HomeMy WebLinkAboutGEO2024-00108 Dias Residence - GEO General - 8/20/2024 �EO 202.z - aorog
Date: August 20, 2024
Project Name: Dias Residence
Project Number: 24254
Client Name: Bryan Dias
Client Address: 411 SE Allen Road
Client City,St,zip: Shelton,Washington 98584
Site Address: 407 SE Allen Road, Shelton
Parcel: 31911-22-00070
Site Visit Date - July 31, 2024
Project Information: a single family residence, grading,retaining walls, and other
ancillary features typical of this type of development
Max Slope: 67%
Upslope Geomorph hillside of glacial origin
Surface Drainage moderate to excessive
Upslope Water There are no apparent water bodies or wetlands located upslope
from the planned development that would significantly influence the project.
Slope Observations Except for results of ordinary shoreline erosion, these slope
instability indicators or other significant mass wasting on the property or within the
general vicinity of the project were not observed. Indications of deep-seated slope
problems were not observed during the site visit.
Geology
Map Unit: Qgt
Age: Quaternary
GeoMaterial: Glacial till
Description: Unsorted,unstratified,highly compacted mixture of clay, silt, sand, gravel,
and boulders deposited by glacial ice; may contain interbedded stratified sand, silt,and
gravel.
Map Unit: Qga
Age: Quaternary
GeoMaterial: Alluvial sediment
Description: Glaciofluvial sand and gravel and lacustrine clay, silt, and sand deposited
during the advance of glaciers; sandy units commonly thick, well sorted, and fine
grained, with interlayered coarser sand,gravel, and cobbles; locally contains nonglacial
sediments and deposits mapped as transitional between glacial and nonglacial
Map Unit: Qapo
Age: Quaternary
GeoMaterial: Clastic sediment
Decription: Stratified sand, gravel, and cobbles;locally includes peat, silt,clay, and
weathered loess; gray to subtle yellow weathering.
Map Unit: Ev(c)
Age: Eocene
GeoMaterial: Extrusive igneous material
Description: Tholeiitic basalt flows,basaltic flow breccia, filled tubes, and
volcaniclastic conglomerate;gabbro dikes and sills; locally contains thin interbeds of
basaltic tuff,chert,red argillite, limestone, and siltstone;rare andesite, dacite, and
rhyolite;marine,pillow-dominated lower part grades into flow-dominated,partially non-
marine near top with local columnar jointing; altered to palagonite,chlorite, zeolite,or
epidote.
Map Unit: Qa
Age: Quaternary
GeoMaterial: Alluvial sediment
Description: Sorted combinations of silt, sand,and gravel deposited in streambeds and
alluvial fans; surface relatively undissected;locally includes alpine drift,peat,lacustrine,
landslide,lahar,and rare loess deposits.
Map Unit: Ev(c)
Age: Eocene
GeoMaterial: Extrusive igneous material
Description: Tholeiitic basalt flows,basaltic flow breccia, filled tubes, and volcaniclastic
conglomerate; gabbro dikes and sills; locally contains thin interbeds of basaltic tuff,
chert, red argillite,limestone,and siltstone;rare andesite,dacite, and rhyolite; marine,
pillow-dominated lower part grades into flow-dominated,partially non-marine near top
with local columnar jointing; altered to palagonite, chlorite, zeolite, or epidote.
Map Unit: Qgo
Age: Quaternary
Name: Undifferentiated outwash
Description: Recessional and proglacial stratified sand,gravel, and cobbles with minor
silt and clay interbeds deposited in delta,ice-contact,beach, and meltwater stream
environments;may include advance outwash
Fill The project is primarily composed of undisturbed, native soils,
with some indications of old fill.
Bearing Depth 18 inches
Groundwater Depth 50 feet
Groundwater Seeps Surface seepage was observed on or near the property, and perched
potential groundwater(mottling) at shallow depths were recorded per the septic logs.
Soils Soils within the upper 3 feet of natural ground were partially
observed by Envirotech and recorded by other soil specialists to be primarily moist,
brown silty sand with gravel(SM)
Hardpan? Soils below this upper soil strata were recorded to be clay.
Strongly cemented glacial till,locally known as hardpan is about 20 to 25 feet below
natural ground according to the well report on the property.
Seismic Faults Olympia Structure Fault Zone
Mapped Landslide DNR did indicate historic landslide activity,both on and near the
project.
Foundation For a bearing capacity requirement of no more than 1500 psf, a
minimum continuous footing width of 15 inches shall be placed at a minimum of 18
inches below the existing natural ground surface atop unyielding soils and away from any
potential old fill or disturbed soils.
"ctrl `A' then right click then update"
�6-0 2024 - Oo lob
Geotechnical Report
Dias Residence
407 SE Allen Road, Shelton
Parcel No. 31911-22-00070
Mason County,Washington
August 20, 2024
Project#24254
Prepared For:
Bryan Dias
411 SE Allen Road
Shelton,Washington 98584
Prepared By:
Envirotech Engineering,PLLC
PO Box 984
Belfair,Washington 98528
Phone: 360-275-9374
PAL CLYDE sT
WASy�tic�r�L
�4
n
,P 43045
0" FcisTE1�F
Frs/OINN AL�aG\
8/20/24
MASON COUNTY Submittal Checklist
I COMMUNITY SERVICES Geotechnical Report
ixuimnp runm,q i o.nnnmrnrni i irenn c rmmnniry i o-nun
Instructions:
This checklist must be submitted with a Geotechnical Report and completed,signed, and stamped by the licensed
professional(s)who prepared the Geotechnical Report for review by Mason County pursuant to the Mason County
Resource Ordinance. If an item is found not applicable,the report should explain the basis for the conclusion.
Note: Unless specifically documented, this report does not provide compliance to the International Residential
Code Sections R403.1.7 for foundations on or adjacent to slopes, Section R403.1.8 for expansive soils or section
1808.7.1 of the International Building Code Section for Foundations on or adjacent to slopes.
Applicant/Owner Bryan Dias Parcel#3 1 9 1 1-22-00070
Site Address 407 SE Allen Road, Shelton
(1) (a) A discussion of general geologic conditions in the vicinity of the proposed development,
Located on page(s) 5
(b) A discussion of specific soil types,
Located on page(s) 6
(c) A discussion of ground water conditions,
Located on page(s) 7
(d) A discussion of the upslope geomorphology,
Located on page(s) 3
(e) A discussion of the location of upland waterbodies and wetlands,
Located on page(s) 3
(f) A discussion of history of landslide activity in the vicinity,as available in the referenced maps and
records.
Located on page(s) 8
(2) A site plan which identifies the important development and geologic features.
Located on Map(s) Geotechnical Site Plan—Appendix A
(3) Locations and logs of exploratory holes or probes.
Located on Map(s) Geotechnical Site Plan and Soil Logs(Appendix B)
(4) The area of the proposed development,the boundaries of the hazard,and associated buffers and
setbacks shall be delineated(top,both sides,and toe)on a geologic map of the site.
Located on Map(s) Geotechnical Site Plan
(5) A minimum of one cross section at a scale which adequately depicts the subsurface profile,and
which incorporates the details of proposed grade changes.
Located on Map(s) Soil Profile(Appendix B)
(6) A description and results of slope stability analyses performed for both static and seismic loading
conditions.Analysis should examine worst case failures.The analysis should include the Simplified
Bishop's Method of Circles.The minimum static safety factor is 1.5,the minimum seismic safety
factor is 1.1,and the quasi-static analysis coefficients should be a value of 0.15.
Located on page(s) 10 Page 1 of 43
(7) (a) Appropriate restrictions on placement of drainage features,
Located on page(s) 19
(b) Appropriate restrictions on placement of septic drain fields,
Located on page(s) 20
(c) Appropriate restrictions on placement of compacted fills and footings,
Located on page(s) 14 and 16
(d) Recommended buffers from the landslide hazard areas shoreline bluffs and the tops of other slopes.
Located on page(s) 19
(e) Recommended setbacks from the landslide hazard areas shoreline bluffs and the tops of other slopes.
Located on page(s) 18
(8) Recommendations for the preparation of a detailed clearing and grading plan which specifically identifies
vegetation to be removed,a schedule for vegetation removal and replanting,and the method of vegetation
removal.
Located on page(s) 19
(9) Recommendations for the preparation of a detailed temporary erosion control plan which identifies the specific
mitigating measures to be implemented during construction to protect the slope from erosion, landslides and
harmful construction methods.
Located on page(s) 10
(10) An analysis of both on-site and off-site impacts of the proposed development.
Located on page(s) 13
(11) Specifications of final development conditions such as,vegetative management,drainage,erosion control,and
buffer widths.
Located on page(s) 14-20
(12) Recommendations for the preparation of structural mitigation or details of other proposed mitigation.
Located on page(s) 20
(13) A site map drawn to scale showing the property boundaries,scale, north arrow,and the location and nature
of existing and proposed development on the site.
Located on Map(s) Geotechnical Site Plan
I, Michael Staten, hereby certify under penalty of perjury that I am a civil engineer licensed in the State of Washington
with specialized knowledge of geotechnical/geological engineering or a geologist or engineering geologist licensed in
the State of Washington with special knowledge of the local conditions. I also certify that the Geotechnical
CLYDF S Report,dated August 20, 2024 ,and entitled Dias
Residence meets all the requirements of the Mason
9
County Resource Ordinance,Geologically Hazardous Areas
P. RF(43 5 �� Section, is complete and true,that the assessment
`.aLF��'� demonstrates conclusively that the risks posed by the landslide
8/20/24
hazard can be mitigated through the included geotechnical
Disclaimer:Mason County does not design recommendations,and that all hazards are mitigated in
certify the quality of the work done in such a manner as to prevent harm to property and public
this Geotechnical Report. health and safety.Page 2 of 2
TABLE OF CONTENTS
1.0 INTRODUCTION.................................................................................................................................1
1.1 PROJECT INFORMATION.................................................................................................................... 1
1.2 PURPOSE OF INVESTIGATION AND SCOPE OF WORK........................................................................ 1
2.0 SURFACE CONDITIONS....................................................................................................................3
2.1 TOPOGRAPHY.....................................................................................................................................3
2.1.1 Upslope Geomorphology............................................................................................................3
2.2 SURFACE DRAINAGE..........................................................................................................................3
2.2.1 Upland Water Bodies.................................................................................................................3
2.3 SLOPE AND EROSION OBSERVATIONS...............................................................................................4
3.0 SUBSURFACE INVESTIGATION..............».....................................................................................5
3.1 FIELD METHODS,SAMPLING AND FIELD TESTING...........................................................................5
3.2 GEOLOGIC CONDITIONS....................................................................................................................5
3.3 SPECIFIC SUBSURFACE CONDITIONS.................................................................................................5
3.3.1 Groundwater............................................................................................................................... 7
4.0 ENGINEERING ANALYSES AND CONCLUSIONS......................................................................0
4.1 SLOPE STABILITY...............................................................................................................................0
4.1.1 Slope Stability Analysis..............................................................................................................2
4.2 EROSION.............................................................................................................................................2
4.2.1 Shoreline Recession...................................................................................................................3
4.3 SEISMIC CONSIDERATIONS AND LIQUEFACTION...............................................................................3
4.3.1 Liquefaction...............................................................................................................................3
4.4 LANDSLIDE,EROSION AND SEISMIC HAZARDS CONCLUSIONS.........................................................4
4.5 LATERAL EARTH PRESSURES............................................................................................................4
4.6 ON-SrrE AND OFF-SITE IMPACTS......................................................................................................5
5.0 ENGINEERING RECOMMENDATIONS..».....................................................................................6
5.1 BUILDING FOUNDATION RECOMMENDATIONS..................................................................................6
5.1.1 Bearing Capacity........................................................................................................................ 6
5.1.2 Settlement................................................................................................................................... 7
5.1.3 Concrete Slabs-on-Grade........................................................................................................... 7
5.2 EARTHWORK CONSTRUCTION RECOMMENDATIONS........................................................................7
5.2.1 Excavation.........................................:....................................................................................... 7
5.2.2 Placement and Compaction of Native Soils and Engineered Fill............................................8
5.2.3 Retaining Wall Backfdl.............................................................................................................. 9
5.2.4 Wet Weather Considerations.....................................................................................................9
5.2.5 Building Pads............................................................................................................................10
5.3 BUILDING AND FOOTING SETBACKS.................................................................................................10
5.4 SURFACE AND SUBSURFACE DRAINAGE...........................................................................................11
5.5 VEGETATION BUFFER AND CONSIDERATIONS.................................................................................11
5.6 TEMPORARY AND PERMANENT EROSION CONTROL.......................................................................12
5.7 SEPTIC DRAINFIELDs........................................................................................................................12
5.8 STRUCTURAL MITIGATION...............................................................................................................12
6.0 CLOSURE............................................................................................................».........................»...13
Appendix A—Geotechnical Site Plan
Appendix B-Soil Information
Appendix C-Slope Stability
Appendix D—Erosion Control
Appendix E—Drainage Details
1.0 INTRODUCTION
Envirotech Engineering, PLLC. (Envirotech)has completed this geotechnical report for a
property located at 407 SE Allen Road, Shelton, identified as parcel number 31911-22-
00070 in Mason County,Washington.
As presented herein, this report includes information pertaining to the project in this
Introduction Section; observations of the property and surrounding terrain in the Surface
Conditions Section; field methods and soil descriptions in the Subsurface Investigation
Section; supporting documentation with relation to slope stability, erosion, seismic
considerations, and lateral earth pressures in the Engineering Analyses and Conclusions
Section; and, recommendations for foundation, settlement, earthwork construction,
retaining walls, erosion control, drainage, and vegetation in the Engineering
Recommendations Section.
An initial geotechnical evaluation of the project was conducted by Envirotech on July 31,
2024. It was determined that slopes in excess of 40% with a vertical relief of at least 10
feet were present within 300 feet of the planned development. Based on this site
characteristic, the proposed development will require a geotechnical report pursuant to
Landslide Hazard Areas of Mason County Resource Ordinance (MCRO) 8.52.140.
During the site visit by Envirotech, surface and subsurface conditions were assessed.
After completion of the field work and applicable project research, Envirotech prepared
this geotechnical report which, at a minimum,conforms to the applicable MCRO.
1.1 Project Information
Information pertaining to the project was provided by the proponent of the property, and
observations from a field visit by Envirotech. The proposed development is expected to
consist of a single family residence, grading, retaining walls, and other ancillary features
typical of this type of development . Approximate site development footprint with
relation to existing geological site features are illustrated in the Geological Site Plan in
Appendix A of this report.
1.2 Purpose of Investigation and Scope of Work
The purpose of this geotechnical investigation is to assess geological hazards, and
evaluate the project in order to provide geotechnical recommendations that should be
implemented during development. The investigation included characterizing the general
project surface and subsurface conditions, and evaluating the suitability of the soils to
support the planned site activities.
In order to fulfill the purpose of investigation, the geotechnical program completed for
the proposed improvements of the project include:
Envirotech Engineering Geotechnical Report
PO Box 984 page I Parcel 31911-22-00070
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20, 2024
• Review project information provided by the project owner and/ or owner's
representative;
• Conduct a site visit to document the site conditions that may influence the
construction and performance of the proposed improvements of the project;
• Define general subsurface conditions of the site by observing subsoils within test
pits and/ or cut banks, review geological maps for the general area, research
published references concerning slope stability, and review water well reports
from existing wells near the project;
• Collect bulk samples, as applicable, at various depths and locations;
• Perform soils testing to determine selected index and/or engineering properties of
the site soils;
• Complete an engineering analysis supported by the planned site alterations, and
the surface and subsurface conditions that were identified by the field
investigation, soil testing, and applicable project research; and,
• Establish conclusions based on findings, and make recommendations for
foundations, drainage, slope stability, erosion control, earthwork construction
requirements, and other considerations.
04
,o^
SE LYrct)Rd
1W
SE Sells Dr
itkle
Skooki Inlet
Project
SE Kamilche POlnt Rtl
f
j�
Vicinity Map from Mason County Website
Envirotech Engineering Geotechnical Report
PO Box 984 page 2 Parcel 31911-22-00070
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20,2024
2.0 SURFACE CONDITIONS
Information pertaining to the existing surface conditions for the project was gathered on
July 31, 2024 by a representative with Envirotech. During the site visit, site features were
documented that may reveal potential geological hazards. This Surface Conditions
Section provides information on topography, drainage and slope/ erosion conditions for
the project and surrounding areas. An aerial photo of the project and immediate vicinity
is provided on the following page.
Currently the property is accessed from an existing gravel driveway. Some grading and
clearing has been previously completed, as well as construction of a well and septic
system. In addition, a curtain drain has been installed along the north property line with
rock retaining walls associated with the septic system.
2.1 Topography
The topographic information provided in this section was extrapolated from a public lidar
source, and incorporated observations and field measurements. Where necessary, slope
verification included measuring slope lengths and inclinations with a cloth tape and
inclinometer. See the Geological Site Plan in Appendix A for an illustration of the
general slope indicators with respect to the planned development.
Maximum sloping grades within 300 feet of the proposed development area with a
vertical relief in excess of at least 10 feet were observed to be 67%.
2.1.1 Upslope Geomorphology
The landform that is upland from property is considered a hillside of glacial origin
with centuries of weathering overburden. Additional geomorphology that is
pertinent to both upslope and downslope areas are provided in the Subsurface
Investigation Section of this report.
2.2 Surface Drainage
The majority of the stormwater runoff originating upslope from the anticipated
development is expected to be moderate to excessive . Significant scour, erosion and
sediment transport was not apparent near the project. However, hillside seepage and an
abundance of water loving plants were observed.
2.2.1 Upland Water Bodies
There are no apparent water bodies or wetlands located upslope from the planned
development that would significantly influence the project.
Envirotech Engineering Geotechnical Report
PO Box 984 page 3 Parcel 31911-22-00070
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20,2024
2.3 Slope and Erosion Observations
The existing moderate slopes near the project signal a potential landslide or erosion
hazard area. Some indicators that may suggest past slope movements include:
• Outwash of sediments near the bottom of the slope,
• Fissures, tension cracks or naturally stepped land masses on the face or top of the
slope, and parallel to the slope,
• Fine, saturated subsurface soils,
• Old landslide debris,
• Significant bowing or leaning trees,or,
• Slope sloughing or calving.
Except for results of ordinary shoreline erosion, these slope instability indicators or other
significant mass wasting on the property or within the general vicinity of the project were
not observed. Indications of deep-seated slope problems were not observed during the
site visit.
r
Aerial Photo from Mason County Website
Envirotech Engineering Geotechnical Report
PO Box 984 page 4 Parcel 31911-22-00070
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20,2024
3.0 SUBSURFACE INVESTIGATION
Information on subsurface conditions pertaining to the project was gathered during
research and a site reconnaissance. The site visit was accomplished on July 31, 2024 by a
representative with Envirotech. Specific information on field methods, sampling, field
testing, subsurface conditions,and results from soil testing are presented in this section of
the report. See Appendix B for a soil profile cross-sections, soil logs, and other
appropriate information as necessary.
3.1 Field Methods,Sampling and Field Testing
Information on subsurface conditions for the project was accomplished by probing
anticipated foundation areas with hand tools, and observing soils within test pit
excavations and/ or earth cuts. Information on subsurface conditions also included
reviewing geological maps within the project vicinity, and water well reports originating
from nearby properties. No soil samples were collected for this project. Envirotech
measured the relative density of the in-situ soils by gauging the resistance of hand tools.
3.2 Geologic Conditions
In general, soils at the project are composed of materials from glacial advances. The
geologic conditions as presented in the "Geologic Map of Washington," compiled by J.
Eric Schuster, 2002 indicates Quaternary sediments, Qg. Quaternary sediments are
generally unconsolidated deposits, and dominantly deposited from glacial drift, including
alluvium deposits. This project is located within the Puget Lowland. Typically, "lower
tertiary sedimentary rocks unconformably overlie the Crescent Formation." as revealed in
the Geologic Map. Initial sedimentary rocks were formed from shales, sandstones and
coal deposits from rivers. During the Quaternary period, the Puget Lowland was covered
by numerous ice sheets, with the most recent being the Fraser glacier with a peak of
approximately 14,000 years ago. Upon the glacial retreat, the landscape was formed by
glacial erosion glacial drift deposits. More specifically for the project location, a caption
from the Washington State Department of Natural Resources is as follows:
Map Unit: Qgt
Age: Quaternary
GeoMaterial: Glacial till
Description: Unsorted, unstratified, highly compacted mixture of clay, silt, sand, gravel,
and boulders deposited by glacial ice; may contain interbedded stratified sand, silt, and
gravel.
3.3 Specific Subsurface Conditions
The following subsurface conditions are estimated descriptions of the project subgrade
utilizing information from the depth of penetration at all testing, sampling, observed and
Envirotech Engineering Geotechnical Report
PO Box 984 page 5 Parcel 31911-22-00070
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20, 2024
investigated locations.
Soils for this project were described utilizing the Unified Soil Classification System
(USCS). Using the USCS in conjunction with estimated relative densities and other
anticipated engineering properties of the soil, susceptibility for potential landslides,
erosion and seismic hazards may be assessed.
The project is primarily composed of undisturbed, native soils, with some indications of
old fill. Within native, undisturbed areas, competent bearing soils were encountered at 18
inches below the existing ground surface in locations where the ground was probed. For
engineering purposes, these native soils consist of distinguishable layers, as presented
below.
Soils within the upper 3 feet of natural ground were partially observed by Envirotech and
recorded by other soil specialists to be primarily moist, brown silty sand with gravel
(SM) . Soils below this upper soil strata were recorded to be clay. Strongly cemented
glacial till, locally known as hardpan is about 20 to 25 feet below natural ground
according to the well report on the property.
Not withstanding the potential for any old fill incompetencies, the relative densities are
suitable for foundations as provided above. Expanded and specific subsurface
descriptions, other than what is provided in this section, are provided within additional
soil information located in Appendix B of this report.
According to the "Soil Survey of Mason County," by the United States Department of
Agriculture, Soil Conservation Service (SCS), the site soils are described as Shelton
gravelly sandy loam with 5% - 15% slopes. See the soil map below.
Envirotech Engineering Geotechnical Report
PO Box 984 page 6 Parcel 31911-22-00070
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20, 2024
i`
�►;K � r�yo-. r '�1�.
yr 1 ' , •
Y7! •f Z 4 • �•
Soil Survey From USDA Natural Resources Conservation Service
3.3.1 Groundwater
From the water well report(s) and knowledge of the general area, permanent
groundwater is at least 50 feet below the current ground surface. Surface seepage
was observed on or near the property, and perched potential groundwater
(mottling)at shallow depths were recorded per the septic logs.
Envirotech Engineering Geotechnical Report
PO Box 984 page 7 Parcel 31911-22-OW70
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20,2024
4.0 ENGINEERING ANALYSES AND CONCLUSIONS
The following section includes slope stability, erosion, seismic considerations, and
impacts to both on-site and off-site properties.
4.1 Slope Stability
Landslides are natural geologic processes, and structures near slopes possess an inherent
risk of adverse settlement, sliding or structural damage due to these processes.
Geotechnical engineering cannot eliminate these risks for any site with sloping grades
because gravity is constantly inducing strain on the sloping soil mass. Excessive wet
weather and/ or earthquakes will exacerbate these strains. Geotechnical engineering
considers excessive wet weather and `design' earthquakes in order to provide an
acceptable factor of safety for developing on or near sloping terrain with relation to
current engineering protocol. These factors of safeties are based on engineering standards
such as defining engineering properties of the soil, topography, water conditions, seismic
acceleration and surcharges. Surface sloughing or other types of surficial slope
movements usually do not affect the deep-seated structural capability of the slope.
However, repeated surficial slope movements, if not repaired, may present a threat to the
structural integrity of the slope. If any slope movement arises, the slope should be
inspected by an engineer. Subsequently, maintenance may be required in order to prevent
the possibility of further surficial or deep seated slope movements that may be damaging
to life and property.
According to the Coastal Zone Atlas of Mason County,Washington, the project is within
and near terrain labeled `Stable' and `Unstable' regarding potential landslide activity.
Descriptions of these mapping units may be found in the aforesaid Atlas. A Stability Map
from the Coastal Zone Atlas for the general area of this project is provided below:
Project
Map from Washington State Department of Ecology Website
According to the Resource Map from the Washington State Department of Natural
Resources (DNR), the project is not within terrain labeled `highly unstable' relating to
soils. DNR labeled portions of this project as medium and high slope instability with
relation to slopes. A Resource Map from the DNR Forest Practices Application Review
System is provided below:
a
1
Ar
S Puyet Sound
Resource Map from Washington State Department of Natural Resources Website
WADNR PUBLIC FP Soils
Soils-Highly Erodible
IM
WADNR PUBLIC FP Soils
Soils-Highly Unstable
WADNR PUBLIC FP Soils
Soils-Hydric
Envirotech Engineering Geotechnical Report
PO Box 984 page 1 Parcel 31911-22-00070
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20,2024
4.1.1 Slope Stability Analysis
The Simplified Bishop Method, utilizing `STABLE' software, was used to
analyze the static stability of the site slopes. Seismic conditions were estimated
utilizing worst case scenario values from the static analysis, a quasi-static analysis
coefficient of at least 0.15, and applying the applicable values to STABLE
software. Various radii's and center points of the circle were automatically
selected, and produced factor of safeties in a graphical and tabular format. Worst
case scenario values were used in the slope stability analysis in regards to
topography, surcharges, water content, internal friction and cohesion of the site
soils. STABLE software has been repeatedly checked with manual calculations,
and consistently proved to be a very conservative program. The following soil
properties were used in the analysis, and are based on observed conditions,known
geology, and/or published parameters:
Soil unit weight: 124 pcf
Angle of internal friction: 30 degrees
Cohesion: 250 psf
Based on the slope stability analysis, unacceptable factors of safety could be
present on and near the critical slope, but do not reflect conditions where
development is expected to occur. For this project, at the location of the proposed
development, minimum factor of safeties for static and dynamic conditions were
estimated to be at least 1.5 and 1.1, respectively. See the slope stability
information in Appendix C for a depiction of minimum factors of safety away
from the project.
4.2 Erosion
Based on the USCS description of the project soils, the surface soils are considered
moderately erodible. According to the Resource Map from the Washington State DNR,as
provided above, the project is not within terrain labeled `highly erodible.' This project is
not within an erosion hazard area as defined by the MCRO. Erosion hazard areas are
those with USDA SCS designations of River Wash (Ra), Coastal Beaches (Cg),
Alderwood Gravelly Sandy Loam on slopes 15%or greater(Ac and Ad), Cloquallum Silt
Loam on slopes 15% or greater (Cd), Harstine Gravelly Sandy Loam on slopes 15% or
greater(Hb), and Kitsap Silt Loam on slopes 15%or greater(Kc).
It is our opinion that minor erosion control recommendations provided in this report is
sufficient for the development of this project, and additional engineered erosion control
plans are not required. Temporary and permanent erosion control measures are required
for site development. Extents of temporary erosion control will mostly depend on the
timeliness of construction, moisture content of the soil, and amount of rainfall during
construction. Soil erosion typical to the existing site conditions and planned disturbance
Envirotech Engineering Geotechnical Report
PO Box 984 page 2 Parcel 31911-22-00070
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20, 2024
of the project include wind-borne silts during dry weather, and sediment transport during
prolonged wet weather. Sediment transport could be from stormwater runoff or tracking
off-site with construction equipment.
The Temporary and Permanent Erosion Control Section (Section 5.6) of this report
consist of specific erosion controls to be implemented. Additional erosion control
information and specifications may be found in the latest addition of the "Stormwater
Management Manual for Western Washington," prepared by the Washington State
Department of Ecology Water Quality Program.
4.2.1 Shoreline Recession
Due to the close proximity of a shoreline, an evaluation of the shoreline recession
rate for this project was completed. This was accomplished by interviewing
property owners within the vicinity of the project, and/or carefully reviewing and
comparing historical aerial photographs of the project. Historical aerial
photograph sources may be found in the 1951 aerial for the Soil Survey of Mason
County, aerials from the Washington State Department of Ecology, and from the
Washington State Department of Natural Resources website. Based on available
information, we conclude that the past shoreline recession for this project is less
than 5 feet in 50 years.
4.3 Seismic Considerations and Liquefaction
There are no known faults beneath this project. The nearest Class `A' or 'B' fault to this
property is the Olympia Structure Fault Zone , which is not located on the property or
adjacent properties. This information is supported by the USGS Quaternary Fault and
Fold Database for the United States.
Potential landslides due to seismic hazards have been considered, and are addressed in
the Slope Stability Analysis Section provided earlier in this report.
Soils immediately below the expected foundation depth for this project are generally
Type D, corresponding to the International Building Code (IBC) soil profiles. According
to the IBC, the regional seismic zone is 3 for this project. The estimated peak ground
acceleration ranges from 0.50g to 0.60g. This estimation is based on the United States
Geological Survey (USGS) National Seismic Hazard project in which there is an
estimated 2%probability of exceedance within the next 50 years.
4.3.1 Liquefaction
The potential for liquefaction is believed to be low for this project. This is based,
in part, on the subsurface conditions such as soil characteristics and the lack of a
permanent shallow water table. Subgrade characteristics that particularly
Envirotech Engineering Geotechnical Report
PO Box 984 page 3 Parcel 31911-22-00070
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20,2024
contribute to problems caused from liquefaction include submerged, confined,
poorly-graded granular soils (i.e. gravel, sand, silt). Although gravel- and silt-
sized soil particles could be problematic, fine and medium grained sands are
typically subjected to these types of seismic hazards. No significant saturated sand
stratifications are anticipated to be within the upper 50 feet of the subsoil for this
project.
4.4 Landslide,Erosion and Seismic Hazards Conclusions
DNR did indicate historic landslide activity, both on and near the project. This landslide
appears to be ancient—and most likely resulting from the last ice age melt. Mapped slope
conditions, as delineated by the Departments of Ecology and/or Natural Resources, were
considered in our slope stability assessment. Based on the proximity and severity of
mapped delineations with respect to the proposed development, results of the aforesaid
slope stability analysis, observed surface conditions, and other pertinent information, it is
our opinion that the proposed development may occur in accordance with the
recommendations in this geotechnical report.
4.5 Lateral Earth Pressures
Retaining walls may be utilized for this project. The lateral earth pressures exerted
through the backfill of a retaining wall are dependent upon several factors including
height of retained soil behind the wall, type of soil that is retained, degree of backfill
compaction, slope of backfill, surcharges, hydrostatic pressures, earthquake pressures,
and the direction and distance that the top of the wall moves.
An equivalent fluid unit weight used for structural design may be estimated as the
product of the backfill soil unit weight and the earth pressure coefficient for at-rest
pressures. Retaining walls should be designed to resist a lateral earth pressure based on
an equivalent fluid unit weight of the following:
At-Rest Active
Native Soils 49 pcf 32 pcf
Engineered Fill Soils 45 pcf 28 pcf
The values provided above shall be increased by 1 pcf for every 1 degree of backfill/
natural slope angle. These equivalent fluid unit weight values do not include lateral earth
pressures induced by earthquakes, groundwater, or surcharges from live loads.
Earthquake pressures should be added to the wall analysis, and treated as an inverted
pressure triangle where the resultant pressure is located at 2/3 of the wall height, or other
method approved by a structural engineer. The following resultant earthquake pressures
Envirotech Engineering Geotechnical Report
PO Box 984 page 4 Parcel 31911-22-00070
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20,2024
as a function of the wall height(H)may be utilized:
At-Rest Active
Native Soils 15AH psf 9.8H psf
Engineered Fill Soils 13.6H psf 8.2H psf
See the Earthwork Construction Recommendations Section for details concerning the use
of native soils, engineered fill and placement of backfill.
4.6 On-Site and Off-Site Impacts
From a geotechnical position, it is Envirotech's opinion that the subject property and
adjacent properties to the proposed development should not be significantly impacted if
all recommendations in this report are followed. This opinion is based on the expected
site development, existing topography, existing nearby development, land cover, and
adhering to the recommendations presented in this report. Future development or land
disturbing activities on neighboring properties or properties beyond adjacent parcels that
are upslope and/or downslope from the subject property could cause problems to the
subject property. For this reason, future development or land disturbance near the subject
property should be evaluated by a geotechnical engineer.
Envirotech Engineering Geotechnical Report
PO Box 984 page 5 Parcel 31911-22-00070
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20, 2024
5.0 ENGINEERING RECOMMENDATIONS
The following sections present engineering recommendations for the proposed
improvements of the project. These recommendations have been made available based on
the planned improvements as outlined in the Introduction Section of this report; general
observations including drainage and topography as recapitulated in the Surface
Conditions Section; soil/ geologic conditions that were identified from the geotechnical
investigation that is summarized in the Subsurface Investigation Section; and, project
research, analyses and conclusions as determined in the Engineering Analysis and
Conclusions Section. Recommendations for the project that is provided herein, includes
pertinent information for building foundations, earthwork construction, building and/ or
footing setbacks,drainage, vegetation considerations, and erosion control.
5.1 Building Foundation Recommendations
The recommended allowable bearing capacities and settlements as presented below,
consider the probable type of construction as well as the field investigation results by
implementing practical engineering judgment within published engineering standards.
Evaluations include classifying site soils based on observed field conditions and soil
testing for this project. After deriving conservative relative densities, unit weights and
angles of internal friction of the in-situ soils, the Terzhagi ultimate bearing capacity
equation was utilized for determining foundation width and depth. Foundation parameters
provided herein account for typical structural pressures due to the planned type of
development. A structural analysis is beyond the scope of a geotechnical report, and a
structural engineer may be required to design specific foundations and other structural
elements based on the soil investigation. Stepped foundations are acceptable, if warranted
for this project. Continuous, isolated, or stepped foundations shall be horizontally level
between the bottom of the foundation and the top of the bearing strata. The frost
penetration depth is not expected to extend beyond 12 inches below the ground surface
for this project under normal circumstances and anticipated design features.
5.1.1 Bearing Capacity
Existing in-situ soils for this project indicates that the structure can be established
on shallow, continuous or isolated footings. Foundations shall be established on
relatively undisturbed native soil that is competent and unyielding. Alternatively,
foundations may be constructed on selective re-compacted native soil or
compacted engineered fill as described in the Earthwork Construction
Recommendations Section of this report.
For a bearing capacity requirement of no more than 1500 psf, a minimum
continuous footing width of 15 inches shall be placed at a minimum of 18 inches
below the existing natural ground surface atop unyielding soils and away from
any potential old fill or disturbed soils. Existing fill soils were tested to be dense
Envirotech Engineering Geotechnical Report
PO Box 984 page 6 Parcel 31911-22-00070
Belfair,Washington 98528 Mason County, Washington
Ph. 360-275-9374 August 20,2024
and consolidated, however, additional testing is required once the foundation
excavation is completed in order to assure complete competency of the fill.
Foundation recommendations are made available based on adherence to the
remaining recommendations that are provided in this report. Alterations to the
aforementioned foundation recommendations may be completed upon a site
inspection by a geotechnical engineer after the foundation excavation is
completed.
5.1.2 Settlement
Total and differential settlement that a structure will undergo depends primarily
on the subsurface conditions, type of structure, amount and duration of pressure
exerted by the structure, reduction of pore water pressure, and in some instances,
the infiltration of free moisture. Based on the expected native soil conditions,
anticipated development, and construction abides by the recommendations in this
report, the assumed foundation system may undergo a maximum of 1.0 inch total
settlement, and a maximum differential settlement of 0.75 inch.
5.1.3 Concrete Slabs-on-Grade
Interior slabs, if utilized, should be supported on a minimum of 4 inches of
compacted coarse, granular material (Retained on U.S. Sieve #10 or greater) that
is placed over undisturbed, competent native subgrade or engineered fill per the
Earthwork Recommendations Section below.
The recommendations for interior concrete slabs-on-grade as presented herein are
only relevant for the geotechnical application of this project. Although beyond the
scope of this report, concrete slabs should also be designed for structural integrity
and environmental reliability. This includes vapor barriers or moisture control for
mitigating excessive moisture in the building.
5.2 Earthwork Construction Recommendations
Founding material for building foundations shall consist of undisturbed native soils to the
specified foundation depths. Compacted engineered fill, or selective re-compacted native
soils may be used to the extents provided in this Earthwork Construction
Recommendations Section. The following recommendations include excavations,
subgrade preparation,type of fill,and placement of fill for building foundations.
5.2.1 Excavation
Excavation is recommended to remove any excessive organic content, old fills/
disturbed soils or other deleterious material, if present, beneath foundations and to
achieve appropriate foundation depth. Additional sub-excavation will be required
Envirotech Engineering Geoeechnical Report
PO Box 984 page 7 Parcel 31911-22-00070
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20, 2024
for this project if the soils below the required foundation depth are loose,
saturated, not as described in this report, or otherwise incompetent due to
inappropriate land disturbing, or excessive water trapped within foundation
excavations prior to foundation construction. All soils below the bottom of the
excavation shall be competent, and relatively undisturbed or properly compacted
fill. If these soils are disturbed or deemed incompetent, re-compaction of these
soils below the anticipated footing depth is necessary. Excavations shall be
completely dewatered, compacted, and suitable before placement of additional
native soil,engineered fill or structural concrete.
5.2.2 Placement and Compaction of Native Soils and Engineered Fill
For engineered fill or disturbed native soils that will be utilized as fill material
directly beneath foundations, observation and/ or geotechnical testing is required
prior to foundation construction. The following placement and compaction
requirements are necessary.
For disturbed native soils or engineered fill beneath foundations, limits of
compacted or re-compacted fill shall extend laterally from the bottom edge of the
foundation at a rate of one horizontal foot for each foot of compacted or re-
compacted fill depth beneath the foundation. See the illustration below.
FOOTING
COMPACTED
NATIVE SOILS
OR ENGINEERED t
FILL
1
I I UN)�ISTURBED SUBGRADV
Both engineered fill and native soils used as compacted fill should be free of roots
and other organics, rocks over 6 inches in size, or any other deleterious matter.
Because of moisture sensitivity, importing and compacting engineered fill may be
more economical than compacting disturbed native soils. Engineered fill shall
include having the soils retained on the No. 4 sieve crushed (angular), and should
consist of the following gradation:
U.S. Standard Sieve %Finer weight)
6" 100
3" 60— 100
No.4 20—60
No. 200 0- 8
Table 1
Particle Size Distribution of Engineered Fill
Envirotech Engineering Geotechnical Report
PO Box 984 page 8 Parcel 31911-22-00070
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20, 2024
Compaction shall be achieved in compacted lifts not to exceed 6 inches for both
native soils and engineered fill, respectively. Each lift should be uniformly
compacted to at least 95% of the modified Proctor maximum dry density (ASTM
D 1557) and within 3% of optimum moisture content. Each lift surface should be
adequately maintained during construction in order to achieve acceptable
compaction and inter-lift bonding.
Fill soils may also be used for driveways and yards, and should be limited to not
more than 2 feet in height. Temporary earth cuts and fill slopes exceeding 4 feet
in height should be limited to a slope of 1:1 (horizontal:vertical)for not more than
2 months unless during the dry season of the year. Utility trenches or other
confined excavations exceeding 4 feet should conform to OSHA safety
regulations. Permanent cut and fill slopes of native soils shall be limited to a slope
of 2:1, and engineered fill may be 1.75:1.
5.2.3 Retaining Wall Backfill
Native soils may be used as retaining wall backfill for this project if the total wall
height is 4 feet or less and the recommendations below are followed. Native soils
for retaining walls exceeding 4 feet in height must be approved by the local
authority or evaluated by an engineer. Backfill may consist of engineered fill, as
presented in this report, or borrow material approved by a geotechnical engineer.
Compaction of these materials shall be achieved in compacted lifts of about 12
inches. Each lift should be uniformly compacted to at least 85%, and no more
than 90% of the modified Proctor maximum dry density (ASTM D 1557). If
pavement or building loads are planned to be located within retaining wall
backfill, then 90% compaction is required. In addition, heavy construction
equipment should be at a distance of at least 'h the wall height. Over-compaction
and limiting heavy construction equipment should be prevented to minimize the
risk of excess lateral earth pressure on the retaining structure. Envirotech
recommends that retaining wall backfill is compacted with light equipment such
as a hand-held power tamper. If clean, coarse gravel soils are utilized as
engineered fill, and surcharges will not influence the retaining wall, compaction
may be achieved by reasonably densifying granular soils with construction
equipment.
5.2.4 Wet Weather Considerations
Due to the types of subsurface soils, additional provisions may be required during
prolonged wet weather. Every precaution should be made in order to prevent free
moisture from saturating the soils within excavations. If the bottom of excavations
used for footing placement changes from a moist and dense/hard characteristic as
presented in this report to muck or soft, saturated conditions, then these soils
Envirotech Engineering Geotechnical Report
PO Box 984 page 9 Parcel 31911-22-OW70
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20, 2024
become unsuitable for foundation bearing material. If this situation occurs, a
geotechnical engineer should be notified, and these soils should be completely
removed and replaced with compacted engineered fill or suitable native material
as presented in this section.
5.2.5 Building Pads
Building pad fills for this project, if utilized, shall be constructed per the fill
placement and compaction recommendations as presented above. Both engineered
fill and native soils may be used for building pads. Building pad slopes shall be no
steeper than 2:1 for both compacted engineered fill and re-compacted native soils
used as fill. Building pad fill shall be "keyed" into the existing subgrade to a
depth of at least 2 feet below the existing ground surface. The term "keyed," as
used here, implies that the interface between the building pad and subgrade is
horizontally level. Alternatively, building pads may be keyed into the subgrade to
the above specified depth, and stepped. Stepped fill should be keyed into the
subgrade at a minimum width of 10 feet. All footings shall be located at least 5
feet away from the top of the engineered fill slope. For this project, fill pads are
limited to heights of 2 feet and less.
5.3 Building and Footing Setbacks
Provided that assumptions relating to construction occur and recommendations are
followed as presented in this report, the factor of safety for slope stability is sufficient for
a 27 feet footing setback from the face of the nearby descending slopes exceeding 40%.
See the figure below and the Site Plan in Appendix A for an illustration of the setbacks.
STRUCTURE
TOP OF
SLOPE SLOPE
FACE
I ILI—I I
�---- SETBACK --- FOOTING
A setback reduction of 5 feet is allowed if foundations are at least 3 feet below the
existing ground surface, and only applies to those foundation within the setback
encroachment. A setback reduction of 10 feet is allowed if foundations are at least 5 feet
below the existing ground surface. All depths should be measured from the downslope
side of the foundation edge.
Envirotech Engineering Geotechnical Report
PO Box 984 page 10 Parcel 31911-22-00070
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20,2024
5.4 Surface and Subsurface Drainage
Positive drainage should be provided in the final design for all planned residential
buildings. Drainage shall include sloping the ground surface, driveways and sidewalks
away from the project structures. All constructed surface and subsurface drains should be
adequately maintained during the life of the structure. If drainage problems occur during
or after construction, additional engineered water mitigation will be required
immediately. This may include a combination of swales, berms, drain pipes, infiltration
facilities, or outlet protection in order to divert water away from the structures to an
appropriate protected discharge area. Leakage of water pipes, both drainage and supply
lines, shall be prevented at all times.
If impervious thresholds are exceeded per the prevailing agency code, then engineered
stormwater management plans are required for this project. The drainage engineer must
coordinate with a geotechnical engineer for input with relation to slope stability prior to
submitting drainage plans. If stormwater management plans are not required for this
project,then the following recommendations should be followed.
For this project, we recommend that infiltration is avoided in order to maintain slope
stability, and that roof water shall be tightlined to a protected discharge point beyond the
slope toe. Recommended drainage details are provided in Appendix E of this report. In
addition, the existing curtain drain on the property must be continually monitored and
maintained immediately if not functioning as intended. Driveway runoff should be
allowed to sheet flow over natural or established vegetation. Foundation perimeter drains
are required for this project, and should have a gravity outlet located at least 20 feet
beyond the east side of the residence. The foundation drain may share the roof tightline if
a backflow preventor is utilized to prevent roof water from entering the foundation drains
in the event of clogged pipes.
5.5 Vegetation Buffer and Considerations
For this project, we believe that a detailed clearing and grading plan is not warranted
unless the prevailing agency thresholds are exceeded, and basic vegetation management
practices should be adhered to.
Vegetation Buffer — Any trees may be limbed for viewing. Vegetation shall not be
removed from the face of the critical slope or within a distance of 5 feet beyond the top of
the slope. However, any tree deemed hazardous to life or property shall be removed. If
tree removal is necessary, then stumps and roots shall remain in place, and the
underbrush and soil shall remain undisturbed as much as possible. Any disturbed soil
shall be graded and re-compacted in order to restore the terrain similar to preexisting
conditions and drainage patterns. See the Site Plan in Appendix A of this report for a
depiction of the vegetation buffer.
Envirotech Engineering Geotechnical Report
PO Box 984 page 11 Parcel 31911-22-00070
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20, 2024
5.6 Temporary and Permanent Erosion Control
Erosion control during construction should include minimizing the removal of vegetation
to the least extent possible. Erosion control measures during construction may include
stockpiling cleared vegetation, silt fencing, intercepting swales, berms, straw bales,
plastic cover or other standard controls. Although other controls may be used, if
adequate, silt fencing is presented in this report as the first choice for temporary erosion
control. Any erosion control should be located down-slope and beyond the limits of
construction and clearing of vegetation where surface water is expected to flow. If the
loss of sediments appears to be greater than expected, or erosion control measures are not
functioning as needed, additional measures must be implemented immediately. See
Appendix D for sketches and general notes regarding selected erosion control measures.
The Site Plan in Appendix A depicts the recommended locations for erosion control
facilities to be installed as necessary.
Permanent erosion control is necessary if substantial vegetation has not been established
within disturbed areas upon completion of the project. Temporary erosion control should
remain in place until permanent erosion control has been established. Permanent erosion
control may include promoting the growth of vegetation within the exposed areas by
mulching, seeding or an equivalent measure. Selected recommendations for permanent
erosion control are provided in Appendix D. Additional erosion control measures that
should be performed include routine maintenance and replacement, when necessary, of
permanent erosion control,vegetation,drainage structures and/or features.
5.7 Septic Drainfields
Septic drainfields have been constructed with a final permit accepted at the time of our
site visit.
5.8 Structural Mitigation
With respect to landslide alleviation or slope improvements, structural mitigation is not
necessary for this project unless setback reductions are needed. See Section 5.3 for this
type of mitigation. This determination is based on the anticipated improvements of the
project, engineering conclusions, and compliance with all recommendations provided in
this report.
Envirotech Engineering Geotechnical Report
PO Box 984 page 12 Parcel 31911-22-00070
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20, 2024
6.0 CLOSURE
Based on the project information provided by the owner, the proposed development, and
site conditions as presented in this report, it is Envirotech's opinion that additional
geotechnical studies are not required to further evaluate this project.
Due to the inherent natural variations of the soil stratification and the nature of the
geotechnical subsurface exploration, there is always a possibility that soil conditions
encountered during construction are different than those described in this report. It is not
recommended that a qualified engineer performs a site inspection during earthwork
construction unless fill soils will influence the impending foundation. However, if native,
undisturbed subsurface conditions found on-site are not as presented in this report, then a
geotechnical engineer should be consulted.
This report presents geotechnical design guidelines, and is intended only for the owner,
or owners' representative,and location of project described herein. This report should not
be used to dictate construction procedures or relieve the contractor of his responsibility.
Any and all content of this geotechnical report is only valid in conjunction with the
compliance of all recommendations provided in this report. Semantics throughout this
report such as `shall,' `should' and `recommended' imply that the correlating design
and/or specifications must be adhered to in order to potentially protect life and/ or
property. Semantics such as `suggested' or `optional' refer that the associated design or
specification may or may not be performed,but is provided for optimal performance. The
recommendations provided in this report are valid for the proposed development at the
issuance date of this report. Changes to the site other than the expected development,
changes to neighboring properties, changes to ordinances or regulatory codes, or
broadening of accepted geotechnical standards may affect the long-term conclusions and
recommendations of this report.
The services described in this report were prepared under the responsible charge of
Michael Staten, a professional engineer with Envirotech. Michael Staten has appropriate
education and experience in the field of geotechnical engineering in order to assess
landslide hazards, earthquake hazards, and general soil mechanics.
Please contact Michael Staten at 360-275-9374 if you have any questions, comments, or
require additional information.
Sincerely,
Envirotech Engineering
/� szPac
Michael Staten, P.E.
Geotechnical Engineer
Envirotech Engineering Geotechnical Report
PO Box 984 page 13 Parcel 31911-22-00070
Belfair,Washington 98528 Mason County,Washington
Ph. 360-275-9374 August 20,2024
ALLOWABLE NEW
DEVELOPMENT AREA
SCALD I IMCN-se FEE
WELL
27' BUILDING SETBACK
FROM CRITICAL SLOPE
EX. GLENDON 5' VEGETATI❑N
DRAINFIELD TER BUFFER/ / CRITICAL SLOPE
LM ASBUILTS
TOP OF CRITICAL
EX. SEPTIC 31 1 SLOPE >40%
TANKS PER T �407 SE,ALLEN R8
ASBUILTS
TOE OF CRITICAL
SLOPE
SEE SEPTIC SITE MAP
ON FOLLOWING PAGE
FOR CURTAIN DRAIN
AND SEPTIC DETAILS,
SEE GEOTECHNICAL
REPORT FOR
ALLOWABLE SETBACK
REDUCTIONS
NOTES,
L EROSION CON7REL-Ar BE REQUIQED FOR TMS S17L CKERAL LOCATIONS ARC bum AND ALTERwTIvEs wv BE LEGEND
UTILIZED AS TAPLAINEE 1N THE 60TECLNICAL REPEPT -------
8.CONTRIRS WERE war PREPmED BY A LICD.SED LAND SLRVCYDR CORT➢UPS WORD EXTRAPOLATEU FROG A PUBLIC TEMPORARY ENGINEER
LISM SOURCE.AND INMRJ DkATED FIELD MMUNCMENTS AS EXPLAIIEU IA ME UEOTELHNICAL RCYORI. f+-f EROIIIIN CONTREL ENYWITTECH ErGINEERING
3,BO-NENR:ES WERE NOT PNEPARCD BY A LICENSED SURVEPOR•LOCATM4S OF SITE[EATUNES 7HAT ARE SIOMIR{ERE. Pp)OB 96A
SUCH AS TOP Of SLOPES.RE OF SLOOPES.WATER FEA7LRES.ETC...wIM RELATION TO THE PRWERTY LINES MUST BE SLOPE DRDICATDR FAIR.VASHING7pN 965PU
VERIFIED BY THE OWNER-RMOMMENDATIONS IN THE EEOTECHRICAL REPpiT PROVIDE SETBACKS.BUFFERS,DEPTHS,ETC. 3E1-273-9374
WITH RELATION TO LEOUILLCC FCATLRES,NOT"O-ER[Y LINES.T Tl� --'THESE GmLOUD:FEA7uREs MAY BE LOCATED 0\ W— CRIST[4b CONTOUR
SUBJECT PROPERTY OR NEIA)CIR Nc PROPERTIES. TP1A TEST PIT SITE PLAN
\
' PbR PRO7nse b ZBDRri PRopb« ..�6u
n•p qom► t `1 � i`
i'' r I
Ms7D•�ISS L�, � �R � , /
_ / All
Sam- WDG6.
+4z5s17.71
�
mrsem
�►.Er—
em'
Low awl<
Ib"-3C'SUs�nY � .., oElv1M
.S'"t t�o -mme� PLoT- PAN
�-
� � -
7" S
13auu�20AG
3m1 to,
APPENDIX B
SOIL INFORMATION
Ica - xxn xemnvrA�sAm
EXISTING GRADE
PROPOSED
HOUSE
�
26��9 STABILITY LINE
7! UPON 75 YRS OF
REGRESSION
SOIL CONGLOMERATE Ssi
PUGET
SOUND
DENSE GLACIAL TILL
SECTION A.A
NOTES.
1)MINOR GRADE CHANCES REWIRED IN ORDER TO ACHIEVE EWMETh
PIT ITNE CRAIAAGE 6NVIROTECH ENGINEERING
PY THE Ste.PRDFIC IS ACCUMTE FDR THE DEPTH CF PO fox 90'
TIE OBSDiVED TEST PITS AT THE SPECIFIED LC:AIMNS� DELFADI,VASHENGTON S05N
LOVER LEPTHS'AG
BASED ON SITE GEDLOG�. HAD-P76-477!
'.ELL LOCay.AADiOR TxPEBTENCE IN TK rveRAL AREA SOIL PROFILE
TEST PIT LOG
(TP-1)
Date of Log: July 31, 2024
Location: 407 SE Allen Road, Shelton
Logged By: MCS
Depth USCS Description
0—3ft SM Silty Sand with Gravel.Medium brown and moist
medium dense.
Gravel is primarily coarse and subrounded
Sand is mostly medium
No plasticity
Density increases with depth
APPENDIX C
SLOPE STABILITY
l 1 O
J 1 .00
1 . 60
2.00
O. 62
Slope Stability: Dynamic
1 . 30
1 . 4 0
1 . 5 0
1 .60
4
1 . 70
=a . 00
1
1
i
i�
Slope Stability: Static
APPENDIX D
EROSION CONTROL
GEOTEXTILE FABRIC
WRAP AROUND TRENCH
TO AT LEAST ENTIRE
BOTTOM OF TRENCH
BEFORE PLACING GRAVEL 2'x2'x5' WOOD POST OR
12' DEEP, 8' WIDE TRENCH EQUIVALENT OR BETTER
FILLED WITH 3/4' TO 1 1/2' 7
WASHED GRAVEL OR VEGETAT�N
DIRECTION OF 2s
WATER FLOW EXISTING
GROUND SURFACE
T E3 ET
1 �
SILT FENCE - CROSS SECTION
N.T.S.
2'x2' WOOD POST (TYP) GEOTEXTILE FABRIC
OR EQUIVALENT OR BETTER AND WIRE MESH
@ 6 FT MAX. O.C.
f` 6R I F --
EXISTING +
GROUND SURFACE
z
12' DEEP, 8' WIDE
TRENCH FILLED WITH
3/4' TO 1 1/2' f 2s ET
WASHED GRAVEL OR VEG TI
BOTTOM EXTENTS OF
GEOTEXTILE FABRIC SILT FENCE - DETAIL
N,T,S,
PROVIDE FULL WIDTH
3/4 IN TO 1 1/ Er INGRESS/EGRESS
CRUSHED GRAVEL
PLACED AT 6 IN _T
MINIMUM DEPTH
WELL-DRAINED
SOILS
-0.02 IN/MIN F_LL LEIGTH
R=25 FT MIN
IL_
L —
ACCESS RMID
STABILIZED CONSTRUCTION ENTRANCE
N.T.S.
PERMANENT EROSION CONTROL NOTES
ENERAL NOTES-
SEEDING FOR RAW SLOPES
SHOULD THE TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHOWN ON
FESE PLANS PROVE TO BE INADEQUATE DURING CONSTRUCTION,THE CONTRACTOR L BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF C13NTR13L
HALL INSTALL ADDITIONAL EROSION AND SEDIMENT CONTROL FACILITIES MEASURES SUCH AS GRADIENT TERRACES,INTERCEPTOR DIKES,
2.ALL EROSION AND SEDIMENT CONTROL FACILITIES AND DEVICES SHALL BE SWALES,LEVEL SPREADERS AND SEDIMENT BASINS,
INSPECTED DAILY AND IMMEDIATELY MAINTAINED,IF NECESSARY. 2.THE SEED BED SHALL BE FIRM WITH FAIRLY FINE SURFACE,
3.ALL EROSION AND SEDIMENT CONTROL FACILITIES AND DEVICES SHALL BE LEFT IN FOLLOWING SURFACE ROUGHENING.PERFORM ALL OPERATIONS ACCROS
LACE UNTIL THE UPSLOPE AREAS HAVE BEEN PERMANENTLY STABILiZEA OR PERPENDICULAR TO THE SLOPE.
3.SEEDING RECOMMENDATIONS,AS SHOWN BELOW, AND SHOULD BE
EMPORARY EROSDN CONTROL NOTES APPLIED AT THE RATE OF 120 POUNDS PER ACRE.
4.SEED BEDS PLANTED BETWEEN MAY 1 AND OCTOBER 31 W01
R ALL AREAS WHICH HAVE BEEN STRIPPED OF VEGETATION OR EXPERIENCED LAND REQUIRE IRRIGATION AND OTHER MAINTENANCE AS NECESSARY TO
ISTURBING ACTIVITIES,AND WHERE NO FURTHER VORK IS ANTICIPATED FOR A FOSTER AND PROTECT THE ROOT STRUCTURE
RIOD EXCEEDING THE LISTED CRITERIA BELOW, ALL DISTURBED AREAS MUST BE 5.SEED BEDS PLANTED BETWEEN NOVEMBER L AND APRIL 30,
MMEDIATELY STABILIZED WITH MULCHING, GRASS PLANTING OR OTHER APPROVED ARMORING IF THE SEED BED WILL BE NECESSARY, (e.0„
ROSION CONTROL TREATMENT APPLICABLE TO THE TIME IF YEAR. GRASS SEEDING GEOTEXTILES,JUTE MAT,CLEAR PLASTIC COVERING).
ONE WELL ONLY BE ACCEPTABLE DURING THE MONTHS OF APRIL THROUGH 6.FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIERS'
EPTEMBER. HOWEVER, SEEDING MAY PROCEED WHENEVER IT IS IN THE INTEREST OF RECOMMENDATIONS.AMOUNTS SHOULD BE MINIMIZED, ESPECIALLY
HE OWNER/CONTRACTOR, BUT MUST ALSO BE AUGMENTED WITH MULCHING, NETTING ADJACENT TO WATER BODIES AND WETLANDS.
R OTHER APPROVED TREATMENT,
USE THE FOLLOWING RECOMMENDED SEED MIXTURE FOR EROSION
RY SEASON (MAY 1 THRU SEPTEMBER 30)--THE CLEARING OF LAND, INCLUDING THE CONTROL,OR A COUNTY APPROVED ALTERNATE SEED MIXTURE.
NAVAL IF EXISTING VEGETATION IR OTHER GROUND COVER, MUST BE LIMITED TO
NLY AS MUCH LAND AS CAN RECEIVE APPROPRIATE PROTECTIVE COVER OR BE PROPORTIONS PURITY GERMINA
THERVISE STABILIZED, AFTER HAVING REIN CLEARED OR OTHERWISE DISTURBED NAME BY VEIGILT(X) <X) (X)
Y NO LATER THAN SEPTEMBER 30 IF A GIVEN YEAR. UNLESS IMMEDIATE
TABILIZATION IS SPECIFIED IN THE EROSION AND SEDIMENT CONTROL PLAN, ALL REDTOP (AGROSTIS ALBA) 10 92 90
PEAS CLEARED OR OTHERWISE DISTURBED MUST BE APPROPRIATELY STABILIZED ANNUAL RYE(LOLIUM NRLTIFISIRUM) 40 98 90
HROUGH THE USE OF MULCHING, NETTING, PLASTIC SHEETING,EROSION BLANKETS, CHEWING FESUE 40 97 80
REE DRAINING MATERIAL,ETC., BY SEPTEMBER 30 OR SOONER PER THE APPROVED (FESTUCA RUBRA COMMUTATA)
AN IF ACTION. UNLESS OTHERWISE APPROVED BY THE COUNTY,SEEDING, (JAMESTOWN, BANNER, SHADOW,KOKET)
RTILIZING AND MULCHING DE CLEARED OR OTHERWISE DISTURBED AREAS SHALL BE WHITE DUTCH CLOVER LO 96 90
RFORMED DURING THE FOLLOWING PERIODS MARCH 1 TO MAY 15,AND AUGUST 15 TO (TRIFOLIUM REPENS)
CTOBER L SEEDING AFTER OCTOBER 1 WILL BE DOE WHEN PHYSICAL COMPLETION
IF THE PROJECT IS IMM]TENT AND THE ENVIROMEHTAL CONDITIONS ARE CONDUCIVE MULCHING
SATISFACTORY GROWTH IN THE EVENT THAT PERANENT STABILIZATION IS NOT
SSIBLE,AN ALTERNATIVE METHOD[F GROND COVER, SUCH AS MULCHING, NETTING,L MATERIALS USED FOR MULCHING ARE RECOMMENDED TO BE WOOD
ASTIC SHEETING,EROSION BLANKETS,ETC., MUST BE INSTALLED BY NO LATER THAN FIBER CELLULOSE,AND SHOULD BE APPLIED AT A RATE OF 1000
EPTEMBER 30. POUNDS PER ACRE
2.MULCH SHOULD BE APPLIED IN ALL AREAS WITH EXPOSED SLOPES
N THE EVENT THAT CONSTRUCTION ACTIVITIES OR OTHER SITE CEVELOPMENT GREATER THAN 211 (HORIZONTALlVE2TICAL).
CTIVITIES ARE DISCONTINUED FOR AT LEAST 4 CONSECUTIVE DAYS, THE 3.MULCHING SHOULD BE USED IMMEDIATELY AFTER SEEDING OR IN
VNER/CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSPECTION OF ALL EROSION AREAS WHICH CANNOT BE SEEDED BECAUSE OF THE SEASON.ALL
ND SEDIMENT CONTROL FACILITIES IMMEDIATELY AFTER STORM EVENTS. AND AT AREAS REQUIRING MULCH SHALL BE COVERED BY NOVEMBER L
AST ONCE EVERY WEEK. THE OWNER/CONTRACTM SHALL BE RESPONSIBLE FOR
HE MAINTENANCE AND REPAIR IF ALL EROSION AN SEDIMENT CONTROL FACILITIES. TOPSCHLING
i SEASON(OCTOBER 1 TIRU APRIL 30)—ON SITES WHERE UNINTERUPTED L TOPSOIL SHOULD BE USED FOR THIS PROJECT DUE TO HIGHLY
INSTRUCTION ACTIVITY IS IN PROGRESS,THE CLEARING OF LAND, INCLUDING THE DENSE EXPOSED SOILS.
EMOVAL OF EXISTING VEGETATION AND OTHER GRD.ND COVER, SHALL BE LD4ETED 2.TOPSOIL SHOULD BE PLACED ON SLOPES NOT EXCEEDING 2.1.
0 AS MUCH LAND AREA AS CAN BE COVERED OR STABILIZED WITHIN 24 HOURS IN I STRIPPING AND STOCKPILING[IN-SITE SOILS SHALL ONLY BE
HE EVENT A MAJOR STORM IS PREDICTED AND/ OR EROSION AND SEDIMENT PERMITTED IF TOPSOIL IS FRIABLE AND LOAMY (LOAM, SANDY LOAM,
RANSPORT ffF-SITE IS OBSERVED, SILT LOAM, SANDY CLAY LOAM,CLAY LDAM).
CLEARED OR DISTURBED AREAS SHALL RECEIVE APPRIRRIATE PROTECTIVE 4. STRIPPING SHALL BE CONFINED TO THE IMMEDIATE CONSTRUCTION
UL OVER OR BE OTHERWISE STABILIZED, SUCH AS MCHING,NETTING,PLASTIC AREAS A FOUR TO SIX INCH STRIPPING DEPTH IS COMMON, BUT
MEETING,EROSION BLANKETS, FREE DRAINING MATERIAL,ETC.. WITHIN 5 DAYS AFTER DEPTH MAY VARY DEPENDING[IN THE PARTICULAR SOIL ALL
AVING BEEN CLEARED OR OTHERWISE DISTURBED IF NOT BEING ACTIVELY WORKER SURFACE RUNOFF CONTROL STRUCTURES SHALL BE IN PLACE BEFORE
ILT FENCING,SEDIMENT TRAPS,SEDIMENT PONDS,ETC., VLL NOT BE VIEWED AS STRIPPING,
DEQUATE COVER IN AND OF THEMSELVES,IN THE EVENT THAT ANY LAND AREA NOT
ING ACTIVELY WORKED REMAINS UNPROTECTED OR HAS NOT BEEN APPROPRIATELY
TABILIZED 5 DAYS AFTER HAVING BEEN CLEARED,ALL CONSTRUCTION ACTIVITY W
HE SITE.EXCEPT FOR APPROVED EROSION AND SEDIMENT CONTROL ACTIVITY, SHALL
MMEDIATELY CEASE UNTIL SUCH A TIME AS AFOREMENTIONED LAND AREA HAS BEEN
PPR13PRIATELY PROTECTED OR STABILIZED.
STOCKPLE MANAGEMENT
STDCKPLE SHALL BE STABILIZED(WITH PLASTIC COVERING OR OTHER APPROVED DEVICE)DAILY BETWEEN MWEMBER 1 AND MARCH
3L
L IN ANY SEASON,SEDIMENT LEACHING FROM STOLE(PILES MUST BE PREVENTED,
3.TOPSOIL SHALL NOT BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION.WHEN THE SUBGRADE IS EXCESSIVELY VET.OR WHEN
CONCITIONS EXIST THAT MAY OTHERWISE BE DETR:KD4TAL TO PRIpEQ GRADING OR PROPOSED SODDING OR SEEDING,
4,PREVIOUSLY ESTABLISHED GRADES O.THE AREAS TO BE TOSOOED SHALL BE MAINTAINED ACCORDING TO THE APPROVED PLANS.
STABILIZED CONSTRUCTION ENTRANCE
L MATERIAL SHALL BE 4 INCH TO 8 INCH QUARRY SPALLS(4 TO 6 INCH FOR RESIDENTIAL SINGLE FAMILY LOTS)AND MAY BE
TOP-DRESSED WITH 1 INCH TO 3 INCH ROCK. (STATE STANDARD SPECIFICATIONS, SECTION 8-15.)
2.THE ROCK PAD SHALL BE AT LEAST 12 INCHES THICK AND 50 FEET LONG(20 FEET FOR SITES WITH LESS THAN 1 ACRE OF
DISTURBED SOIL).WIDTH SHALL BE FULL WIDTH 13F THE VEHICLE INGRESS AND EGRESS AREA.SMALLER PADS MAY BE APPROVED
FOR SINGLE-FAMILY RESIDENTIAL AND SMALL COMMERCIAL SITES.
3.ADDITIONAL ROCK SHALL BE ADDED PERIO➢ICALLY TO MAINTAIN PROPER FUNCTION[IF THE PAD.
4,IF THE PAD DOES NOT ADEQUATELY REMOVE THE MUD FROM THE VEHICLE WHEELS. THE WHEELS SHALL BE HOSED OFF BEFORE
THE VEHICLE ENTERS A PAVED STREET.THE WASHING SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK AND WASH
WATER SHALL DRAIN TO A SEDMENT RETENTION FACILITY OR THROUGH A SILT FENCE.
ILT FENCE
GEOTEXTILE FILTER FABRIC TYPE SHALL BE PER SPECIFIED IN THE'STORMWATER MANAGEMENT MANUAL
THE PUGET SOUND BASIN;OR APPLICABLE COUNTY STANDARDS
GEOTEXTILE FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL CUT TO THE LENGTH OF
ACH BARRIER TO AVOID USE ff JOINTS.IF JOINTS ARE NECESSARY,FILTER FABRIC SHALL BE SPLICED
13GETFIFR ONLY AT A SUPPORT POST WITH A MINIMUM 6-INCH OVERLAP AND SECURELY FASTENED AT
OTH ENDS TO THE POST.
.STANDARD FILTER FABRIC SHALL DE FASTENED USING V STAPLES OR TIE WIRES(HOG RINGS) 2 4 IN
PACING.
POSTS SHALL BE SPACED AND PLACED AT DEPTHS INDICATED IN THE DETALS IN THIS SHEET,AND
RIVEN SECURELY INTO THE GROUND.
WIRE MESH SHALL BE 2'X2'X14 GAUGE OR EQUIVILENT,THE WERE MESH MAY BE ELD4INATED IF
TRA-STRENGTH FILTER FABRIC (MONNIFILAMENT),AND CLOSER POST SPACING IS USED.
.A TRENCH SHALL BE EXCAVATED ACCORDING TO THE DETAILS ON THIS SHEET ALONG THE LINE OF TIE
OSTS AND UPSLOPE FROM THE SILT FENCE
SILT FENCES SHALL BE LOCATED DOWNSLOPE FROM THE CLEARING LIMITS IF THE PROJECT.
APPENDIX E
DRAINAGE DETAILS
HOUSE
Sam
LIN snob
2E MR
NDY
v
A'MA,NI
SKID PVC F1NE-6SH 6'VIA
SCREI]V SOLID PIPE
12'CATCH BASH AoCHOR
'YARD DRAIN)
ExPOSED PIPE
�£R-:GHTLT.{
EETAILS ��
ROpF DRAn?A� CETA .3 4i,.Q.
N 7.S. )
l�
STEO-CLAIMS CTYP)
:ORRJS'TEI T[GNTLI+E 30 FT*t 3PACV G 1/2 INCH DIN£TER
E-D�CH�QN,tIAPETER Sc. FASTENED TO PIvE
LEVEL SECTTO.
3FT IIFFUSER TEE
i
TWO -s cr I`
AVCFORS CTY�), NOTES.
IA REIAR OR IT IS STRONLY SLK.7ES7ED TO
C2AVALLNT FL av UTILIOC A HEAT vELrEo HIGH DEIS17Y
POLYETHYLENE EHDPE) M IN LZU OF
CIIIRUGATCD PLASTIC PIPE,
e IF PLASTE PIPE IS USES.FREQUENT
ENVIECTDCH RBI-ANNJAL r.Ant
IECESSART F-AATENANCE IS REXIREL
TT}ITL+.F pFTA[LS I HOLE tIANETEv SHALL PC i II.CH FOR
h,T.S. 6-IN-H TEES.Ant a IhtHEs FOR]2-INCH
TEES.
A HOLE SPACING SHALL TE EQUAL TO
(3.3 a MOLE A"ETER).
S DI DI
AMETER OF TEE SHALL EQUAL
DIAIETER OF TI3I7LINE PIPE
NO HOLES LFPOSITE
OF PIPE
Oep
o DRILL FRONT
NT EN
HA
0 1N FRIM ONLY
o O o DF TEE pNLT
a fT (/)6'yA PEWS
SCRE'w CAI'OR DENT OVER TEE AS
BOLTED FLANGE, SHOVIL ALTERNATE
FA
E,E ACHORRG IETVEEN
FRONT AND BACK IF
TEE.
p F K R i p TAD s
14,T,S.
ENGINEER,
ETYVIRIITECH ENGINEERING
POP
O ILIX 984
DE FAIR,VASIAZME ON 98528
366-?75.-9774
DRAINAGE DETAILS