HomeMy WebLinkAboutBLD2005-00629 Garage - BLD Permit / Conditions - 5/16/2005
Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext. 352
Mason County Bldg. 3 426 W. Cedar P.O. Box 186
Shelton, WA 98584
RESIDENTIAL BUILDING PERMIT BLD2005-00629
OWNER: MEL MORI RECEIVED: 4/15/2005
CONTRACTOR: CONSOLIDATED BUILDERS, INC. LICENSE: CONSOI*993L1 EXP: 6/10/2005 ISSUED: 5/16/2005
SITE ADDRESS: j4Q.Wjy.ACON POINT LOOP SOUTH LILLIWAUP EXPIRES: 11/16/2005
PARCEL NUMBER. 24015
LEGAL DESCRIPTION: B DIV 1 TRACT 47 DIV 1
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
GARAGE N ON HWY 101, LEFT AT BEACON POINT GO TO FIRST LEFT AND
FOLLOW TO SITE
General Information Construction &Occupancy Information Square Footage Information
No.of Bedrooms: Type of Constr.: VB
Type of Use: MH Insp.Area: No.of Bathrooms: Occ. Group: U-1 Lot Size: Deck:
Type of Work: ACC Fire Dist.: 2 No.of Stories: 1 Occ. Load: Building: Garage-Detached 576
Valuation: Building Height: 16 Occ. Status: Primary Basement:
Manufactured Home Information Setback Information Shoreline&Planning Information
Make: Length: Ft. Front: W 20.0 Ft. Shoreline: Ft. Water Body:
Rear: E 10.0 Ft. Slope: Ft. SEPA?: No
Model: Width: Ft. Side 1: S 5.0 Ft. Shoreline Desig.: Not Applicable
Year: Serial No.: Side 2: N 70.0 Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Plan Check Fee KS 4/15/2005 $154.21 S12005
Building Permit Fee KS 4/15/2005 $237.25 S12005
Building State Fee ARC 4/20/2005 $4.50 S12005
EH Plan Review CEW 4/27/2005 $35.00 S12005
Total $430.96
BLD2005-00629 Please referto the following pages for conditions of this permit. 1 of 4
CASE NOTES FOR
BLD2005-00629
CONDITIONS FOR
BLD2005-00629
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
The otential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-8 -0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
2) The internationnl code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved
ac5e §§, j'ad. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where
su tis connect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road.
X
3) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be d. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Depa c n prior to any further inspections being performed or approvals granted.
X
4) In accordance with international codes and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads," all new structures that
require an address shall have approved numbers or addresses located at the beginning of long driveways when the address is not clearly visible from the
access road. The numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background.
Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted
by the jurisdiction.,and the international codes will be assessed if the owner and/or contractor fail to post the address on site prior to requesting
Xspections. F�<
5) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the
corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building
Official. he permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
remou' it approved documents will result in failure of required building inspections.
X
6) This structure is approved as un-heated space. If at any time this building is to be used for anything other than what it is approved for, a change of use
Xermit� II e applied for, reviewed and approved prior to the change.
7) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X \I '
BLD2005-00629 Please referto the following pages for conditions of this permit. 2 of 4
8) The "approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved"site plan is not on site, then
approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Build n;)Qebartment prior to any further inspections being performed or approvals granted.
9) Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather, garage floor slabs and other
vertical concrete work exposed to the weather shall have a minimum compressive strength of 3000 psi (IRC Table R402.2).
X C�11
10) This structure is limited to U-occupancy use only(private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the
interp n I codes and Mason County Regulations unless a "Change of Use" permit is applied for, reviewed and approved.
X
11) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit M
tion.
X
12) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact
adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your project.n�
X �
13) All changes to p oved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
ordinance orp ation, must be reviewed and approved by Mason County prior to construction.
X yVV
14) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with th?,Ot ational codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
IInspe t®s all be made prior to requesting additional inspections.
15) All property lines shall be clearly identified at the time of foundation inspection. X
BLD2005-00629 Please referto the following pages for conditions of this permit. 3 of 4
16) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mas o my ordinances and building regulations.
X 1
17) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action r eriod not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder �revented action from being taken. No more than one extension may be granted.
X
18) Pressurestreated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
co tits, and flashing. Install metal connectors approved for contact with the new types of pressure treated material.
X
19) Temporary erosion control measures must be implemented to prevent water qua t e radation of adjacent waters or wetlands. Silt fencing must be
installed and maintained until upland vegetation has become established. X
20) Approved�r dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
X �1 .
21) Prior to final approval, all upland areas disturbed Or ni' 'N
eated by construction activities shall be seeded, vegetated or given an equivalent type of
erosion protection (silt fencing or straw matting). �
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is
commenced. Evidence of continuation o ork is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a pr�re s inspection. he owneror the agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to
the above described prTe1 an tru for review and inspection.
OWN ER OR AGENT: , ,./) DATE:
BLD2005-00629 Please referto the following pages for conditions of this permit. 4 of 4
``07 M •i
7�
a CONCRETE MECHANICAL MANUFACTURED HOM
0
T Footings / Setbacks / Date By Ribbons
rn Date ic>yr /%�1� Gas Piping Date B y
N
Foundation Walls Date B y Set-up
Date By INSULATION Date By
B G / Slab Insulation Floors Final
Date By Date By Date By
FRAMING Walls FIRE DEPT
D ate B y Date B y Date B y
PLUMBING Attic OTHER
Groundwork Date B y
Date By WALLBOARD NAILING
D.W.V. Date By
Date By FINAL N P_ECPB
Water Line Date d�
Date By Date By
CD
a
st
CD
cc
r
y O
O
8 N
O
a O
o' (�
0 1
o O
� r
C N
0