Habitat Management Plan
Parcel: 31911-2 2-00070
407 SE Allen Rd
Shelton, WA 98584
Mason County
Report prepared for:
Bryan Dias
411 SE Allen Rd
Shelton, WA 98584
Prepared by:
Rob Nagel
PO Box 2466
Shelton, WA 98584
rob@arctos-environmental.com
(360) 229-3118
Arc.tos Environmental LLG
Project: 2024-H M P-014
October 2024
Project: 2024-HMP-014 October 2024 Arc-to-, Environmental LLG
Table of Contents
Overview............................................................................................................1
PropertyDescription...........................................................................................2
Analysis of Potential Impacts..............................................................................3
Mitigation Measures...........................................................................................4
Monitoring..........................................................................................................9
Summary............................................................................................................9
References........................................................................................................10
Appendix: Site Photos.......................................................................................11
List of Figures
Figure1: Vicinity Map .........................................................................................2
Figure2: Site Map...............................................................................................7
Project: 2024-HMP-014 October 2024 /krc+os Environmental LLG
Habitat Management Plan
31911-22-00070
407 SE Allen Rd
Shelton, WA 98584
Overview
This report details a Habitat Management Plan (HMP) for the above referenced
property in Mason County, Washington. The purpose of this report is to address
potential adverse impacts from the construction of a proposed Single-Family
Residence (SFR) and accessory building within the regulated buffer of the
shoreline of Little Skookum Inlet. The total development area proposed is
±2,275ft2, consisting of a ±1,775ft2 SFR and a ±500ft2 accessory building. The SFR
is proposed approximately 115ft from the Ordinary High-Water Mark (OHWM) of
the shoreline at its closest point, and the accessory building is proposed
approximately 97ft. Mitigation sequencing has been followed to avoid, minimize,
and mitigate impacts to the buffer area. Mitigation measures have been designed
to offset the potential impacts of constructing the SFR on the ecological functions
and fish and wildlife habitat of the shoreline buffer. Measures include best-
management practices for construction, noxious weed removal, and planting a
mitigation area of±2,300ft2 with native trees, shrubs, and ferns. The objectives of
this report are as follows:
• Identify potential impacts of the proposed development on the critical area
buffer's ecological functions and fish and wildlife habitat.
• Determine mitigation measures that would offset those impacts and result
in no-net-loss to ecological functions and fish and wildlife habitat.
1
Project: 2024-HMP-014 October 2024 Arctos Environmental LLG
13 N
G
Figure 1:Vicinity Map of project
Property Description & Project Background
The parcel is 1.84 acres in size and located in section 11 of Township 19 North,
Range 3 West. The property slopes from the north to the south where Little
Skookum Inlet is located at the bottom of the lot. A forested, slope wetland
originates on the slope above the subject property and flows south where it
meets the access road and is then diverted east down the ditch. The wetland and
ditch contained flowing water during a site visit on 8/30/2024. The ditch runs east
towards an Np stream, but went dry prior to reaching the stream, with no clear
channel making it to the stream.
Typical vegetation growing within the wetland portion of the property includes
western red cedar (Thuja plicata), skunk cabbage (Lysichiton americanus),
horsetail (Equisetum spp.), and western lady fern (Athyrium filix-femina). The
upland vegetation on the property immediately adjacent to the wetland, and just
south of the road is characterized mostly by Douglas fir (Pseudotsuga menziesii),
big-leaf maple (Acer macrophyllum), and beaked hazelnut (Corylus cornuta).
The area proposed for constructing the SFR and accessory building were
previously cleared and maintained as open grass areas. Three areas exist on the
lot which would benefit from habitat improvements. The first area,just south of
2
Project: 2024-HMP-014 October 2024 Arc+os Environmental LLG
the existing well and proposed accessory building, is mostly open grass and leads
to a primitive trail to the shoreline. The second area, located south of the existing
septic tanks, has a healthy understory but lacks any mature trees. The third area is
located adjacent to the existing septic system and is currently maintained in grass.
Analysis of Potential Impacts
Vegetated buffers serve an important role in protecting critical public resources
from adverse impacts associated with development, as well as providing fish and
wildlife habitat. Below are the potential adverse impacts to ecological functions
associated with the construction of the proposed SFR within the stream, wetland,
and shoreline buffers.
- Loss of fish and wildlife habitat
The development footprint of the proposed project within the buffers is an
estimated ±2,275ft2 and located in areas on the property currently
dominated by grasses. Three mature cedar trees are required to be
removed in order to complete this project.
- Impervious surfaces
Increasing impervious surfaces on a lot can increase the amount of storm
water run-off and increase erosion potential. Three mature cedar trees will
be removed for this project, but mitigation plantings will improve the
remaining buffer's ability to filter sediment and nutrients from runoff from
the property. No increased risk of erosion is anticipated as long as
construction BMPs prescribed in this report are followed.
- Increased disturbance from noise pollution
A temporary increase in noise from construction activities is likely to occur.
but activities will be limited to daylight hours, and the project is located in a
rural residential area where human noises are a daily occurrence. Also, no
known nesting sites or individual occurrences of priority habitats and
species have been identified near the project site.
3
Project: 2024-HMP-014 October 2024 /arc+os Environmental LLG
- Solar input
Three mature cedar trees will be removed in order to implement this plan,
however 20 trees planted within the mitigation area, closer to the
shoreline, will contribute to shading the edge of the shoreline from
excessive solar input as they mature, which will have a net benefit on the
shoreline's micro-climate.
Mitigation Measures
To avoid, minimize, and mitigate for the potential adverse impacts identified
above, the following have been identified as appropriate measures for this
project:
- Minimizing/avoiding impact
Given that the lot is entirely encumbered by critical area buffers, it is not
possible to avoid impact by constructing the project outside of the
buffer areas. This plan proposes minimizing the impact to the critical
area buffers by keeping the development area modest and constructing
the SFR and accessory building, in areas that were already previously
cleared and maintained as open grass areas. The three trees required to
be removed will be bucked into as long of logs as feasible and retained
within the shoreline buffer.
- Best Management Practices for construction
Construction activities related to this project will be restricted to
favorable weather conditions and best management practices for
reducing disturbance will be followed, including erecting silt fencing
below the project area, and placing straw over any exposed areas until
they are re-vegetated. Any equipment used will be checked daily for
leaks and all fuel, lubricant, and chemicals will be stored off-site.
- Clustering of development
All activities related to this project will be clustered to the extent
possible without impacting more of the buffer areas than necessary.
Equipment and materials will be stored outside the buffer area when
not immediately necessary for construction activities.
4
Project: 2024-HMP-014 October 2024 Arc-tog Environmental LLG
- Noxious weed removal
All occurrences of English holly on the lot will be removed by hand. As
much root material as possible will be removed with the plant. Weed
debris will be bagged and brought to the landfill. Any holly too large to
be pulled up will be cut at the base and treated with an herbicide using a
paint brush to reduce potential for drift.
- Mitigation area
A mitigation area of approximately 2,300ft2 will be planted with native
vegetation in three distinct areas of the property according to the
planting guidelines below. Mitigation area A will be planted with trees,
shrubs, and ground covers. Mitigation area B will be planted with trees
only. Mitigation area C will be planted with shrubs and ground covers
only. The minimum number of native plants required to be installed in
order to satisfy this requirement are as follows:
o Trees: 20
o Shrubs: 55
o Ferns/ground covers: 85
Planting Guidelines for the Mitigation Area
Earthwork
Machinery earthwork will be restricted to the minimum necessary to implement
this plan; planting holes for specified vegetation installation will be hand dug.
Native Plantings
Native plantings will be installed within the mitigation area parallel to the edge of
the shoreline to achieve the following minimum densities:
Trees— 10' on center
Shrubs— ±5' on center
Ferns/ground covers — ±4' on center
The plan calls for installing single trees on 10ft centers, and single shrubs on ±5ft
centers. The areas between the trees and shrubs will be filled with ferns or
5
Project: 2024-HMP-014 October 2024 /arc+os Environmental LLG
groundcovers on ±4ft centers. Mitigation area B will be planted with trees only.
Mitigation area C will be planted with shrubs and groundcovers only. Exact
placement of installed materials will be up to the landscape installer, following
the basic spacing pattern described above. Trees may be installed within 10ft of
existing mature trees on site. Installed plants must be flagged to aid in monitoring
visits. If any portion of the mitigation area is deemed unsuitable for planting
either due to concerns of plant survivability or installer safety, then alternate
mitigation areas must be determined by a qualified biologist.
Native plants suitable for the mitigation area include, but are not limited to the
following:
Trees:
Big-leaf maple (Acer macrophyllum)
Western red cedar (Thuja plicata)
Shrubs:
Salal (Gaultheria shollon)
Oregon grape (Mahonia aquifolium)
Vine maple (Acer circinatum)
Evergreen huckleberry (Vaccinium ovatum)
Beaked hazelnut (Corylus cornuta)
Ferns/groundcovers:
Western swordfern (Polystitchum munitum)
Wild strawberry (Fragaria virginiana)
Kinnikinnick (Arctostaphylos uva-ursi)
All planting should occur during winter dormancy. The optimum time for planting
is from November to March.
Installation
Installation of the prescribed vegetation will be performed by experienced
landscapers familiar with planting native vegetation in natural settings or the
property owner. Installation will be performed during the first winter planting
season after approval of this plan. Installed plants will be flagged to aid in
monitoring requirements.
6
Project: 2024-HMP-014 October 2024 Arctos Environmental LLG
Fertilizing
Due to the proximity of the mitigation area to the critical areas, NO fertilizer will
be used during plant installation or maintenance.
Maintenance
Maintenance of the installations will be the responsibility of the property owner.
Maintenance is to include any weeding or watering necessary to ensure plant
survival for at least five years after the date of installation.
Project: 2024-HMP-014 October 2024 Arc+os Environmental LLG
Monitoring
A baseline monitoring report will be submitted to the Mason County Planning
Department when all construction is complete, and mitigation measures have
been implemented. This initial report will establish photo points and document
the location and general size of installed vegetation. An annual monitoring report
will also be submitted to the county for 5 years to document the success of the
mitigation area. If the survival rate of installed vegetation falls below 90% in the
first two years, the area will be re-planted to meet the original target densities.
The 90% threshold will be assessed annually at each monitoring visit and
replanted the following planting season if required. After the first two years, a
minimum visual plant cover area of 70% must be achieved within the mitigation
area, or the area must be replanted to meet the 70% target. The reports will also
include photos from the photo points established in the baseline monitoring
report and document any occurrence of noxious weeds in the vicinity of the
project site or mitigation area. Any noxious weeds observed will be removed.
Summary
This report details a Habitat Management Plan (HMP) for the above referenced
Property in Mason County, Washington. The purpose of this report is to address
potential adverse impacts from the construction of a proposed SFR and accessory
building with a total development footprint of±2,275ft2 within the regulated
buffers of the shoreline of Little Skookum Inlet, a Type-Np stream, and a category
III slope wetland. Mitigation measures have been designed to offset the potential
impacts of constructing the project on the ecological functions and fish and
wildlife habitat of the buffer areas. Measures include best-management practices
for construction, noxious weed removal, and planting a ±2,300ft2 mitigation area
with native vegetation in areas of the buffer currently lacking native vegetation in
at least one habitat strata. Proper implementation of this plan will result in no-
net-loss of ecological function to the buffers from the development proposed by
the applicant.
Project: 2024-HMP-014 October 2024 Arc+os Environmental LLG
References
Guard,J. 1995.Wetland Plants of Oregon &Washington. Lone Pine Publishing. 240 pp. Edmonton,
Alberta, Canada.
Penttila, D. 2007. Marine Forage Fishes in Puget Sound. Puget Sound Nearshore Partnership Report No.
2007-03,Seattle,WA.
Pojar,J. and A. MacKinnon. (1994). Plants of the Pacific Northwest Coast(Revised Edition 2014). Lone
Pine Publishing. 528 pp. Vancouver, British Columbia,Canada.
WDFW. 2002. Integrated streambank protection guidelines. Washington Department of Fish and
Wildlife,Washington Department of Transportation, and Washington Department of Ecology.
Posted on Washington Department of Fish and Wildlife web site:
https://wdfw.wa.gov/sites/defa u It/files/publications/00046/wdfw00046.pdf
WDFW. 2001. Over-Water Structures: Freshwater Issues.Washington Department of Fish and Wildlife,
Washington Department of Transportation,and Washington Department of Ecology. Posted on
Washington Department of Fish and Wildlife web site:
htt ps://wdfw.wa.gov/sites/default/files/publications/00052/wdfw00052.pdf
Project: 2024-HMP-014 October 2024 Arctos Environmental LLG
,'�,2I
�t Environmen+ol LLG
`
. ,
s!C _ e. ,:,�z.,•�- ���� � �t.. r...',; 41 �'�' � ;Tyr} «+ 9r"� a�`�
•� �- - �.,�. �- • �_ � '� - �_ � '� � .��;`� Environmental Consulting ( Drone Imagery
n-
T ,. ..
'
r
�` t ' .Y � _ « - •�+' .�� � °:� PO Box 2466
'fOA
R :01.
y.
G
Shelton,
1 A
(360) 2 931$8
4
.,
�; ,.-'�� .': R y<,. t - - '� "-• - � .T, � '"� � www.arctos-environrnentaLcom
47
CD
CD
00
CD
ry-
00
4
i
�r
[ T j
,
T!X`
y,
C M
i
4y
Ny i
A t
,
' ti . ;'\ _ l x" _ a mot. •� 'mod' N
Ki
UJ
` r• I Q�
s - �
•
. Y+
7 ,
r
, « 1
t .-«; ,.q" •r '�►"- fir,. 'Y ,. , +� s � �¢x. ,l� R '�'. ii('kf 4 I.
-s. � �� - �» - x � ,. .� � ��_.fir...f.�� I ^►
Legend ' -
s
Q 1 - Little Skookum Inlet �r r Map created by Rob Nagel
-s- 3 1 -1s� t � �,t 4 �r,.
2 - 150ft Conservancy Shoreline Buffer t "
' ' October 9, 2024
3 - 165ft Conservancy Shoreline Structure Setback h ` it Revison:
x ,
4 - Unmapped Non-fish bearing, perennial (Np) Stream
,
0 5 - 100ft Np Stream Buffer
6 - 115ft Np Stream Structure Setback
7 - Category III Slope Wetland
C3 8 - 110ft Wetland Buffer `°
4 ^sir
9 - 125ft Wetland Structure Setback
10 - Proposed SFR (f 1,775ft2) ' V
® 11 - Proposed Accessory Building (t500ft2) 0 20 40 60 80 ft
® 12 - Existing Septic System This is not a survey map.
Measurements are approximate and
• Existing Well Scale: 1 " = 30'
Q Approximate Parcel Boundaries must be field verified.
, 4t,r�
of
��.�,�' ., -T',?• S'' '.i Y ��w. - .. "� a '�'i f
14
Ike
w Ito
-r+ t ��. '��< �� � I ,� „�f.:, �`�•;:fir 1�`'
.o-
'►�,�S,• . :1:.•l;,,sJr�.; ''�, i �� � ,,���r,' �. • - i.`�,r•. ' ,� iii"' ' �.�/+,
r t
f . ..- . . . - . . . . , . .- . •. . - . ..-
Project: 2024-HMP-014 October 2024 Arcto,5 Environmental LLG
.T
jj/ K Jar
41
b '
41
if
�t
.
`,�, r
IKII��
..i` • mil, .
Site Photo 2:Image showing the location of the existing well and proposed building area of the proposed 500ft2 accessory
building.
Project: 1 ' 1 October 2024 ' • • - i
i `} w7{ i { a yrl i ,�rtyc riy
.�r' '�l � �� ��,rlty'.�: et qw�.v. S *�ig�f°���'2,� � f{K- � ..•.
4+Yr XIOU
Site
r
y� �f l
PhotoImage showingthebuilding area Itheproposed
Project: 1 ' 1 October 2024 • - i
7-11
J.} � . _yam` I� - wa._°`YS�'A�'C?•r -_ «/,
Site Photo 4:Image showing a portion of the proposed mitigation area.
1
-��; � y<
a..
Project: 21 1 October 2024 • - •
Site Photo 5:Image showing the location of the existing septic system and the location of one of the proposed mitigation areas.
lJ.. �y ems'.►. ) .`� � F} � ,�Ya.�� r S '7�.1
l