HomeMy WebLinkAboutMIS99-0591 Remove 83ft Marine Railway, Install 50ft above beach, support footings - BLD Permit / Conditions - 11/2/1999 MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
M 1 C-3 G E L—. 1—. ^N F— C3 U P F: Eft M 1 —1" FDR INSPECTIONS CALL 427-9670
M I S9A•-0591 PARCEL :322352,200010 PLAT : D I V s OLK ; LOT s
JOB ADDRESS - 12571 NE. NORTH SHORE. RD BELFAIR
APPLICANTS ROBERT HALL 425-455-0416
OWNER : ROBERT HALL. 425-455--0416
LEGAL : TA I Of LOT 5 1 T.L.
PROJECT DESCRIPTION :
REMOVE EXISTING 83 F"T . LONG MARINE RAILWAY (OLD IRON RAIL AND CONCRETE R I PRONS ON TIIE Br-ACH) ;
i NSTAL.L. 50 F'r .. LONG STAINLESS STEEL RAIL ABOVE THE BEACH AND SUPPORT FOOTINGS BELOW GRADE .
PROJECT LOCATION :
NORTH SHORE RD. 12 .5 MILES TO DRIVE WITH "HALL" SIGN AT ROAD .
PROJECT NOTES : PE Ex
v00 w�
�c\
TYPE AMOUNT" BY DATE RECEIPT 10D
PLCK $ 64 .84 KW 09/ 14/99 1838
STFF t 4 .50 KS '10/2.7/99 BELFAIR
PRMT $ 99 .75 KS 1 0127/99 BELFAIR � C
TOTAL : 169 .0g / OWNER OR AGENT DATE
418—PRMT, revs gllilitl2 COMPLIANCE TO ATTACHED CONDITIONS IS
REQU 1 RED
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
dat by Gas Piping date b
oundation Walls date by Set Up
date by INSULATION date by
BC#'SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D W WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
P.O. Box 186 Shelton, Washington 98584
P E R n4 1 "V +C +Ca N D I !_ i av iq ::j
Case No . : M I a99"-0591
Fore ROBERT HALL
Page . 1
1 ) Approved per dimensions and setbacks on submitted
site-plan .
2) The proposed project must be consistent with all applicable policies and other
provisiolns of the Shoreline Management Act , Its rules , and they Mason County ShorelineMsstwr�.rprtm .
IT
3 ) The applicant, sha i l apply for a Substantial Development shoreline permit for the
removal of the old ooncret ex ribbons along the old alignment of the marine ra i 1 system;
this permit application shall be made prior to February 15, 2000 so that the 3 .5 month
review t"oopsU may take place prior to summer of 2000
4 ) - A Hydraulic Project Approval from the Washington State Department of Fish & Wildlife
CONCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
date by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date by date by date by
FRAMING Walls FIRE DEPT.
date by date by
PLUMBING Attic by OTHER
Groundwork
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by `�
MASON COUNTY
Mason County Bldg. III 426 W. Cedar
must be granted pr i of rP,,q, .,PQx 186 Shelton, Washington 98584 95_.4756 )
a�4
5 ) A Sec; ion 10 Permit (Rivers and Harbor Aut of 1899) or exemption must be granted by the
Army�- u fs of Engineers prior to work within navigable waters of the United States .
01,
6 ) Temporary erosion control measures within the beach project area muRt be Implemented 'to
preve _ Ater quaiity degradation of adjacent waters or breach area .
X
7) All construction and demolition deter i s must be removed front the beach after project
completion . Proper disposal of construction debris must be on land In such a manner
that debrI � cannot enter or cause water quaIitu degradation of State waters .
C
8 ) All approved plans are required to be on-site for inspection purposes . If Inspection
Is called for and plans are not on site, Approval WILL NOT be granted . In addition , a
Re Inspection fee in the amount of $42 .00 per hour (mInimum 1 hour ) will be charged and
must be collected by this department ,prior to any further inspections being performed or
approvaA ranted ,
G) PURSUANT TO 1997 UNIFORM BUILDING CODE , ALL S , TE MUST BE MARKED WITH APPROVED NUMBEIIS
OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE
STREET OR ROAD FRONTING THE PROPERTY . MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT
THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . A REINSPECTION FEE , BASED
ON RATES AD6PTED FEE SCHEDULES AND THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSFD 1F
ONtNFR CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS .
X
10) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UBC
REQU i_R> Milt:kJTS
11 ) ALL SLABS WITHIN THE HEATED SPACE SHALL HE INSULATED TO A MINIMUM R-10 FOR 24 " TOTAL .
COMCRETE MECHANICAL MOBILE HOME
Footings-Setback date by Ribbons
d.Ate by Gas Piping date b
Foundation Walls date by Set Up
date by INSULATION date by
BG/SLAB Insulation Floors Final
date FRAMING by date by date by
Walls FIRE DEPT.
date by date by date by
PLUMBING OTHER
Groundwork Attic
date by date by
D.W.V. WALLBOARD NAILING
date by date by
Water Line FINAL INSPECTION
date by date by date by
/0 .Q.7c n � 1
PERMIT NO.: MIS q_0
MASON COUNTY I
MISCELLANEOUS PERMIT APPLICATION
426 W.Cedar/P.O.Box 186,Shelton,WA 98584
Shelton 360 427-9670 Belfair 360 275-4467 Elma 360 482-5269 Seattle 206 464-6968
APPLICANT INFORMATION CONTRACTOR INFORMATION C ►'�
Owner P"6Pp tr+A. 4 Lym C. a Contractor Name�j�etr I Garr+ d C��
MailingAddress O �� Maili►!;o�Address i
City 2 le u State Zip Code City V l Siat Zip Code
Phone(�jTV !VS'S=0Sc1 Other Ph.tA. z 2 8-/bhp Ph. they Pk,c�53
Lien/Title Holder Sa tm4 Contractor Reg. #,
Address Set Vwt Expiration / 0.1 / Vc 0
PARCEL INFORMATION-12 igit Tax Parcel No. / o: / O 1 Fire District
Legal Description G. . r4e 31, iCv n A
Site Address(include street n me and city I` r - 2 T
Directions to site: 11 d S om4- 1A d7v
Will timber be cut and sold in parcel preparation? (Yes4No)
Is your property within 200' of the following: Body of Water(Name) :±a= xA uA Saltwater X
Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or
Bluffs X
TYPE OF JOB New Add Alt__)( Repair Other Use of Building
Describe proposed constructigpj=JP 4 t5:1 la(¢,, a x, I S'y N4 MG r I r) l Ir I wet V , LUp L4MI d
(2rrnIIca. bh �o re VA 0e -KR
SHORELINE PROJECTS New Replacement Repair Expansion
Bulkhead Material (concrete, rock, wood, etc.) Length Height
A FLOOR PLAN AND PLOT PLAN MAY BE REQUIRED DEPENDING ON THE TYPE OF PERMIT.
NOTICE: THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF
CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED.
PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the
information provided is accurate and grants employees of Mason County access to the above described property and structures for review and
inspection of this project. Acknowledgment of such is by signature below:
OWNER AFFIDAVIT-I certify that I am exempt from the requirements of CONTRACTOR'S AFFIDAVIT-1 certify that I am currently registered as a
the Contractor Registration Law RCW 18.27 and am aware of the contractor in the State of Washington and that I am aware of the
ordinance requirements for which this permit is issued and that all work ordinance requirements regulating the work for which this permit is issued
will be dTL.V conformance therewith. No changes shall be made without and all work shall be done in conformance therewith. No changes shall
first obt nin approval. b e wi Irst obtaining approval.
X �17Nv. DA 2 lllj J( Date
✓'
FOR OFFICIAL USE BEYOND THIS POINT
Accepted by Date ( q Submittal Amount Due �t �� Receipt No.
DEPARTMENTAL REVIEW APPROVED DENIED CONDITION CODES
Building Department 7
+,<
Occ Gr Type of Const.
Planning Department
Environmental Health Department
Public Works Department
Fire Marshal
�r 1
Valuation $ 1 . .�
FEES
Building Permit Fee �' '1 Site Inspection
Plan Review Fee Other
UFC Plan Review Fee Other Ll
Violation Fee Pre-Paid at Submittal ( `
TO TALFEES
:i A