DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-340)
SEP2018-00047
Description of Proposal: REPLACE EXISTING 1964 FAILING CONCRETE BULKHEAD
WITH 60 LB MANOR STONE BULKHEAD 65FT LONG AND 18"
HIGH, ALL WORK WAS WITHIN THE EXISTING BULKHEAD
FOOTPRINT
Proponent: BRIAN K FITE
Location of Proposal: 61 NE HAVEN LN TAHUYA
Parcel Number: 223305000075
Legal Description: HAVEN LAKE TR. 75
Directions to Site: ST RT 3 TO BELFAIR, L ON ST RT 300/NORTH SHORE RD, R
ON BELFAIR TAHUYA RD, R ON HAVEN WY, THEN FOLLOW
TO HAVEN LN
Lead Agency:9 Y Mason County
The Lead Agency for this proposal has determined that it does not have a probable significant
adverse impact on the environment. An Environmental Impact Statement (EIS) is not required
under RCW 43.21 C.030(2)(c). This decision was made after review of a completed
Environmental Checklist and other information on file with the Lead Agency. This information is
available to the public upon request.
Please contact Marissa Watson at ext. 367 with any questions. This DNS is issued under WAC
197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown
below, when the determination is final. Comments must be submitted to Dept. of Community
Development, 615 W Alder St, Shelton WA 98584 by 6/22/2018. Appeal of this determination
must be filed within a 14-day period following this final determination date, per Mason County
Code Chapter 15.11 Appeals.
lelx'C3
'Aut6orized Local Government Official 7 bate
• SEPA Environmental Checklist Alason County Permit Center Use:
Single Family DNS: $600.00 SEP 2 n P)- 600,4
❑ Other DNS: 0 to 9.99 acres: $730 Parcel #: aa,330 -56- GZ,7S I
10 to 20 acres: $880 p'1 516 - 60 •6I7(p
Date Rc Over 20 acres: $1100 E C E
❑ DS/EIS: $5000 + $90 per hour L.ins
MAY 21 2018
615 W. Alder Street
Purpose of checklist:
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization
or compensatory mitigation measures will address the probable significant impacts or if an environmental
impact statement will be prepared to further analyze the proposal.
Instructions for applicants: [hel
This environmental checklist asks you to describe some basic information about your proposal. Please
answer each question accurately and carefully, to the best of your knowledge. You may need to consult
with an agency specialist or private consultant for some questions. You may use"not applicable" or
"does not apply"only when you can explain why it does not apply and not when the answer is unknown.
You may also attach or incorporate by reference additional studies reports. Complete and accurate
answers to these questions often avoid delays with the SEPA process as well as later in the decision-
making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this checklist may ask you to explain your
answers or provide additional information reasonably related to determining if there may be significant
adverse impact.
Instructions for Lead Agencies:
Please adjust the format of this template as needed. Additional information may be necessary to
evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse
impacts. The checklist is considered the first but not necessarily the only source of information needed to
make an adequate threshold determination. Once a threshold determination is made, the lead agency is
responsible for the completeness and accuracy of the checklist and other supporting documents.
A. BACKGROUND of elpl
1. Name of proposed project, if applicable: ILLeM
Existing Concrete Bulkhead replacement
2. Name of applicant: hf elpl
Tina Fite
3. Address and phone number of applicant and contact person: LLLei
Mailing Address:8410 182nd Ave E,Bonney Lake,WA 98391
Phone#206 200 0467
Contact Person: Tina Fite
Subject property Location: 61 and 51 NE Haven Lane,Tahuya,WA 98588.
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 1 of 11
4. Date checklist prepared: of eM
5/2/18
5. Agency requesting checklist: hei
Mason County Code enforcement
6. Proposed timing or schedule (including phasing, if applicable): hf elpl
Unknown.
7. Do you have any plans for future additions, expansion, or further activity related to or connected with
this proposal? If yes, explain. of gl
No
8. List any environmental information you know about that has been prepared, or will be prepared,
directly related to this proposal. of el
I do not know of any environmental information that was prepared.The following maps have been attached for your reference.
FEMA Flood plain map,mason county parcel map,Elevation maps,
Environmental Designation map.
9. Do you know whether applications are pending for governmental approvals of other proposals
directly affecting the property covered by your proposal? If yes, explain. nI em
NO. I do not know of any.
10. List any government approvals or permits that will be needed for your proposal, if known. Lbfjpj
To be determined by regulating authorities.
11. Give brief, complete description of your proposal, including the proposed uses and the size of
the project and site. There are several questions later in this checklist that ask you to describe
certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead
agencies may modify this form to include additional specific information on project description.) h[ em
f�TF
Replace existing 1964 failing concrete bulkhead with 60 lb manor stone bulkhead 65 ft long and 18" high. New
bulkhead placed in the same location as the existing.
paves [ 7-Z33o - -5v , oeo-Zco: Fiof1Vh LxPe/' 1-1 /0u;1f w/
P6k-0-*-I, Zz33o--SO -0007 vG
S• T3lII1� z S 'Lx le)"/Y /,v�l
CC,n-v%-cv MaKorL. 6(ohe-s 14�ea 3 h�`�y)` .
12. Location of the proposal. Give sufficient information for a person to understand the precise location
of your proposed project, including a street address, if any, and section, township, and range, if
known. If a proposal would occur over a range of area, provide the range or boundaries of the
site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably
available. While you should submit any plans required by the agency, you are not required to
duplicate maps or detailed plans submitted with any permit applications related to this checklist. hf M
Parcel#(S): 22330-50-00076 and 22330-50-00075 Mason county parcel map and elevations are attached for your reference.
Address: 61 and 51 NE Haven Lane,Tahuya WA
Legal Description: HAVEN LAKE TR.76and 75
Twp/Range/Section and/or GPS location: Range 2w,Township 23N,Section 30
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 2 of 11
B. ENVIRONMENTAL ELEMENTS hl eM
1. Earth
a. General description of the site n( eM
(circle one): la rolling, hilly, steep slopes, mountainous, other:
b. What is the steepest slope on the site (approximate percent slope)? hf el
No slope. see elevation map attached.
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)?
If you know the classification of agricultural soils, specify them and note any agricultural land of
long-term commercial significance and whether the proposal results in removing any of these
soils. hf elpl
Hard Pan and Clay just under the surface and sand,gravel and topsoil on the top.No soil removed to replace the bulkhead
New bulkhead placed where the previous bulkhead had been.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe. hf elpl
No
e. Describe the purpose, type, total area, and approximate quantities and total affected area of any
filling, excavation, and grading proposed. Indicate source of fill. hf eM
Total length 65'long 18"high. Minimal fill needed behind the manor stones since the new wall is the same place as the previous
bulkhead.Space needed to fill 4" wide and 18"high.Source of fill is sandy loam/topsoil from local landscape supply.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. hf eM
If the original bulkhead was removed without replacing then erosion would occur and the House would have been in jeopardy..
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)? hf eM
Project construction will not change percentage of impervious surfaces
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: hf eM
Manor stones bulkhead with landscape fabric directly behind will assist with erosion control.
2. Air
a. What types of emissions to the air would result from the proposal during construction, operation,
and maintenance when the project is completed? If any, generally describe and give
approximate quantities if known. LheM
N/A
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe. hf eM
N/A
c. Proposed measures to reduce or control emissions or other impacts to air, if any: LheM
N/A
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 3 of 11
3. Water
a. Surface Water: hf M
1) Is there any surface water body on or in the immediate vicinity of the site (including year-
round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and
provide names. If appropriate, state what stream or river it flows into. of el
Yes,Haven Lake.
2) Will the project require any work over, in, or adjacent to (within 200 feet)the described
waters? If yes, please describe and attach available plans. nei
Yes,in winter there is roughly 4 feet of distance between bulkhead and water and in summer the bulkhead touches the water line.
&TT--
3) Estimate the amount of fill and dredge material that would be placed in or removed from
surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material. hI el
Nothing remove or impacted in the water.
4) Will the proposal require surface water withdrawals or diversions? Give general description,
purpose, and approximate quantities if known. of el
No
5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. of elpl
Yes. See attached FEMA Map
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge. of eM
No
b. Ground Water:
1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a
general description of the well, proposed uses and approximate quantities withdrawn from
the well. Will water be discharged to groundwater? Give general description, purpose, and
approximate quantities if known. of eM
N/A
2) Describe waste material that will be discharged into the ground from septic tanks or other
sources, if any (for example: Domestic sewage; industrial, containing the following
chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of
such systems, the number of houses to be served (if applicable), or the number of animals or
humans the system(s) are expected to serve. hf M
N/A
c. Water runoff(including stormwater):
1) Describe the source of runoff(including storm water) and method of collection and disposal,
if any (include quantities, if known). Where will this water flow? Will this water flow into other
waters? If so, describe. nt eM
N/A
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 4 of 11
2) Could waste materials enter ground or surface waters? If so, generally describe. nei
No waste material from this project
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so,
describe.
No
d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern
impacts, if any:
The drainage patterns were not impacted.
4. Plants hI eM
a. Check the types of vegetation found on the site: Lhei
deciduous tree: alder, maple, aspen, other
x evergreen tree: fir, cedar, pine, other
x shrubs
x grass
pasture
crop or grain
orchards, vineyards or other permanent crops
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered? hf elpl
None
c. List threatened and endangered species known to be on or near the site. hf eM
None
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any: hf el
None at this time.There are existing shrubs and grass that will remain.
e. List all noxious weeds and invasive species known to be on or near the site.
Blackberry vines
5. Animals
a. List any birds and other animals which have been observed on or near the site or are known to
be on or near the site. Examples include: h[ ei
birds: hawk, heron, eagle songbirds, other: eagle,small birds
mammals ddg bear, elk, beaver, other: Deer in the area
fish: bass almo rout erring, shellfish, other: Trout and bass are in the lake
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 5 of 11
b. List any threatened and endangered species known to be on or near the site. LLLel
I am not familiar with the endangered species list,but there are several eagles that frequent the lake.
c. Is the site part of a migration route? If so, explain. LLLeM
We get ducks migrating each year at the lake. I am unaware of other migrations
d. Proposed measures to preserve or enhance wildlife, if any: hf el
None. No affect to wildlife.
e. List any invasive animal species known to be on or near the site.
Unknown
6. Energy and natural resources
a. What kinds of energy(electric, natural gas, oil, wood stove, solar)will be used to meet the
completed project's energy needs? Describe whether it will be used for heating, manufacturing,
etc. hf elpl None,,the project does not require energy.
b. Would your project affect the potential use of solar energy by adjacent properties?
If so, generally describe. Lhei
No
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any: hf el
N/A
7. Environmental health
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal?
If so, describe. hf e�
1) Describe any known or possible contamination at the site from present or past uses.
None known
2) Describe existing hazardous chemicals/conditions that might affect project development and
design. This includes underground hazardous liquid and gas transmission pipelines located
within the project area and in the vicinity.
None. No chemicals needed.
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during
the project's development or construction, or at any time during the operating life of the
project.
N/A
4) Describe special emergency services that might be required. N/A
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 6 of 11
5) Proposed measures to reduce or control environmental health hazards, if any: None needed
b. Noise
1) What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)?LheM
None
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi-
cate what hours noise would come from the site. hel
None
3) Proposed measures to reduce or control noise impacts, if any: hf el
N/A
8. Land and shoreline use
a. What is the current use of the site and adjacent properties?Will the proposal affect current land
uses on nearby or adjacent properties? If so, describe. LhLei
Current use is residential/vacation. The proposed will not affect any properties.
b. Has the project site been used as working farmlands or working forest lands? If so, describe.
No
How much agricultural or forest land of long-term commercial significance will be converted to
other uses as a result of the proposal, if any?
N/A
If resource lands have not been designated, how many acres in farmland or forest land tax
status will be converted to nonfarm or nonforest use? hf el
N/A
1) Will the proposal affect or be affected by surrounding working farm or forest land normal
business operations, such as oversize equipment access, the application of pesticides,
tilling, and harvesting? If so, how:
No
c. Describe any structures on the site. hI elpl
61 NE Haven Lane: 1000 ft house, 1 small shed less than 200 sq ft.
51 NE Haven Lane: 2 small sheds less than 200 sq ft.
d. Will any structures be demolished? If so, what? of el
No
e. What is the current zoning classification of the site? of ey
RR5
f. What is the current comprehensive plan designation of the site? hf el
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 7 of 11
g. If applicable, what is the current shoreline master program designation of the site? hf eM
Residential.
h. Has any part of the site been classified as a critical area by the city or county? If so, specify.
h� a Mason county Map Sifter shows Critical area as FEMA Zone A,however FEMA maps shows lake as zone A and Lot as Zone C.
i. Approximately how many people would reside or work in the completed project? hf eM
N/A
j. Approximately how many people would the completed project displace? hf el
N/A
k. Proposed measures to avoid or reduce displacement impacts, if any: hf eM
N/A
L. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any: hdl
N/A
m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest
lands of long-term commercial significance, if any:
N/A
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-
income housing. Lhel
N/A
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing. hf elpl
N/A
c. Proposed measures to reduce or control housing impacts, if any: hI eM
N/A
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed? hf eM
N/A Manor stones are total of 18"high
b. What views in the immediate vicinity would be altered or obstructed? hf eM
No views would be altered or obstructed
c. Proposed measures to reduce or control aesthetic impacts, if any: hf eM
Replacing failed wall should improve aesthetics.
11. Light and glare
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur? hf eM
There would be no glare
b. Could light or glare from the finished project be a safety hazard or interfere with views? hf el
No
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 8 of 11
c. What existing off-site sources of light or glare may affect your proposal? n[ eM
None
d. Proposed measures to reduce or control light and glare impacts, if any: [help]
None
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity? h[ elpl
Lake activities,fishing,boating,hiking etc.
b. Would the proposed project displace any existing recreational uses? If so, describe. hf ei
No.
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any: h( M
No impact on recreation
13. Historic and cultural preservation
a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old
listed in or eligible for listing in national, state, or local preservation registers located on or near
the site? If so, specifically describe. hf m
The house is over 45 years old but not listed in the national stat or local preservation registers.
b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation?
This may include human burials or old cemeteries. Are there any material evidence, artifacts, or
areas of cultural importance on or near the site? Please list any professional studies conducted
at the site to identify such resources. hf elpl
No
c. Describe the methods used to assess the potential impacts to cultural and historic resources on
or near the project site. Examples include consultation with tribes and the department of
archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. hel
None
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to
resources. Please include plans for the above and any permits that may be required.
No loss,changes or disturbance to resources.
14. Transportation
a. Identify public streets and highways serving the site or affected geographic area and describe
proposed access to the existing street system. Show on site plans, if any. h( eM
Haven Lane is the only street by the lots.
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 9 of 11
b. Is the site or affected geographic area currently served by public transit? If so, generally
describe. If not, what is the approximate distance to the nearest transit stop?ILgipi
No.
c. How many additional parking spaces would the completed project or non-project proposal have?
How many would the project or proposal eliminate? hf eM
N/A
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle
or state transportation facilities, not including driveways? If so, generally describe (indicate
whether public or private). hei
NO
e. Will the project or proposal use (or occur in the immediate vicinity of)water, rail, or air
transportation? If so, generally describe. LLfjpJ
No
f. How many vehicular trips per day would be generated by the completed project or proposal? If
known, indicate when peak volumes would occur and what percentage of the volume would be
trucks (such as commercial and nonpassenger vehicles). What data or transportation models
were used to make these estimates? hf eM
N/A
Will the proposal interfere with affect or be affected b the movement of agricultural and forest
9 P P Y 9
products on roads or streets in the area? If so, generally describe.
N/A
h. Proposed measures to reduce or control transportation impacts, if any: hf em
N/A
15. Public services
a. Would the project result in an increased need for public services (for example: fire protection,
police protection, public transit, health care, schools, other)? If so, generally describe. nei
N/A
b. Proposed measures to reduce or control direct impacts on public services, if any. hf el
N/A
16. Utilities
a. Circle utilities currently available at the site: hf elpl
ec na natural gas, water, refuse service, telephone,
sanitary sewer, pis sys a other `^cell
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 10 of 11
b. Describe the utilities that are proposed for the project, the utility providing the service, and the
general construction activities on the site or in the immediate vicinity which might
be needed. hf eM
None they are all existing
C. SIGNATURE n( M
The above answers are true and complete to the best of my knowledge. I understand that the lead
agency is relying on them to make its decision.
Signature: JirtQ
Date Signed: 5/3j18
Print Name of Signee: Tina Fite
If applicable, Position and Agency/Organization: N/A
Date Submitted: 5j3/18
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 11 of 11
Mason County WA GIS Page 1 of 1
AW Mason County WA GIS
+ ♦ 223305000075 X Q
2233
811E+tF:N 11,A.NE
7
W302222 22 75 NE 1NVEN LN
•
NE NWE#1 U+
63 NE WAN LN
....+,. ]ad30JIpNl4
41 NE NAOtN LN ;
283%U22?a2?2 • 5
51/E KAMEN/!
•
41 IR I AN U+
IL3.�Uk111l7
�780600078
21 NE"IN IN
3�000E0871
11 WE 10.11/EN LN
s
W38580e881 =
51 NE NI IJLC NORd/ s L
7a32fYitI0U1M �!`/,/��
-122.980 47.458 Degrees
https://gis.co.mason.wa.us/mason/?find=223305000075 3/8/2018
Intranetix Viewer [5301150130C.tifJ Page 1 of 1
Scale.76 LOMC 1''v
J
20 BENNETTSEN
ZONE A LAKE --
�'zoNE a �t VAS��
LADE WODTEN 21�
_J `t
HAVEN Fite Lot's 61 and
LAKE /� ZONE
�y
YDNE A \ 24
30 jl 26
toNEA yr'/
20NEc ZONE A--
ZONE c
f`
YONEA.
i
ZONEA
31 "ZONE
\ mw.a
iuo
32
p 33
� ✓�.
ewz � ZONE
https://mapl.msc.fema.gov/idms/IntraView.cgi?ROT=O&O X=5902&O_Y=4930&O ZM=... 3/8/2018
+�y Mason County
`, Shoreline Master Program Update
/� MM1saPt, Kn
,j Shoreline k-
Environmental Designations Hai,
- t � ♦ `"'� ,• Pierce
�Op
anther Lake
Plucsc�mlth i.uk.E• � l:+t=t r .
Shoreline
Environmental Designations
secliotl
Commercial
One Pond;
Residential
�j , s .r Rural
Grxtl Ranch
11 uutet9 �'!'el_�c'tl.c�rJ( La Conservancy
✓vAua flab akc� LFuicrnrecl Lak -
BrLFAIRI �., ,r� : Natural
1:%jeudcthl f'�.s UGA ; . ,t M / Note: There is also an'Aquatic'SED,
�1'if1J7 1t Lu < ' which encompasses areas waterward
1 ii'e l akc Fite t ` ` of the"mean higher high water"and/or
i '� "ordinary high water mark."
D.vereavx r '
� f,t7kc� f Miles
i
iaf file LakE� 0 0.5 1 2 3 4 5
C EJoll
ALLYN 1 inch = 9,000 feet
UGA
Lake s , I
Anc�erso
f\ 1 R W F
JNJON
Zz 330- so UovZS
`a�,stare o�
4.
y'trine
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
PO Box 47775 •Olympia, Washington 98504-7775 -(360)407-6300
711 for Washington Relay Service •Persons with a speech disability can call 877-833-6341
June 22,2018
Marissa Watson,Planner I
Mason County
Department of Community Services
Planning Division
PO Box 279
Shelton, WA 98584
Dear Ms. Watson:
Thank you for the opportunity to comment on the determination of nonsignificance for the Fite
Concrete Bulkhead Replacement Project(SEP2018-00047/SHX2018-00034) located at 61 and
51 Northeast Haven Lane in Tahuya as proposed by Tina Fite. The Department of Ecology
(Ecology)reviewed the environmental checklist and has the following comment(s):
SOLID WASTE MANAGEMENT: Derek Rockett(360)407-6287
All removed debris and dredged material resulting from this project must be disposed of at an
approved site. Contact the local jurisdictional health department for proper management of
these materials.
WATER QUALITY: Chris Montague-Breakwell(360)407-6364
Erosion control measures must be in place prior to any clearing, grading, or construction.
These control measures must be effective to prevent stormwater runoff from carrying soil
and other pollutants into surface water or stormdrains that lead to waters of the state. Sand,
silt, clay particles, and soil will damage aquatic habitat and are considered to be pollutants.
Any discharge of sediment-laden runoff or other pollutants to waters of the state is in
violation of Chapter 90.48 RCW, Water Pollution Control,and WAC 173-201A, Water
Quality Standards for Surface Waters of the State of Washington, and is subject to
enforcement action.
The following construction activities require coverage under the Construction Stormwater
General Permit:
1. Clearing, grading and/or excavation that results in the disturbance of one or more
acres and discharges stormwater to surface waters of the State; and
Marissa Watson,Planner I
June 22, 2018
Page 2
2. Clearing, grading and/or excavation on sites smaller than one acre that are part of a
larger common plan of development or sale, if the common plan of development or
sale will ultimately disturb one acre or more and discharge stormwater to surface
waters of the State.
a) This includes forest practices(including,but not limited to, class IV conversions)
that are part of a construction activity that will result in the disturbance of one or
more acres, and discharge to surface waters of the State; and
3. Any size construction activity discharging stormwater to waters of the State that
Ecology:
a) Determines to be a significant contributor of pollutants to waters of the State of
Washington.
b) Reasonably expects to cause a violation of any water quality standard.
If there are known soil/ground water contaminants present on-site, additional information
(including, but not limited to:temporary erosion and sediment control plans; stormwater
pollution prevention plan; list of known contaminants with concentrations and depths found;
a site map depicting the sample location(s);and additional studies/reports regarding
contaminant(s))will be required to be submitted.
You may apply online or obtain an application from Ecology's website at:
http://www.ecy.wa.gov/programs/wq/stormwater/construction/-Application. Construction
site operators must apply for a permit at least 60 days prior to discharging stormwater from
construction activities and must submit it on or before the date of the first public notice.
Ecology's comments are based upon information provided by the lead agency. As such,they
may not constitute an exhaustive list of the various authorizations that must be obtained or legal
requirements that must be fulfilled in order to carry out the proposed action.
If you have any questions or would like to respond to these comments,please contact the
appropriate reviewing staff listed above.
Department of Ecology
Southwest Regional Office
(MLD:201803043)
cc: Derek Rockett, S W M
Chris Montague-Breakwell, WQ
Tina Fite(Proponent)