Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Streamlined Process - JARPA - SHX Application - 6/19/2003
r.l Application for Streamlined Process for FISH HABITAT ENHANCEMENT PROJECTS Addition to the Joint Aquatic Permit Application Form. (,DARPA) Under recent laws,you may qualify for a streamlined permit process with no fees,if your project is designed to enhance fish habitat. If your project meets the requirements below,you are entitled to the streamlined Hydraulic Project Approval(HPA) process,exemption from.the State Environmental policy Act,and exemption from all local government permits and fees. To apply for the exemption process,the applicant must provide on the same day,the JARPA form and this cover addition to:the Department of Fish and Wildlife(WDFW)and all applicable Local Government planning and permitting departments, Local governments have 15-days to provide comments to WDFW,who will use these comments to aid them in making decisions(see below for details). APPLICANTS -TO QUALIFY`or thB fish habitat enhanCamont erernntinr vnu nriict rAo� at legit o�je�n�h frv�en d nnil R A)Projects must accomplish one or more of the following fish habitat restoration tasks(check which one applies): Removal of human-made fish passage barriers;or O Restoration of an eroded or unstable stream bank using bioengineering techniques; or AM D Placement of woody debris or other in-stream structures that benefit naturally reproducing fish stocks. g)Projects must also be approved in one of more of the following ways(check which apply,and provide details as requested): O By WDFW,through the Salmon Enhancement,or VoluntAAr Cnnnerative,Pi-ah AnA W;l N&P_nhaneement Programs;Provide project name,and who at WDFW approved the project_ _ By the sponsor of a watershed restoration_plan as provide in ChRDmr 99. CW Provide of nl"and dat, nd__ approving or sponsoring agency e e i'Z sr ❑ By the Department of Fish and Wildlife as a department-sponsored fish enhancement ar restoration project; d" `a oaI ❑ Through the review and approval process for the Jobs for the Environment program; Sn/'W67fe44* sex ❑ Throughthe review and approval process for Conservation Districts sponsored projects, where the project complies withC-r"z""e PP P P P J � P J P design standards established by the conservation commission through interagency agreement with the United States Fish and Wildlife Service and the Natural Resource Conservation Service;Provide approval date and name of Conservation District approving project or O Through a formal grant program established by the legislature or the Department of Fish and Wildlife for fish habitat enhancement or restoration(currently the Dept.of Transportation is handling grant applications-contact Peter Downey at (360)705-7492 for information)Provide grant application date .and circle status-Approved,Denied,or Pending. To APPLYfor the Exemption-if you have checked a box from bJ1LA and B above,complete:the following, 1) Submit this cover letter and a complete JARPA form as an application for the fish habitat enhancement exemption to the Local Government planning department,and WDFW. These applications must be submitted on the same day starting a 15-day comment period. If significant concerns are raised during the 15-day comment period regarding adverse impacts that cannot be addressed through hIPA conditions,WDFW can determine that the project does not qualify for the exemption process.If this determination is made,the applicant may re-apply to WDFW,the applicable Local Government,and any other applicable permitting agency for approval under the full permitting process. Provide I)name and number of habitat hinlneict at WDFW you annlied t__ and 2)what local government you applied to_/2'v7 ism - 2) Apply for all other Federal and State permits needed as defined in the JARPA form.(Fill in waters of the state will require a 404 permit from the Corps of Engineers,and possibly a 401 Water Quality Certification from Ecology). 3) The g vl work covered by the exemption process must be for fish habitat enhancement. If only a piece of your project is for habitat enhancement,the remainder of the project must be covered by the full permitting process. 4) If WDFW determines that your project meets the criteria for the exemption,your project is exempt fiom SEPA and from local government permits and fees. You will have an answer from WDFW within 45 days of the receipt of this cover letter and complete JARPA form. LOCAL GOVERNMENTS: PLEASE NOTE—you only have 15 days to review the projects and provide comments to WDFW or your comments will be considered waived.Per the new law, you are responsible for the following; 1. You must accept the JARPA application form and this revised cover addition for project review; JARPM2879form.doc.4/27/98,page 1 of 2 : 00 TO BE KEPT IN THE `�-' ('0 ©o 00 PARCEL FILE MAY 20 '03 08:36AM WDFW PORT ORCHARD P.2 2., if the Local Government chooses to comment on the project,comments(support or objection)must be provided to the WDFW local habitat biologist responsible for the project area wj hi n 15-dav of receipt of the JAFFA form; 3. If determined by WDFW that the project meets the habitat enhancement exemption criteria,SEPA and all local government permits arc considered exempt and consistent with the revisions to the WACs,and local government fees are waived. 4. The law determines that"fish habitat enhancement projects that conform to the provisions of the act are determined to be consistent with local shoreline master programs". DEPARTMENT OFFISH AND WILDLIFE: 1. Upon receipt of a complete JARPA and request for the fish habitat exemption process,review the proposed project plan for compliance with the requirements listed in section I and 2 of 2SHB 2879(also listed on page 1,applicant section#A and B). a) If JARPA is incomplete or if it is determined that a project does NOT meet the exemption criteria.contact the applicant and local government planning department and inform them the project does not qualify for the exemption. Return JARPA to the applicant. The applicant may reapply to WDFW,the applicable Local Government and other permitting agencies for approval under the full permitting process- b) If JARPA is complete and the project meets the criteria,start the EPA 45-day exemption process(defined below); 1. WDFW must allow 15 days for interested parties,and local governments to provide comments on the project—no approval action can be taken within the first 15 days of receipt of the DARPA; 2. If comments are received,WDFW will decide whether the concerns raised can be mitigated through conditions of the HFA—if yes, continue to#4. If no.WDFW will notify the applicant and applicable Local Government. The applicant may reapply to WDFW,the applicable Local Government and other permitting agencies for approval under the full permitting process; 3. WDFW must approve or deny the HPA,or make a determination that the proposed work does not qualify for the exemption process within 45 days. JARPA\2879form.dm 4/27198,page 2 of 2 HbCtVI.T UOr-UIVLT Agency Reference#: Date Received: Circulated by: (local govt. or agency) JOINT AQUATIC RESOURCES PERMIT APPLICATION FORM (DARPA) (for use in Washington State) PLEASE TYPE OR PRINT IN BLACK INK Application for a Fish Habitat Enhancement Project per requirements of RCW 77.55.290. You must submit a copy of this completed JARPA application form and the(Fish Habitat Enhancement JARPA Addition)to your local Government Planning Department and Washington Department of Fish &Wildlife Area Habitat Biologist on the same day. NOTE: LOCAL GOVERNMENTS—You must submit any comments on these projects to WDFW within 15 working days. Based on the instructions provided, I am sending copies of this application to the following: (check all that apply) ❑ Local Government for shoreline:❑Substantial Development ❑Conditional Use ❑Variance ElExemption ❑ Revision ❑ Floodplain Management ❑Critical Areas Ordinance x Washington Department of Fish and Wildlife for HPA(Submit 3 copies to WDFW Region) ❑ Washington Department of Ecology for 401 Water Quality Certification(to Regional Office-Federal Permit Unit) ❑ Washington Department of Natural Resources for Aquatic Resources Use Authorization Notification ❑ Corps of Engineers for: ❑ Section 404 ❑Section 10 permit ❑ Coast Guard for General Bridge Act Permit ❑ For Department of Transportation projects only: This project will be designed to meet conditions of the most current Ecology/Department of Transportation Water Quality Implementing Agreement SECTION A-Use for all permits covered by this application. Be sure to ALSO complete Section C(Signature Block)for all permit applications. 1.APPLICANT Hood Canal Salmon Enhancement Group MAILING ADDRESS: PO BOY 1004,Allyn,WA 98534 WORK PHONE E-MAIL ADDRESS PHONE FAX# HOME 360-275-3575 hcseg@hctc.com 360-275-0698 ff an agent is acting for the applicant during the permit process,complete#2. Be sure agent signs Section C(Signature Bloch for all permit applications 2 AUTHORIZED AGENT Pat McCullough PE, Engineering Services Associates MAILING ADDRESS 210 NE Cherokee Beach,Belfair,WA 98528 WORK PHONE E-MAIL ADDRESS HOME PHONE FAX# 360-275-7384 padi@lictc.com 360-277-3187 3.RELATIONSHIP OF APPLICANT TO PROPERTY: ❑OWNER ❑PURCHASER ❑LESSEE ❑OTHER: 4.NAME,ADDRESS,AND PHONE NUMBER OF PROPERTY OWNER(S),IF OTHER THAN APPLICANT: Mason County,411 North Fifth Street, Shelton,Washington 98584 5.LOCATION(STREET ADDRESS,INCLUDING CITY,COUNTY AND ZIP CODE,WHERE PROPOSED ACTIVITY EXISTS OR WILL OCCUR) Elfendahl Pass Road MP 1.5 &5 LOCAL GOVERNMENT WITH JURISDICTION(CITY OR COUNTY) Mason County WATERBODY YOU ARE WORKING IN TRIBUTARY OF WRIA# Little Tahuya Creek Tahuya River 15.0046 the Little IS THIS WATERBODY ON THE 303(d)LIST?YES❑ NO Tahuya R. (Unnamed 1F YES,WHAT PARAMETER(S)7 streams 15.0492& http:r/www.ecY.wa.gov/proesams'wullinks/impaired wtrs.htnil tvEaslTEFoa303d M LIST 15.0000) %SECTION SECTION TOWNSHIP RANGE GOVERNMENT LOT SHORELINE DESIGNATION S1, 27 23N 02W LATITUDE&LONGITUDE: Long Marsh 47021'20"N; ZONING DESIGNATION 122054'26"W. Tonnerville Rural 49130'39"N; 122052'59"W TAX PARCEL NO: DNR STREAM TYPE,IF KNOWN S27= Long Marsh; S1 =Tonnerville marsh Type 3 6.DESCRIBE THE CURRENT USE OF THE PROPERTY,AND STRUCTURES EXISTING ON THE PROPERTY. HAVE YOU COMPLETED ANY PORTION OF THE PROPOSED ACTIVITY ON THIS PROPERTY? ❑YES ❑O NO FOR ANY PORTION OF THE PROPOSED ACTIVITY ALREADY COMPLETED ON THIS PROPERTY,INDICATE MONTH AND YEAR OF COMPLETION. The property is used for forest land. It is managed by the Washington State Department of Natural Resources. IS THE PROPERTY AGRICULTURAL LAND? ❑YES O NO ARE YOU A USDA PROGRAM PARTICIPANT? ❑YES ❑NO 7a. DESCRIBE THE PROPOSED WORK THAT NEEDS AQUATIC PERMITS: COMPLETE PLANS AND SPECIFICATIONS SHOULD BE PROVIDED FOR ALL WORK WATERWARD OF THE ORDINARY HIGH WATER MARK OR LINE,INCLUDING TYPES OF EQUIPMENT TO BE USED. IF APPLYING FOR A SHORELINE PERMIT,DESCRIBE ALL WORK WITHIN AND BEYOND 200 FEET OF THE ORDINARY HIGH WATER MARK IF YOU HAVE PROVIDED ATTACHED MATERIALS TO DESCRIBE YOUR PROJECT,YOU STILL MUST SUMMARIZE THE PROPOSED WORK HERE. ATTACH A SEPARATE SHEET IF ADDITIONAL SPACE IS NEEDED. This project is the replacement of two fish passage barrier culverts at the existing line and grade. Long Marsh Creek Culvert Replacement: Remove the existing 18" and 30"CMP culverts and replace them with a 15 foot wide by 5'-8"deep by 42' long aluminum box culvert with a metal bottom. 6"of 6" minus cobble spawning gravel will be placed in the bottom of the culvert.The outlet elevations of the culvert will prevent any change in the water levels of the 1319 acres of upstream wetlands. The proposed culvert will be laid on a flat grade. The size of the culvert was selected based on the width of the downstream stream.We are attempting to match the historic stream width.The culvert will be flooded at all times. Toonerville Marsh Creek Culvert Replacement: Remove the existing 24"CMP culvert and replace it with a 6'-3"span x 5' deep by 50 long concrete trench laid on a flat grade. Bank full width of the stream in the area of the culvert is difficult to determine but some evidence indicates that bank full width is approximately 5 feet for this small stream. There will be approximately 2 feet of 4" minus spawning gravel placed in the new culvert. PREPARATION OF DRAWINGS: SEE SAMPLE DRAWINGS AND GUIDANCE FOR COMPLETING THE DRAWINGS. ONE SET OF ORIGINAL OR GOOD QUALITY REPRODUCIBLE DRAWINGS MUST BE ATTACHED. NOTE: APPLICANTS ARE ENCOURAGED TO SUBMIT PHOTOGRAPHS OF THE PROJECT SITE,BUT THESE DO NOT SUBSTITUTE FOR DRAWINGS. THE CORPS OF ENGINEERS AND COASTGUARD REQUIRE DRAWINGS ON B-112 X If INCH SHEETS. LARGER DRAWINGS MAYBE REQUIRED BY OTHER AGENCIES. 7b. DESCRIBE THE PURPOSE OF THE PROPOSED WORK AND WHY YOU WANT OR NEED TO PERFORM IT AT THE SITE PLEASE EXPLAIN ANY SPECIFIC NEEDS THAT HAVE INFLUENCED THE DESIGN. The purpose of the proposed work is to remove two partial fish passage barriers and replace them with structures that meet the current requirements of the WDFW. Both culverts will be laid on a flat grade and can easily carry the expected flows—over the 100 year flood. 7c. DESCRIBE THE POTENTIAL IMPACTS TO CHARACTERISTIC USES OF THE WATER BODY. THESE USES MAY INCLUDE FISH AND AQUATIC LIFE,WATER QUALITY,WATER SUPPLY, RECREATION,and AESTHETICS. IDENTIFY PROPOSED ACTIONS TO AVOID,MINIMIZE,AND MITIGATE DETRIMENTAL IMPACTS,AND PROVIDE PROPER PROTECTION OF FISH AND AQUATIC LIFE IDENTIFY WHICH GUIDANCE DOCUMENTS YOU HAVE USED. ATTACH A SEPARATE SHEET IF ADDITIONAL SPACE IS NEEDED. Long Marsh Creek: The only potential impacts to the stream would be short term construction impacts. A small earthen dike will be constructed using a 30 mil sheet of poly(wrapped around the fill) —and then removed—to isolate the work area. Stream flow is expected to be non existant in August when we plan to construct this project. If there is water flowing in the stream is will be pumped around the work area. Any dirty water in the construction area will be pumped to a settling pond located in a nearby gravel pit where the water will soak into the ground. Tonnerville Marsh Creek:This stream will be completely dry in the summer. No construction impacts are expected. NO. HPA WDFW Section 7 Review by USFW USFW 16.HAS ANY AGENCY DENIED APPROVAL FOR THE ACTIVITY YOURE APPLYING FOR OR FOR ANY ACTIVITY DIRECTLY RELATED TO THE ACTIVITY DESCRIBED HEREIN?❑YES x NO IF YES,EXPLAIN: 7d. FOR IN WATER CONSTRUCTION WORK,WILL YOUR PROJECT BE IN COMPLIANCE WITH THE STATE OF WASHINGTON WATER QUALITY STANDARDS FOR TURBIDITY WAC 173.201A-110? ❑O YES ❑NO (SEE USEFUL DEFINITIONS AND INSTRUCTIONS) 8.WILL THE PROJECT BE CONSTRUCTED IN STAGES? ❑YES ❑N PROPOSED STARTING DATE. August 1, 2003 ESTIMATED DURATION OF ACTIVITY: Three Weeks 9.CHECK IF ANY TEMPORARY OR PERMANENT STRUCTURES WILL BE PLACED: ❑WATERWARD OF THE ORDINARY HIGH WATER MARK OR LINE FOR FRESH OR TIDAL WATERS,AND/OR ❑WATERWARD OF MEAN HIGHER HIGH WATER LINE IN TIDAL WATERS 10.WILL FILL MATERIAL(ROCK,FILL,BULKHEAD,OR OTHER MATERIAL)BE PLACED: ❑WATERWARD OF THE ORDINARY HIGH WATER MARK OR LINE FOR FRESH WATERS?YES—Spawning Gravel IF YES,VOLUME(CUBIC YARDS)900 SF/AREA 0.02(ACR ❑WATERWARD OF THE MEAN HIGHER HIGH WATER FOR TIDAL WATERS? IF YES,VOLUME(CUBIC YARDS) AREA (ACRES 11.WILL MATERIAL BE PLACED IN WETLANDS? ❑YES ❑O NO IF YES: A. IMPACTED AREA IN ACRES: B. HAS A DELINEATION BEEN COMPLETED? IF YES,PLEASE SUBMIT WITH APPLICATION. ❑YES ❑NO C. HAS A WETLAND REPORT BEEN PREPARED? IF YES,PLEASE SUBMIT WITH APPLICATION. ❑YES ❑NO D. TYPE AND COMPOSITION OF FILL MATERIAL(EG.,SAND,ETC.): E. MATERIAL SOURCE: F. LIST ALL SOIL SERIES(TYPE OF SOIL)LOCATED AT THE PROJECT SITE,&INDICATE IF THEY ARE ON THE COUNTY'S LIST OF HYDRIC SOILS.SOILS INFORMATION CAN BE OBTAINED FROM THE NATURAL RESOURCES CONSERVATION SERVICE(NRCS): G. WILL PROPOSED ACTIVITY CAUSE FLOODING OR DRAINING OF WETLANDS? ❑YES ❑NO IF YES,IMPACTED AREA IS_ACRES OFDRAINED WETLANDS. NOTE: It your project will impact greater than M.of an acre of wetland,submit a mitigation plan to the Corps and Ecology for approval along with the JARPA form .NOTE:a 401 water quality,certification wi#be required from Ecology in addition to an approved mitigation plan if your project impacts wetlands that are: a)greater than 14 acre in size,or b)tidal wetlands or wetlands adjacent to tidal water. Please submit the JARPA form and mitigation plan to Ecology for an individual 401 certification if e)or b)applies. 12. STORMWATER COMPLIANCE FOR NATIONWIDE PERMITS ONLY: THIS PROJECT IS(OR WILL BE)DESIGNED TO MEET ECOLOGY S MOST CURRENT STORMWATER MANUAL,OR AN ECOLOGY APPROVED LOCAL STORMWATER MANUAL x YES ❑NO IF YES—WHICH MANUAL WILL YOUR PROJECT BE DESIGNED TO MEET StormWater Management Manual for Westem Wash. August 200 If NO—FOR CLEAN WATER ACT SECTION 401 AND 404 PERMITS ONLY—PLEASE SUBMITTO ECOLOGY FOR APPROVAL ALONG WITH THIS JARPA APPLICATION,DOCUMENTATION THAT DEMONSTRATES THE STORMWATER RUNOFF FROM YOUR PROJECT OR ACTIVITY WILL COMPLY WITH THE WATER QUALITY STANDARDS,WAC 173.201(A) 13.WILL EXCAVATION OR DREDGING BE REQUIRED IN WATER OR WETLANDS? ❑YES IFINO IF YES: A. VOLUME:(CUBIC YARDS)/AREA. B. COMPOSITION OF MATERIAL TO BE REMOVED: C. DISPOSAL SITE FOR EXCAVATED MATERIAL: D. METHOD OF DREDGING: 14.HAS THE STATE ENVIRONMENTAL POLICY ACT(SEPA)BEEN COMPLETED?This project is exempt ❑YES O NO SEPA LEAD AGENCY: SEPA DECISION: DNS,MDNS,EIS,ADOPTION,EXEMPTION DECISION DATE(END OF COMMENT PERIOD): SUBMIT A COPY OF YOUR SEPA DECISION LETTER TO WDPN AS REQUIRED FOR A COMPLETE APPLICATION 15.LIST OTHER APPLICATIONS,APPROVALS,OR CERTIFICATIONS FROM OTHER FEDERAL,STATE OR LOCAL AGENCIES FOR ANY STRUCTURES,CONSTRUCTION,DISCHARGES,OR OTHER ACTIVITIES DESCRIBED IN THE APPLICATION(I.E.,PRELIMINARY PLAT APPROVAL,HEALTH DISTRICT APPROVAL,BUILDING PERMIT,SEPA REVIEW,FEDERAL ENERGY REGULATORY COMMISSION LICENSE(FERC),FOREST PRACTICES APPLICATION,ETC.) ALSO INDICATE WHETHER WORK HAS BEEN COMPLETED AND INDICATE ALL EXISTING WORK ON DRAWINGS. NOTE:FOR USE WITH CORPS NATIONWIDE PERMITS,IDENTIFY WHETHER YOUR PROJECT HAS OR WILL NEED AN NPDES PERMIT FOR DISCHARGING WASTEWATER AND/OR STORMWATER. A SECTK)N B-Use for Shoreline and Corps of Engineers permits only: 17a. TOTAL COST OF PROJECT. THIS MEANS THE FAIR MARKET VALUE OF THE PROJECT,INCLUDING MATERIALS,LABOR,MACHINE RENTALS,ETC. 17b. IF A PROJECT OR ANY PORTION OF A PROJECT RECEIVES FUNDING FROM A FEDERAL AGENCY,THAT AGENCY IS RESPONSIBLE FOR ESA CONSULTATION. PLEASE INDICATE IF YOU ILL RECEIVE FEDERAL FUNDS AND WHAT FEDERAL AGENCY IS PROVIDING THOSE FUNDS. SEE INSTRUCTIONS FOR INFORMATION ON ESA** FEDERAL FUNDING l7 YES ONO IF YES,PLEASE LIST THE FEDERAL AGENCY_USFW will do the section 7 review and ESA consultation. (USFW programatic) 18.LOCAL GOVERNMENT WITH JURISDICTION: Mason County 9.FOR CORPS,COAST GUARD,AND DNR PERMITS,PROVIDE NAMES,ADDRESSES,AND TELEPHONE NUMBERS OF ADJOINING PROPERTY OWNERS,LESSEES,ETC... PLEASE NOTE: SHORELINE MANAGEMENT COMPLIANCE MAY REQUIRE ADDITIONAL NOTICE—CONSULT YOUR LOCAL GOVERNMENT. NAME ADDRESS PHONE NUMBER DNR all around SECTION C-This section MUST be completed for any permit covered by this application 0.APPLICATION IS HEREBY MADE FOR A PERMIT OR PERMITS TO AUTHORIZE THE ACTIVITIES DESCRIBED HEREIN. I CERTIFY THAT 1 AM FAMILIAR WITH THE INFORMATION CONTAINED IN THIS APPLICATION,AND THAT TO THE BEST OF MY KNOWLEDGE AND BELIEF,SUCH INFORMATION IS TRUE,COMPLETE,AND CCURATE. I FURTHER CERTIFY THAT I POSSESS THE AUTHORITY TO UNDERTAKE THE PROPOSED ACTIVITIES. I HEREBY GRANT TO THE AGENCIES TO WHICH HIS APPLICATION IS MADE,THE RIGHT TO ENTER THE ABOVE-DESCRIBED LOCATION TO INSPECT THE PROPOSED,IN-PROGRESS OR COMPLETED WORK. I AGREE TO START WORK ONLY AFTER ALL NECESS RY PERMITS HAVE BEEN RECEIVED. SIGNATURE OF CA DATE X15 D SIGN AUTHORIZED AGE UT C ATE D e DATE I HEREBY DESIGNATE Q/ TO ACT AS MY TIN MATT RS RELA TO THIS APPLICATI N FO ERMIT(S). I UNDERSTAND THAT IF A FEDERAL PERMIT IS ISSUED, I MU TH ERMIT. / SIGNATURE OF APPLICANT DATE SIGNATURE OF LANDOWNER(EXCEPT PUBLIC ENTITY LANDOWNERS,E.G.DNR) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND THE AGENT,IF AN AUTHORIZED AGENT IS DESIGNATED. 18 U.S.0§1001 provides that Whoever,in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies,conceals,or covers up by any trick,scheme,or device a material fact or makes any false,fictitious,or fraudulent statements or representations or makes or uses any false writing or document knovdng same to contain any false,fictitious,or fraudulent statement or entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or both. COMPLETED BY LOCAL OFFICIAL A. Nature of the existing shoreline. (Describe type of shoreline, such as marine, stream, lake, lagoon, marsh, bog, swamp,flood plain,floodway, delta;type of beach, such as accretion, erosion, high bank, low bank, or dike; material such as sand, gravel, mud,clay, rock, riprap; and extent and type of bulkheading, if any) B. In the event that any of the proposed buildings or structures will exceed a height of thirty-five feet above the average grade level, indicate the approximate location of and number of residential units, existing and potential,that will have an obstructed view. the application involves a conditional use or variance, set forth in full that portion of the masterprogram which provides that the proposed use may be a conditional use, or, in the case of a variance,from which the variance is being sought: These Agencies are Equal Opportunity and Affirmative Action employers. For special accommodation needs,please contact the appropriate agency in the instructions. t SECTION t, TOWNSHIP 23 NORTH, RANGE 2 WEST, W.M. CONTRACT PLANS FOR TONNERVILLE MARSH CREEK �6 RES TORN TION PROJECT " i s C UL VERT REPL A CEMENT �z !���� �� 3 /QrY� 22'APSH�l.IYP Y GRAVEL SHOULDER.TYP' 'T/�` •' •-' EkI5TIN0 CULVERT. .[ Y•n .. i .. [IEHD OF CULVERT STA +1T.97, S' 17 O 2 STORATION, DRA*1NC 19T TA. LTA\y, I COVER k NCINRY WP.WDER. Oyu END OF CULVERT ' yy sy SITE PLAN/HORIZONTAL CONTR0. / T��,;.H�.:.. A:1+59.70.20.5'RI '2+7 021 - 2 PLAN.PROFILE h DETAiLS 2+00 .0 OMITS OF REST ORAT ON A STA 1+7Ot STREAM CENTERLINE,TYP no PROJEC N I A.-A Mr. .`. ,45/ �.;. ?• I r • 1% TONNERVILLE MARSH CREEK SITE PLAN / HORIZONTAL CONTROL SCALE: 1'=20' Aaa. A q w.w,• mM HOOD CANAL SALMON ENHANCEMENT GROUP F s, sx— dhginee+ting Services Asscetafes ='0 TUNNERVILLE MARSH CULVERT M`— a�„wa� �S� ti.+ra a.i►.MtUMr nas a�.r '='0• COVER SHEET, VICINITY MAP, INDEX J 2 ^ JA0°1 NS- �'°A IPS SITE PLAN / HORIZONTAL CONTROL h 7R6A!/.TQOJ 796-1J91 xs M. OII CM IAPWI ROAD CENTERLINE 428 IACN COAT TOP OF VAULT -3"-0"COMPACTED 3"COMPACTED DEPTH 428 : MATCH EMSTBVG GRADE DEPTH CLASS B CLASS B ASIIPAL7.IYP. SAW CUT,T wSHPALI 1 1P I 1'CRUSHED SURFACING . ' 18',..TYP t _� 18=,TYP _. .-.t TOP COeSE�JV-— 411 \ j 121 -MARCH EW NU1IDT G i' STREAM H S MnhG GRAVEL SPECIFICATION: EAIS7INC'ROAD 8'MIN BASE COURSE TO SEX TYP 6'COBBLE MIA FOR RIFFLE WEIRS 1,d COMPACTED - 8'-4"COBME 4 SCOOPS 9"-LS'COBBLE -2 SCOOPS BANK RUN tl"MINUS SPnWNNG GRAVEL, 1.5'-PEACRAvEt -2 SCOOPS GI COMPACTED SUBORADE,TIP'- E _ WELL GRAIN AND CLEMGRAVEL6 MIN' AND COBBLE MIA ASIM SAND -2 SCOOPS TOTAL - 10 SCOOPS 420 - 12D TYPICAL SPAWNING GRAVEL 3/9•MINUS CRUSHED o DETA11- ROCK FOUNDATION NOTE: I .MATERIAL 1 G[E: CULVERT SMALL BE SO-FOOl LONG,6'-3"W 1.5'SPAVMINO CRAVEL A 4.0' H(INSIDE DIMENSIONS)U7ILITY VAUL7 6070 TRENCH.DESIGNED FOR H2O LOADING. 4 416 10 1+36 1*40 1144 1+48 TYPICAL 1+52 1156 1+80 1164 TAENCH INEOTIONN 8ECTIIJ •.cru 1•-r 43O c 430 EAISIING FUAU - a: CULVERT SLOPE-a0.Q —— NOTE: — - FOR ROADWAY MATERIALS,SEE SECTION A N 1r� - --- -- T.5' TYPICAL U I 28 _ -_ A — `—--. PAVEMENT SECTION M ----- _ 420 TAI 420 i T VAULT BOTTOM cu[:nn e VAULI BOTTOM REMOVE EAISTINO!CULVERT SPAVAiMC CRAvEI� ELEX-42425 i ,ELEw42O,25 MATCH EAISTINO STREAM 410 410 A c CALL Y YOU PROPOSED CULVERT PROFILE 4100 Y611 00 42 ""'A Y tl HOOD CANAL SALMON ENHANCEMENT GROUP A 2 L7S4 Engineering Services Associates TONNERVILLE MARSH CREEK Ltl 1 PLAN, PROFILE 2 La4W4�4W dMW(YW A1Av?cbwaf of AND DETAILS Aa eV: M6 HP LRnvEr4 dYaFA eMI �.A l M cla Ppr Rwr4rn LN eMEpr.. ra sasia(mo)XPs-PW4 SPNr SECTION 1, TOWNSHIP 23 NORTH, RANGE X WEST, W.M. CONTRACT PLANS FOR g LONE MARSH CREEK RES TORA TION PROJEC T CULVERT REPL A CEMENT [KRIS W' AI RCS'IQYAIgv,SF 57A 7.05 j�' � J�Eh J +� E" rxm.c CUYcers � P,iVPO5f0 80.t CUtYCR7 a• J r� ''^^a•rw�i• f- nr 0� I C[MCBUNpI f/WR7 DRAWING INDEX siNaY •1.7J. 71r RI }' CCN7ERLINC PAOP0'%2 C!ff Alt 1.501 B� •.// CI COYER k NCINTT NAP,IRDEA, 57A 175J➢,77. 17 - 1 F�'80 SITE PLAN/RORIZOxiA1 CONTROL CZ PROFILE,PUN AND DETAILSum 1 PROJEllyllb x' 0➢1 s o7 Rwawr ;TA I.W 7 ) t I 151TE PLA / H RI NT L CONTROL d } J NOTE 1 P J FOR 1EMPOHANi DAM •� f t. 111 _ �;� t fOR CONSTRUCTION.SEE 8 PF.rJ w a.—4 n!. n""'+ HOOD CANAL SALMON ENHANCEMENT GROUP 1 Y Engineering SIrnims AssociatBs ='" LONG MARSH CREEK RESTORATION Aw �� L—Id fb.dAn.I P^ '"° COVER SHEET, VICINITY MAP. INDEX� t ¢e 770 m.w..er..A w SITE PLAN / HORIZONTAL CONTROL ae. By c1d. Rrvtaien �•- !Y(A/r, R AIKI/(leol 176-7JN _ MATCH EM5TINO i.7 FEET COVER OVER STREAM MOTH .'I BOIL-,CRT A 5'-S'ALUMINUM BOR_... 0 JJO -' : CULVERT HIT" METAL INVERT 37 ,'MN Ef CLASS 8. PAVAMEni SCCTN)N: BANNRUry GRAVEL BACI[RLL ASPNALT,OVERLAY; OVER CULVERT" COMPACTED N ACCORDANCE WITH F'NOWSEU GRADE 0'MnUS SPAWNING GRAVEL. CULVERT SUPPLIERS SPECIFICATIONS WELL GRADED CLEAN GRAVEL AND COBBLE MU PAVEMENT TRANSITION,TTP SPMSARC ORRa SPECFICAIIOW Gr>imC CNxlJE 1�' _ 320 ( _ !� S"COBBLE MIA8B FOR RIFFLE 4S WEIRS C OF 1-1/1 INUs B'-1.COBBLE •1 SCOOPS BEDDING 1'-,.5'COBBLE •2 SCOOP' GRAVEL BLACK ROCA 1.5'-PEA7RAVEL 2 SCOOPS ASTM SAND .2 SCOOPS TOTAL 10 SCOOPS EAISTINC CRAVE " PROPOSED GRADE ![OTYPICAL 310 .. xe - ' SPAWNING GRAVEL t a r DETAIL h CENTERLINE TRENCH SECTION 8ECT� CCNTD 34 R 0 370 ' 0 BOX CULVERT 6"NMUS w[u"CD LTIRRLC SPAtMM GRAVEL 1EMPOMRY DAY JO77O11 C[[WRON 317.6 DIN UP WATER,PIMP AS NEEDED ELEVIFIGN 127.8 30 NFL WIN POTHETNLENE �i NARVE FILL MATERIAL,- Ox.O &SO - asa a.7c Mo 0— 7.00 7.10 1.2O 1.30 A A DEPTH AND WIDTH 4 NEWIPEU PROPOSED CULVERT PROFILE Er FLOW JCALlI 1'.S' Sw C9/1 exTp(j PAYLAEM CDC& PAVCMCM SEC71ON 7YP i z' �' I ! ERrsnnc s'tnEAx+nonoM NO P[M[m [ SECTION A-A [•un,w;[rouRN[ °b°A xP Wnt MVCNCN7 I NITS V `CGSpACICO co"PAC 1.OE- 1•wx.wz LYY,ILS[ f AYpHLiG --co.x"cno aecx.U[ SVRCRNIC IN[T COxCRII[ CWPMi[U t0 YiA TYPICAL e c'MN.roP caRR: PAVEMENT TRANSITION amRn[o to Vsx TEMPORARY PAVEMENT SECTION 3 UETAI�, EARNER f DETAIL /;1 �'N[:Ms� DETAIL AAra A7pmwJ JV: n ml. �•''•' H000 CANAL SALMON ENHANCEMENT GROUP I., / Engineering Services Associates °'"�— a e s-as \ LoroMJ,.�� A6sd ssON LONG MARSH CREEK RESTORATION a 2 / J K6 J/O GhrnM d►avA Md PROFILE, PLAN AND DETAILS xh AMe BP I CM 7Mv[sian __ 6M7/O)r, /a.JJ6J0(l6OJ JP6-PJSI • c. ,.a^..sa�ava:s axvil �.,.=WaL6IfdlIIaaal.�+Ea i a KUL FISH HABITAT" ENHANCEMENT PROJECTS � Addition to the Joint Aquatic Permit Application Form (JAR-PA I Under recent laves,you may quality for a streamlined permit process with no fees,if your project is designed to enhance fish habitat, If your project meets the requirements below,you are entitled to the streamlined hydraulic Project Approval(HPA) process,exemption from the State)environmental Policy Act,and exemption from all local government permits and fees. To apply for the exemption process,the applicant must provide an the same day,the JARPA form and this cover addition to:the Department of Fish and Wildlife(WDFNAV and all applicable Local Government planning and permitting departments, Local governments have 15-days to provide comments to WDFW,who will use these comments to aid them in making decisions(se_- below for detais). APPLICANTS -T_o�F1�11«Z�"1'��� t a���kabipp��n cepraen�e��ta�ntfar�a nu k�}�eck at least one each from A aced L?,_ A)Projects must accomplish one or more of the following fish habitat restoration tasks(check which one applies): Removal of human-made fish passage barriers;or /13 Restoration of an eroded or unstable stream bank using bioengineering techniques; ot- D Placement of woody debris or other in-strearn structures that benefit naturally reproducing fish stocks. AM B)Projects must also be approved in one or more of the following ways(check which apply,and provide details as requested): o By WDFW,through the Salmon Enhancement,or VoluntpAr C,;ennYativA Pi.ch a„A Wildlife Enhancement Prn¢rams;Pmvide project name,and who at WDFW approved the project By the sponsor of a watershed restoration plan as provided in 8_chapt .89. GW Provide#fip of-1-3 aid dater ►td approving or sponsoring agency j.L e h�Y ❑ By the Department of Fish and Wildlife as a department-sponsored fish enhancement or restoration project;!-/^o- ylcz © Through the review and approval process for the Jobs for the Environment program; � PP P p o • Through the review and approval process for Conservation District sponsored projects,where the project complies with Cr,z�u.� design standards established by the conservation commission through interagency agreement with the United States Fish and Wildlife Service and the Natural Resource Conservation Service;Provide approval date and name of Conservation Dkirlet approving project `or ❑ Through a formal grant program established by the legislature or the Department of Fish and Wildlife for fish habitat enhancement or restoration(currently the Dept.of Transportation is handling grant applications—contact Peter Downey at (360)705-7492 for information)Provide grant application date __and circle status-Approved,Denied,or Pending. To APPLY for the Exemptions—if you have checked a box from �A and B above,complete-the following, 1) Submit this cover letter and a complete JARPA form as an application for the fish habitat enhancoment exemption to the Local Government planning department,and WDEV. These applications must be submitted on the same day starting a 15-day comment period. If significant concerns are raised during the 15-day comment period regarding adverse impacts that cannot be addressed through BPA conditions,WDF%1 can determine that the project does not qualify for the exemption process.If this determination is made,the applicant may re-apply to WDFW,the applicable Local Government.and any other applicable permitting agency for approval under the full permitting process. Provide I)name and number of habitathinlneist at WDt%Fy_vou ann1ied z._ and 2)what.local government you applied to-. u 2) Apply for all other Federal and State permits needed as defined in the-JARk form.(Fill in wirers of the state will require a 4044 permit from the Corps of Engineers.and possibly a 401 Water Quality Certification from Ecology). 3) The pWy work covered by the exemption process must be for fish habitat enhancement. If only a piece of your project is for habitat enhancement,the remainder of the project must be covered by the full permitting process. 4) If WDFW determines that your project rYmc.ets the criteria for the exemption,your project is exempt from SEPA and from local government permits and fees. You will have an answer from WDFW within 45 days of the receipt of this cover letter and complete JARPA form. LOCAL GOVERNMENTS: rP°LEASE NOTE—you only have 15 days eo review the projects and provide comments to WDFW or your comments will be considered waived.Per the new law, you are responsible for the following; 1. You must accept the JARPA application form and this revised cover addition for project review; JARM2879form.doc.4127/98,page 1 of 2 2. - If the Local Government chooses to comment on the project,comments(support or objection)must be provided to the WDFW local o 7' habitat biologist responsible for the project,area y�zthin_15�w.of receipt of the.,JAIZI?A forn_. 3. If determined by WDFW that the project meets the habitat enhancement exemption criteria,SEPA and all local government permits are considered exempt and consistent with the revisions to the WACs,and local government fees are waived. 4. The law determines that"fish habitat enhancement projects that conform to the provisions of the act are determined to be consistent with local shoreline master programs". DEPARTMENT OF FISH AND WILDLIFE: 1, Upon receipt of a complete DARPA and request for the fish habitat exemption process,review the proposed project plan for compliance with the requirements listed in section 1 and 2 of 2SHB 2879(also fisted on page 1,applicant section#A and B). a) If JARPA is incomplete or if it is determined that a project does NOT meet the exemption criteria.contact the applicant and local government planning department and inform them the project does not qualify for the exemption. Return JARPA to the applicant. The applicant may reapply to WDFW,the applicable Local Government and other permitting agencies for approval under the foil permitting process. b) If JARPA is complete and the project meets the criteria,start the EPA 45-day exemption process(defined below), I. WDFW must allow 15 days for interested parties,and local governments to provide comments on the project—no approval action can bo taken within the first 15 days of receipt of the DARPA; 2. If comments are received,WDFW will decide whether the concerns raised can be mitigated through conditions of the BYA—if ves, continue to#t4. If no.WDFW will notify the applicant and applicable Local Government. The applicant may reapply to WDFW,the applicable Local Government and other permitting agencies for approval under the full permitting process; 3. WDFW must approve or deny the HPA,or make a determination that the proposed work does not qualify for the exemption process within 45 days. JARPA\2979foraAw,4127/99,page 2 of 2 51 i- N tZ .f -� 3011lair �---_ --- �t I LONG MARSH EXISTING CULVERT PLAN SCALE: 1"=20 330cc ------- �- _ 320 PA �O O N Y 30 J 1� ri ri t, b f N � inh MI 17 M n M n n 50 3+ 0+00 0+60 1+00 1+50 2+00 2+50 3+00 i EXISTING ROADWAY PROFILE SCALE: 1"=50' 330 -- _-- = +.t EXHIBIT E-1 320 • EXISTING CONDITIONS DATUM ELEV310.00 1p Na N N LONG MARSH CULVERT CROSSING OF ELFENDAUL RD. o+oo EXISTIN +00 G CULVERT PROFILE SCALE: 1"= 30' -422 ��1 �O k16' f. c�'S A` �l= rNG� � . CL ORTH ELFENDAU CRE a+-715- ��y`� / E'LFENDAU� 80: STA: +49 EXISTING CULVERT PLAN ! SCALE: 1"=20 430 420 11 CULVERT i D i10.Wff- 0 N N + ~ • Y �I f a+00 0+50 1+00 1+50 2+00 2+50 ]r ` EXISTING ROADWAY PROFILE __: SCALE: 1' =50' 430 PERCH 24"CM_ CULVERT -- - - - -- EXHIBIT E azo -1 FLATGRADE—XE = 422.0 — ,EXISTING CONDITIONS DATL%Itf EZ,�%�'b' TAHUYA TRIBUTARYAT ELFENDAUL RD NORTH CULVERT CROSSING EXISTING CULVERT PROFILE SCALE: i"= 30' I Long Marsh Watershed with Restoration Project Location f j ..• r D (?!f s (- , � 'C Ej i, - - 'Ti, P°PV ? ttt r ;'� f��• l.'{`�-(� 7Ir .'f_ � .frr.---•": �` �°. �f ,tl �• • i _ �- •, I r i _ t�-..�`fiE`��y�j�• f � '�j F ray r C�pis" �� �•,tif"F ' E f- � l(vrl f� I j• •{ rr-t�t r1 '+^ �•' �^',' '� �J Ii `Wr/ �, Lt zrrf •r. f �.v� �� f t t i t �1 �.. , h : x`' i� �,. i .1 J�• r �FL.L; L��,l" "t`. • i,; �� -.�E"' �' I + F ��j !4� � � •Ff J '� \�+� .''E tY' ��., 4.'C. �, f� � tip, c+ 7! j •�.,!'�_ .l i� •,}f 'y"•�,t F`} ! i t t'!.�r + `-�rr QS-'� t �� ,, i.! t r� � t � �� �� � r t+ ,f( 4✓�l f ! ! (�".-11 J t ,�?-� L•6^3Pt l„ ���t -` t � +1 . !1• 'f Fi f fl-..�r-. '`'' 'mil! �e o Seattle elfair a J a y .-� r sTacoma y mar' 4 ry�`•�..�` 'Zy-'1•• �- � �\ Q, } '` - r fff u -;f- " Upper watershed 1 g f,- ;x,i Culvert Project drainag f LongMarsh Location _ " {t s �,f,•s r/ ` ',( '`r it 3 (+`n.. x ! ._ = t" 'mod'\ -.. c� l F� 1 f r'• n'` r ��' �\ rt / f£ ��•�8..,,.,\:.l I��{jyf{ t�.`_'✓f!f f. ' J; «x `�v''•�;�t�"=� ��'�4 � _ `` -`' ^). a--r`'' i5 �14r1` J ��•/ r � f ,�w -- -- )MSC ` !± �; � L , •�%�f�lkf . ,�/[ ����rt ;' �•; -_=,�� ! "% r 1073 acres in upper ` 4 ., "',• 1(' f. r s watershed "— �-s —t_�_ r �-�, �� �f. I+ �1 tr�Jn',•4�,_ :� ff.�:?}L�/�� � ��f� ?. y ;7 t,�,•t� /" .(f�'/'' }{rr�1 < "'� '` '�i' `p'� a{ti, t$ J .^ _ '!1t J"TG S t �!6/• .r i - t /'-- -.-••ice tr � _ - �'f.t}�r'+% '�. , :. `M1� *IK• +7.`�:'. � �// jjt``r'� �"!}; �: r• j �5,\ 1 �Jt.t '? •: ;'Z; �' .< '"!f._zl�i � �,� ' ,rf�j'r= '11 < !` /f � r•F-� .—•.�i e.+2t � r f f�='' ,<: '•t � � Y V f( `r J ( � 7� 1;r - rA� . Y 1` .` �L� 1 -...N r:r' • j :� \ , •� rf/ r. v li,�� n/! r ii i' •�^r�' �I•� !��• t d< g�, •'+!f' •`;Y� e raj^�. ��( �' `�`. _ rfli r� +����� J� `. f f� 1�tr `� �' l��"`j���4 j' � -�_�1�` �. r,`''t yf�--•Z �,.� �Ji ,'"t ....r. �' j rY t air f 1 1 �~ ! t;+,'f h.�, r,' t: r%'\ �!•'-1 r r1S. r •' �+F i••' - ,.�r�!Jfl� `f r -r., r i r! �rF4 r'\ ,f' ( hrr�� F`e �,Y +; '( � t^�-� ^•�.. `Ft ` ? ��f��r 1., C �!! ,��• � � �t r� if ( // "'f1` •� :1�.' � lil .». � -f �.:. +! � ,• _yY, J � li �,..:^1 .g';�• �r f(.:!- // � � ft: a } '41,�<ji.c' �7�/ F¢'(�J `''�-C �� �fi ` �'' f r>�,if:`���!f�j �• � F� Ji;� i�i (:{� ��l �f/} t£t'.��'..Er t'�y� , i�`'""'<• r- A_ �j-J�:�t�!�a�`-- ;k�, , . ,� � ���/,"��� �� iG..Ji/`i •� �!s' •{'Ir .�"}'; �rj�`3L� /Y "'' !.` ter•• v'S^1 i � �j� ��' ` i. Hood Canal ! rfy �`L`.��'• ,:QI '�� r� ,� -� F t �'�wY4f,"9S \..J `•:`� TA ij. s (1 �+.�) ��/P ` ���J14�1 — .•R1 n _ �' y = :�r'(,� ' ; ,y ,:► I, Belfair ?, r 1N Ivor 11 ., r;t y. sir, '= State Park '� < f' I� !r`! e r. ✓ �^,.'+ x:.x?s��tFk ffi.�f-a srJr, r�..a f. NJ ?A 5co 4 % e7 Be lfair r 41-1 z� aroma ,� y' �1 441 Tributary enters Tahuya 1, RO IL mainstern at 34000m and the watersehd Jf? comprises 448 acres m 7 V I %P J1, e '4 B, r/ 7 03 0.6 0.9 1.2 1.5 Miles 0 500 1000 1500 2000 2500 3000 3500 4000 Feet Long Marsh Watershed A above blocking culvert _.� =" �4` _ ! -Adm{ .. /• lI �,7yI Jet' �.f �'_� /I`�� _ .� �..:_ YJ '. � "'�I1+1" Grp, � ,�•'kM�.��^ '� 1 �: -� > -' �'l tcs . p ft—W, L r � . 1319 acres in watershedlow with approx. � 10.3 miles of stream d a R� r Stream-Blocking Culvert .+'+ ,; .sue, r, �•�, �_ . � —r� Pt �• r � 9�a 1ift.,Contours at Cuivert 4 d , Long Marsh Hydro (LiDAR) , Stream-Blocking Culvert ' .Aw— DrainageLine3(LiDAR) 'y ^�Transportation DNR Hydro (arcs) DNR Hydro 0 500 1000 2,000 3,000 40 i Feet i 1 inch equals 500 feet - _ Long Marsh Watershed "=� 1 inch equals 2,000 feett> ' Elfehdahl Pass Rd./Tahuya Trib. (above blocking culvert) y - • t i e t „ x +' ry ream-Blocking Culvert F a r S .' . � 108 watershed __.. J — ,. Due to only a very slight rise acres with,1 .4 , here, wetland flood waters may miieSAOf stream bypass the normal watershed boundary and escape through ,. blocking culvert, considerably increasing water flow at culvert ' ;..•` during flood events. This addition is 136 acres, and has 1.6 miles of stream and 19.5 acres of b wetlands ` 40 One Ft.'Contours r 5-4 YKI nr � Stream-Blocking Culvert �f , r /' � ��• �250 500 y 1,000 1,500 r: inch equals 200 inch equals 800 feet ,�,. w NORTH ELFENDAUL Creek FISH PASSAGE FLOWS - BASED ON FISH PASSAGE DESIGN FLOWS FOR UNGAGED CATCHMENTS IN WASHINGTON 9/8/02 Hydrologic Analysis-Flood Flows and Fisheries Design Flows Basin:N ELFENDAUL Culvert:UNNAMED Region: 2 Basin Area: 0.7 sq.mi. Mean Annual Precipitation: 65 inches 2-year 24-hour Precipitation: 4.2 inches Discharge Discharge -SE +SE Description/Quanlile a b c S.E. (cfs) (crns) (cfs) (cfs) Proportion of Q100 Peak Flood Flows 1 2-year 0.090 0.877 1.51 0.56 36 3.3 16 56 3.08 0.32 10-year 0.129 0.868 1.57 0.53 66 6.2 31 102 1.67 0.60 25-year 0.148 0.864 1.59 0.53 83 7.7 39 127 1.33 0.75 50-year 0.161 0.862 1.61 0.53 98 9.1 46 150 1.13 0.89 100-year 0.174 0.861 1.62 0.54 111 10.3 51 170 1.00 1.00 Fish Passage Design Flows 2-region 2 (use just for region 2) Winter 0.13 0.930 1.15 0.49 10.91 1.0 6 16 Spring 0.00 1.090 2.07 0.75 4 0.4 1 7 Fish Passage Design Flows 2-region 1 (use just for region 1) Winter 6.99 0.95 1.01 0.257 21 16 27 Spring 2.25 0.85 0.95 0.306 6 5 8 Default Fish Passage Flow (0.18'Q2+36) 36 3.3 16 46 Approx.Bankful Width 6 It Sources: I Magnitude and Frequency of Floods in Washington.USGS Water Resources Investigations report 97-4277,USGS,Tacoma,1998 2 Hydraulics Manual,Washington State Department of Transportation, January 1997(updated May 1997) LONG MARSH Creek FISH PASSAGE FLOWS - BASED ON FISH PASSAGE DESIGN FLOWS FOR UNGAGED CATCHMENTS IN WASHINGTON 918102 Hydrologic Analysis-Flood Flows and Fisheries Design Flows Basin:LONG MARSH Culvert:ELFENDAUL Region: 2 Basin Area: 2.06 sq.mi. Mean Annual Precipitation: 65 inches 2-year 24-hour Precipitation: 4.2 inches Discharge Discharge -SE +SE Description/Quantile a b c S.E. (cfs) (cros) (cfs) (cfs) Proportion of Q100 Peak Flood Flows 1 2-year 0.090 0.877 1.51 0.56 93 8.6 41 145 3.02 0.33 10-year 0.129 0.868 1.57 0.53 170 15.8 80 259 1.65 0.60 25 year 0.148 0.864 1.59 0.53 211 19.6 99 323 1.33 0.75 50-year 0.161 0.862 1.61 0.53 249 23.1 117 381 1.13 0.89 100-year 0.174 0.861 1.62 0.54 280 26.0 129 432 1.00 1.00 Fish Passage Design Flows 2-region 2 (use just for region 2) Winter 0.13 0.930 1.15 0.49 29.76 2.8 15 44 Spring 0.00 1.090 2.07 0.75 12 1.2 3 22 Fish Passage Design Flows 2-region 1 (use just for region 1) Winter 6.99 0.95 1.01 0.257 59 44 74 Spring 2.25 0.85 0.95 0.306 16 11 21 Default Fish Passage Flow (0.18"Q2+36) 53 4.9 41 62 Approz Bankful Width 9 It Sources:1 Magnitude and Frequency of Floods in Washington,USGS Water Resources Investigations report 974277,USGS,Tacoma,1998 2 Hydraulics Manual,Washington State Department ofTransponation, January 1997(updated May 1997)