HomeMy WebLinkAboutBLD2024-01347 MFG Home - BLD Inspections - 4/24/2025 f ;-
r ,
e _
615 W.Alder St.Bldg 8,SHELTON,WA 98584
MASON COUNTY SHELTON: 360-427-9670, EXT 352
COMMUNITY SERVICES ICES BELFAIR: 360-275-4467, EXT 352
Building,Planning,Environmental ilwlt4Community Health ELMA: 360-482-5269, EXT 352
` www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY**
To schedule an inspection call or visit http:/twww.co.mason.wa.us/community-services/bid-inspection.php
Permit Number BLD2024-01347 Date Issued 01/13/2025 Issued By41NLals
Project Park Model Placement
Site Address 61 N BASS PL
Applicant Olson,Alan
Contractor MOBILE HOME MEDIC
Contractor Phone 360-239-5048
Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type
Permit Type MANUFACTURED HOME Occupancy
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION, FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
**THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.**
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building Building Official: Community Services Designee
Department
Concrete Setbacks Slab
Footing Perimeter Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building
Manufactured Setbacks Setup c,�
Home 2�2s1�s J'� q/I/�S cJuIC-1
Concrete Foot/Runners 3 fy/ - Final 'I r Zy 1 zs 3-0-
Other
FO� �IZs I2C;_ JT;a_ g-.,,,A W
-Je wp J; � 3(2s [2S �► 44
-F; T'Q7t Ll(22 tZ5 5zc.i4'�_
INSPECTION RESULTS Page
MASON COUNTY Department of Community Development
COMMUNITY DEVELOPMENT 615 W Alder St, Shelton,WA 98584
Permit Assistance Center,Building,Planning (360)427-9670 ext. 352
Application# BLD2024-01347 Application Type MANUFACTURED HOME Owner OLSON ALAN M &
KATHERINE E
Parcel# 422165300035 Site Address 61 N BASS PL HOODSPORT, WA 98548
Inspector Inspection Type Date Status Comments
2-25-25-JQ
1':frost depth not met- Please see county conditions pg 3 bullet point circled on sheet
and cover sheet of foundation plan. see IRC R403.1.4 & R403.1.4.1
Joshua FOOTING INSPECTION 02/25/2025 FAIL
Quarders
Please make corrections and call for reinspection when ready
DO NOT POUR
r
w
INSPECTION RESULTS Page
MASON COUNTY Department of Community Development
COMMUNITY DEVELOPMENT 615 W Alder St, Shelton, WA 98584
Permit Assistance Center,Building,Planning (360)427-9670 ext. 352
Application# BLD2024-01347 Application Type MANUFACTURED HOME Owner OLSON ALAN M &
KATHERINE E
Parcel# 422165300035 Site Address 61 N BASS PL HOODSPORT, WA 98548
Inspector Inspection Type Date Status Comments
3-25-25-JQ
/1- Per approved pier plan and Fig 21 of the installation manual perimeter piers shall
be spaced no greater the 8' oc for a 16'W in a 40#snow load please add the missing
perimeter piers.
current condition perimeter piers are spaced greater then 8' oc please correct
Perimeter pier at front right corner is missing a shim-shims shall be installed in
Joshua pairs to properly level the dwelling. per the setup manual pg34 note 4 and figure 19
Quarders SET-UP INSPECTION 03/25/2025 FAIL please address
Check all shims for gaps the shim sets shall overlap each other filling the center
space along the top cap. please address.
CALL FOR REINSPECTION WHEN CORRECTIONS ARE MADE BEFORE
PROCEEDIN G WITH ANY FURTHER WORK
DO NOT SKIRT
INSPECTION RESULTS Page
MASON COUNTY Department of Community Development
COMMUNITY DEVELOPMENT 615 W Alder St, Shelton, WA 98584
Permit Assistance Center,Budding,Planning (360)427-9670 ext. 352
Application # BLD2024-01347 Application Type MANUFACTURED HOME Owner OLSON ALAN M &
KATHERINE E
Parcel# 422165300035 Site Address 61 N BASS PL HOODSPORT, WA 98548
Inspector Inspection Type Date Status Comments
c � k 4-22-25-JQ
Propane Tank has been installed On site and connected to dwelling - Please add
propane tank to permit (no gas line inspection has been conducted; edge of tank is
�
18"from crawlspace vent 120gal tank has a setback min of 3'from any portion of the
tank to underfloor vents and operable window openings) closest underfloor vent will
need to be covered in a permanent manor.
Joshua . stairway-graspable handrail 34"min to 38" max are required on one side with turn
Quarders BLD-FINAL INSPECTION 04/22/2025 FAIL opts when there are 4 or more risers. please add
toe kicks are required on all risers at the front landing.
PHOTOS OK FOR ITEMS 2& 3
Call the permiting office to add propane tank to permit
CALL FOR RE-INSPECTION WHEN CORRECTIONS HAVE BEEN MADE
k' lrv"�
Mason County
Mason County - Division of Community Development
615 W. Alder St.
K�C Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
B DD2024-01347 MANUFACTURED HOME
PROJECT DESCRIPTION: PARK MODEL PLACEMENT ISSUED: 01/13/2025
SITE ADDRESS: 61 N BASS PL HOODSPORT
EXPIRES: 10/19/2025
PARCEL: 422165300035
APPLICANT: Olson, Alan OWNER: OLSON ALAN M &KATHERINE E
11928 53rd Ave SE 11928 53RD AVE SE
Everett,WA 982089224 EVERETT, WA 98208
7072900693
GENERAL CONTRACTOR'S LICENSE: MOBILE HOME MEDIC License: MOBILHM778KU
5410 222ND AVE SW Expires: 05/31/2025
CENTRALIA,WA 98531
360-239-5048
FEES: Paid Due
Technology Surcharge $13.34 $0.00
State Fee-Residential $6.50 $0.00
Planning Residential Review $275.00 $0.00
Fee
Modular/Manufactured Home $275.00 $0.00
Fee- 1st half collected at
submittal
Building Plan Review/Change of $135.00 $0.00
Use - Onsite Sewage
Modular/Manufactured Home $275.00 $0.00
Fee-2nd half collected at ready
to issue
Mechanical Fees $87.00 $0.00
Mechanical Base Fee $30.00 $0.00
Totals : $1,096.84 $0.00
FIXTURES
(sty Mechanical Fixtures
1.0000 Gas Outlet(s) (1-5)
Printed by:Annie Wilson on:04/22/2025 11:27 AM
Page 1 of 5
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MANUFACTURED HOME BLD2024-01347
A ni I Fix ures
0NA
REQUIRED INSPECTIONS
Setback Inspection Connection is to be verified by Health or Utilities
.................
Footing Inspection BLD-Final Inspection
...................................................... — — — — — — — — — — -- -- — — -- —
Footing Inspection BLD-Final Inspection
.............................a_....................... _ _
Set-Up Inspection
---------------------------------------I----------
CONDITIONS
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED",they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
--------- --------------- -_._____........._-_..... .............................
* This permit is for the placement and installation of the manufactured home only and does not imply approval or review for
any other items indicated on the plot plan.
. ....-----__a..... ..................... ....... ...................
* CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
.............................. ........................................................
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition,a re-inspection fee(refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
............................
* By definition, propane tanks and heatpumps are structures,which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
---------- -----------------------------------------------------------------------------------------------------
* All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee(refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
------------------------------------------- ...............................................................
* Retaining walls needed to support a surcharge such as structures, roads,or to support slopes, shall require a separate
building permit and approval prior to construction of the retaining wall.
....................................... .. . .. . ........ .. ............. ................... .....
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the farthest projection of the
structure. Front setbacks are measured from the front lot line or road easement boundary,whichever is closer.
--------------------------------------------------------- ....................
* The installation permit shall be displayed in clear view of the site access road.The approved site plan and other applicable
instructions, including installation instructions, shall be available in this location OR placed in the location specified by WAC
296-150M. Support configuration shall be clearly marked in the installation instructions.
------ _ . - - --------------------------------------------------------------------------------------
...
Printed by:Annie Wilson on:04/22/2025 11:27 AM
Page 2 of 5
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncoun"a.gov
MANUFACTURED HOME BLD2024-01347
* REQUIRED INSPECTIONS (Footing Inspection-prior to pour(set-up manual must be on-site), Set-up Inspection-prior to
skirting, Final Inspection-prior to occupancy). I hereby assume all responsibility for the scheduling of my required
inspections. If the required inspections are not requested, inspected and signed off(approved) by the inspector in the
prescribed order, I understand that reinspection fees and an hourly investigation fee pursuant to the current fees adopted by
the Mason County Building Dept., and will be assessed in addition to my original permit fees to resolve any questionable
practices or problems that have been discovered. Until resolution of any/all problems no occupancy(Final Inspection)will be
granted for the residence.
OWN ER/CONTRACTOR(indicate which)
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit
expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being
taken.
* The foundation/footing must be placed on undisturbed, firm-native soil. Proper frost depth, minimum 12 inches, shall be
observed below grade in undisturbed soils.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Code 14.28 and 14.17.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* All property lines shall be clearly identified at the time of foundation inspection.
* All other necessary permits from Mason County, Washington State, Federal Agencies, and/or other agencies/groups that
are required for this proposed development and construction must be obtained PRIOR TO DEVELOPMENT AND
CONSTRUCTION.
* Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
* A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit
application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the
responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that
Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement
of any development activities. *NOTE if Stormwater Management option"A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots, The Small Parcel
Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the
development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other,
parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final
inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater
management system have been installed as approved on the stormwater site plan. Under the requirements of Mason County
Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior
approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose.
Printed by:Annie Wilson on:04/22/2025 11:27 AM
Page 3 of 5
r'
Mason County
lop Mason County - Division of Community Development
615 W.Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MANUFACTURED HOME BLD2024-01347
* Any retailer, manufacturer or contractor who installs a manufactured structure warrants that the manufactured structure is
installed in accordance with the State Installation code, chapter 296-150M WAC.All installers hired to do installation work
shall be certified manufactured structure installers and shall be present to supervise the installation of all on-site work. An
Installer Tag shall be posted on site giving the certification number and signature of the certified installer responsible for
each major part of the installation. RCW43-63B.090
An approved Installer certification tag shall be placed on the end of the manufactured home directly above or below the HUD
certification tag or temporarily located in plain site within three feet of the home's front entry. There shall be one certification
tag for each certified installer accounting for the work that each installer performed or installed. Certification number and
signature of the certified installer responsible for each major part of the installation. WAC365-210
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED.
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
contact the Mason County Public Works Department prior to construction at Ext 450
* Disclaimer: Mason County does not require a survey to obtain a building permit.As a result, site plans may not reflect
accurate data. It is the applicant's responsibility to comply with setback requirements.
* When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For any construction which is proposed to be located within 25'of a Mason
County road right of way, it is suggested to contact that office to review future planned work which may affect your project.
For more information contact Public Works, at(360)427-9670, ext. 450 or 100 W Public Works Dr. Shelton. The building
permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled
and approved.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* If you are installing a manufactured structure and no longer have the installation manual, you must use the instructions of
the most current 24 CFR.
* All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and
approved by the Washington State Department of Transportation. For more information contact Washington State
Department of Transportation, at(206)357-2620, ext. 630.
* Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered.
A.) Drainfield/Reserve requires a 1 Oft setback from all footing/foundations.
B.)Septic tank(s) requires 5ft setback from all footing/foundations.
C.) No foundation/Perimeter Drains within 30ft,down gradient of Drainfield/Reserve area.
D.) No Cut Bank(s)(greater than 5ft and over 45 degrees)within 50ft, down gradient of Drainfield/Reserve area.
Printed by:Annie Wilson on:04/22/2025 11:27 AM
Page 4 of 5
Mason County
Mason County - Division of Community Development
615 W. Alder St.
A►C Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MANUFACTURED HOME BLD2024-01347
PLANNING SETBACKS
Setbacks measured from farthest projection of structure
Front: 25'
Rear: 10'ADV2024-00160
Side: 20'
Side: 5'ADV2024-00160
*Subject to EH Setbacks
* REVIEW FOR PARK MODEL STRUCTURE ONLY
hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: Date:
Printed by:Annie Wilson on:04/22/2025 11:27 AM
Page 5 of 5
1<
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
B DD2024-01347 MANUFACTURED HOME
PROJECT DESCRIPTION: PARK MODEL PLACEMENT ISSUED: 01/13/2025
SITE ADDRESS: 61 N BASS PL HOODSPORT
EXPIRES: 07/12/2025
PARCEL: 422165300035
APPLICANT: Olson,Alan OWNER: OLSON ALAN M & KATHERINE E
11928 53rd Ave SE 11928 53RD AVE SE
Everett,WA 982089224 EVERETT,WA 98208
7072900693
GENERAL CONTRACTOR'S LICENSE: MOBILE HOME MEDIC License: MOBILHM778KU
5410 222ND AVE SW Expires: 05/31/2025
CENTRALIA,WA 98531
360-239-5048
FEES: Paid Due
Technology Surcharge $11.00 $0.00
State Fee-Residential $6.50 $0.00
Planning Residential Review $275.00 $0.00
Fee
Modular/Manufactured Home $275.00 $0.00
Fee - 1st half collected at
submittal
Building Plan Review/Change of $135.00 $0.00
Use- Onsite Sewage
Modular/Manufactured Home $275.00 $0.00
Fee-2nd half collected at ready
to issue
Totals : $977.50 $0.00
REQUIRED INSPECTIONS
Setback Inspection Connection is to be verified by Health or Utilities
Footing Inspection BLD-Final Inspection
Printed by:Anna Schaffran on:01/13/2025 08:17 AM
Page 1 of 5
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MANUFACTURED HOME BLD2024-01347
Set-Up Inspection
CONDITIONS
The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
This permit is for the placement and installation of the manufactured home only and does not imply approval or review for
any other items indicated on the plot plan.
CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your
"Approved Site Plan"to ensure these structures meet the setback conditions listed.
All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted_ _______________ _._____..-----------.__.______
Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate
building permit and approval prior to construction of the retaining wall.
* Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the farthest projection of the
structure. Front setbacks are measured from the front lot line or road easement boundary,whichever is closer.
The installation permit shall be displayed in clear view of the site access road. The approved site plan and other applicable
instructions, including installation instructions, shall be available in this location OR placed in the location specified by WAC
296-150M. Support configuration shall be clearly marked in the installation instructions.
REQUIRED INSPECTIONS (Footing Inspection-prior to pour(set-up manual must be on-site), Set-up Inspection-prior.to
skirting, Final Inspection-prior to occupancy). I hereby assume all responsibility for the scheduling of my required
inspections. If the required inspections are not requested, inspected and signed off(approved) by the inspector in the
prescribed order, I understand that reinspection fees and an hourly investigation fee pursuant to the current fees adopted by
the Mason County Building Dept., and will be assessed in addition to my original permit fees to resolve any questionable
practices or problems that have been discovered. Until resolution of any/all problems no occupancy (Final Inspection)will be
granted for the residence.
OWN ER/CONTRACTOR(indicate which)
All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
........... ...._.... ..__.. .. .. .... _........ .
Printed by:Anna Schaffran on:01/13/2025 08:17 AM
Page 2 of 5
Mason County
i1
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MANUFACTURED HOME BLD2024-01347
All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit
expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being
taken.
* The foundation/footing must be placed on undisturbed, firm-native soil. Proper frost depth, minimum 12 inches, shall be
observed below grade in undisturbed soils.
* Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Code 14.28 and 14.17.
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
* Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* All property lines shall be clearly identified at the time of foundation inspection.
* All other necessary permits from Mason County, Washington State, Federal Agencies, and/or other agencies/groups that
are required for this proposed development and construction must be obtained PRIOR TO DEVELOPMENT AND
CONSTRUCTION.
* Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
* A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit
application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the
responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that
Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement
of any development activities. *NOTE if Stormwater Management option "A" was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel
Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the
development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other,
parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final
inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater
management system have been installed as approved on the stormwater site plan. Under the requirements of Mason County
Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior
approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose.
* Any retailer, manufacturer or contractor who installs a manufactured structure warrants that the manufactured structure is
installed in accordance with the State Installation code, chapter 296-150M WAC. All installers hired to do installation work
shall be certified manufactured structure installers and shall be present to supervise the installation of all on-site work. An
Installer Tag shall be posted on site giving the certification number and signature of the certified installer responsible for
each major part of the installation. RCW43-63B.090
An approved Installer certification tag shall be placed on the end of the manufactured home directly above or below the HUD
certification tag or temporarily located in plain site within three feet of the home's front entry. There shall be one certification
tag for each certified installer accounting for the work that each installer performed or installed. Certification number and
signature of the certified installer responsible for each major part of the installation. WAC365-210
Printed by:Anna Schaffran on:01/13/2025 08:17 AM
Page 3of5
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncoun"a.gov
MANUFACTURED HOME BLD2024-01347
OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED.
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
contact the Mason County Public Works Department prior to construction at Ext 450
* Disclaimer: Mason County does not require a survey to obtain a building permit. As a result, site plans may not reflect
accurate data. It is the applicant's responsibility to comply with setback requirements.
* When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For any construction which is proposed to be located within 25' of a Mason
County road right of way, it is suggested to contact that office to review future planned work which may affect your project.
For more information contact Public Works, at(360)427-9670, ext. 450 or 100 W Public Works Dr. Shelton. The building
permit will not be finaled until the permit holder can show proof that the access permit from Public Works has been finaled
and approved.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* If you are installing a manufactured structure and no longer have the installation manual, you must use the instructions of
the most current 24 CFR.
* All changes to"approved"building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and
approved by the Washington State Department of Transportation. For more information contact Washington State
Department of Transportation, at (206)357-2620, ext. 630.
Applicant/Owner assumes all responsibility if On-site Sewage Components are encumbered.
A.) Drainfield/Reserve requires a 1 Oft setback from all footing/foundations.
B.) Septic tank(s) requires 5ft setback from all footing/foundations.
C.) No foundation/ Perimeter Drains within 30ft, down gradient of Drainfield/ Reserve area.
D.)No Cut Bank(s)(greater than 5ft and over 45 degrees)within 50ft, down gradient of Drainfield/Reserve area.
* PLANNING SETBACKS
Setbacks measured from farthest projection of structure
Front: 25'
Rear: 10'ADV2024-00160
Side: 20'
Side: 5'ADV2024-00160
'Subject to EH Setbacks
REVIEW FOR PARK MODEL STRUCTURE ONLY
Printed by:Anna Schaffran on:01/13/2025 08:17 AM
Page 4 of 5
F
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
MANUFACTURED HOME BLD2024-01347
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other statellocal law regulating construction or the performance of construction.
Issued By: 'IS . Z111
If
Contractor or Authorized Agent: Date:
Printed by:Anna Schaffran on:01/13/2025 08:17 AM
Page 5 of 5
� 3 �
W