our homeowner association newsletters is enclosed . The owner of Lot 6 is drilling a well and will provide me with three water hook-ups . I have discussed this matter with Don Brush. He has suggested that I write a letter to you explaining our circumstances . Considering the above information and history of this site, I am requesting your approval of the proposed short plot of this site . I am available to answer any questions you may have . S nc rely, 24 Dennis Lamphe Lamphere Construction Ltd . DEL: ll cc : Don Brush i i I I e PAX DATE FROM: DENN I S IiMPHERE P. 0. Ill 371 GIG HAOOR, WA. 88336 206-86-5776 FAX 96-876-2431 FAX TO: coMMENTS 110 77- - -- ! xt� ,ll YS/ e11j1�L Q _ ?AGE$ INWDING TRANSMITTAL SHEET: �7 .-A �TIerr f A-5, � 0 7- 10 WIC 110 3 o' P—0,tho p fJ ql� ` +` �s urr c.r r y 17 �, xi I'G OU/jT— 1136 rP STUpe$Ed) NORTHLA44 SURVEYINIQ < ' '�S' -T W 5�3' AL LYN, WA 9$6524 ", 'Q\� {�r..:. P G4[JP�T I_ t •:. (M) 275-05e0 �oN_srq rF o C A o �, DEPARTMENT OF COMMUNITY DEVELOPMENT = 0Nu I 2 J N Y aoY Planning - Landfill - Utilities 1864 February 25, i993 TO: LAKE ERDMAN AREA PROPERTY OWNERS FROM: MASON COUNTY RE: SHORELINE MANAGEMENT Dear Resident : Please be advised that the state Department of Ecology has recently determined that Lake Erdman meets the necessary size criteria for inclusion as a "shoreline of the state" . The minimum required size is 20 acres which can include certain "associated wetlands" . Beginning immediately, all development activities3 within 200 feet of the Ordinary High Water Mark of the lake will be regulated under the state Shoreline Management Act and the Mason County Shoreline Master Program. Some types of development are exempt from the requirements of obtaining shoreline permits , but all development must meet the requirements found in the Shoreline Master Program. Most development activities require building permits and all building permits will be reviewed for consistency with the shoreline regulations . Prior to beginning any development or to submitting a building permit application, we advise you to contact a Shoreline Planner in the Mason County Planning Department . We are located in county Building III at the corner of 5th and Cedar in downtown Shelton. The phone number is 427-9670 . A Shoreline Planner is also available at the Belfair Annex on Tuesday afternoons, between 2 : 30 and 4 : 00 . We will be happy to answer any questions or concerns you may have. Thank you very much and we look forward to working with you. Respectfully, Don Brush, Shoreline Planner Department of Community Development Gary Yando,Director of Community Development • Erik Fairchild,Planning Director Mason County Bldg. III • 426 W. Cedar • P. O. Box 578 • Shelton, WA 98584 • (206) 427-9670 2ecycied 0 MASON COUNTY DEPARTMENT of COMMUNITY DEVELOPMENT z; °;`�Y J\� U. pJS1AG Mason County Bldg.III 426 W.Cedar .2 ; P.O.Box = . I Shelton,Washington 98584 � � , �• P® R C CELENTANO 89 OUGH LAME SE YELM P�oa.STgrFo o io N DEPARTMENT OF COMMUNITY DEVELOPMENT Z N T Lj �o Y aoy Planning - Landfill - Utilities J 1864 February 18, 1993 , TO: LAKE ERDMAN AREA PROPERTY OWNERS FROM: MASON COUNTY RE: SHORELINE MANAGEMENT Dear Resident: Please be advised that the state Department of Ecology has recently determined that' Lake Erdman meets the necessary size criteria for inclusion as a "shoreline of the state" . The minimum required size is 20 acres which can include certain "associated wetlands" . Beginning immediately, all development activities within 200 feet of the Ordinary High Water Mark of the lake will be regulated under the state Shoreline Management Act and the Mason County Shoreline Master Program. Some types of development are exempt from the requirements of obtaining shoreline permits, but all development must meet the requirements found in the Shoreline Master Program. Most development activities require building permits and all building permits will be reviewed for consistency with the shoreline regulations. Prior to beginning any development or to submitting a building permit. application, we advise you to contact a Shoreline Planner in . the Mason County Planning Department. We are located in county Building III at the corner of 5th ,and Cedar in downtown Shelton. The phone number is 427-9670. A Shoreline Planner is also available at the Belfair Annex on Tuesday afternoons, between 2 :30 and 4 :00. We will be happy to answer any questions or concerns you may have Thank you very much and we look forward to working with you. Respectfully, Don Brush, Shoreline Planner Department of Community Development Gary Yando,Director of Community Development Erik Fairchild,Planning Director Mason County Bldg. III • 426 W. Cedar P. O. Box 578,• Shelton,WA 98584 • (206)427-9670 Recycled gTATg O� i EO 1889 a0 REcraIN STATE OF WASHINGTON BAH 2 91993 DEPARTMENT OF ECOLOGY Mail Stop PV-11 • Olympia, Washington 98504-8711 • (206) 459-6000 N�Sw t0 January 22, 1993 Mr. Gary Yando Mason County Department of Community Development Post Office Box 578 Shelton, WA 98584 Dear Mr. Yando: This past summer, Mr. Don Brush requested that we assist the County in determining whether Lake Erdman meets the definition of a shoreline of the state. Ecology staff members Kim Van Zwalenburg, from the Shoreline Management Section and Alan Wald, Hydrologist from the Floodplain Management Section walked the site in September. Kim Van Zwalenburg revisited the site with Don Brush and Jason Manassee a month later. The field visits verified extensive wetlands areas on both ends of the lake that are within the normal water level (ordinary high water mark) of the lake. These wetland areas were not included in the acreage of the lake which is described in Lakes of Washington (WSB No. 14, Volume 1; 1973) as 20.15 acres. This acreage was based on a 1957 survey by the Department of Fisheries. The surface area of Lake Erdman, as shown on the 1957 Department of Fisheries survey, is 23.8 acres. The surface area of Lake Erdman shown on the 1953 Lake Wooten quadrangle map (USGS) , photorevised in 1968, is 25.8 acres. From this, we conclude that Lake Erdman is a shoreline of the state. Development around the lake is thus subject to the policies and regulations of the Shoreline Management Act and the Mason County Shoreline Master Program. Until an environment designation is established for the lake in the master program, the County should determine and use the most appropriate designation for a site as developments or questions arise. If a permit application is received before the program is amended, a designation can be made as part of the findings and conclusions on a permit. If y v. cr vour staff have any questions, please call Vim Van Zwalenburg at 2 6). 4'38-7449. Si er ly ) Ttomaa Mark, AICP Management Section Supervisor Shorelands and Coastal Zone Management Program TM:dh AERDMAN.DOC cc: Alan Wald, Ecology Kim Van Zwalenburg, Ecology Joan Velikanje, Ecology 10 sae area o� �y1 lase aoy REcre. STATE OF WASHINGTON BAH 2 91993 DEPARTMENT OF ECOLOGY M it Stop PV-11 • Olympia, Washington 98504-8711 • (206) 459-6000 January 22, 196 Mr. Gary Yando Mason County Department of Community Development Post Office Box 578 Shelton, WA 98584 Dear Mr. Yando: This past summer, Mr. Don Brush requested that we assist the County in determining whether Lake Erdman meets the definition of a shoreline of the state. Ecology staff members Kim Van Zwalenburg, from the Shoreline Management Section and Alan Wald, Hydrologist from the Floodplain Management Section walked the site in September. Kim Van Zwalenburg revisited the site with Don Brush and Jason Manassee a month later. The field visits verified extensive wetlands areas on both ends of the lake that are within the normal water level (ordinary high water mark) of the lake. These wetland areas were not included in the acreage of the lake which is described in Lakes of Washington (WSB No. 14, Volume 1; 1973) as 20.15 acres. This acreage was based on a 1957 survey by the Department of Fisheries. The surface area of Lake Erdman, as shown on the 1957 Department of Fisheries survey, is 23.8 acres. The surface area of Lake Erdman shown on the 1953 Lake Wooten quadrangle map (USGS) , photorevised in 1968, is 25.8 acres. From this, we conclude that Lake Erdman is a shoreline of the state. Development around the lake is thus subject to the policies and regulations of the Shoreline Management Act and the Mason County Shoreline Master Program. Until an environment designation is established for the lake in the master program, the County should determine and use the most appropriate designation for a site as developments or questions arise. If a permit application is received before the program is amended, a designation can be made as part of the findings and conclusions on a permit. If y ;�x or your staff have any questions, please call Kim Van Zwalenburg at 2 Q 438-7449. Si er ly Th s ark, AICP Management Section Supervisor Shorelands and Coastal Zone Management Program TM:dh AMMAN.DOC cc: Alan Wald, Ecology Kim Van Zwalenburg, Ecology Joan Velikanie, Ecology 3 Memorandum September 10, 1992 To: Planning Department From: Don Re: Lake Erdman We have just been notified by the Department of Ecology that Lake Erdman, located in north Mason County between Haven and Collins lakes, will most likely meet the size criteria necessary for designation as a shoreline regulated under the Shoreline Management Act. While their numbers have not been finalized, they have recommended that we consider it designated, effective this date. Any permit requests or land segregation applications should be evaluated through the Shoreline Master Program. A temporary and tentative shoreline designation, pending approval by the County Commissioners, is Conservancy. The legal description is: Section 31, Township 23 North, Range 2 West, W.M. X *. �ON.:STgTFO P � a N DEPARTMENT OF COMMUNITY DEVELOPMENT U = i2 O T 2 �oJ N Y y Planning - Landfill - Utilities 1864 July 30 , 1992 Tom Mark Shorelands Program Department of Ecology Mail Stop PV-11 Olympia, Wa. 98504-8711 Re: Shoreline Management Designation Criteria, lake size determination. Dear Mr. Mark: Mason County has been informed by a local citizen that Lake Erdman, located in the northeast section of the county, may meet the 20 acre size criteria needed for inclusion under the Shoreline Management Act. We would like to formally request an evaluation by your department which will determine the actual size of this lake, within the guidelines established under the Act. It is our understanding that if the lake is determined to meet the necessary size criteria, it immediately falls under the regulations of the local Shoreline Master Program. The location of Lake Erdman is as follows: '/X/ z ,, -vim Northeast--I-�4—, North-/2 , Section 31, Township 23 North, Range 2 West, Willamette Meridian. Lake Erdman is located roughly between Collins Lake to the south and Haven Lake to the north. We would greatly appreciate acknowledgement of this request . If Mason County can provide any assistance to your department in making this evaluation, please contact us . Thank you very much for your assistance. Sincerely, Don Brush, Planner Department of Community Development Gary Yando,Director of Community Development • Erik Fairchild,Planning Director Mason County Bldg. III • 426 W. Cedar • P. O. Box 578 a Shelton, WA 98584 • (206) 427-9670 CC: Andrew A. Bacon, Lake Erdman Kim Van Zwalenburg, W.D.O.E. Gary Yando, Community Development William 0. Hunter, County Commissioner July 27, 1992 Andrew A. Bacon 22706 N.E. 12th Place Redmond, Wa. 98053 Re: Lake Erdman, Mason County, Shoreline designation Dear Mr. Bacon: Thank you for contacting us regarding the potential for official shoreline designation for Lake Erdman. As you know, the criteria for inclusion as a shoreline of the state is a minimum of 20 acres . I believe associated wetlands can be added to the open water acreage. Mason County will make a formal request to the state Department of Ecology asking that they perform a size determination of the lake. If the lake is determined to meet the criteria, we believe it immediately comes under the jurisdiction of the Mason County Shoreline Master Program regulations. This is a point we will have clarified by the state. A copy of our letter to WDOE will be sent to you. If you have any questions feel free to call. And thanks again for bringing this matter to our attention. Respectfully, Don Brush, Planner Department of Community Development �gnV J 14 S rn�,� s z� �l�' a'Y7 S 3� `✓ ' 3 i 71 ry 3�l174f _/ 9� ?,fir11 (�7a/ -1 07 , 1 •-�'�R�pv , v o/L �� 3 z/S s�%' �f�'�� �'� sAa��►�a�J ,�� �!3�9�5�aYt/3 -?g (7 Pdy ru r Z1�J_..,� ' Alcsv .S ti I / Aj AAec-lwlk�l VA) e., eft & oo 064 OP leGA !?a7i J14-1 y � 44 �wl K Q 5 /1 ce 7 kG2e(� 7 �7rtJl/�k/ /'�'• /✓I'�LO�II �'y �6fS -2i-7�► 1v 3q Z —�6 yG �1r19/95 first-Namie Last-Naa%e Address City ST 'Lip Telephone Lot#(s) Danny & Roxanne Bates P.O.Box 295E Sil'vardale WA 98383 (206)698-7283 1 Don Knudsen P.O.Bo- K. Shelton (dA 98584 (2061426-6350 2 3A 6 10 11 13 Ue'i ie and Rom Wilson 1040 17th Avenue NE Seattle WA 98115 (2(16)522-3858 3B Donald C. & Deva L. Ellis 2t002 127th Place S E Kent WA 98031 (206)631-8498 3C Plinio L. & Rizalina V. GestD.o 3740 S. Brandon Street Sea.ttIe WA 98118 (2-06)722-9466 4 Gloria Escano & Apolonio Van2_;_lr 3204 S. Kenyon Street Seattle WA 98119 (206)722-2009 5 C -d T r 7 +^• v� r e Lamphere ons'u�.ion LTD Denn_� P.O.>so; 3,1 �24 Harbor ;� +8335 (206)857-57 6 7 Alan and Debby Griswold 1813 Rocky Point Rd Bremertor! WA 98312 (206)373-8381 8A 8D Lori K. Benline & Steven Greer, 8420 Dawnhill Rd. S E Olympia WA 98503 fIL06)491-0692 SB Bruce H. & Diane R. Robinson 2129 NE Ravenna Blvd Seattle WA 98105 (2061524-3039 8C 15 n n" Walter &- Marsha McLean <?710 SE 312th (day Black ti.amond N:a �_0,10 (2061 9A 16 17 Lawrence R, Winter 30233 NE Cherry Valley Road Duvall WA 98019 (206) 9A 16 17 Laurie R. McLean P.D. Box. 351 Everett +�A 98206 (206) 9A 16 17 Suds McLean 29321 BE 312 Way Black Diamond WA 98010 (206)886-2755 9A 16 17 Robert S. McLean 502 NE 72th Street #A Seattle EtiA 98115 i206) 9A 16 17 Randy & Ramona RaL+b 15003 Elan St. E Sumer WA 92,110 (206IB63-1478 9B Richard & Linda Mansur P.O.Bov, 219 Puyallup WA ?8371 (206184B-1771 9C Josef & Eli2abeth Hinkofer 22618 12th Place Nest Bothell WA 98021 (206) 9D Russ & Julie Puskarcik Wolf NE 11 Eagle Creek Lane Tahuya 0 96588 (2061275-0212 12 14 Andrew & Linda Bacon 22706 NE 12th Place Redmond WA 983590 (206)B68-2179 I8AIBB Marvin Jr & Jennifer Eidinycr 12128 BE 174th Lane Apt.M303Renton 4A 98058 (206)235-1025 18C Mary n'.rin 14417 Silven Ave. N E Beinbriddge IslandbA 98110 (206QU-5602 19A Ma!•tha Hess 245 N. it--4th St. ieLi York ivY 1€025 (212)666-2771 19B Emerick BUIl�m,a. 140.24 Greenwond Ave. N. Seattle WA 98i33 (206)361-0540 19B Wallace E & Nancy C }is �,1 n.• + Erik 98'i2 r�� _q ? 03ov 4064 G: eaertrrl (206i3;3 161 I.0 c WA 2r . r �rie ]:?Each 1012.� !1U 1'U.':: Flay Seattle ?%+ � i16112 r61;k 1 D -r ti aiC� 1t. � Jan Belnap 6237 S 129th St #101 aeattle WH =n17B (206)772-4283 19D Greta 1lorf0ra P.O.Bc!a 40165 Berkeley -.A 94764 20A Rand- & C'Sia'%telie Wisner 7472 SW AIzP,Vista Part ( 6) 7r +i'3 20B * 11 ' � r c r r� r ••1cc r day 4re1VT; CDaaee! 1? E 11. dlndflower lda. 'a?'iii' a iG 4P,FF f2,06)L7rSt 5 2f1L• C CAP �� U 8 � u Gv ,f PLAS77C C 4,P "LO(/l 77 -1135S — 6PD/YIq" !. one, 7 1 I L�Ic �, v-�-i, , 0 /MLJTY 2StcP77G O In /.71,2c, Cryv- L N N Ilk wit- Ty 4600 7 /6W4471 )eO,4 U Pl-Ar � f Yo P ,ems ► ' W "*4 oviTT- jp�sTU�B�b� NORTHLAND SURVEYING P.O. Box 349 85 / / ��f" GAGle'7"z&i-��2qy ALLYN, WA 98524 p0 (206) 275-9580 i �a UIF- /A Off" 7` \� 1JW 1A �\ "T. 23 1.� . Q . 2 W. Lamphere Const. , Ltd. M.q� Q , u,�z•�o� 1�•�E #�. oeo� rp 94.5t> eO. w/� /O 7 �o �6 07 0 Cl 4-1 Q O En Piz C.Lwj P _ to , U4. i Q S t 1 .lr ._ . ' l ;;strative only. ' ROGER D. LOVIT T 8 ASSOC.,I NC. P.S. S\-lCya2 PUS--Z P.O. BOX 816 DWN/CHKD SCALE J06 NO. SHELTON ,WA 98584 �►�S/ClG 1"= 100' 17 7� II RANGE 2 TOWNSHIP 23 SECT I SCALE I" = 400' TAHUYA BLACKSMITH ROAD 7/fit' 7/777P/ 2 7 � T590 7590200 7590202✓ 73901 7590 181 7500150 190 191 7590 SP 192 590 7590 1693 7590201 ✓ SP 1692 193 ISO ✓ 0 7500030✓ 7500 0\ ✓ ` 750001 O / SP 1885 SP /691 ,,y� 0 � 7500160 750014( 75000ao✓ ERDMAN LAKE 7500 ✓ 120✓ —7 O 7� 1 7500100 7500050 1 IL Z l 7390 V 093L/ 75001 10✓ 75001: 7590✓ to 7500060� 062 7590083✓ Sp 1843 7500020`/ 7300070 ✓ Sp /690 7590080V/ 7590081✓ 7590092 F- 22331 00 60000 I i t �r l y� �. 1. AN �u+ $Q�tTrf t�/E5T 6-A.0 O F 4 A k C5 A)oleTrf. Suomi cT 5,rE i a,4/,4Ao a,= t>H o TO %/-F15 Sr DE 0t L14t% J J Z-5o,4rN cF 4,Ri« F,4c„vG- /VC.47-4 • �u�Jc-ci r S 1 t i�wf}2.v L�F7- oe� rz�lo-To tr�1/S S,�t