Loading...
HomeMy WebLinkAboutSEP2007-00005 Comment on DNS - SEP Determinations - 6/7/2007 JUN-07-2007 THU 12:31 PN DOE SW REGIONAL OFFICE FAX NO. 360 407 6305 P. 02 a4 2 Y STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775 • Olympia, Washington 98504-777.5 • (360) 407-6.100 June 7, 2007 Ms. Grace Miller � Your address Mason County _ is in the Department of Community Development Kennect')r- Goldsborough Planning Division watershed PO Box 279 Shelton,WA 98584 Dear Ms.Miller: Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the Conrad/Buzzard Joint-Use Pier, Ramp and Float Construction project(SEP2007-00005) located at 9331 Southeast Lynch Road in Shelton as proposed by Eric Conrad and Steve Buzzard. The Department of Ecology (Ecology)reviewed the environmental checklist and has the following comment(s): WATER QUALITY: Roberta Woods (360) 407-6269 Erosion control measures must be in place prior to any clearing, grading,or construction. These control measures must be effective to prevent soil from being carried into surface water by stormwater runoff. Sand,silt, clay particles,and soil will damage aquatic habitat and are considered pollutants when discharged to waters of the state. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48, Water Pollution Control, and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. During construction,all releases of oils,hydraulic fluids, fuels, other petroleum products, paints, solvents, and other deleterious materials must be contained and removed in a manner that will prevent their discharge to waters and soils of the state. The cleanup of spills should take precedence over all other work on the site. Proper disposal of construction debris must be on land in such a manner that debris cannot enter Hammersley Inlet, Puget Sound or cause water quality degradation of state waters. All trenches,depressions,or holes created in the intertidal area shall be backfilled prior to inundation by tidal waters. All stormwater discharges must be constructed in a manner that will not cause scouring on the beach. JUN-07-2007 THU 12:32 PM DOE SW REGIONAL OFFICE FAX NO. 360 407 6305 P. 03 June 7, 2007 Page 2 Ecology's comments are based upon the information provided with the SEPA checklist. As such, they do not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments please contact the appropriate reviewing staff listed above. ent of Ecology gY Southwest Regional Office (AW: 07-4281) cc: Roberta Woods, WQ Eric Conrad (Applicant) Steve Buzzard (Applicant) Amy Leitman(Contact)