HomeMy WebLinkAboutSEP2007-00005 Comment on DNS - SEP Determinations - 6/7/2007 JUN-07-2007 THU 12:31 PN DOE SW REGIONAL OFFICE FAX NO. 360 407 6305 P. 02
a4 2
Y
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
PO Box 47775 • Olympia, Washington 98504-777.5 • (360) 407-6.100
June 7, 2007
Ms. Grace Miller � Your address
Mason County _ is in the
Department of Community Development Kennect')r-
Goldsborough
Planning Division watershed
PO Box 279
Shelton,WA 98584
Dear Ms.Miller:
Thank you for the opportunity to comment on the mitigated determination of nonsignificance for
the Conrad/Buzzard Joint-Use Pier, Ramp and Float Construction project(SEP2007-00005)
located at 9331 Southeast Lynch Road in Shelton as proposed by Eric Conrad and Steve
Buzzard. The Department of Ecology (Ecology)reviewed the environmental checklist and has
the following comment(s):
WATER QUALITY: Roberta Woods (360) 407-6269
Erosion control measures must be in place prior to any clearing, grading,or construction.
These control measures must be effective to prevent soil from being carried into surface
water by stormwater runoff. Sand,silt, clay particles,and soil will damage aquatic habitat
and are considered pollutants when discharged to waters of the state.
Any discharge of sediment-laden runoff or other pollutants to waters of the state is in
violation of Chapter 90.48, Water Pollution Control, and WAC 173-201A, Water Quality
Standards for Surface Waters of the State of Washington, and is subject to enforcement
action.
During construction,all releases of oils,hydraulic fluids, fuels, other petroleum products,
paints, solvents, and other deleterious materials must be contained and removed in a manner
that will prevent their discharge to waters and soils of the state. The cleanup of spills should
take precedence over all other work on the site.
Proper disposal of construction debris must be on land in such a manner that debris cannot
enter Hammersley Inlet, Puget Sound or cause water quality degradation of state waters.
All trenches,depressions,or holes created in the intertidal area shall be backfilled prior to
inundation by tidal waters.
All stormwater discharges must be constructed in a manner that will not cause scouring on
the beach.
JUN-07-2007 THU 12:32 PM DOE SW REGIONAL OFFICE FAX NO. 360 407 6305 P. 03
June 7, 2007
Page 2
Ecology's comments are based upon the information provided with the SEPA checklist. As
such, they do not constitute an exhaustive list of the various authorizations that must be obtained
or legal requirements that must be fulfilled in order to carry out the proposed action.
If you have any questions or would like to respond to these comments please contact the
appropriate reviewing staff listed above.
ent of Ecology
gY
Southwest Regional Office
(AW: 07-4281)
cc: Roberta Woods, WQ
Eric Conrad (Applicant)
Steve Buzzard (Applicant)
Amy Leitman(Contact)