Loading...
HomeMy WebLinkAboutSEP2014-00062 - SEP Determinations - 10/24/2014 STgrFO'o MASON COUNTY O DEPARTMENT OF COMMUNITY DEVELOPMENT O o A u �= Planning Division i o T �? P O Box 279, Shelton, WA 98584 ooJ Y ~ (360)427-9670 1864 DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-340) SEP2014-00062 Description of Proposal: Bulkhead replacement on two lots (75 ft. + 75 ft. length), 4 ft. maximum height, concrete wall with footing; located 4 to 6 ft. back from existing stacked blocks or wood. Proponent: ATES & WILLIAMS BULKHEAD Location of Proposal: 60 NE LAKE DR TAHUYA Parcel Number: 223305000162 Legal Description: HAVEN LAKE TR 162 & NE 25' TR 161 -DPC #03-44 Directions to Site: BELFAIR TO BELFAIR TAHUYA RD TO TAHUYA BLACKSMITH RD, TO LAKE DR TO SITE ADDRESS Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. Please contact Allan Borden at ext. 365 with any questions. This DNS is issued under WAC 197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, P.O. Box 279, Shelton WA 98584 by 11/7/2014. Appeal of this determination must be filed within a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals g& k 04 ( y Authoriz d Local Government Official Date From: Allan Borden To: SEPA review list CC: Allan Borden Date: 10/24/2014 12:35 PM Subject: Ates & Williams bulkhead Haven Lk. SEP2014-00062 checklist Attachments: ates williams bulkhead SEP2014-00062 checklist.pdf SEPA Reviewer: Please find the SEP2014-00062 checklist review for Ates & Williams bulkhead at Haven Lk. northwest of Belfair area. Cover sheet and the checklist as a PDF format document is attached. Comment Deadline is November 17, 2014. Allan Borden Planner - Long Range & Site Inspection 426 W. Cedar St., Shelton, WA 98584 (360) 427-9670 ext. 365 T 23;R-- F2 L ne 01 4b, POR D\N Ay /y4VEN WA T23NR3W La ake 7V T23N C7 73-R:4 NE SHOE LAKE RD NE WINDFLOWER WAY eX Jy T22NR3W NR2W Igo ke W-*E 2 1 incl ,, 2,101 feel -,A 1 0 6Z' 1 inch = 0 miles � ����� �liv?J8 S r�� •� � `'� +"�" "fir ,r�� �: :�. - ` a �` 'fir I•� .�. `�� ���� •�`�► ` � y � � CO J Z .. *Yb o I IkL Yam. '�• ^I, �� '". s ° yi•a .:`7 !. Source: E-sri, DDiyitalGlolbe, GeoEye, i-cubedW'US+ 1J`�(�:S M X Cyeurrr ppin.g, erogrid,, IG ,.IGP wiss o�po d the GIS ser G�ori�rr 1 N 1 inch = 200 feet W` E 1 inch = 0 miles S 1I 1! alti n .a' a 4w YA „, iil! •�., .. fir. -. � t 223305000164 *AV • A h e D 1 � s - a 223302222222 k t 50 r f tr. F 223305000156 S• rce: E—sri. DigitalGlobe, GeoE,ye. i-cubed. SDA USGS.AE�X. G�etmappin.g.Aerogrid, IGN. IGP. swissdopo an TILKS-11111.,er Community N 1 inch = 50 feet W E 1 inch = 0 miles S I - Site Plan cceea In protwctld buildlrq PI pie,Chock After Doing Site pion: (t�Septic and dralnUeltl of slco roperry dlmonsione @r linos sad and Elovallon of praperlY s—_— — a W�ap I-31N l Setbacksalpopo Bodies of Wolof TOWn�(,OUCltit�!_ S„wa.j,621tedµw99-LY—WIId, xtspngtx,ltdl.,. a110 ase-i171 AMrK" 1• xlsling{wNdinpa t'loorpinn POST FpAME BUI4DItd(i5 Evewe:1 1 70b 7{1t+S f proposed bulWlrtg L�ealn road with name l / I&WIe��ed'FuMn:(20,6) Lusanlanl$ 1� t -11�.1. & Jnb sfro Pddiosa' FAX:Ituet l{2-t�In TNr p.w: t•606+l2{-05'S7 n .. tovvtlCPFu911L7 Job Nam:-._ r l Q-11ry;pW cw h.. l npul Uoacr4lton TAX ACCOUNT# .__�._.....__ ... -•r' r _ ...A .f�1 IN G cm "-!ALL SETBACKS ARE MEASUREID �-• 3 r __ :...._; ...: ....�....F�tO(�L..TWE FURTHEST' _...__.. U 0- __...._. __..... . W 'PROJ CT•ION.:OF-THE•BUI•LI I'll , CV __.,.._.__.........._......... i171-1 rT t O j TV ♦R •r tw z 'WRaYos"�� a J ,,c �, .,.........., _. ia� , .. G1tt.P�G?R ........... • .' •NtS 'tea- ' -� 1 .. .�., ._.;--....,..y�S � S ..... _.. .. .. .. '�►c � � /� if � Il��'I�C.G'ai.:.�. � `i l.� 1 . M '.. •... .... .. .. _� •r J. .. .�i+r>l.�'.•Yl.ri.• �.r.'.i 1. r�,'ti���{Pi:Y+•�'-0'.a�.�.br..�. . "i�' i�4 N►c" J G J N � I o _'A f 1 o R'"+-" ,_; aYs ';:=_��1�`: A40 TT � � 4 PROVIDE FLOOD PROOF COATING 2"0 DRAINS AT 12` 0-C_ a-= GROUND a i I SURFACE !t` tsted P i 777 ZIP W�. • I ! .0 d� qr e aw 44. �b t� 3F. - too 6 A. background 1. Name of proposed project, if applicable: 2. Name of applicant: ,lie vc 4-1,-S 3. Address and phone number of applicant and contact person: L-gke- D/: ���ya kir} gas 4. Date checklist prepared: /p-3-20 y 5. Agency requesting checklist: M0.30n lotln 6. Proposed timing or schedule (including phasing, if applicable): QC-f-dbe,,- 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. 17 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. A/A. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain./7 0 10. List any government approvals or permits that will be needed for your proposal, if known. 1 SEP/-Q � 5h X 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) I U / I(�ep l®c� b �x,.�,�� � SAG, SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 2 of 13 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. 0 0016 D tcLaw-5 B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site La ke- 'F'%,t o" (circle one): Flat, rolling, hilly, steep slopes, mountainous, other a K FK'a,1 t F/G 1� b. What is the steepest slope on the site (approximate percent slope)? Nk c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. Son dot gr4,�,e / d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. w h e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and 7rading proposed. Indicate source of fill. Q.f/uc MA-w' #.*(&//'e L,sP ,fir be,c K f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. AHf �.c Joel two lleo� gs ®(f ri^��e/ �r�f'oi�� /Ir�U /e C1 vr✓� ��. /N�s67 �e��fyd�i���� g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? 0 h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: 51'/+ f<rIL SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 3 of 13 2. Air a. What types of emissions to the air would result from the proposal during construction, operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known.YA b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. N.4 c. Proposed measures to reduce or control emissions or other impacts to air, if any: �✓ 3. Water a. Surface Water: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. �aveli /-r e 2) Will the project require any work over, in, or adjacent to (within 200 feet)the described waters? If yes, please describe and attach available plans. HI veil la ke 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. [V4 4)Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. N/� 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.Y,4 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. AIA SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 4 of 13 b. Ground Water: 1)Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. tA- 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. h fA, c. Water runoff(including stormwater): 1) Describe the source of runoff(including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. (VA 2) Could waste materials enter ground or surface waters? If so, generally describe. I/A 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. t4 A d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: N►� 4. Plants a. Check the types of vegetation found on the site: deciduous tree: Orchards, vineyards alder, maple, aspen, other or other permanent crops. evergreen tree: water plants: water lily, eell fir, cedar, pine, other grass, milfoil, other shrubs wet soil plants:cattail, X grass buttercup, bullrush, skunk _pasture cabbage, other crop or grain other types of vegetation SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 5 of 13 b. What kind and amount of vegetation will be removed or altered? vt1L 9 IV c. List threatened and endangered species known to be on or near the site. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site if an 9 � :Y e. List all noxious weeds and invasive species known to be on or near the site. w7k 5. Animals a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: birds: hawk, heron, eagle, songbirds, other: mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other b. List any threatened and endangered species known to be on or near the site.O' c. Is the site part of a migration route? If so, explain. fVO d. Proposed measures to preserve or enhance wildlife, if any: N14 e. List any invasive animal species known to be on or near the site. M4 6. Energy and natural resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. W, b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. N c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 6 of 13 7. Environmental health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. NA_ 1) Describe any known or possible contamination at the site from present or past uses.VA 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located IV r- 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. N/+ 4) Describe special emergency services that might be required. V,4- 5) Proposed measures to reduce or control environmental health hazards, if any: N/� b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? J(74 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, onstruction, operation, other)? Indi- cate what hours noise would come from the site. f VV� J 3) Proposed measures to reduce or control noise impacts, if any./-T 8. Land and shoreline use a. What is the current use of the site and adjacent properties?Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. VO b. Has the project site been used as working farmlands or working forest lands? If so, describe. How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? 110 SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 7 of 13 1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: po , c. Describe any structures on the site. S'"Y le ��;/�, /-s d. Will any structures be demolished? If so, what? //)0 e. What is the current zoning classifications of the site? 5',y fC y "irl -5 f. What is the current comprehensive plan de ignation of the site? i'n9le Fo,-, u rc �Q— g. If applicable, what is the current shoreline master program designation of the site? (�A V V b6'4t h. Has any part of the site been classified as a critical area by the city or county? If so, specify. i. Approximately how many people would reside or work in the completed project? T&."fq j. Approximately how many people would the completed project displace? 012,46 k. Proposed measures to avoid or reduce displacement impacts, if any: W* L. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: (J,4- m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest lands of long-term commercial significance, if any: M,4 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, mid- dle, or low-income housing. Vfj b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. Y4 SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 8 of 13 c. Proposed measures to reduce or control housing impacts, if any: �11rrQ 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? V,+ b. What views in the immediate vicinity would be altered or obstructed? no-'(e c. Proposed measures to reduce or control aesthetic impacts, if any: 01� 11. Light and glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? N.4-- b. Could light or glare from the finished project be a safety hazard or interfere with views? c. What existing off-site sources of light or glare may affect your proposal?/1a1 e d. Proposed measures to reduce or control light and glare impacts, if any: 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? Vll b. Would the proposed project displace any existing recreational uses? If so, describe. 00 c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: + 13. Historic and cultural preservation a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers located on or near the site? If so, specifically describe. ()0 SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 9 of 13 b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. N,4-- c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc.V14 d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. N+ 14. Transportation a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. VA- b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop?k4 c. How many additional parking spaces would the completed project or non-project proposal have? How many would the project or proposal eliminate? #14 d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). Al,+ e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. Nr� f. How many vehicular trips per day would be generated by the completed project or proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and nonpassenger vehicles). What data or transportation models were used to make these estimates?Yll- g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe.All - h. Proposed measures to reduce or control transportation impacts, if any: /V//- SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 10 of 13 15. Public services a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe./)O b. Proposed measures to reduce or control direct impacts on public services, if any. rvA 16. Utilities a. Circle utilities currently available at the site: electrici , natural gas a , refuse service 6ph; , sanitary sew septic system, other b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. l `Oil C- C. Signature The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on the o make its decision. Signature: _ ��.i� �1� Print name of signee � CPe Position and Agency/Organization Date Submitted: I0 SEPA Environmental checklist(WAC 197-11-960) May 2014 Page 11 of 13