HomeMy WebLinkAboutBLD2024-00782 Cancelled DEMO - BLD Inspections - 4/7/2025 INSPECTION CARD
Mason County I
615 W. Alder St. � l
Building 8, Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
PERMIT# BLD2024-00782 PROJECT ADDRESS 450 N DOW MOUNTAIN DR HOO, WA 98548
PARCEL# 423295000173 PROJECT DESCRIPTION demo of old home for resale of property
OWNER FITTING ET AL RUTH A ADDRESS S J FITTING/J K FITTING/TESA HUDSON/ROBERT PHONE
HUDSON
CONTRACTOR ADDRESS PHONE
CONTRACTOR LICENSE LENDER
INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments
Connection is to be verified by IDemolition Final Inspection
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
C 360-427-9670 ext 352
ANCELLEO www.masoncountywa.gov
B DD2024-00782 DEMO
PROJECT DESCRIPTION: DEMO OF OLD HOME FOR RESALE OF ISSUED: 07/08/2024
PROPERTY
SITE ADDRESS: 450 N DOW MOUNTAIN DR HOO EXPIRES: 01/04/2025
PARCEL: 423295000173
APPLICANT: Gall, Gabe OWNER: FITTING ET AL RUTH A
PO Box 26 S J FITTING/J K FITTING/TESA
Hoodsport,WA 98548 HUDSON/ROBERT HUDSON
3604908377 HOODSPORT,WA 98548
FEES: Paid Due
State Fee-Residential $6.50 $0.00
Technology Flat Convenience $5.00 $0.00
Fee
Demolition Fee $120.00 $0.00
Totals : $131.50 $0.00
REQUIRED INSPECTIONS
Connection is to be verified by Health or Utilities Demolition Final Inspection
CONDITIONS
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s)for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED.
* All other necessary permits from Mason County, Washington State, Federal Agencies, and/or other agencies/groups that
are required for this proposed development and construction must be obtained PRIOR TO DEVELOPMENT AND
CONSTRUCTION.
Printed by:Anna Schaffran on:07/09/2024 07:56 AM
Page 1 of 2
Mason County
Mason County - Division of Community Development
615 W.Alder St.
Building 8
lip Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
DEMO BLD2024-00782
For public safety, it is the responsibility of the applicant to confirm through written verification all utility services(electric,
gas, water, sewer, ...) have been terminated prior to demolishing a structure.
" Proper erosion and sediment control practices must be used on the construction site and adjacent areas to prevent upland
sediments from entering the aquatic environment. Erosion control measures must be in place prior to any clearing, grading,
or construction. These control measures must be effective to prevent soil from being carried into surface water by
stormwater runoff.Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of state
regulations.Any work in or adjacent to waterways that will adversely affect water quality must receive specific prior
authorization from the Department of Ecology. Silt fencing, straw matting, etc. must be installed and maintained until seeding
or upland vegetation has become established around all areas disturbed or newly created by construction activities.
The demolition and disposal of demolition debris must meet requirements as per Mason County regulations. it is unlawful
for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing
materials have been removed from the area to be demolished.work shall not commence on an asbestos project or
demolition unless the owner or operator has obtained written approval from ORCAA @ 2490 B Limited Lane NW, Olympia
WA 98502, 360-586-1044, 800-422-5623,www.orcaa.org
All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
" The Washington State Clean Air Act prohibits the burning of any construction or demolition debris in an outdoor fire.
" All construction debris must be removed from the site after project completion to an approved location. Proper disposal of
construction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of aquatic
environments.
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state/local law regulating construction or the performance of construction.
Issued By: /}Vino, SCh)c i-ca.n
Contractor or Authorized Agent: On/1he' {�a Nrne,n/' Date: o-7. o9 . 2 c a-1
Printed by:Anna Schaffran on:07/09/2024 07:56 AM
Page 2 of 2