Loading...
HomeMy WebLinkAboutMEP2013-00008 - MEP Application - 3/1/2013 MASON ENVIRONMENTAL PERMIT($630 or$38Q w/other permit) Mason County Permit Center Use: ❑ CONDITIONAL USE($1520) MEP�Li 3 - WDD8 ❑ HABITAT MANAGEMENT PLAN REVIEW($445) Date Rcvd ` 13 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Mason County Resource Ordinance(Chapter 17.01 MCC) ENVIRONMENTAL PERMIT APPLICATION The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is under the authority of Chapters 36.32,36.70A, 39.34,58.17,76.09,84.33, 84.34 and 90.58 RCW. PLEASE PRINT 1.PROPERTY OWNER Name: m So n cpmbA Mailing Address: N5 1'h IY 5<99 Work Phone: Email Address: Home/Cell Phone: Fax#: If an agent is acting for the property owner during the permit process, complete#2. 2. AUTHORIZED AGENT Name: WA t a�l5YA � �ldllFe CGirls Cq 0u,rl f::�j Mailing Address: (.Poo l tU( NO t w A O 1 Work Phone: _83 Email Ad ress:Chrts UOtU'I )e atJ.W4 Home/Cell Phone: Fax#3 W , pa-8 Le 7 3. PROJECT SITE Site Address: Fj10d0dn, , 0 f1 Parcel#: 30 5o O Legal Description:5co,30 {a3N a-Lk) Directions to Site::Frorn &,ffatr5n wesf—m v 3c0 3.4 mt. I wyn njht-1—on 8zff-buy-- Attac a site plan showing the following: Lot Dimensions,Flood Zones,Existing Structures,Fences, Water Lines,Driveways,Drainage Plans,Shorelines,Septic System,Topography,Proposed Improvements,Easements,North Arrow,and Scale. Also draw a separate topography diagram. L\Community DevelopmentAPAC\MEP Page I oil Revised.lune'_010 4. State which section requires permit: ❑ Long Term Commercial Forest,Chapter 17.10.060 ❑ Frequently Flooded Areas,Chapter 17.01.090 ❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Landslide Hazard Area,Chapter 17.01.100 ❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Seismic Hazard Areas,Chapter 17.01.102 ❑ Erosion Hazard Area,Chapter 17.01.104 Fish&Wildlife Habitat Conservation Areas,Chapter ❑ In-Holding Lands,Chapter 17.01.062 17.01.110 ❑ Wetlands,Chapter 17.01.070 5. Identify current use of the property with existing improvements: -Fh�ooerf�v has a Qr-"ej boas+ l aA ,nah.va A L& f v t 4A, G ra'u ej �?&vla na a.�een ,avld a cl ay n +ka.± reau,I akes streAm �c to � I ak-e_ lwd. 6. Identify and describe the proposed project,including the type of materials to be used,construction methods, principle dimensions,and other pertinent information(attach additional sheets,if needed): td w1 (( remove, a c+,t l.vG-+ i nAtr fhe, Carl vewo-k ano( _r.T1(ia ii w t441 a Lava W N A Vert gym- -Fish :oas 'a.rre-, 54 ''�Z►-C'�� 7. Describe why the action requiring this permit cannot be avoided. - hf- 0_u,l v.e r+ i'lrdV l CS Da ssaa� 1Z a halrlc__WQ15ev W Fl t� vria,t he, (mil j -�s h . I-I- is rvA na cmd n.e ells re,Dl 8. Will there be an alteration of a wetland and/or wetland vegetation area(circle one)? Yes No 9. Identify any surface water on or adjacent to property(circle one): Saltwater Lake Stream Pond Wetland Drainage Ditch 10. Identify existing septic/sewer connection(circle one): If septic is located on project site,include records. Connected to Septic Connected to Community Septic None, 11. Identify existing water supply(circle one): Public Water Supply Well 11. Type of Job(circle one): New Add Alteration Repair Demolition Other: Chas boa,yle. (wOrw) 03 Print Name Signatu• U Date L\Community Development\PAC\MEP Page 2 ot'2 Revised June 2010 '�~ NE wen Way AN 1p a It A f. lei 7-1 .y .sSf'T •* 'Yet t `w.s < i •1, F �� r ' . rY V. 0 0 �_���_._.__.._..__--O \. C S