Loading...
HomeMy WebLinkAboutBLD5308 Final Mobile Home - BLD Permit / Conditions - 6/17/1977 Veach, Ronald L. #5308 6-15-77 Lot 2 Blk 4 Reids Development 1 1/2 mile up Mission Creek on Reid Development Mobile Home BUILDING PERMIT APPLICATION MASON COUNTY P.O. Box 186 Shelton, Washington 98584 DATE ISSUED C,/`S/� 7 PERMIT NO. If OWNER NAME MAIL A D ES CITY 1,STAT ZIP PHONE l - r � DIRECTIONS TO JOB SITE LEGAL DESCR. t4x0 nC. V 't �9 ===4t�S� PHONE MAIL AD9 ESS CITY&STATE LICENSE NO CONTRACTOR USE OF BUILDING Class of work: UVINEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE Describe work: > Valuation of work: $ PLAN CHECK FEE PERMIT FEE _.t; SPECIAL CONDITIONS: APPLICATION ACCEPTED BY PLANS CHECK BY APP ED FOFf I UANCE Type of Occupancy Division B (�<.t,(�'t�� ,, Const Group Size of Bldg. No. of Max. (Total) Sq. Ft.G�, _ Stories / Occ. Load CONTRACTOR AFFIDAVIT PERMANENT SEASONAL E.D.NUMBER I certify that I am a currently registered contractor in RESIDENCE the State of Washington and I am aware of the MOBILE HOME ordinance requirements regulating the work for which the permit is issued and all work done will be in Special Approvals Required Received Not Required conformance therewith. ZONING HEALTH DEPT. - .7 Firm PUBLIC WORKS By ROAD DEPT. Lic. No. Date OWNERS AFFIDAVIT I certify that I am exempt from the requirements of the N O T I C E contract or registration law RCW 18.27, and am aware of the Mason County ordinance requirements for SEPARATE PERMITS ARE REQUIREDFOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. which this permit is issued and that all work done will be in conformance ther With. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER Owne ate. WORK IS COMMENCED. PLAN CHECK VALIDATION CK. M.O. CASH PERMIT VALIDATION K. M.O. CASH