HomeMy WebLinkAboutSEP2009-00097 - SEP Determinations - 1/6/2010 ON_STA MASON COUNTY
MC ° DEPARTMENT OF COMMUNITY DEVELOPMENT
S U Planning Division
? o T 2 P O Box 279, Shelton, WA 98584
�00 1 o~ (360)427-9670
1864
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-340)
SEP2009-00097
Description of Proposal Remove 15 cu. yds. of gravel materials deposited along Haven
Lake shoreline during December 2007 storms; area of existing
dock in lake will be functional again and shoreline will be replanted
with native plant species.
Proponent: JILL VADEN
Location of Proposal: 2000 NE TAHUYA BLACKSMITH RD TAHL
Parcel Number: 223305000217
Legal Description: HAVEN LAKE TRS. 217 & 218 - DPC #06-14
Directions to Site:
Lead Agency: Mason County
The Lead Agency for this proposal has determined that it does not have a probable significant
adverse impact on the environment. An Environmental Impact Statement (EIS) is not required
under RCW 43.21 C.030(2)(c). This decision was made after review of a completed
Environmental Checklist and other information on file with the Lead Agency. This information is
available to the public upon request.
Please contact Allan Borden at ext. 365 with any questions. This DNS is issued under WAC
197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown
below, when the determination is final. Comments must be submitted to Dept.. of Community
Development, P.O. Box 279, Shelton WA 98584 by 1/20/2010. Appeal of this determination
must be filed within a 14-day period following this final determination date, per Mason County
Code Chapter 15.11 Appeals.
*/,, ,,&,- /a 11'0
Authorized Local Government Official Date
srq MASON COUNTY
�PyoN T�° DEPARTMENT OF COMMUNITY DEVELOPMENT
4 M
o A ° = Planning Division
o T z P O Box 279, Shelton, WA 98584
N Y (360)427-9670
OJ �O
1864
Exemption from Shoreline Management Act
Case No.: SHX2009-00056 Substantial Development Permit Requirement
The Proposal By: SILL VADEN
3832 34TH AVE SW
SEATTLE, WA 98126-2540
To undertake the following development:
Remove 15 cu. yds. of gravel materials deposited along Haven Lake shoreline during December
2007 storms; area of existing dock in lake will be functional again and shoreline will be replanted
with native plant species.
Within Haven Lake and/or its associated wetlands is exempt from the requirement of substantial development because
the development is categorized under WAC 173-27-040(2) as being category
B-normal maintenance
Please contact Allan Borden at ext 365 if you have any questions.
Z�4 (=Zt
Issued: 12/31/2009
Expires: 12/31/2011 Authorized Local Government Official
cc: APPLICANT WDFW USACOE WDOE TRIBAL COUNCIL
223195000083
223195000084
223192222222
e 223192222222
223195000085
223195000086 223195000900I / N
223195000087 223195000009
223195000119 223 5000088 \ \
2231�00089 223195000007`
223195000118 22319 000090 223195000092 223195000001 22319500 005
22319500 f91 , \ \223195000003
223195000002 \ \
223190004000 223195000904 J I 223195000096
+
223195000117 F, 223195000094 223195000095
O
223190060000 /
R
223195000116 --- /2231900060000
223194309051
2231950001 11104 2231935000103
223195000115 223195000105 223195000101
223195000099
i
223195000107 223195000097
T23NR2W 223195000114 2231950 0109 223194309050
Y223195000110 223195000120
1295000111
-223190060000 223192222222 223194300010
223305000219 223305000217 223305000001
223307500020 �C ZC 223305000002
223305000216 223305000405
223305000220 `--"
223302222222 223305000003
223305000215 F----
223305000221 223305000214 '2233050 0- . .1 223305000404
223305000005
223305000213r__----{I L223309999999
223305000222 223305000212 /
223305000007
223305000403
223305000211 v 223305000008 223301260000
223307500030 223305000223 223305000009
05000009
223305000209 k 1 223305000402
223305000224 223302222222 223305000011
223305000206 J
.--� % 223305000012 223305000401
223305000225 223305000205
i 22330500 0013
Y 223309999999� � ' 223305000400
223305000226 1,-- 223305000014
223305000204�
' 223305000399
223305000203 223305000016
223305000227 / 223305000200 �.. 1� 223305000395
223305000202 /2233 0050 0199 223305000017 22330500039� '
Lf223305000198
3305000201/ / / `�223305000396
223305000228 / 223305000195 223305000018
223307500040 223305000196" ` -��� 223305000397
223305000020
22330500022 223305000197 223305000194 22 033 5000021 lI
223305000230 223305000903 223305000265�223305000193 223305000022 223305000036
N vado l b l l��l,
1 inch = 300 feet
W E RewVe qra- e[ •{rv'+t�l. U�
1 inch = 0.06 miles
S
vow
d dp
•' It. 1 1 1 •.1 1 1 1
6 i V R
4m
•111 111 •11.1111
•,,I T23 R2
19 1
WAIL
+ V
p
k r
7# y� t Mr.
�, - •111.111 r
1, • k 1
1.. • M` � rk r ya� 1�, h ,
4
i r • ,, a + r
•► i s a
r r
J f
,
3
• :.r 1 111� - � 1 �� �
41.
iS
s•
A�• * a
II
♦ * � #
r
• 223305000214
223195000105
223195000115
l
y�I� i ll4
o 223195000107
o vA
e�<
ti}w
r
223190004000
223190060000
� E
"� 223195000109
223195000114 `� ""
223195000110
a
I
E
'` "' 223195000111 I
t,
k
223190060000 400 400 I
� 223192222222
223190004000
223305000219""
� 223305000217
0
i
223305000216
2233050, 20
4�
4 223305000215
223305000221 223305000214d
4qp
223309999999 223305000213
o�
22 330 0 5000222 223305000212
223305000223 223305000211 ;» ;
223307500030 f
� 223305000209
N
1 inch = 100 feet
W E
1 inch = 0.02 miles
S
A r Le end
8 Exposed Aggregate
Rhododendron
Evergreen Huckleberry
Sword Fern Japanese Maple
Sala[
Gravel deposit wetland plants
Oregon Grape
to be removed * '
€ Overstory Tree
f
Haven Lake
Clearing Line -
® ° 0 T i
1� F A S �`•i Illy pk
o..
Clearing Line
:0 +
o0
°.
Qtio4 'y�♦ i
y y /
:oo;ay -r-�
'4''�S4R�o oeoo Q$°.°g .s°PD:q°°Sb,'•.o�oS o,,r4:o•$��a5o$°o=°.t' °oq:° e• 7---
°0�'�4 off:.�o o:,'a•o;4i, 0�0.6:°o00 o t,of b'�;�:o g.°, o�'b
House 3_4b °•�;.�°pw4•. :o off.
I scale s"=1 L 7/8 drain rock
2000 NE Tahuya Blacksmith Road Lakefront Design November, 2009 The Wetland corps
i
Le end
Exposed Aggregate
Rhododendron
Evergreen Huckleberry
a
• Sword Fern Japanese Maple
Salal
Gravel deposit Wetland plants
to be removed Oregon Grape
® Overstory Tree
Haven Lake
Clearing Line 4 �V 44 4 _
1 1W.Pa I
Clearing Line
000 R�
•�°b oho i
o �T
k
,a r
•�13•°Qo^A� :O a �o. ,�'O°..oc°wti A;°i�.•o°'"s3••.o:gfi °0'°°4:o'o tnio¢°°;'p' �o:: 1
.�'OA.a•fo •o:,o'o•E:a+o o"°. >b000x;a�.'.°o�:a o•$�o,��%.a•o •o•, 'I`—r—'� //,,'�,,�-^•
House •ooaba � °oa ��� •oo�a�q;°.a ,,.�br°.�oo.°
1 7/8 drain rock
)00 NE Tahuya Blacksmith Road Lakefront Design November, 2009 The Wetland Corps
5Y2_o09 —
MASON CO. ENVIROMENTAL CHECKLIST
A. BACKGROUND
1 . Name of proposed project, if applicable: ' c -�5` ��,1�"�"''�'
�It1vu� (.�Gt S �',�
2. Name of applicant:
3. Address and phone number of applicant and contact: erson:
SW
4. Date checklist prepared: I,_
5. Agency requesting checklist:
6. Proposed timing or schedule (including phasing, if applicable):
7. Do you have any plans for future expansion, or further activity related to or connected with this
proposal: If yes, explain. I ,,
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal.
I 1
9. Do you know whether applications are pending for governmental approvals of other proposals
directly affecting the property covered by your proposal? If yes, explain.
10. List any government approvals or permits that will be needed for your proposal, if known.
1
11. Give a brief, complete description of your proposal, including the proposed uses and the size
of the project and site. There are several questions later in this checklist that ask you to
describe certain aspects of your proposal. You do not need to repeat those answers on this
page. (Lead agencies may modify this form to include additional specific information on
project description.) ti
a
tc
12. What is the location of the proposal? Give sufficient information for a person to understand the
precise location of your proposed project including a street address, if any, and section,
township, and range, if known. If a proposal would occur over a range of area, provide the
range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and
topographic map, if reasonably available. While you should submit any plans required by the
agency, you are not required to duplicate maps or detailed plans submitted with any permit
applications related to this checklist. A1v
Pp a009 `
SEA �W� l a3�
B. ENVIRONMENTAL ELEMENTS:
1. EARTH:
a. General description of the site (circle one): Flat, rollin hilly, steep slopes, mountainous, other
b. What is the steepest slope on the site (approximate percent slope)?
C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)?
If you know the classification of agricultural soils, specify them and note any prime farmland.
d. Are there surface indications or history of unstable soils in the immediate vicinity: If so,
describe. 4
! .
Mason County Environmental Checklist Page 2
e. Describe the purpose, type, and approximate quantities of any filling or grading proposed.
Indicate source of fill.
Ccklc 5
Cal L Of I Jl i,
J �.
f. Could erosion occur as a result of clearing, construction, or use: If so, generally describe.
F,/
Graz; � Ste,'
g. About what percent of the site will be covered with impervious surfaces after project
constructions (for example, asphalt or buildings)?
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
� J
2. AIR:
a. What types of emissions to the air would result from the proposal (i.e. dust, automobile, odors,
industrial wood smoke) during construction and when the project is completed? If any,
generally describe and give approximate quantities, if known.
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe.
Mason County Environmental Checklist Page 3
C. Pro osed measures to reduce or control emissions or other impacts to air, if any:
1
3 WATER:
a. Surface:
1) Is there any surface water body on or in the immediate vicinity of the site (including
year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe
type and provide names. If appropriate, state what stream or river it flows into.
�/,-wtjx �<R r,NJ. 5 rt wl J``y 4,5 oV"UJ R1,na I e_ AVIC
C'01- CA Pro-e-J S;t�
2) Will the project require any work over, in, or adjacent to (within 200 feet) the described
waters? If yes, please describe and attach available plans.jj
44
tv
3) Estimate the amount of fill and dredge material that would be placed in or removed from
surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material.
ClJ�l� 5 Ok t�G,k.I� , , � .
I Q
1
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known.
i
Mason County Environmental Checklist Page 4
5) Does the proposal lie within a 100 year floodplain . If so, note location on the site plan.
he proposal
I involve an discharges of waste materials to surface waters? If so,
6 Does t p p Y 9
describe the type of waste and anticipated volume of discharge.
b. Ground:
1) Will ground water be withdrawn, or will water be discharged to ground water? Give
general description, purpose, and approximate quantities, if known.
�do
2) Describe waste material that will be discharged into the ground from septic tanks or
other sources, if any (for example; domestic sewage, industrial, containing the following
chemicals.... agricultural, etc.). Describe the general size of the system, the number of
such systems, the number of houses to be served (if applicable), or the number of
animals or humans the system(s) are expected to serve.
/VootC_'
C. Water runoff (including storm water):
1) Describe the source of runoff(including storm water) and method of collection and
disposal, if any (include quantities, if known). Where will this water flow? Will this flow
into other waters? If so, describe.
NQIV--,
2) Could waste materials enter ground or surface waters: If so, generally describe.
/V O
Mason County Environmental Checklist Page 5
d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any:
4. PLANTS:
a. Check or circle types of vegetation found on the site-
-deciduous tree: alder, maple, aspen, other
evergreen tree: fir, cedar, pine, other
k' shrubs
_grass
pasture
—crop or grain
>_wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
—other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
/Von- /VCR CasSS
C. List threatened or endangered species known to be on or near the site.
Oil _
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any:
5 �{
Mason County Environmental Checklist Page 6
5. ANIMALS
a. Circle any birds and animals which have been observed on or near the site or are known to be
on or near the site:
Birds: aw hero I ongbird�, other
Mammals: , ee ear elk, beaver,of er
Fish: �almd ,Q r�Out, rring, shellfish, other
b. List any threatened or endangered species known to be on or near the site.
_"f1re e-I�M 4 � 1�,� 5"'11/bIlkt—eX "r^�
TA_�v 1'11rUU��
c. Is the site part of a migration route? If so, explain.
/J
d. Proposed measures to preserve or enhance wildlife, if any:
6. ENERGY AND NATURAL RESOURCES:
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the
completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc.
' I
b. Would your project affect the potential use of solar energy by adjacent properties: If so,
generally describe.
C. What kinds of energy conservation features are included in the plans of this proposal? List
other proposed measures to reduce or control energy impacts, if any:
Mason County Environmental Checklist Page 7
7. ENVIRONMENTAL HEALTH:
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire
and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so,
describe.
1) Describe special emergency services that might be required.
2) Proposed measures to reduce or control environmental health hazards, if any-
b. Noise.
1) What types of noise exist in the area which may affect your project (for example: traffic,
equipment, operation, other)? , /
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)?
Indicate what hour's noise would come from the site.
r �
raiSL ji f pc-v r. -(' r ��/ rK l/: o�r a y S
3) Proposed measures to reduce or control noise impacts, if any:
14ed lXwJ:.C' a� a •�,,�j
8. LAND AND SHORELINE USE:
a. What is the current use of the site and adjacent properties?
Mason County Environmental Checklist Page 8
b. Has the site been used for agriculture? If so, describe. /UO
C. Describe any structures on the site.
A^ QO 000 tl --.
d. Will any structures be demolished? If so, what?
e. What is the current zoning classification of the site.� 1 d d c- 5
f. What is the current comprehensive plan designation of the site?
C66� "
g. If applicable, what is the current Shoreline Master Program designation of the site?
h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify.
1 l/
/0 (Akz OW&64�
i. Approximately how many people would reside or work in the completed project?
j. Approximately how many people would the completed project displace?
k. Proposed measures to avoid or reduce displacement impacts, if any:
Mason County Environmental Checklist Page 9
I. Proposed measures to ensure the proposal is compatible with existing and projected land uses
if any: r r w
and tans
p Y' � �'
11 f '
9. HOUSING:
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or
low-income housing.
"1
b. Approximately how many/ nit i any, woul b lminated? Indicate whether high, middle, or
low-income housing.
C. Proposed measures reduce,or control housing impacts, if any:
10. AESTHETICS:
a. What is the tallest height of any proposed structure(s), not including antennas-, what is the
principal exterior building material(s) proposed?
b. What views in the immediate vicinity would be altered or obstructed?
C. Proposed measures to reduce or control aesthetic impacts, if any.
Mason County Environmental Checklist Page 10
11. LIGHT AND GLARE
a. What type of light or glare will the proposal produce? What time of day would it mainly occur?
b. Could light or glare from the finished project be a safety hazard or interfere with views?
N49
C. What existing off-site sources of light or glare may affect your proposal:
d. Proposed measures to reduce or control light and glare impacts, if any:
Na14,
12. RECREATION:
a. What designated and informal recreational opportunities are in the immediate vicinity?
b. Would the proposed project displace any existing recreational uses? If so, describe.
C. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
/AJ o vie-,
Mason County Environmental Checklist Page 11
13. HISTORIC AND CUL
TURAL PRESERVATION:
a. Are there any places or objects listed on, or proposed for, national, state, or local preservation
registers known to be on or next to the site? If so, generally describe.
b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural
importance known to be on or next to the site.
C. Proposed measures to reduce or control impacts, if any:
14. TRANSPORTATION:
a. Identify public streets and highways serving the site and describe proposed access to the
existing street system. Show on site `1�lans, if any.
b. Is site currently served by public transit? If not, what is the approximate distance to the
existing street system? Show on site plans, if any.
C. How many parking spaces would the completed project have? How many would the project
eliminate?
d. Will the proposal require any new roads or streets, or improvements to existing roads or
streets, not including driveways? If so, generally describe (indicate whether public or private).
AIC3?
Mason County Environmental Checklist Page 12
o water, rail or air transportation? If
e. WIII the project use (or occur In the immediate vicinity f)
so, generally describe.
X/O
f. How many vehicular trips per day would be generated by the completed project: If known,
indicate when peak volumes would occur. VO
g. Proposed measures to reduce or control transportation impacts, if any:
15. PUBLIC SERVICES:
a. Would the project result in an increased need for public service (for example: fire protection,
police protection, health care, schools, other)?
If so, generally describe: /O
b. Proposed measures to reduce or control direct impacts on public services, if any:
Mason County Environmental Checklist Page 13
16. UTILITIES:
a. Circle utilities currently available at the site: ectric' , natural ga wate refuse service,
elepho: , sanitary sewer,(septic syste other:
b. Describe the utilities that are proposed for the project, the utility providing the service, and the
general construction activities on the site or in the immediate vicinity which might be needed.
Signature:
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relying on them to make its decision.
Signature:
Date submitted:
Mason County Environmental Checklist Page 14
ESA LISTED SALMONIDS CHECKLIST 60 0"
Applicant Information Project Information
Name �I + �-ul� - �r_:x r. ;r� � Name Shd,.JlAt— RLc-s I�Skr-w i
Phone Location St )►.J Scc BUJ iz aLj
Description _.
v
r '
fr �
and government agencies, identify when a project
This worksheet was designed to help project proponents, a g g fy P J
g P
needs further analysis regarding adverse effects on ESA (Endangered Species Act) listed salmonlds. S almonids
are salmon, trout and chars, e.g. bull trout. For our purposes, "ESA Listed Salmonids" is defined as fish species
listed as endangered,threatened or being considered for listing.
If ESA listed species are present or ever were present in the water shed where your project will be located, your
project has the potential for affecting them, and you need to comply with the ESA. The questions in this section
will help determine if the ESA listings will impact your project.
The Fish Program Manager at the appropriate Department of Fish and Wildlife (DFW) regional office can provide information for the
following two questions.
1. Are ESA listed salmonids currently present in the watershed in which your project will be located?
YES x NO Please describe.
2. Has there ever been an ESA listed salmonid stock present in this watershed?
YES NO Uncertain Please describe.
If you answered "yes" to either of the above questions, you should complete the remainder of this
checklist.
April 2003
Mason County Environmental Checklist Page 15
i
PROJECT SPECIFICES: The questions in this section are specific to the project and vicinity.
1. Name of watershed: WZ
�1�
2. Name of nearest waterbody:
3. W at is the stance �om this project to the nearest body of water:
�, C tt Often a buffer between the project and a stream can reduce
the chance of a nega've impaq fish.
4. What is the current land use between the rod ct and the potentially affected water body (parking lots,
farmland,etc.)?
o
5. Is the project above a:
* natural permanent barrier(waterfall) YES NO
* natural temporary barrier(beaver pond) YES NO
* man-made barrier(culvert, dam) YES NO
* other(explain):
6. If yes, are there any resident salmonid populations above the blockage?
YES NO Don't know
7. What percent of the project will be impervious surface (including pavement&roof area)?
Mason County Environmental Checklist Page 16
FISH MIGRATION: The following questions will help determine if this project could interfere with
migration of adult and juvenile fish.
Both increases and decreases in water flows can affect fish migration.
1. Does the project require the withdrawal of:
a. Surface water? YES NO
Amount
Name of surface water body
b. Ground water? YES NO
Amount
From where
Depth of well
2. Will any water be rerouted: YES NO
If yes, will this require a channel change?
3. Will there be retention or detention ponds? YES NO
If yes,will this be an infiltration pond or a surface discharge to either a municipal storm water system or
a surface water body?
If to a surface water discharge, please give the name of the waterbody.
4. Will this project require the building of new roads? YES NO
Increased road mileage may affect the timing of water reaching a stream and may impact fish habitat.
5. Are culverts proposed as part of this project? YES NO
6. Will topography char es affect the duration/direction of runoff flows?
YES NO 7 If yes, describe the changes.
7. Will the project involve any reduct' n of the floodway or floodplain by filling or other partial blockage
of flows? YES NO If yes, how will the loss of flood storage be mitigated by your
project?
Mason County Environmental Checklist Page 17
WATER QUALITY: The following questions will help determine if this project could
Adversely impact water quality. Such impacts can cause problems for listed species.
Water quality can be made worse by runoff from impervious surfaces,altering water temperature,discharging
contaminants,etc.
l. Do you know of any problems with water quality, in any of the streams, within this watershed? YES
NO If yes, describe. IotJ � � �v.
2. Will your project either reduce or increase shade along or over a waterbody?
YES NO
Removal of shading vegetation or the building of structures such as docks or floats often results in a change in shade.
3. Will the project increase nutrient loading or have the potential to increase nutrient loading or
contaminants (fertilizers, other waste discharges,or runoff)to the waterbody? YES NO
4. Will turbidity be inc ased because of construction of the project or during operation of the project?
YES _X NO
In-water or near water work will often increase turbidity.
5. Will your project require long term maintenance, i.e. bridge cleaning, highway salting, and chemical
sprays for vegetation management, clearing of parking lots?
YES NO If yes, please describe.
Mason County Environmental Checklist Page 18
VEGETATION: The following questions are designed to determine if the project will affect riparian
vegetation,thereby, adversely impacting salmon.
1. Will the project involve t r oval of any vegetation from the stream banks:
YES NO
If yes, please describe the existing conditions, and the amount and type of vegetation to be removed.
2. If any vegetation is removed, do you plan to re-plant?
YES NO If yes, what types of plants will you use? l'
Mason County Environmental Checklist Page 19
I
�.'♦ .r e r.�.1't♦ .,� 1 1 1 V'..�5' {{♦♦♦i hi 1 M i t ��+f-1 1 ~Y v�..!�-/♦ � � ..' --. I-I.1 �t
-.:-'r- .,..,Lit-27.� '�i=T « � . . � ..-.�F;±� • K '.
.c...{+-•sue.}...'.::" [�:3 :.
-...:• =•�t"!'�. :a c n A i l'>-+ti.li.�++1��t l l �f �,+.. �-i-l i' i�h+�..? y�w
Skokomish Indian Tribe
Natural Resources Department (360) 877-5213
N. 541 Tribal Center Road Fax (360)877-5148 Skokomish Nation,WA 98584
January 20", 2010
Environmental Review Application No.: SEP2009-00097
Project Name: Haven Lake shoreline reestablishment
Description of Proposal: Remove 15 cu. yds. Of gravel materials deposited along haven
Lake shoreline during Dec. 2007 storms;area of existing dock in lake will be functional
again and shoreline will be replanted with native species.
Location: 2000 NE Tahuya Blacksmith Rd
Tahuya, WA 98588
Proponent: Jill Vaden
Dear Allan,
It has been determined that the above project will not have any negative
environmental impacts to the Skokomish Tribe and/or their resources if the following
mitigation measures are adhered to. Given that salmonids are present in Haven Lake and
have the potential to use the downstream reaches,all measures need to be taken to
prevent excess sediments from entering the waters of the state. As such sediment and
erosion control measures need to be taken during and after construction to prevent
sediments from entering the waters of the state. See WDOE and/or WDFW best
management practices for preventing sediments form entering state waters.
The Skokomish Tribes Tribal. Historic Preservation Officer will be providing
comment as to the potential cultural impacts of this SEPA and you should not move
forward with the above project until you receive those continents. Thank you for
including the Skokomish Tribe in the planning process, if you have any questions about
the comments provided herein please contact Randy N. Lumper(Environmental Planner)
at 1-360-877-5213 ext#508 or email them to rlumper@,skokomish.org.
Sincerely,
ro
Joseph Pavel
Director
Skokomish Natural Resources Department
i
a
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
PO Box 47775 •Olympia, Washington 98504-7775 •(360)407-6300
711 for Washington Relay Service •Persons with a speech disability can call 877-833-6341
January 20,2010
Allan Borden, Planner Your address
Mason County sy is in the
Department of Community Development » Kitsap
Planning Division watershed
PO Box 279
Shelton,WA 98584
Dear Mr. Borden:
Thank you for the opportunity to comment on the determination of nonsignificance for the Haven Lake
Shoreline Re-Establishment project(SEP2009-00097)located at 2000 Northeast Tahuya Blacksmith Road
in Tahuya as proposed by Steven and Jill Vaden. The Department of Ecology(Ecology) reviewed the
environmental checklist and has the following comment(s):
WATER QUALITY: Roberta Woods(360)407-6269
Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of
Chapter 90.48 RCW,Water Pollution Control,and WAC 173-201A,Water Quality Standards for
Surface Waters of the State of Washington,and is subject to enforcement action.
Erosion control measures must be in place prior to any clearing,grading,or construction. These
control measures must be effective to prevent stormwater runoff from carrying soil and other
pollutants into surface water or storm drains that lead to waters of the state. Sand,silt,clay
particles,and soil will damage aquatic habitat and are considered to be pollutants.
Proper disposal of construction debris must be on land in such a manner that debris cannot enter
seasonal drainage or cause water quality degradation of state waters.
During construction,all releases of oils, hydraulic fluids,fuels,other petroleum products, paints,
solvents,and other deleterious materials must be contained and removed in a manner that will
prevent their discharge to waters and soils of the state. The cleanup of spills should take
precedence over other work on the site.
Dredged sediments from your project(e.g.,gravel and mud) cannot be deposited in the lake and the
seasonal drainage or their buffers,or any waters of the state. The buffers should be marked with
flagging or stakes before the start of any gravel removal from the lake.
Ecology's comments are based upon information provided by the lead agency. As such,they may not
constitute an exhaustive list of the various authorizations that must be obtained or legal requirements
that must be fulfilled in order to carry out the proposed action.
If you have any questions or would like to respond to these comments, please contact the appropriate
reviewing staff listed above.
Department of Ecology
Southwest Regional Office
(S M: 10-0069)
cc: Roberta Woods,WQ
Steven and Jill Vaden (Applicant)
Lee Bood (Contact)