Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SEP2010-00034 - SEP Determinations - 6/9/2010
oN STATF MASON COUNTY C �� DEPARTMENT OF COMMUNITY DEVELOPMENT s° i Planning Division ° Y P O Box 279, Shelton, WA 98584 (360)427-9670 1864 DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-340) SEP2010-00034 Description of Proposal New fixed wooden dock extending 28 feet into Haven Lake; 4.5 ft. wide by 12 ft long section at shore and 12 ft. wide by 16 ft. long section farther into the lake. Proponent: RODNEY K POLSON Location of Proposal: 170 NE LAKE DR TAHUYA Parcel Number: 223305000174 Legal Description: HAVEN LAKE TR. 174 Directions to Site: Belfair Tahuya Rd. to Haven Rd. to Lake Dr. on west side of Haven Lake. Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. Please contact Allan Borden at ext. 365 with any questions. This DNS is issued under WAC 197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, P.O. Box 279, Shelton WA 98584 by 6/23/2010. Appeal of this determination must be filed within a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. o �oq Authorized Local Government Official Date MASON CO. ENVIROMENTAL CHECKLIST A. BACKGROUND � ?.��d 6003 f 1. Name of proposed project, if applicable: �DoCk Tor Lo� 4 1'1q 1 Rk t> 2z33b � b�l`l y 2. Name of applicant: O-)0nika, chson 3. Address and phone number of applicant and contact person: Imo- god. Polson z53- q�I-(oa75 4te25 S . 29q PI. 0,)#2Dto -4o(o-9539 AIJOW n , bJf� O M I 4. Date checklist prepared: 5 - b3 -2010 5. Agency requesting checklist: 6. Proposed timing or schedule (including phasing, if applicable): J J-) tot o - 7. Do you have any plans for future expansion, or further activity related to or connected with this proposal: If yes, explain. N,0 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. obn e' 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. N�3 10. List any government approvals or p/ � e�rmits that willbe needed for our proposal, if known. S UPP CViec,k + 11. Give a brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) �n Sfr 1- � �- -Sh aOC]L W;� Q X 12 Wal�l�w a-� a�-►.r� C. I Z' X lip, Ali' v�vw , �h i s 0 A loge 'm0c1E fvcm _k' A 1 u-M6-e, m ct L+ will be bu-'A ajor �o sts d n �P�,r►exit �Z�o�y s 12. What is the location of the proposal? Give sufficient information for a person to understand the precise location of your proposed project including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. l.-occ Curt t5 c-A- 1-70 N,t I-. C Dry-lV e, tS SO wtde, b'J 1 1� Will b- Pr y`f 5v of wb. "Cr l lace 6 Cwcov l ma4cl (to' -FrrmL � n orb �r ' B. ENVIRONMENTAL ELEMENTS: 1. EARTH: a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other Less IS% Sto fe_ b. What is the steepest slope on the site (approximate percent slope)? 1Z +a 1`t C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. d. Are there surface indications or history of unstable soils in the immediate vicinity: If so, describe. t`o Mason County Environmental Checklist Page 2 e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. N 04-- CCTX, � f. Could erosion occur as a result of clearing, construction, or use: If so, generally describe. )'�D g. About what percent of the site will be covered with impervious surfaces after project constructions (for example, asphalt or buildings)? '14o n2-, h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: IAO n e, 2. AIR: a. What types of emissions to the air would result from the proposal (i.e. dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. )4o o t, b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. Np Mason County Environmental Checklist Page 3 C. Proposed measures to reduce or control emissions or other impacts to air, if any: 3 WATER: a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. Fresh w6J-e-1- l oLlLe — /4&v c.' Lz'k.f_ — N� o'4A-r W CJe--(- 'P' C its 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. `{e s, -l-1ne (\oc L W M -E?AW 30 ' {tee on3 'VL c '}� 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. e, 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. ►4one" Mason County Environmental Checklist Page 4 5) Does the proposal li`e, within a 100-year floodplain? If so, note location on the site plan. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. ND 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example; domestic sewage, industrial, containing the following chemicals..., agricultural, etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. C. Water runoff (including storm water).- 1 Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this flow into other waters? If so, describe. �� koc*__ � S��-C M�i,r r -five �,oc.k�, - 'r" �c-ow'_ � 2) Could waste materials enter ground or surface waters: If so, generally describe. NO Mason County Environmental Checklist Page 5 d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: Ion-e, 4. PLANTS: a. Check or circle types of vegetation found on the site: deciduous tree: alder maple, aspen, other evergreen tree: fir, cedar pine other shrubs grass pasture crop or grain wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? I\A0n-R- c. List threatened or endangered species known to be on or near the site. Noo-e-, d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: ' o i �, r h�C.e_ `� Ve- �aAe '+ W�'1Th 1')Av c Y eC� t�` `c?vl' C Mason County Environmental Checklist Page 6 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: Birds: hawk, heron, eagle songbir other Mammals: deer bear, elk, beaver, of er Fish: ba salmon, trou erring, shellfish, other b. List any threatened or endangered species known to be on or near the site. � A0(\-e c. Is the site part of a migration route? If so, explain. d. Proposed measures to preserve or enhance wildlife, if any: n,Q, 6. ENERGY AND NATURAL RESOURCES: a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. No b. Would your project affect the po tential use of solar energy by adjacent properties. If so, generally describe. IAo C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: Mason CountyEnvironmental Checklist Page 7 7. ENVIRONMENTAL HEALTH: a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. 0 1) Describe special emergency services that might be required. IV,::>y'1-e- 2) Proposed measures to reduce or control environmental health hazards, if any: iA0 f\-e. b. Noise. 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? N�r�e, 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hour's noise would come from the site. S6(-f - ►Y` -I A rw- ��ikk saw �0.mrv�e.+ tnc� u�luu fie, 6, est +DoiS 1,Sea. 3) Proposed measures to reduce or control noise impacts, if any: 8. LAND AND SHORELINE USE: a. What is the current use of the site and adjacent properties? �( e Cr eo_'�-t©ncA o e Tr s w'mrn� , bocin Mason County Environmental Checklist Page 8 b. Has the site been used for agriculture? If so, describe. C. Describe any structures on the site. - " ✓"� S tr �2 re o-4 Sh e� 1 c. c o.�n o�ne.r 159 ��� �o►� `�11� d. Will any structures be demolished? If so, what? 1�o e. What is the current zoning classification of the site? � f. What is the current comprehensive plan designation of the site? -(�eureai�OOC,A fA� g. If applicable, what is the current Shoreline Master Program designation of the site? 1b R�S Jain �nvi`�nrv.e h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. No i. Approximately how many people would reside or work in the completed project? i�o,o j. Approximately how many people would the completed project displace? (YJn-e— k. Proposed measures to avoid or reduce displacement impacts, if any: Mason County Environmental Checklist Page 9 I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: Igo n� 9. HOUSING: a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. C. Proposed measures to reduce or control housing impacts, if any: N/(k 10. AESTHETICS: a. What is the tallest height of any proposed structure(s), not including antennas, what is the principal exterior building material(s) proposed? -Fv\�e &C-L v��ll eX � Pfox�m� y �8 I OJAe s a�Ov-e b. What views in the immediate vicinity would be altered or obstructed? No-�)-,-- c. Proposed measures to reduce or control aesthetic impacts, if any: I Aoyl e, Mason County Environmental Checklist Page 10 -11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? NL0-e b. Could light or glare from the finished project be a safety hazard or interfere with views? l \0 C. What existing off-site sources of light or glare may affect your proposal: Non-e. d. Proposed measures to reduce or control light and glare impacts, if any: �Acn-e 12. RECREATION: a. What designated and informal recreational opportunities are in the immediate vicinity? ISe.�ghbc�c�S SW(mm tnq , F�5hioq C—cJ bc)Anq b. Would the proposed project displace any existing recreational uses? If so, describe. t�o C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: Igo n e✓ Mason County Environmental Checklist Page 11 13. HISTORIC AND CULTURAL PRESERVATION: a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. 60 b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. N(\e. c. Proposed measures to reduce or control impacts, if any: N/ik 14. TRANSPORTATION: a. Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on site plans, if any. 111A b. Is site currently served by public transit? If not, what is the approximate distance to the existing street system? Show on site plans, if any. No C. How many parking spaces would the completed project have? How many would the project eliminate? d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). No Mason County Environmental Checklist Page 12 e Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. 11n� ducl�. w M be, use-A �v moor cLte' �o w�� �c-a-r s t�c�i o n `l�ern� c���r �'ha�n ��►vc�e� f. How many vehicular tripper day would be generated by the completed project: If known, indicate when peak volumes would occur. Igz'n-e - g. Proposed measures to reduce or control transportation impacts, if any: OD nc, 15. PUBLIC SERVICES: a. Would the project result in an increased need for public service (for example: fire protection, police protection, health care, schools, other)? If so, generally describe: Nc) b. Proposed measures to reduce or control direct impacts on public services, if any: N\00 e Mason County Environmental Checklist Page 13 16. UTILITIES: a. Circle utilities currently available at the ctri Ite: lecity natural gas ater;refuse service, telephone, sanitary sewer e �syst_em, other: S t� c hG�S bey — 200 yecL. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. Signature: The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature. Date submitted: 5, tP ©t O Mason County Environmental Checklist Page 14 ESA LISTED SALMONIDS CHECKLIST Applicant Information Project Information Name ` � ���S°n Name ?b L SO N Phone 53- 1 -toa-1� Location 170 ME �I,& D Description "L" s h e4.,f dock exJe^d,%r 28' ,-�fr !/ave,n This worksheet was designed to help project proponents, and government agencies, identify when a project needs further analysis regarding adverse effects on ESA(Endangered Species Act) listed salmonids. Salmonids are salmon, trout and chars, e.g. bull trout. For our purposes, "ESA Listed Salmonids" is defined as fish species listed as endangered, threatened or being considered for listing. If ESA listed species are present or ever were present in the water shed where your project will be located, your project has the potential for affecting them, and you need to comply with the ESA. The questions in this section will help determine if the ESA listings will impact your project. The Fish Program Manager at the appropriate Department of Fish and Wildlife (DFW) regional office can provide information for the following two questions. I. Are ESA listed salmonids currently present in the watershed in which your project will be located? YES NO Please describe. 2. Has there ever been an ESA listed salmonid stock present in this watershed? YES NO Uncertain \ _ Please describe. If you answered "yes" to either of the above questions, you should complete the remainder of this checklist. April 2003 Mason County Environmental Checklist L PROJECT SPECIFICES: The questions in this section are specific to the project and vicinity. ' 1. Name of watershed: 1-M A �m..4 � V.�c, r-�1r•e 1�l l b� \g 2. Name of nearest waterbody: i "C"",u\ `- 3. Wha is the distancre� from this 1pr9ject to the nearest body of water: -DOl CAL bA j`(rS`�I Vi,)(Axc often a buffer between the project and a stream can reduce the chance of a negative impact to fish. 4. What is the current land use between the project and the potentially affected water body (parking lots, far nlnnd,etc.)? Iy/N 5. Is the project above a: * natural permanent barrier(waterfall) YES NO * natural temporary barrier(beaver pond) YES NO �— * man-made barrier(culvert, dam) YES NO _ * other(explain): 6. yes, Y If are there an resident salmonid populations above the blockage? YES NO Don't know 7. What percent of the project will be impervious surface (including pavement& roof area)? Mason County Environmental Checklist Page 16 l FISH MIGRATION: The following questions will help determine if this project could interfere with migration of adult and juvenile fish. Both increases and decreases in water flows can affect fish migration. 1. Does the project require the withdrawal of: a. Surface water? YES NO -X Amount Name of surface water body b-'4 e �n b. Ground water? YES NO _ Amount From where Depth of well 2. Will any water be rerouted: YES NO If yes, will this require a channel change? 3. Will there be retention or detention ponds? YES NO �C _ If yes, will this be an infiltration pond or a surface discharge to either a municipal storm water system or a surface water body? If to a surface water discharge, please give the name of the waterbody. 4. Will this project require the building of new roads? YES NO Increased road mileage may affect the timing of water reaching a stream and may impact fish habitat. 5. Are culverts proposed as part of this project? YES NO 6. Will topography changes affect the duration/direction of runoff flows? YES NO __)(_ If yes, describe the changes. 7. Will the project involve any reduction of the floodway or floodplain by filling or other partial blockage of flows? YES NO �C_ If yes, how will the loss of flood storage be mitigated by your project? Mason County Environmental Checklist Page 17 WATER QUALITY: The following questions will help determine if this project could Such impacts can cause problems for listed species. Adversely impact water quality: Water quality can be made worse by runoff from impervious surfaces,altering water temperature,discharging contaminants,etc. 1. Do you know of any problems with water quality, in any of the streams, within this watershed? YES NO If yes, describe. 2. Will your project either reduce or increase shade along or over a waterbody? YES NO Removal of shading vegetation or the building of structures such as docks or floats often results in a change in shade. 3. Will the project increase nutrient loading or have the potential to increase nutrient loading or contaminants (fertilizers, other waste discharges, or runoff to the waterbody? YES NO _X 4. Will turbidity be increased because of construction of the project or during operation of the project? YES NO )— In-water or near water work will often increase turbidity. 5. Will your project require long term maintenance, i.e. bridge cleaning, highway salting, and chemical sprays for vegetation management, clearing of parking lots? YES NO If yes, please describe. Mason County Environmental Checklist Page 18 VEGETATION: The following questions are designed to determine if the project will affect riparian vegetation,thereby, adversely impacting salmon. 1. Will the project involve the removal of any vegetation from the stream banks: YES NO x If yes, please describe the existing conditions, and the amount and type of vegetation to be removed. 2. If any vegetation is remglred, do you plan to re-plant? YES NO //`` If yes, what types of plants will you use? remr C� Mason County Environmental Checklist Page 19 I • �44' Gt. � X r STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775 •Olympia, Washington 98504-7775 •(360)407-6300 711 for Washington Relay Service •Persons with a speech disability can call 877-833-6341 June 23,2010 Mr.Allan Borden Your address Mason County is in the Department of Community Development Kitsap Planning Division ;+� watershed PO Box 279 Shelton,WA 98584 Dear Mr. Borden: Thank you for the opportunity to comment on the determination of nonsignificance for the Polson Dock Repair project(SEP2010-00034)located at 170 Northeast Lake Drive in Tahuya as proposed by Rodney and Donita. The Department of Ecology(Ecology) reviewed the environmental checklist and has the following comment(s): WATER QUALITY Erosion control measures must be in place prior to any clearing,grading,or construction. These control measures must be effective to prevent soil from being carried into surface water by stormwater runoff. Sand,silt,clay particles,and soil will damage aquatic habitat and are considered pollutants when discharged to waters of the state. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48,Water Pollution Control,and WAC 173-201A,Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. During construction,all releases of oils, hydraulic fluids,fuels,other petroleum products, paints, solvents,and other deleterious materials must be contained and removed in a manner that will prevent their discharge to waters and soils of the state. The cleanup of spills should take precedence over all other work on the site. Proper disposal of construction debris must be on land in such a manner that debris cannot enter water of the state or cause water quality degradation of state waters. All trenches,depressions, or holes created in the intertidal area shall be backfilled prior to inundation by tidal waters. All stormwater discharges must be constructed in a manner that will not cause scouring on the beach. The applicant should consider alternatives to treated wood or other chemically treated wood for in- water construction of wooden structures. Over time,treated wood may contaminate nearby sediment and cause toxicity for aquatic organisms. • ' June 23, 2010 Page 2 Shoreline armoring(e.g., hardening with rock)can result in adverse impacts to the natural character of the shoreline,but can be avoided. Ecology recommends the applicant use appropriate plantings of native vegetation to stabilize shorelines, rather than hardening them with rock or concrete. Ecology can provide further information on request. Applicants should consider that placement of a bulkhead may in some cases accelerate erosion of the beach. Bulkheads are not truly permanent, and may require expensive maintenance,especially after storm events. Per Chapter 90.58 RCW(WA State Shoreline Management Act), local governments must also consider the cumulative impacts of armoring large stretches of currently natural shoreline. Ecology's comments are based upon information provided by the lead agency. As such,they may not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments,please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (SM: 10-3042) cc: Rodney Polson(Proponent) Page 1 of 1 Allan Borden - Poison dock on Haven Lake SEP2010-00034 checklist From: Allan Borden To: SEPA review list BE KEPT 1N THE Date: 6/9/2010 1:20 PM TO Subject: Poison dock on Haven Lake SEP2010-00034 checklist PAL FILE Attachments: Poison dock haven lake SEP2010-00034 checklist.pdf SEPA Reviewer: Please find attached the PDF format document for the environmental checklist review for a proposed 28-ft. long dock structure in Haven Lake 5 miles northwest of Belfair. Cover sheet explains the June 23, 2010 comment period. Note: document is split into two email messages. This message has the checklist attached. Allan Borden Planner - Long Range &Site Inspection P.O. Box 279, Shelton, WA 98584 (360) 427-9670 ext. 365 file://C:\Documents and Settings\Ahb\Local Settings\Temp\XPgrpwise\4COF952EMasonmai11001... 6/9/2010