Loading...
HomeMy WebLinkAboutAFTER THE FACT - SWG As-Built - 4/14/2025 SEPTIC SYSTEM SKETCH The Septic System Professional must use this form to draw a sketch of the septic system components based on their inspection.This information is necessary for system maintenance.Information on this form is to be used for general reference and not for legal or official use. Property Address: I 0Z7 W. iA�>s2LEy Wt4LD 2tP 6ta\ Sl1amwy WA ` WW'l Tax Parcel#: 3 ( 13o l- 3`i o0 3 0 'Measurements on the drawing must be from fixed points,such as a building foundation.The sketch must include all existing site features,including all septic system components(tanks,transport lines,drainfield area),wells,waterlines, structures,and surface water.Any encroachments(i.e. structures,driveways,etc.)onto the septic system components 9W be identified on the sketch. �/® WOW � ^ A-- W. (,0r 6G rat- L N —a Lv Y m 4, � -._-_ -'_'CEO a.�.•-- --- - ---•F--{t7.�.�i-� �,, — Signature of Industry Professional: �. '1�we.-�9('Cos Date: Company Name: �IGF..S