HomeMy WebLinkAbout1989-1991 - SPI Inspections - 7/29/1991 BUILDING PERMIT APPLICATION
MASON COUNTY
DEPARTMENT of GENERAL SERVICES
P.O. BOX 186 SHELTON, WASHINGTON 98584
427-9670 DATE ISSUED
PERMIT NO.
OWNER piAME MAIL ADDRESS T`� CITY&STATE ZIP PHONE
DIRECTIONS
TO JOB SITE
PARCEL LEGAL
NUMBER 2 .t r:;2r DESCR. J
NAME MAIL ADDRESS CITY&STATE LICENSE NO. ZIP PHONE
CONTRACTOR
USE OF
BUILDING
CLASS OF NEW ADDITION 7[ACTERATION REPAIR MOVE REMOVE
WORK
DESCRIBE
WORK
BEDROOMS DECKS CARPORT NOTICE
SEPARATE PERMITS ARE REQUIRED FOR PLUMBING, HEATING, VENTILATING OR AIR
BATHROOMS TOTALSQ.FT. GARAGE CONDITIONING.
NO.OF STORIES BASEMENT ATTACHED THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT
COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR
TOTAL SQ.FT. FIREPLACE DETACHED ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED.
PERMANENT SHORELINE
SEASONAL
OWNERS AFFIDAVIT CONTRACTORS AFFIDAVIT
I CERTIFY THAT I AM EXEMPT FROM THE REQUIREMENTS OF THE CONTRACTORS I CERTIFY THAT I AM A CURRENTLY REGISTERED CONTRACTOR IN THE STATE OF
REGISTRATION LAW RCW 18,27, AND AM AWARE OF THE MASON COUNTY ORDINANCE WASHINGTON AND I AM AWARE OF THE ORDINANCE REQUIREMENTS REGULATING THE
REQUIREMENTS FOR WHICH THIS PERMIT IS ISSUED AND THAT ALL WORK DONE WILL BE WORK FOR WHICH THE PERMIT IS ISSUED AND ALL WORK DONE WILL BE IN
IN CONFORMANCE THEREWITH, NO CHANGES SHALL BE MADE WITHOUT FIRST CONFORMANCE THEREWITH.NO CHANGES SHALL BE MADE WITHOUT FIRST OBTAINING
OBTAINING APPROVAL FROM THE BUILDING DEPARTMENT. APPROVAL FROM THE BUILDING DEPARTMENT.
X OWNER DATE X BY DATE
FOR OFFICE USE ONLY
DEPARTMENT YES
PPROVENo DEPARTMENT YES NO
BUILDING VALUATION
HEALTH PUBLIC WORKS FEE
PLANNING FIRE BUILDING PERMIT
D.O.T. BUILDING PLAN CHECK
SPECIAL CONDITIONS BUILDING GROUP PRE-INSPECTION
SHORELINE
f
WOODSTOVE
PLUMBING
MECHANICAL
STATE BUILDING FEE
STATE SURCHARGE
APPLICATION ACCEPTED BY I PLANS CHECK BY APPROVED FOR ISSUANCE PERMIT VALIDATION
TOTAL
BY CASH CK MO
MASON COUNTY
DEPARTMENT of GENERAL SERVICES
Courthouse Annex I N. Fourth & W. Cedar
P.O. Box 186 Shelton, Washington 98584
(206) 427-9670
building environmental health maintenance landfill parks&recreation fair/convention center planning sewer&water
Terry W . McNabb August 21 , 1989
11624 - 106th Ave . NE
Kirkland , WA . 98034
Dear Mr . McNabb,
I conducted a pre-inspection of the property , Tract 1 of Lot 5
Tidelands , Parcel #322352200010 , on August 11 , 1989 . Following are
my comments regarding this piece of property as a site for a single
family residence .
-The shoreline designation for this property is Urban Residential
according to the Shoreline Master Program . All structures greater
than 30 inches in height must be a minimum of 15 feet landward of
the existing bulkhead ( OHWM ) or the common line , whichever is
stricter ; in this case , the 15 feet . This leaves a minimum amount
of space to build a residence , as I had measured approximately 15
feet landward from the bulkhead to be where the steep slope begins .
It is feasible to build on a slope if a structural engineer has
designed the building plans according to a soil analysis of the
property . ( The structural engineer must be certified in the state
of Washington . )
-In the Urban designation side yard setbacks are a minimum of 5
feet . This is from the furthest protruding point of any structure
greater than 30 inches in height to the side property lines . There
is also a side yard setback of 5 feet from the highway right-of-
way and from recorded easements .
-It is possible to add on to the existing residence or remodel , but
all new construction must comply with the current regulations .
-A bulkhead may be constructed at the toe of the bank adjacent to
the unimproved shoreline . Depending on the value of the bulkhead ,
a Shoreline Permit may be required before construction would be
authorized . Bulkheads shall be constructed as close to the toe of
the bank as possible, but in no case shall be constructed more than
6 feet waterward from the toe of the bank ( OHWM) . This would be
considered as landfill and is prohibited by the Shoreline Master
Program .
-The septic system and well criteria should also be considered
during your review of this property ( setbacks from water , etc . ) .
The property appears to be insufficient for the construction of a
reasonably sized residential structure that would meet all the
requirements of the Shoreline Master Program. Shoreline Variances
are options available to property owners to vary the regulations
of the Shoreline Master Program. However , application does not
grant approval and a hardship needs to be shown .
If you have any questions or I can be of further assistance , please
call .
Sincerely,
Lenore Marken , Planner
Dept . of General Services
o � � � ouL� D
Terry & Zola McNabb
11624-106th Ave. N.E. �iJL 16 1989
Kirkland, WA 98034
206 823-2630
7/13/89 caFNERAL SERVICES
Lenore Marken
Mason County Dept. of General Services
P.O. Box 186
Shelton, WA 98584
Re: Pre Inspect Request Hood Canal Waterfront
K/A Tract 1 of Lot 5 Tidelands , Parcel 322352200010
(Best Address Known: 12571 N. Shore, 12 5/10 and 71/100
miles from Belfair, Wa. , Sewell G. & Betty Thomas
My wife and I are interested in building a single family
residence on a portion of the above described waterfront
property. We are discussing with Betty Thomas , that portion,
East (toward Belfair) of the existing cement , land filled, Qr
bulkhead. We note that there may be insurmountable
restrictions regarding the respective 172 ' of unimproved (n
shoreline. We hope this is not the conclusion, however in
the event that it is , we would still be interested in
discussing the possibility of our building on the "east"
portion of the existing, land filled, bulkhead.
-
Please our us give best g y efforts estimate of where and -_-
what can be built utilizing approximately 75 ' of existing '
bulkhead.
Attached is a site plan to the best of my ability. Your
assistance in helping us understand what the realistic, legal
and density possibilities are, would be greatly appreciated.
Feel free to contact Zola or myself should you have any
questions . Requested $25. 00 check is enclosed.
Sincerely,
Terry W. McNabb
Enclosures �' it ' al
x�V
d..-
1,, ��/�f�fikJ
MASON COUNTY 4
DEPARTMENT of GENERAL SERVICES
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
(206) 427-9670 3.�a �' �� o��
building environmental health fire marshall parks & recreation fair/convention center planning
July 29 , 1991
Mary Ann White
1916 Olympic Hwy. North
Shelton, WA 95884
Subject : Shoreline request for pre-inspection. Sec. 35 , Twn 22N,
R 3W. Tract 1 of Gov' t Lot 5 + TL' s . North Shore Hood
Canal .
Dear Ms . White :
Per your request, a site inspection was conducted of the above
property. The following is a summary of the planning department' s
findings :
The structure as it now stands would be considered "existing
nonconforming" for the following reasons . Firstly, the shore yard
setback now stands at 13 . 5 feet . The required minimum at the site
is 15 feet . Secondly, the required side yard setback is 5 feet;
and on the west property line the storage area seems to encroach
this setback as well . Of course, a survey would be the only way to
determine "proof-positive" that such is the case.
The fact that the residence is "existing nonconforming" prohibits
any further expansion of that structure, so long as the setbacks
are not met . If alterations were made, such that the setbacks were
met; then expansion could be allowed. The only other possibility
is the pursuance of a shoreline variance. If a variance were
approved for the encroachment of the two setbacks then expansion
could be allowed so long as the expansion didn' t worsen the
nonconformities (i .e . encroached further into these varied
setbacks) .
I cannot judge on whether or not such a permit would be approved,
as it is not my decision. Rather it is up to the Shoreline
Advisory Board, and ultimately the County Commissioners to make
that decision.
In addition, the new construction on the lot should not, in total
with the existing structures , exceed a 60 percent site coverage .
In other words, the total area of all impervious surfaces on the
lot shall not exceed 60 percent of the total area of the lot
excluding submerged lands . A gravel parking area would not be
included in the definition of impervious surface .
Building a new residence in place of the old would be permitted, so
long as shore yard (15 feet) and side yard (5 feet) setbacks were
met . Also, residence structures should not exceed 35 feet in
� r
continued . . .
height .
In addition, any excavation into the existing slope on the
property, would be reviewed carefully for stability of remaining
slopes . The Mason County Department of Public Works would have a
special concern, considering the possible effects on North Shore
Road.
Repair of the existing boat launch structure is allowable under our
"normal repair and maintenance" clause of the Mason County
Shoreline Master Program. This clause allows for the repair or
replacement of structures without requirement of a shoreline
substantial development permit . However, such reconstruction is
not exempt from obtaining a Mason County Building permit, SEPA
review, and Hydraulic Project Approval ( . . . as provided by the
Washington Department of Fisheries) .
In the future, if the bulkhead becomes in need of repair the same
"normal repair and maintenance" clause applies again; and thusly
the same permits are required.
If you have any questions regarding the information provided;
please feel free to contact this office at 427-9670 .
Sincerel
. �
Steve NicJols, shor-er.-:zr planner
Department of General Services
CC: Sewell G Thomas