HomeMy WebLinkAboutBLD2011-00371 Addition - BLD Permit / Conditions - 10/27/2011 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Shelton, WA 98584
r Not$
RESIDENTIAL BUILDING PERMIT BLD2011-00371
OWNER: JOHN LAYNE RECEIVED: 5/10/2011
CONTRACTOR: LICENSE: EXP: ISSUED: 6/15/2011
SITE ADDRESS: 111 NE LAKE DR TAHUYA EXPIRES: 12/15/2011
PARCEL NUMBER: 223305000280
LEGAL DESCRIPTION: HAVEN LAKE TR. 280
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
ADDITION TO MASTER BEDROOM & BATH ST RT 3 TO BELFAIR, L ON ST RT 300 / NORTH SHORE RD, R ON BELFAIR
TAHUYA RD, R ON TAHUYA BLACKSMITH RD, R ON LAKE DR TO SITE
ADDRESS ON THE LEFT SIDE
General Information Construction &Occupancy Information Square Footage Information
No. of Bedrooms: Type of Constr.: VB
Type of Use: SF Insp. Area: No. of Bathrooms: Occ. Group: R-3 Lot Size: Deck:
Type of Work: ADD Fire Dist.: 2 No. of Stories: 1 Occ. Load: Building:183
Valuation: $ 14,334.90 Building Height: 16 Occ. Status: Primary Basement:
Manufactured Home Information Setback Information Shoreline & Planning Information
Make: Length: Ft. Front: E 90.0 Ft. Shoreline: Ft.
Water Body:
Rear: W 40.0 Ft. Slope: Ft. SEPA?:
Model: Width: Ft. Side 1: S 50.0 Ft. Shoreline Desig.: Not Applicable
Year: Serial No.: Side 2: N 28.0 Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Water Closets (Toilets) 1 Dryer Vent 1 Plan Check Fee GMM 5/10/2011 $163.31 S12011000i
Lavatories 2 Planning Review Fee GMM 5/10/2011 $205.00 S1 201 1 0001
Clothes Washer 1 EH Plan Review MRB 5/10/2011 $103 00 S520110001
Building State Fee LDK 6/2/2011 $4.50 S 120110001
Building Permit Fee LDK 6/2/2011 $251 25 S12011000i
Mechanical Permit Fee LDK 6/2/2011 $9.00 S12011000i
Mechanical Base Fee LDK 6/2/2011 $2&50 S120110001
Plumbing Base Fee LDK 6/2/2011 $24.70 S12011000(
Plumbing Permit Fee LDK 6/2/2011 $34.80 S12011000i
Total $824.06
BLD2011-00371 Please refer to the following pages for conditions of this permit. Page 1 of 5
CASE NOTES FOR
BLD2011-00371
CONDITIONS FOR
BLD2011-00371
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-6477 he person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
s
2) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Department
prior to any further inspections being performed or approvals granted.
3) Owner/A en is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.
4) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the
corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building
Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
5) All wall cavities serving as exterior walls, exposed during construction or remodeling work shall be insulated to the full depth of the wall cavity and
inspected prior to covering. Insulation R-values shall be as follows: 2x4 wall cavities min. R-15 and 2x6 wall cavities min. R-21.
X
6) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X 7y�
7) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then
approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
X c
BLD2011-00371 Please refer to the following pages for conditions of this permit. Page 2 of 5
8) Washington State Energy Code Compliance has been approved as follows:
Heat Type: Electric or other than electric, Compliance Method: Prescriptive option III, Window(Max U-Factor):0.30, Skylight(Max U-Factor):0.50, Doors
(Type/Max U-Factor):0.20 or less, Wall insulation R-21, Floor insulation R-30, Ceiling Insulation R-38 advanced or R-49 standard, Vault Insulation R-38,
and Slab Insulation R-10.
In addition the following credit from Table 9-1 shall be completed: 6
X
9) A minimum of 50 percent of all luminaires shall be high efficacy luminaries unless lighting compliance was approved using the options available in WSEC
Section 1520 or 1530. Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall
be high efficacy luminaries unless permanently installed outdoor luminaires are controlled by a motion sensor(s)with integral photocontrol photosensor or
installed in or around swimming pools or water features. All fluorescent fixtures must be fitted with T-8 or smaller lamps (but not T-10 or T-12 lamps).
Reference WSEC 505.
X
10) REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the
manufacturer's installation instructions.
X
11) A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement,
inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the
owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel
prior to the commencement of any development activities. *NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes
an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are
responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic
system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final
inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater management system have been
installed as approved on the stormwater site plan. X ,7�- _
12) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered.
A. Drainfield/ Reserve requires a 10ft setback from all footing/foundations.
B. Septic tank(s) requires 5ft setback from all footing/foundations.
C. No foundat on drains within 30ft, down gradient of drainfield/reserve area.
X �
13) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved
access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where
X such roadect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road.
BLD2011-00371 Please refer to the following pages for conditions of this permit. Page 3 of 5
14) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building
Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached
thereto. If documents are removed,approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be
charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted.
X
1
15) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revocation.
X
16) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact
adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your project.
X
U
17) Placement of structure must comply with standards set forth per the international codes regarding descending and/or ascending slopes.
X
18) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
ordinance,pr regulation, must be reviewed and approved by Mason County prior to construction.
X
19) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspector shall a made prior to requesting additional inspections.
X
20) All property lines shall be clearly identified at the time of foundation inspection. X�'"`
21) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason Cou ty rdinances and building regulations.
X
22) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prevented action from being taken. No more than one extension may be granted.
X .
BLD2011-00371 Please refer to the following pages for conditions of this permit. Page 4 of 5
23) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
connectors, and gashing. Install metal connectors approved for contact with the new types of pressure treated material.
X
24) Retaining walls needed to support a surcharge s ch as structures, roads, or to support slopes, shall require a separate building permit and approval prior
to construction of the retaining wall. X
25) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure
these structures meet the setback conditions listed.
X
26) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your
"Approved Sit Plan"to ensure these structures are shown and meet the setback conditions listed.
X
27) Approved per gimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
X
28) Temporary erosion control measures must be implemented to prevent water quality degradation of adjacent waters or properties. Silt fencing or straw
matting must be installed and maintained until upland vegetation has become established. X
29) All construction and demolition debris must be removed from the site after project completion. Proper dispersal of construction debris must be on land in
such a manner that debris cannot enter or cause water quality degradation of State waters. X QM
This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any
time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be
occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate
and grants employees of Mason County access to the-above described property and structure for review and inspection.
OWNER OR AGENT: DATE: Z/�E,//
BLD2011-00371 Please refer to the following pages for conditions of this permit. Page 5 of 5
v
r.
o ^ CONCRETE MECHANICAL MANUFACTURED HOME
Footings 13etbaeka Date 9-�-� BY Ribbons z
�t Gas Piping Ill
o Interor Date By Interior-Date By Date By
Exterior Date 7 B Exterior-Date By Set-up
INSULATION
Point Load I isolated Footings Date By Z
BG I SLAB INSULATION -� ---•------
Date By Data By FIRE DEPARTMENT
Foundation Walla Floors Date By
Date f-ew BY/7Data By DECKS
FRAMIt�LG walls _ Date By
Date ��/l g— By � Data — By PROPANE TANKS
PLUMBING vault Date By
Date By OTHER
Groundwork Attic
Date By Date By Type
Date By
D.w.v DRYWALL Type:
Int Brace Wall Date By
Date � BYT Date By FINAL INSPECTION
m
v
y Water Line By Fire Separation IS3
CD CD
CD Date
Date By Date/Q"� �� By
s Pass nor Request Inspect.
Type of Insp. Fail Date Date Done By Comments CD w
F OT71P 7/1 7-13-If T"
CD
0 t
� 'r �O `fir �� /`�✓lS
O
c1-0 4s
N
U
f•vsi/1j9� I ,
v
rn
0
}� t 'rr�p �r�„ . ./•whu yf, t/r< IcAhL)1� , , - M,4C K.`SVAC-�
Lo
ELL,
..
I f
too v�
#11 IV
sit {,,f p�� Cj • ' Syr' ���u�� itiv
v h n'� xy t
44
04
L�-
APP VEDYk
MASON COON D o &ING
SITE PLAN REQ IR D TO p '
CHANGE U E TOAR0
By
Date o .i<
v f, .
s I
�i��;t' ��I(i�-+- � ' ._'� ~AID'-'"�►
TOPOGRAPHY PROFILE: C,s-vuU a r-I E u S ��
�* • '
I
p C,, -fi, PIUNMG
,
�c IL`✓9ASG IC)I�N � �
b Dire on: Scale: Approval:for office use
Building Permit numbeANNIN ;,0 Building:
Owner/Applicant: Al I qpTBACKS ARE [AZASUR D pate of Planning:
FROM THE FUR - T I application: Env. Health:
Parcel Number: ILDI G i
MASON COUNTY PERMIT NO.-DIdADI I - nnj I
BUILDING PERMIT APPLICATION
426 W. Cedar• P.O. Box 186, Shelton, WA 98584 �I)A>�
Shelton (360) 427-9670 • Belfair (360) 275-4467• Elma (360) 482-5269 �� r
On the web www.co.mason.wa.us b
APPLICANT INFORMATION CONTRACTOR INFORMATION /�•
Owner _T_19 i+N R• 1—i4,�Z AJ c Company Name
Mailin Address f—r .� e % -2 f1 yZ Mailing Address
City Z' State-924-- Zip Code � s- City State Zip Code
Phone a6D -k77- -7/7 7 Other Ph. Phone Other Ph.
L-ier�Titte Hatder Contractor Reg. # Exp.
E Mail Address
rlriyeL I ic.# .gge Drivers Lic.# DOB
SEPTIC/WATER SYSTEM INFORMATION -Connect to New Septic Existing Septic
Connect to Water System Name of Water System
Well Water System Name of Water System
PARCEL INFORMATION- 12 Digit Parcel No - CX) Fire District
Legal Description
Site Address (Please i lude street dame, stpeet num and city) I n E C� I I l J .T 1 UL e�
ctions, site '- () 't a-
S�
Will timber be cut and sold in parc I preparat on. Yes/No
Is property within 200' of Saltwater Lake River/Creek Pond
Wetland Seasonal Runoff Stream Slopes or Bluffs > 15%
Is this permit submittal the result o Stop Work Notice,Correction Notice or other enforcement action?Yes/No
TYPE OF JOB - New Add Alt Repair Other P IM R SIDENC SEASONAL ❑
Use of Building Describe Work ' r
No. of Bedrooms No. of Bathrooms Square Footage 1st Flo Imp 2nd Floor
3rd Floor Basement Deck Covered Deck Other Sq. ft.
Garage Attached Detached Carport Attached Detached
MANUFACTURED HOME INFORMATION - Make Model Year
Length Width Serial No. No. of Bedrooms No. of Bathrooms
Type of Heat Purchase Price$ Replacement Unit? Yes/No
Installer Name Certification No.
OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of
such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this
permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is
required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained
permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information
provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection.
PROOF OF C NTINONO ORK IS BY MEANS OF A PROGRESS INSPECTION. l
'X(S�'e,up Date:`1�r/�:/�l�
i er can / ners R resent ve/Contractor indicate which one
FOR OFFICIAL USE BEYOND THIS POINT Accepted by• TC � Date -- jo I
DEPARTMENTAL REVIEW APPROVED DENIED NOTES
Building Department 42PIno Enftp
no
Planning Department
Environmental Health Department
Public Works Department
Fire Marshal
FEES
Building Permit Fee Site Inspection
Plan Review Fee EH Review Fee
Plumbing & Base Fee Planning Review Fee
Mechanical & Base fee Other
Wood/Gas/Pellet Stove Fee State Fee
Violation Fee Pre-Paid at Submittal
Valuation$ TOTAL FEES
MASON COUNTY PERMIT NO. (I�
PLUMBING/MECHANICAL PERMIT APPLICATION
426 W.Cedar•P.O. Box 186, Shelton,WA 98584
Shelton (360) 427-967t0B -4467• Elma (360) 482-5269
nheO web www.co.mason.wa.us -
APPLICANT INFORMATION
CONTRACTOR INFORMATION
Owner_ 6 14 L.):_ . . L i/Nf- Company Name
Mailing AddresG Mailing Address
City State Zip Code City State Zip Code
Phone Other Ph Phone Other Ph.
Lien/Title Holder Contractor Reg.It Exp.
E mail address E Mail Address
Drivers Lic.# DOB Drivers Lic.# DOB
SEPTIC INFORMATION - Connect to New Septic Existing Septic. Connect to Sewer System
Name of Sewer System
PARCEL INFORMATION - 12 Digit Parcel No. !' Fire District
Legal Description
Site Address (Please include street name, street number and city) I I I n E7 LA ICE - I Uvl
Directions to site
Is property within 200'of Saltwater Lake River/Creek Pond
Wetland Seasonal Runoff Stream Slopes or Bluffs > 15%
TYPE OF JOB - New Add Alt Repair Other Use of Building
Location of Fixtures/Units - 1st Floor 2nd Floor Basement Garage Closet
PLUMBING FIXTURES (Show Number of each) MECHANICAL UNI
Type of Fixture No. of Fixtures Fees Fuel Type:Electric_ LPCi_ Natural Gas__ Heat Pump_
Toilets _� Type of Unit No. of Units Fees
Bathroom Sink Z Furnace
Bath Tubs Heatpumps
Showers Spot Vent Fan
Water Heater Propane Tank
Clothes Washer 1 Gas Outlets
Kithen Sinks Wood/Gas/Pellet Stove
Dishwasher Kitchen Exhaust Hood
Hosebibs Dryer Vent 1'
Other Other
Base Fee Base Fee
TOTAL PLUMBING TOTAL MECHANICAL
OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of
such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this
permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is
required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained
permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information
provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection.
PROO� CO UATION OF RK IS BY MEANS OF A PROGRESS INSPECTION.
X Date: `� �zc
ner/Owners R presenta e/Contractor (indicate which one)
FOR OFFICIAL USE BEYOND THIS POINT
Accepted b tanning Pd Ck# Dated - 1 1-2-011 Bid I'd Receipt No.
DEPARTMEWAL REVIEW APPROVED DENIED NOTES
Building Department
Occ GroUD—TvDe Constr.
Planning Department
Environmental Health Department
FEES
Plumbing & Base Fee Site Inspection
Mechanical & Base fee UFC Plan Review Fee
Wood/Gas/Pellet Stove Fee Other
Violation Fee TOTAL FEES