HomeMy WebLinkAboutSEP2014-00062 - SEP Determinations - 10/24/2014 STgrFO'o MASON COUNTY
O DEPARTMENT OF COMMUNITY DEVELOPMENT
O
o A u �= Planning Division
i o T �? P O Box 279, Shelton, WA 98584
ooJ Y ~ (360)427-9670
1864
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-340)
SEP2014-00062
Description of Proposal: Bulkhead replacement on two lots (75 ft. + 75 ft. length), 4 ft.
maximum height, concrete wall with footing; located 4 to 6 ft. back
from existing stacked blocks or wood.
Proponent: ATES & WILLIAMS BULKHEAD
Location of Proposal: 60 NE LAKE DR TAHUYA
Parcel Number: 223305000162
Legal Description: HAVEN LAKE TR 162 & NE 25' TR 161 -DPC #03-44
Directions to Site: BELFAIR TO BELFAIR TAHUYA RD TO TAHUYA BLACKSMITH
RD, TO LAKE DR TO SITE ADDRESS
Lead Agency: Mason County
The Lead Agency for this proposal has determined that it does not have a probable significant
adverse impact on the environment. An Environmental Impact Statement (EIS) is not required
under RCW 43.21 C.030(2)(c). This decision was made after review of a completed
Environmental Checklist and other information on file with the Lead Agency. This information is
available to the public upon request.
Please contact Allan Borden at ext. 365 with any questions. This DNS is issued under WAC
197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown
below, when the determination is final. Comments must be submitted to Dept. of Community
Development, P.O. Box 279, Shelton WA 98584 by 11/7/2014. Appeal of this determination
must be filed within a 14-day period following this final determination date, per Mason County
Code Chapter 15.11 Appeals g&
k 04 ( y
Authoriz d Local Government Official Date
From: Allan Borden
To: SEPA review list
CC: Allan Borden
Date: 10/24/2014 12:35 PM
Subject: Ates & Williams bulkhead Haven Lk. SEP2014-00062 checklist
Attachments: ates williams bulkhead SEP2014-00062 checklist.pdf
SEPA Reviewer:
Please find the SEP2014-00062 checklist review for Ates & Williams bulkhead at Haven Lk.
northwest of Belfair area. Cover sheet and the checklist as a PDF format document is
attached. Comment Deadline is November 17, 2014.
Allan Borden
Planner - Long Range & Site Inspection
426 W. Cedar St., Shelton, WA 98584
(360) 427-9670 ext. 365
T 23;R--
F2
L ne
01
4b,
POR D\N Ay /y4VEN WA
T23NR3W La ake
7V T23N C7
73-R:4
NE SHOE LAKE RD
NE WINDFLOWER WAY
eX
Jy
T22NR3W NR2W
Igo ke
W-*E 2 1 incl ,, 2,101 feel
-,A 1 0 6Z' 1 inch = 0 miles � ����� �liv?J8
S
r�� •� � `'� +"�" "fir ,r�� �: :�.
- `
a
�` 'fir I•� .�. `�� ���� •�`�► ` �
y � �
CO
J
Z ..
*Yb o
I
IkL
Yam. '�• ^I, �� '". s ° yi•a .:`7
!. Source: E-sri, DDiyitalGlolbe, GeoEye, i-cubedW'US+ 1J`�(�:S M X
Cyeurrr ppin.g, erogrid,, IG ,.IGP wiss o�po d the GIS ser G�ori�rr
1
N
1 inch = 200 feet
W` E
1 inch = 0 miles
S
1I
1!
alti n
.a'
a 4w
YA
„, iil! •�., .. fir. -. �
t 223305000164
*AV
•
A h e
D
1 � s
- a
223302222222
k t 50
r
f
tr.
F
223305000156
S• rce: E—sri. DigitalGlobe, GeoE,ye. i-cubed. SDA USGS.AE�X.
G�etmappin.g.Aerogrid, IGN. IGP. swissdopo an TILKS-11111.,er Community
N
1 inch = 50 feet
W E
1 inch = 0 miles
S
I -
Site Plan
cceea In protwctld buildlrq
PI pie,Chock After Doing Site pion: (t�Septic and dralnUeltl of slco
roperry dlmonsione @r linos sad and Elovallon of praperlY
s—_— — a W�ap I-31N l Setbacksalpopo Bodies of Wolof
TOWn�(,OUCltit�!_ S„wa.j,621tedµw99-LY—WIId, xtspngtx,ltdl.,.
a110 ase-i171 AMrK" 1• xlsling{wNdinpa t'loorpinn
POST FpAME BUI4DItd(i5 Evewe:1 1 70b 7{1t+S f proposed bulWlrtg L�ealn road with name l
/ I&WIe��ed'FuMn:(20,6) Lusanlanl$ 1� t
-11�.1. & Jnb sfro Pddiosa'
FAX:Ituet l{2-t�In TNr p.w: t•606+l2{-05'S7 n ..
tovvtlCPFu911L7 Job Nam:-._ r l
Q-11ry;pW cw h.. l npul Uoacr4lton
TAX ACCOUNT#
.__�._.....__ ...
-•r'
r _
...A
.f�1 IN G
cm
"-!ALL SETBACKS ARE MEASUREID
�-• 3 r __ :...._; ...: ....�....F�tO(�L..TWE FURTHEST' _...__..
U 0- __...._. __..... .
W
'PROJ CT•ION.:OF-THE•BUI•LI I'll
,
CV __.,.._.__.........._.........
i171-1
rT
t O
j
TV
♦R •r
tw
z
'WRaYos"��
a
J
,,c �, .,.........., _. ia�
,
.. G1tt.P�G?R
...........
• .' •NtS 'tea- ' -� 1 .. .�., ._.;--....,..y�S �
S
.....
_.. .. .. .. '�►c � � /� if � Il��'I�C.G'ai.:.�. � `i
l.�
1
. M '.. •... .... .. .. _� •r J. .. .�i+r>l.�'.•Yl.ri.• �.r.'.i 1. r�,'ti���{Pi:Y+•�'-0'.a�.�.br..�.
. "i�' i�4 N►c" J G J
N � I
o _'A
f 1
o
R'"+-" ,_;
aYs ';:=_��1�`:
A40
TT � �
4 PROVIDE FLOOD
PROOF COATING
2"0 DRAINS
AT 12` 0-C_ a-=
GROUND
a i I SURFACE !t` tsted P i
777
ZIP
W�.
• I !
.0
d�
qr
e
aw
44.
�b
t�
3F.
- too 6
A. background
1. Name of proposed project, if applicable:
2. Name of applicant: ,lie vc 4-1,-S
3. Address and phone number of applicant and contact person: L-gke- D/: ���ya kir} gas
4. Date checklist prepared: /p-3-20 y
5. Agency requesting checklist: M0.30n lotln
6. Proposed timing or schedule (including phasing, if applicable): QC-f-dbe,,-
7. Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal? If yes, explain. 17
8. List any environmental information you know about that has been prepared, or will be
prepared, directly related to this proposal. A/A.
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain./7 0
10. List any government approvals or permits that will be needed for your proposal, if known.
1
SEP/-Q � 5h X
11. Give brief, complete description of your proposal, including the proposed uses and the size
of the project and site. There are several questions later in this checklist that ask you to
describe certain aspects of your proposal. You do not need to repeat those answers on this
page. (Lead agencies may modify this form to include additional specific information on project
description.) I U /
I(�ep l®c� b
�x,.�,�� � SAG,
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 2 of 13
12. Location of the proposal. Give sufficient information for a person to understand the precise
location of your proposed project, including a street address, if any, and section, township, and
range, if known. If a proposal would occur over a range of area, provide the range or
boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic
map, if reasonably available. While you should submit any plans required by the agency, you
are not required to duplicate maps or detailed plans submitted with any permit applications
related to this checklist. 0 0016 D tcLaw-5
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site La ke- 'F'%,t o"
(circle one): Flat, rolling, hilly, steep slopes, mountainous, other a K FK'a,1 t F/G 1�
b. What is the steepest slope on the site (approximate percent slope)? Nk
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them and note any
agricultural land of long-term commercial significance and whether the proposal results in
removing any of these soils. Son dot gr4,�,e /
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe. w h
e. Describe the purpose, type, total area, and approximate quantities and total affected area of
any filling, excavation, and 7rading proposed. Indicate source of fill.
Q.f/uc MA-w' #.*(&//'e L,sP ,fir be,c K
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. AHf
�.c Joel two lleo� gs ®(f ri^��e/ �r�f'oi�� /Ir�U /e C1 vr✓� ��. /N�s67 �e��fyd�i����
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)? 0
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: 51'/+ f<rIL
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 3 of 13
2. Air
a. What types of emissions to the air would result from the proposal during construction,
operation, and maintenance when the project is completed? If any, generally describe and
give approximate quantities if known.YA
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe. N.4
c. Proposed measures to reduce or control emissions or other impacts to air, if any: �✓
3. Water
a. Surface Water:
1) Is there any surface water body on or in the immediate vicinity of the site (including
year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe
type and provide names. If appropriate, state what stream or river it flows into. �aveli /-r e
2) Will the project require any work over, in, or adjacent to (within 200 feet)the described
waters? If yes, please describe and attach available plans. HI veil la ke
3) Estimate the amount of fill and dredge material that would be placed in or removed
from surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material. [V4
4)Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known. N/�
5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.Y,4
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge. AIA
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 4 of 13
b. Ground Water:
1)Will groundwater be withdrawn from a well for drinking water or other purposes? If so,
give a general description of the well, proposed uses and approximate quantities
withdrawn from the well. Will water be discharged to groundwater? Give general
description, purpose, and approximate quantities if known. tA-
2) Describe waste material that will be discharged into the ground from septic tanks or
other sources, if any (for example: Domestic sewage; industrial, containing the
following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the
number of such systems, the number of houses to be served (if applicable), or the
number of animals or humans the system(s) are expected to serve. h fA,
c. Water runoff(including stormwater):
1) Describe the source of runoff(including storm water) and method of collection
and disposal, if any (include quantities, if known). Where will this water flow?
Will this water flow into other waters? If so, describe. (VA
2) Could waste materials enter ground or surface waters? If so, generally describe. I/A
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If
so, describe. t4 A
d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage
pattern impacts, if any: N►�
4. Plants
a. Check the types of vegetation found on the site:
deciduous tree: Orchards, vineyards
alder, maple, aspen, other or other permanent crops.
evergreen tree: water plants: water lily, eell
fir, cedar, pine, other grass, milfoil, other
shrubs wet soil plants:cattail,
X grass buttercup, bullrush, skunk
_pasture cabbage, other
crop or grain other types of vegetation
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 5 of 13
b. What kind and amount of vegetation will be removed or altered? vt1L
9 IV
c. List threatened and endangered species known to be on or near the site.
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site if an
9 � :Y
e. List all noxious weeds and invasive species known to be on or near the site. w7k
5. Animals
a. List any birds and other animals which have been observed on or near the site or are known
to be on or near the site. Examples include:
birds: hawk, heron, eagle, songbirds, other:
mammals: deer, bear, elk, beaver, other:
fish: bass, salmon, trout, herring, shellfish, other
b. List any threatened and endangered species known to be on or near the site.O'
c. Is the site part of a migration route? If so, explain. fVO
d. Proposed measures to preserve or enhance wildlife, if any: N14
e. List any invasive animal species known to be on or near the site. M4
6. Energy and natural resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet
the completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc. W,
b. Would your project affect the potential use of solar energy by adjacent properties?
If so, generally describe. N
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any:
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 6 of 13
7. Environmental health
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal?
If so, describe. NA_
1) Describe any known or possible contamination at the site from present or past uses.VA
2) Describe existing hazardous chemicals/conditions that might affect project development
and design. This includes underground hazardous liquid and gas transmission pipelines
located IV r-
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced
during the project's development or construction, or at any time during the operating
life of the project. N/+
4) Describe special emergency services that might be required. V,4-
5) Proposed measures to reduce or control environmental health hazards, if any: N/�
b. Noise
1) What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)? J(74
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, onstruction, operation, other)? Indi-
cate what hours noise would come from the site. f VV�
J
3) Proposed measures to reduce or control noise impacts, if any./-T
8. Land and shoreline use
a. What is the current use of the site and adjacent properties?Will the proposal affect current
land uses on nearby or adjacent properties? If so, describe. VO
b. Has the project site been used as working farmlands or working forest lands? If so, describe.
How much agricultural or forest land of long-term commercial significance will be converted to
other uses as a result of the proposal, if any? If resource lands have not been designated,
how many acres in farmland or forest land tax status will be converted to nonfarm or
nonforest use? 110
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 7 of 13
1) Will the proposal affect or be affected by surrounding working farm or forest land normal
business operations, such as oversize equipment access, the application of pesticides,
tilling, and harvesting? If so, how: po ,
c. Describe any structures on the site. S'"Y le ��;/�, /-s
d. Will any structures be demolished? If so, what? //)0
e. What is the current zoning classifications of the site? 5',y fC y
"irl -5
f. What is the current comprehensive plan de ignation of the site? i'n9le Fo,-,
u rc �Q—
g. If applicable, what is the current shoreline master program designation of the site? (�A
V V b6'4t
h. Has any part of the site been classified as a critical area by the city or county? If so, specify.
i. Approximately how many people would reside or work in the completed project? T&."fq
j. Approximately how many people would the completed project displace? 012,46
k. Proposed measures to avoid or reduce displacement impacts, if any: W*
L. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any: (J,4-
m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest
lands of long-term commercial significance, if any: M,4
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, mid-
dle, or low-income housing. Vfj
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing. Y4
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 8 of 13
c. Proposed measures to reduce or control housing impacts, if any: �11rrQ
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed? V,+
b. What views in the immediate vicinity would be altered or obstructed? no-'(e
c. Proposed measures to reduce or control aesthetic impacts, if any: 01�
11. Light and glare
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur? N.4--
b. Could light or glare from the finished project be a safety hazard or interfere with views?
c. What existing off-site sources of light or glare may affect your proposal?/1a1 e
d. Proposed measures to reduce or control light and glare impacts, if any:
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity? Vll
b. Would the proposed project displace any existing recreational uses? If so, describe. 00
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any: +
13. Historic and cultural preservation
a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years
old listed in or eligible for listing in national, state, or local preservation registers located on or
near the site? If so, specifically describe. ()0
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 9 of 13
b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation?
This may include human burials or old cemeteries. Are there any material evidence, artifacts,
or areas of cultural importance on or near the site? Please list any professional studies
conducted at the site to identify such resources. N,4--
c. Describe the methods used to assess the potential impacts to cultural and historic resources
on or near the project site. Examples include consultation with tribes and the department of
archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc.V14
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance
to resources. Please include plans for the above and any permits that may be required. N+
14. Transportation
a. Identify public streets and highways serving the site or affected geographic area and
describe proposed access to the existing street system. Show on site plans, if any. VA-
b. Is the site or affected geographic area currently served by public transit? If so, generally
describe. If not, what is the approximate distance to the nearest transit stop?k4
c. How many additional parking spaces would the completed project or non-project proposal
have? How many would the project or proposal eliminate? #14
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian,
bicycle or state transportation facilities, not including driveways? If so, generally describe
(indicate whether public or private). Al,+
e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe. Nr�
f. How many vehicular trips per day would be generated by the completed project or proposal?
If known, indicate when peak volumes would occur and what percentage of the volume would
be trucks (such as commercial and nonpassenger vehicles). What data or transportation
models were used to make these estimates?Yll-
g. Will the proposal interfere with, affect or be affected by the movement of agricultural and
forest products on roads or streets in the area? If so, generally describe.All -
h. Proposed measures to reduce or control transportation impacts, if any: /V//-
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 10 of 13
15. Public services
a. Would the project result in an increased need for public services (for example: fire protection,
police protection, public transit, health care, schools, other)? If so, generally describe./)O
b. Proposed measures to reduce or control direct impacts on public services, if any. rvA
16. Utilities
a. Circle utilities currently available at the site:
electrici , natural gas a , refuse service 6ph;
, sanitary sew septic system,
other
b. Describe the utilities that are proposed for the project, the utility providing the service,
and the general construction activities on the site or in the immediate vicinity which might
be needed. l `Oil C-
C. Signature
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relying on the o make its decision.
Signature: _ ��.i� �1�
Print name of signee � CPe
Position and Agency/Organization
Date Submitted: I0
SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 11 of 13